South Carolina Department of Transportation. Engineering Directive

Similar documents
Richland County Department of Public Works Engineering (Land Development) Division

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Spartanburg County. Storm Water Management Design Manual

LOCATION AND DESIGN DIVISION

STORMWATER MANAGEMENT PROGRAM. Table of Contents

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

Module 4 Regulatory requirements for Land Disturbing Activities

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Review of State and Federal Stormwater Regulations November 2007

HILLSBOROUGH COUNTY UTILITY ACCOMMODATION GUIDE AND RIGHTS-OF-WAY USE PROCEDURES MANUAL APPROVED

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY UTILITIES DESIGN STANDARDS MANUAL

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 3 Dispersion BMPs

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

Location Drainage Study

NPDES Phase II Permit

Ordinance No Lot Surface Drainage

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

Virginia Stormwater Management Permitting

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES

ROADWAY AND ROADSIDE MAINTENANCE

South Carolina

FIRM NAME DESIGNER: CHECKER: DATE: FPID #: DESCRIPTION: COUNTY: DRAINAGE DESIGN CHECKLIST. Designers Initials. Checkers Initials.

Enterprise Parkway Improvement Project, CIP# E364

FLORENCE COUNTY STORMWATER DESIGN MANUAL

Review Zone Application for D&R Canal Commission Decision

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS

Small Site Stormwater Quality Permit Application

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

SECTION CONSTRUCTION SERVICES

E. STORMWATER MANAGEMENT

STORMWATER AND EROSION CONTROL PERMIT

May 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table...

Review Zone Application for D&R Canal Commission Decision

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Background / Regulatory Requirements

CENTRAL MASSACHUSETTS REGIONAL STORMWATER COALITION: Products, Benefits, Sharing of Resources

STORMWATER MANAGEMENT PLAN City of Overland Park, Kansas

MAINTENANCE MANAGEMENT SYSTEM

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

Municipal Stormwater Management Planning

Constructability Guidelines

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

ALTERNATIVE PROJECT DELIVERY DIVISION

Appendix G Preliminary Hydrology Study

SECTION 11: REGULATORY FLOODWAYS

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

Construction Application for Permit (CAP) Instructions

Storm Water Facility Maintenance Responsibility relating to Highway Occupancy Permits (HOPs)

[Rev - 1] 06/

COUNTY OF ALLEGHENY. Pittsburgh, Pennsylvania DEPARTMENT OF PUBLIC WORKS PERMIT MANUAL

All driveways shall have a separate site plan when the application is submitted.

Project Type: Drainage and Storm Systems

City of Vancouver March 2017 DRAFT

TABLE OF CONTENTS SECTION 700 STORM DRAINAGE STANDARDS...

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

Matanuska- Susitna Borough Subdivision Construction Manual Update, Phase 1 4/6/2018 Summary of Changes

STORMWATER POLLUTION PREVENTION PLAN

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

APPENDIX L Hydrology and Stormwater Pond Analysis

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

City of Tulsa. Stormwater Design Criteria Manual

DOCUMENT SPECIAL PROVISIONS

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

REQUEST FOR COUNCIL ACTION

S.O.P. No. HMD

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

3.0 Planning and Submittal Requirements

DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. Water Quality Control Commission

Zoning Permits 11-1 ZONING PERMITS

Chapter 11 Culverts and Bridges

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

UNDERSTANDING THE LAW. In Pennsylvania, both state and federal law govern water pollution caused by stormwater. We briefly examine both.

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

Stormwater Management Manual (SWMM)

Erosion & Sedimentation Control Policy

7/16/2012. Post Construction Best Management Practices (PCBMPs) Article VIII: Post Construction Best Management Practices

THE FIVE GOALS FOR SCDOT S STRATEGIC PLAN ARE: GOAL 1: Improve safety programs and outcomes in our high-risk areas.

Transcription:

South Carolina Department of Transportation Engineering Directive Directive Number: ED-17 Effective: May 5, 2015 Subject: Encroachment Permits References: S.C. Code of Laws, Sections 57-3-110, 57-5-1080, 57-5-1090, 57-1-370, and 57-1-460 SCDOT Access and Roadside Management Standards (ARMS) Purpose: This Directive Applies to: Provide Procedures for Processing of Encroachment Permits Engineering Division The following guidelines will apply to the processing of all encroachment permits at the South Carolina Department of Transportation (SCDOT). All applications for encroachments upon roads in the state highway system shall comply with the latest edition of the SCDOT Access and Roadside Management Standards (ARMS) manual. Submittal of Applications Applications for encroachment permits will be made available at all SCDOT county and district offices, with printable copies available on the SCDOT website. All applicants should make a reasonable effort to utilize the Department s online application process, Encroachment Permit Processing System (EPPS). Permit applications must be submitted to the county where the proposed encroachment will be located. Permit applications for commercial driveways, schools, or multi-residential developments will be routed to the appropriate district permit engineer (DPE) for processing via EPPS. All other permits will be routed to the SCDOT county maintenance office. When an application is made for an encroachment permit that will cross county lines, the application may be submitted to either county in which part of the encroachment will be located. Approval of Applications Applications for commercial driveways, multi-residential developments, schools, and roadway connections shall be reviewed and approved by the DPE. The county resident maintenance engineer (RME) will review and is authorized to approve all other applications for permits, unless otherwise designated herein. Verbal approval will not be given to perform any work until an encroachment permit has been issued. All extensions, amendments, or additions to existing permits must be in writing. Prior to approval of permit applications that include the types of permit activities listed below, the RME or DPE should obtain recommendations from the appropriate SCDOT offices. The DPE will coordinate reviews by headquarters (HQ) offices. When a recommendation is required from another SCDOT office prior to approval of a permit application, the RME or DPE shall promptly forward the information necessary for making the recommendation to the appropriate office. Some permits require approval from the Federal Highway Administration (FHWA). All SCDOT reviews should be completed prior to making a submittal to FHWA for review. Include the original permit application and all SCDOT comments with the submittal to FHWA.

Page 2 of 5 Required Application Reviews The offices listed below shall review encroachment permit applications and provide appropriate recommendations prior to approval: Preconstruction Support (HQ) Municipality funded projects Sidewalks/multi-use paths/pedestrian facilities Landscaping Projects in the Statewide Transportation Improvement Program (STIP) Major reconstruction or relocation of state roads Utilities (HQ) Longitudinal utility within controlled access Railroad crossings Director of Maintenance (HQ) Bridge attachments Beautification/daylighting (interstate only) Traffic Engineering (HQ) School site plans or renovations Resident Construction Engineer Locations within limits of construction activities Special Considerations Monitoring Wells Prior to approval of a permit application for a monitoring well, the applicant must provide a letter from the South Carolina Department of Health and Environmental Control (DHEC) stating that the monitoring well is required. Multi-County Encroachments The county where the permit is submitted or where the majority of the work is to be accomplished shall be the lead county and as such will approve the permit after review by the RME in the other affected county or counties. Each RME is responsible for the inspection of work performed in their county. Copies of the approved permit will be sent to every county involved. Traffic Control Responsibilities Traffic control devices and procedures required during installation and maintenance of the encroachment shall be the responsibility of the applicant, and shall be stated on the permit. Traffic control devices and procedures shall be in accordance with the latest version of the Manual on Uniform Traffic Control Devices (MUTCD). Longitudinal Utility Encroachments Longitudinal installations shall be located on uniform alignment as near as practicable to the right-of-way line in order to provide a safe environment for traffic operation and preserve space for future highway improvements or other utility installations. Where irregularly shaped sections of the right-of-way extend beyond the normal right-of-way limits, variances in the locations from the right-of-way line shall be allowed as necessary

Page 3 of 5 to maintain a reasonable uniform alignment for longitudinal overhead and underground installations. Longitudinal pavement cuts shall be repaired by milling a depth of 2 inches in the entire lane affected by the utility installation and paving with the appropriate asphalt surface course or by resurfacing the entire roadway for the length of the longitudinal cut. The repair, including resurfacing, must restore the pavement structure cross section to the original design. Longitudinal pavement cuts should be minimized and avoided if possible. See the current edition of the SCDOT Utility Accommodations Manual for more details. Stormwater Management and Sediment Control Plan and MS4 Permit Requirements SCDOT will withhold issuing encroachment permits to applicants discharging stormwater runoff or sediment onto the state highway system until an approved national pollutant discharge elimination system (NPDES) permit has been issued to the applicant/landowner. If a development disturbs more than 1 acre, a copy of the approved DHEC stormwater letter is required. All applications for encroachment permits that involve bringing stormwater runoff or sediment to the highway shall include drainage plans with supporting design computations. Post-construction 2-year, 10-year, and 25-year storm events shall be equal to or less than those calculated for predevelopment conditions as determined in accordance with SCDOT design policy for the given site conditions. If post-development discharges to Department right-of-way for 2-year, 10-year, and 25-year storm events exceed predevelopment discharges for the given storm event, the applicant will be required to provide flow detention onsite that meets the pre-developed discharge condition. If proposing to connect directly to an SCDOT crossline pipe, the applicant will be required to meet predevelopment and post-development rates for a 50-year storm if the roadway is an interstate, US, or SC route. Details for detention structures and means of discharge, as well as design calculations, shall be approved by a registered professional engineer, licensed pursuant to Chapter 20 of Title 40 of the S.C. Code of Laws. Plans shall also include measures for controlling erosion on the site and limiting release of sediment to the highway. Applicants must comply with all applicable federal and state stormwater management, sediment, and erosion control guidelines. The municipal separate storm sewer system (MS4) permit requires SCDOT to be responsible for the quality of its stormwater discharges. Encroachment permit applicants will be responsible for the quality of their stormwater discharges to SCDOT facilities. In accordance with NPDES general construction permit number SCR100000, applicants must determine if receiving water bodies are on the 303(d) impaired water bodies list and whether a total maximum daily load (TMDL) has been established for the receiving water body the drainage system is discharging into. Applicants can locate the NPDES general construction permit, along with the TMDL and the 303(d) list, on DHECs website www.scdhec.gov/water. Non-stormwater discharges from applicants will not be permitted. All illicit discharges that are discovered should be reported to DHEC for enforcement. Structures within Department Rights-of-Way A structure shall be defined as a retaining wall, bridge, or culvert. The district engineering administrator (DEA) shall be the approving authority for permits of this type.

Page 4 of 5 Prior to approval of the permit, the DEA should request a review from the Preconstruction Support Office. See the ARMS manual for more details. Encroachment applications for overhead or underground structures must include the items listed below: a. Geotechnical reports, hydrology reports, construction plans, including traffic control plans and contract special provisions, and structural design calculations, including reinforcing steel details, must be provided electronically or the hard copy scanned and placed in EPPS. Plans shall be signed by a registered professional engineer, registered in the state of South Carolina. Each sheet of the plans shall show the detailer s and checker s initials as an indication that details have been checked for accuracy. b. Each set of construction plans must include a standard note sheet. c. The title sheet of the construction plans must include a location map and state the firm or persons that will perform the construction inspection. The title sheet must also contain a certification to ensure that the contractor s work is performed in accordance with the contract plans, special provisions, and the current edition of the South Carolina Standard Specifications for Highway Construction. d. The title sheet must include any necessary municipality and/or county approval, including any state or federal permits when applicable. e. The submittal shall contain a letter indicating that maintenance of the structure will be the responsibility of the permittee, unless there is a signed agreement between the appropriate engineering director and the permittee stating otherwise. Impact on Programmed and Future Projects The RME or DPE will review the application to determine what impact, if any, the encroachment will have on widening, relocation, or new-location projects programmed or in project development. If necessary, the DPE will coordinate this review with the appropriate headquarters offices. Careful consideration should be given to any permit application where development could constrain future road system improvements. Developments near substandard interchanges, edges of suburban growth, and intersections operating over capacity are some examples. Additional guidance can be provided by either Traffic Engineering or Preconstruction Support offices. Utility Lines over Bridge Rights-of-Way No permit shall be issued for utility lines over a bridge right-of-way unless the applicant agrees to construct the line at a height sufficient to accommodate future bridge maintenance, improvement, and reconstruction. Right-of-Way For all permits which require the conveyance of right-of-way to SCDOT for turn lanes, etc., coordination within the Rights-of-Way Office shall take place prior to the issuance of the permit to ensure that the appropriate documents are created to successfully transfer the right-of-way. The actual transfer of the right-of-way shall not occur until all work has been accomplished and accepted by the Department.

Page 5 of 5 Revisions to control-of-access limits are not allowed without approval from the Deputy Secretary for Engineering (DSE). As-Built Plans SCDOT shall receive two bound copies (22 x 36 ) of final as-built construction plans. As-built plans should be prepared in accordance with the SCDOT publication, Instructions for the Preparation of As-Built Plans, latest edition. The RME or DPE may hold the bond until an acceptable set of as-built plans has been received meeting these requirements. One copy of the as-built plans shall be kept in the district and one copy shall be forwarded to the As-Built Plans Office in the Preconstruction Support Office to be scanned and placed in the plan library. Appeal Process Applications that are denied may be appealed to the DSE. The appeal will be made to the RME or DPE and will be escalated through Department authority by submitting a specific written request to the DSE. The response from the DSE may be escalated to the South Carolina Department of Transportation Commission. Record Retention The original application, with supporting documentation and the required recommendations and approval, shall be maintained in EPPS. Other offices may access this documentation through EPPS. Submitted by: Submitted by: Recommended by: Recommended by: Approved: James J. Feda, Jr. Director of Maintenance Anthony Fallaw Director of Traffic Engineering Leland Colvin Chief Engineer for Operations Ron K. Patton Chief Engineer for Design and Traffic Engineering Christy A. Hall Deputy Secretary for Engineering Lead: Director of Maintenance History: Issued on April 25, 2005 First Revision on April 29, 2009 Second Revision on July 19, 2011 Third Revision on May 5, 2015