Sheffield s Energy Recovery Facility

Similar documents
VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

COMMISSIONING REPORT 2011

Fact Sheet. Feb 2011

Welcome To Our Exhibition

EfW Outputs. Guidance on the management of energy outputs and residues including air pollution control residues and incinerator bottom ash

Refuse-to-Energy Facility

TRASH BURNING F 32 CLEAN POWER FROM COVER STORY

Kazushige KUROSAWA*, Zhibao ZHANG**, and Zhengbing WANG** [Delivered Products & Systems] 1. Introduction. 2. Overview of Nanjing

Cacia Pulp mill Portugal

Biomass Boiler Emission Abatement Technologies. Simon Wakefield

Waste treatment technologies I

Appendix VIII: Determination of chimney heights

Introduction. Ridge Road Transfer Station Ridge Road, Cleveland

Introduction: Thermal treatment

EPSRC THERMAL MANAGEMENT OF INDUSTRIAL PROCESSES

Energise your Waste! Waste-to-Energy s environmental contribution towards a circular economy. 4 th October 2012

Opportunities and Challenges Waste to Energy Industry

Exampro GCSE Physics. P1 Foundation - Electrical Energy and Efficiency Self Study Questions. Name: Class: Author: Date: Time: 76. Marks: 76.

COGENERATION PLANT FAQ. What is biomass cogeneration? Cogeneration is the simultaneous production of electricity and heat using a single primary fuel.

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

Waste to Energy WTERT, N.Y., October 2008

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

Enhanced usage of Alternative Fuels in Cement Industry

Pyrolysis is the thermal degradation of residual municipal waste in the absence of air to produce a solid fraction and syngas.

CNIM: the approach for WtE market!

High efficient multi-fuel CYMIC concept for biomass, rejects and coal for Hamburger Hungaria Katriina Jalkanen Valmet Technologies Oy

SIPAPER Reject Power. Environmental Product Declaration. Pulp and Paper Technologies

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

EARLS GATE ENERGY CENTRE

ENVIRONMENTAL PERFORMANCE 2011 UPM Caledonian

Chapter 2.6: FBC Boilers

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT

Sustainable, Clean Energy from Waste

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR

FACILITY PROFILE. New Brunswick Power Corporation for the Belledune Thermal Generating Station

Sustainability factsheet

Biomass technologies

E.ON Climate & Renewables UK Developments Limited Portbury Dock Renewable Energy Plant Carbon Dioxide Emissions Study

To Study of Maximum Efficiency Of Power Generation in Thermal Power Plant

Waste to Energy Technology

Definitions and Comments on 2016 Consolidated Nestlé Environmental Performance Indicators

Gasification of Municipal Solid Waste

WASTE TO ENERGY (W2E) AS THE MODERN CONCEPT OF WASTE MANAGEMENT

Wissington. factory. about

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT

Smart CHP from Biomass and Waste

Appendix C - Focus Group Working Papers. MUNICIPAL SOLID WASTE THERMAL TECHNOLOGIES January 2014

Environmental performance in 2016

This is a draft revision of the briefing, and any comments are welcome please them to Becky Slater on

Hamm MW Pyrolysis Plant. Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials

Kendall Cogeneration Station

High Bridge Combined Cycle Plant

Gold Standard Passport CONTENTS

New 790-Megawatt Unit. Council Bluffs Energy Center

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel

A proposed new gas-fired power station on the Wilton International site

Information Pack BG25 / BG50

Gas turbines have been used for electricity generation. Gas turbines are ideal for this application as they can be started and stopped quickly.

For now... afval = AEB produces green energy for Amsterdam. AEB in society

Hot Gas Filters for Control of Emissions to Atmosphere

WEF Residuals and Biosolids Conference 2017

The following documentation was tabled:

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT:

GCE Environmental Technology. Energy from Biomass. For first teaching from September 2013 For first award in Summer 2014

What does it mean for you?

Kompogas dry anaerobic digestion Energy from organic waste

The world s largest biofuel CHP plant Alholmens Kraft, Pietarsaari

Coal Mine Gas. Utilization Principles

ARC. CEO, Ulla Röttger

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

Permit with introductory note

compaction Our services are based on years of global experience, meet all statutory requirements and are reliable, affordable and professional.

The European position By Ella Stengler

Waste to energy the carbon perspective

Criminal Damage: A review of the performance of municipal waste incinerators in the UK

SUPERCRITICAL COAL FIRED POWER PLANT

Operating Experience of Circulating Fluidized Bed Scrubbing Technology in Utility Size Power Plants

Development status of the EAGLE Gasification Pilot Plant

Energy Audit of 250 MW Thermal Power Stations PTPS, Panipat

natural resources energy resources fossil fuels pollution environment deposition Acid Rain sulfur dioxide carbon dioxide nitrogen oxides

Technical Notes for Biomass and Air Quality Guidance

Energy from Waste Incineration

Welcome to Turning up the heat on wood fuel

LANDFILLS. What is a Landfill? OBJECTIVES: Students will understand what a landfill is.

npower who we are Tilbury Power Station

EPA EMISSION RULES - BOILERS

Control of pollutants in flue gases and fuel gases

Supermarkets launch eco-friendly plastic milk bags. Could this be the end of the milk bottle?

Cement industry Industrial emissions IPPC

SYNERGIA Waste-to-Energy Research and Technology Council

Group METERING SYSTEMS FOR SOLIDS

Richard Kablitz GmbH AHK Geschäftsreise Biomass and Waste to Energy

Experiences in using alternative fuels in Europe and Germany

Environmental Policy. Excellence, Sustainability, Innovation, Passion

VIRIDOR BEDDINGTON ERF SUPPORTING INFORMATION

Decentralized Biomass Power Production

Emission Control Options - Overview

IEA Bioenergy. International Energy Agency. Co-firing Biomass with Coal. Biomass and Bioenergy

HELIOSOLIDS FLUIDIZED BED INCINERATOR

Transcription:

Sheffield s Energy Recovery Facility TRANSFORMING OUR RUBBISH INTO ENERGY Veolia Environmental Services Lumley Street Service Centre Lumley Street, Sheffield S4 7ZJ Tel: 0114 228 3660 Fax: 0114 228 3661 sheffieldenquiries@veolia.co.uka.co.uk www.veolia.co.uk/sheffield Veolia Environmental Services (UK) Plc 2011 Printed on paper that is certified wood fibre from sustainable forests and up to 50% recycled fibre and is made without the use of chlorine.

SHEFFIELD S ENERGY RECOVERY FACILITY The city of Sheffield and the rest of the UK are striving to manage and dispose of rubbish in a more environmentally friendly and cost-effective manner. Legislation from Government and Europe means that the UK can no longer continue to send the majority of its household rubbish to landfill. Along with waste reduction and recycling, energy recovery is part of the solution. ABOUT THE ENERGY RECOVERY FACILITY The mixture of waste awareness campaigns, recycling services and the efficient Energy Recovery Facility (ERF) helps Sheffield to ensure it only sends a small amount of rubbish to landfill sites. The heat generated at the ERF, by burning rubbish in a specially controlled environment, is turned into steam and used to make thermal energy for buildings across Sheffield city centre. It also generates electricity for the National Grid. This is not a new innovation. Sheffield has been recovering energy from rubbish for many years. In the 1970s the waste incinerator was connected to a small network of underground pipes to deliver heat to local homes. In the 1980s, the network was expanded and the ERF developed to generate electricity. A new ERF was opened in 2007 designed to cope with the amount of rubbish created in the city today and to meet new stricter environmental legislation regarding emissions. Along with the waste reduction and recycling initiatives in place, it is a crucial part of the waste management system in Sheffield. Sheffield s Energy Recovery Facility turns local rubbish into electricity and heat for the city. This facility is making the most of the rubbish that is thrown away. It provides a way to generate energy for the local area that reduces carbon emissions and minimises the need for landfill sites. Some facts and figures: The ERF is designed to handle up to 225,000 tonnes of household rubbish a year Up to 45MW of heat is supplied to over 140 buildings connected to the District Energy Network The ERF also generates up to 21MW of electricity to the National Grid. That is enough to power more than 25,000 homes Homes, leisure centres, offices, theatres and university buildings are just some of the different types of buildings that use the energy created by the ERF

HOW DOES IT WORK? Sheffield s energy recovery facility (ERF) is built using the latest technology and is designed to maximise the efficient generation of combined heat and power. A condensing steam turbine takes 40bar steam to produce the electricity. The facility has been designed to allow us to adjust the amount of heat and electricity we generate according to demand. Rubbish from households, Local Authority services and some local businesses is brought to the ERF. It is tipped into the waste storage bunker which can hold up to 2,700 tonnes of rubbish that is the same weight as 2,250 average family cars From the bunker the waste is lifted into a feed hopper by an overhead crane at a rate of 28 tonnes per hour The hopper feeds the waste into a single incineration unit where it is burned at temperatures in excess of 850 C Urea is introduced to the furnace to treat NOx (Oxides of Nitrogen) emissions Lime and activated carbon is introduced to neutralise the acidity of the flue gas and absorb other pollutants The cooled flue gases pass through a filter house where the particulate (dust) is captured by 1,760 filters. Particulate collected in this process is then stored in a silo for separate disposal later Cleaned gases are then released through the 75m chimney. These gases are continuously monitored to ensure they meet strict environmental regulations An electromagnetic overband separator removes metal from the ash. The metal is recycled by a local company Ash from the incineration process goes into a bunker before it is taken away for recycling into aggregate for the construction industry Some power generation processes use a lot of water to cool the steam. To minimise our environmental impact we use air cooled condensers to cool the steam and turn it back into water so it can be recycled back into the energy recovery process. 9 13 Gas fired burners ensure that the correct temperature of 850 C is reached before any rubbish can be fed into the unit Above the incinerator a large boiler produces superheated steam at 400 C. A condensing steam turbine uses this steam to generate electricity for the National Grid and produce hot water for the District Energy Network District Energy Standby Boiler House Zone 2 Zone 1 Zone 5 Zone 3 Zone 4 Particulates removed from the filtering process are taken to a process plant for treatment and then safe disposal Car Park 8 6 3 11 1 4 5 10 14 15 18 7 22 20 19 7 16 21 23 2 12 17 Zone 3 Zone 4 Zone 5 Zone 1 Zone 2 Key to the plant diagram 1 Tipping hall 4 Feed hopper 7 Ash discharger 10 Residue silos 13 Chimney 16 Heat exchangers 19 Ash conveyor 22 Oversize items 2 Refuse pit 5 Grate 8 Bag filters 11 Emissions monitoring 14 Steam turbine 17 District Energy Network 20 Magnetic separator 23 Bottom ash 3 Control room 6 Boiler 9 Reagents silos 12 ID fan 15 Generator 18 Air cooled condensers 21 Ferrous scrap

EMISSIONS AND MONITORING Sheffield s Energy Recovery Facility must meet stringent emission limits set out in EU regulations and legislation. We monitor our performance 24 hours a day. We provide information about our performance to the Environment Agency who verify our monitoring data. They also carry out their own monitoring and checks to ensure we are operating responsibly. Our aim is to ensure pollution released by the plant approaches zero emissions The ERF uses the latest technologies to clean the flue gas produced by the energy recovery process Pollutant levels are always 10% to 60% below the maximum permitted values The following table shows our daily average emission limits. We must ensure that we do not emit more than these permitted amounts. You can take a look at how we are performing on our website: www.veolia.co.uk/sheffield Dust (Particulates) 10mg/m 3 Total Organic Carbon 10mg/m 3 Hydrogen Chloride 10mg/m 3 Carbon Monoxide 50mg/m 3 Sulphur Dioxide 50mg/m 3 Oxides of Nitrogen 180mg/m 3

WORKING FOR A GREENER SHEFFIELD On average, every UK household produces over one tonne of rubbish each year. That is a lot of rubbish to deal with! Sheffield s Energy Recovery Facility helps to manage the rubbish created in the city in a way that provides many environmental benefits: More than 140 buildings, including leisure centres, hotels, houses, schools and colleges and offices use the energy recovered from waste generated in the city Heat provided by the District Energy Network saves up to 21,000 tonnes of carbon emissions from being released into the atmosphere every year The ERF is centrally located which cuts down the miles that the refuse collection vehicles have to travel, minimising congestion and pollution On average this facility generates enough electricity to boil 14,000 kettles every hour This ERF helps to save 2.5 tonnes of CO 2 every hour WORKING TOGETHER As part of our job working with Sheffield City Council to manage the city s rubbish it is vital that we work with communities to raise awareness about waste reduction, recycling and other waste issues. Here are a few examples of how we do that: Education we have a team of waste awareness officers who visit schools and community groups with an exciting programme of activities Roadshows you will often see us in the city centre and in your local community with our mobile information unit promoting services to help you to reduce the amount of rubbish you create or recycle more Getting involved we support local charities and organisations by providing certain recycling services and our employees help by raising money and volunteering their services Using District Energy helps local businesses and organisations to reduce their use of fossil fuels Rubbish doesn t end up in landfill. This helps the city to meet environmental targets

VEOLIA ENVIRONMENTAL SERVICES IN SHEFFIELD We are working with Sheffield city council to find the best way to deal with the rubbish created in the city. As part our 35 year contract we will use up-todate technology and modern infrastructure to deliver reliable and appropriate services to the local community. We will also encourage people to reduce, reuse and recycle. In Sheffield we are responsible for efficient refuse collection services, encouraging waste reduction and providing recycling services to increase recycling rates. We operate a Materials Recovery Facility which sorts 20,000 tonnes of paper and card for recycling as well as the Energy Recovery Facility and District Energy Network. Added to the local knowledge we have in our Sheffield team, we utilise our experience of managing waste and energy recovery across the UK and abroad to ensure we deliver best practice. For further information, please Visit: www.veolia.co.uk/sheffield Call: 0114 273 4567 or Email: sheffieldenquiries@veolia.co.uk