CCUS Moving Ahead: Recent Technical Advances

Similar documents
CO2 Capture in the Steel Industry Review of the Current State of Art

CO2 Capture in the Steel Industry Review of the Current State of Art

CCS and CCU. their Role in the Mitigation of Greenhouse Gas Emissions from Energy Intensive Industry

Carbon Dioxide Capture and Storage: A Status Report

CCUS Projects at LafargeHolcim Focus on Oxycombustion. Michel GIMENEZ, ECRA/CEMCAP Workshop Düsseldorf, 16 September 2015

CCUS Status and New Developments.

Programme Activities & Highlights (A Short Overview)

(Part 2: Cement Industry Sector) Stanley Santos

Advanced Coal Technologies for Power Generation

CO 2 Capture from Steam Methane Reformers: Commercial Scale Demonstration Project

CO 2 Capture and Storage: Options and Challenges for the Cement Industry

Canadian Clean Power Coalition: Clean Coal-Fired Power Plant Technology To Address Climate Change Concerns

Doug Austin. Air Pollution Control Industry Focus on Carbon Capture Control Technology. Forum Session II

Overview of CO2 Capture Technologies, System Integration, and Costs

CO 2 Capture and Sequestration: Views from Industry. Gardiner Hill Director Technology

Demonstrating CCS in Italy The Zero Emission Porto Tolle Project

Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel)

Update on Status and Progress in the DOE CCS Program. Mark Ackiewicz Director, Division of CCS Research U.S. Department of Energy January 23, 2014

Michael H. Wilson Senior Research Engineer 11/15/2016 Center for Applied Energy Research

Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel)

Preparing for the Technology Transition in Steel Production (focus on Carbon Capture & Storage)

Carbon Capture and Sequestration: Kiewit s Petra Nova CCS Project

CCS in Europe and USA Iain Wright CO 2 Project Manager, BP Alternative Energy CAS/ETIP IGCC Workshop Beijing, May 23 rd 2007

The Future of Carbon Capture, Utilization, and Storage (CCUS): Status, Issues, Needs

The Cost of CO 2 Capture and Storage

Outline of this presentation

*** DRAFT ** Sustainable Development and CO 2 Capture and Storage

Advanced Coal Technology 101

CO 2 Recovery and Sequestration at

Carbon Capture and Sequestration and its Potential Implementation in North Carolina. Sam Helton

CO2 Capture in an Integrated Steel Mill

Majuba Underground Coal Gasification

Update on the FutureGen Project Pathway Towards Zero Emissions

ROYAL SOCIETY OF CHEMISTRY TECHNOLOGY IN THE USE OF COAL

TOWARDS SUSTAINABLE DEVELOPMENT

Enabling a Brighter Tomorrow: E-Gas TM Gasification

Decarbonising heat: the potential for steam methane reforming as an enabling technology

Carbon Dioxide Capture and Storage: Research Pathways, Progress and Potential

Update: Global status of CCS. CSLF Policy Group

FINEX - AN OLD VISION OF THE IRON AND STEEL INDUSTRY BECOMES REALITY*

Dr. Roger D. Aines Lawrence Livermore National Laboratory

Status and Outlook for CO 2 Capture Systems

Carbon capture and storage

CCS: Global Status and. General Manager IEA Greenhouse Gas R&D Programme MUSTANG Annual Conference, 2011 June 2011, Edinburgh, Scotland

SALE OF 0.5 MTPA MINI BLAST FURNACE COMPLEX. (Southeast Asia)

Public Workshops on Carbon Capture and Sequestration

Pre-Combustion Technology for Coal-fired Power Plants

Capture 3 Post-Combustion Capture

Facilitating CO 2 capture at a cement plant. Dr Dennis R Van Puyvelde Chemeca 2013, Brisbane 29 Sep 2 Oct 2013

Overview of U.S. and European Climate Change Programs. Reid Harvey, U.S. EPA Presented at LSU Energy Summit October 24, 2007

Interviews and questionnaires

U.S. CCS Policy, Regional Carbon Sequestration Partnerships, and Major Demonstration Projects

Energy Saving & Breakthrough Technologies. Dr Ladislav Horvath Zhang Jiagang, Jiangsu, China, August 1, 2013

Gasification: A Key Technology Platform for Western Canada s Coal and Oil Sands Industries

Johannes Schenk. Hans-Bodo Lüngen. Chair of Ferrous Metallurgy, Montanuniversitaet Leoben, Austria. Steel Institute VDEh, Germany

Commercial scale feasibility of Clean Hydrogen

Challenges and limiting factors for the Recycling of steel scrap in Europe

CCS Renewing the vision. 25 February 2015 Simon Bennett, International Energy Agency

Carbon Capture & Sequestration in the California Context

Advanced Technologies Applicable to Fossil Fuels: Cross-cutting Technologies and Carbon Capture/Storage

Oxy-fuel combustion integrated with a CO 2 processing unit

CCS & the UAE A Development Story An update from the UAE Ministry of Foreign Affairs. 21 October 2014

Focus on Gasification in the Western U.S.

Call for Papers. 13 th International Conference on Greenhouse Gas Control Technologies

Global Iron & Steel Technology Roadmap. Simone Landolina and Araceli Fernandez Kick-off workshop, 20 November 2017

CHOREN USA. Coal Gasification in Indiana. Solutions for a Low Carbon Footprint Environment. December Christopher Peters CHOREN USA, Houston, TX

Coal Based Energy Systems: Options for a Secure Sustainable Environment

GLOBAL STATUS OF CCS: 2017

Petroleum Coke Gasification Sweeny E-GasE. Gas Project

GASIFICATION AND THE MIDREX DIRECT REDUCTION PROCESS

Carbon Dioxide Capture and Sequestration in Deep Geological Formations

Large-Scale CCS Demonstration Projects in Canada

Future of Coal in America Update on CO 2 Capture & Storage Project at AEP s Mountaineer Plant

Siemens Carbon Capture Technology

The HIsarna Ironmaking Process

CO 2 Capture Project Phase 3 Demonstration Phase Update

Capacity Building for the Deployment of CO 2 Capture and Storage (CCS) UNFCC Meetings Bonn, Germany May 20, 2006 Bill Reynen

KALYANI STEELS LIMITED

Technical and economic aspects of production and use of DRI in integrated steel works

Panel II Jänschwalde Oxyfuel demonstartion plant.

CO 2 sequestration: opportunities for Wyoming. Carol D. Frost Interim Director School of Energy Resources

Evaluation of Carbonate Looping. for Post-Combustion CO 2 -Capture from a Utility's Perspective. Energie braucht Impulse

DEVELOPMENT OF HITACHI OXY-COMBUSTION TECHNOLOGY WITH NEW TYPES OF BURNER AND FLUE GAS RE-CIRCULATION SYSTEM

Development of Integrated Flexi-Burn Dual Oxidant CFB Power Plant

Case Study: Al Reyadah CCUS Project

EU market for process heat applications

Bioenergy with CO 2 Capture and Geologic Storage

AEP CCS Project Update Mountaineer Plant - New Haven, WV

NeuStream -EOR. Supplying Field Deployable Systems for CO 2 and Power Generation for the Enhanced Oil Recovery Market

WORKSHOP BIO-ENERGY, CCS & BECCS : OPTIONS FOR INDONESIA

Innovation to improve carbon footprint in the Cement industry Building Material Analysis meeting University of Halle, Germany March 29, 2011

with IEAGHG 3. Learnings from Large-Scale IEA GHG R&D Programme

Helping Pay For CO 2 Capture Projects Through Geological Sequestration of CO 2 Used for Enhanced Oil Recovery (EOR)

Sanford C. Bernstein & Co. 23 rd Strategic Decisions Conference. Steve Angel Chairman, President & Chief Executive Officer. May 31, 2007.

- The Osaki CoolGen Project -

CCS - Commercially Viable but a Political Priority?

Carbon Capture and Storage in Italy

INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE

Development status of the EAGLE Gasification Pilot Plant

UPDATE ON THE KEMPER COUNTY IGCC PROJECT Gasification Technologies Conference

Transcription:

CCUS Moving Ahead: Recent Technical Advances John Gale General Manager IEA Greenhouse Gas R&D Programme IEA-MOST Workshop Advances in Deployment of Fossil Fuel Technologies Wednesday 25 th June 2014 Beijing, China

What is our remit? All Greenhouse Gases Focus on CO2 Our Remit Covers Fossil Fuels & BioCCS Power Sector and Major Industrial sectors

What do we do? Assessing Mitigation Options Focus our R&D CCS Our Core Activities Are: Tracking Capture Technology Developments/Costs Monitoring Geological Storage Performance Providing Members and Policy Audience with Independent Technical Input

Commercial Application of CCS (to date) Sleipner 1Mt/y CO2 Weyburn 2.5 Mt/y CO2 In-Salah 1.2 Mt/y CO2 Snohvit 0.7Mt/y CO2 Gorgon 4Mt/y CO2 350km overland pipeline 150MW e 160km sub sea pipeline Major Scale up in Storage experience 600MWe power plant Pressure Management involved 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018

Boundary Dam, 110MWe

Major CCS Demonstration Projects Project Locations & Cost Share FutureGen 2.0 Large-scale Testing of Oxy-Combustion w/ CO 2 Capture and Sequestration in Saline Formation Project: ~$1.65B Total; ~$1.0B DOE SALINE 1M MTPY 2017 start CCPI ICCS Area 1 FutureGen 2.0 Archer Daniels Midland CO 2 Capture from Ethanol Plant CO 2 Stored in Saline Reservoir $208M Total, $141M DOE SALINE ~0.9M MTPY 2015 start Summit TX Clean Energy Commercial Demo of Advanced IGCC w/ Full Carbon Capture ~$1.7B Total, $450M DOE EOR ~2.2M MTPY 2017 start HECA Commercial Demo of Advanced IGCC w/ Full Carbon Capture ~$4B Total, $408M DOE EOR ~2.6M MTPY 2019 start Southern Company Kemper County IGCC Project Transport Gasifier w/ Carbon Capture ~$4.12B Total, $270M -DOE EOR ~3.0M MTPY 2014 start NRG W.A. Parish Generating Station Post Combustion CO 2 Capture $775 M Total $167M DOE EOR ~1.4M MTPY 2016 start Air Products and Chemicals, Inc. CO 2 Capture from Steam Methane Reformers EOR in Eastern TX Oilfields $431M Total, $284M DOE EOR ~0.93M MTPY 2012 start Leucadia Energy CO 2 Capture from Methanol Plant EOR in Eastern TX Oilfields $436M - Total, $261M DOE EOR ~4.5M MTPY 2017 start 7

Air Products and Chemicals, Inc. ICCS Area 1 Steam Methane Reforming with CO 2 Capture Port Arthur, TX (Hydrogen plant at Valero Refinery) 90%+ CO 2 capture (Vacuum Swing Adsorption) from 2 steam-methane reformers (SMRs) yielding ~925,000 tonnes CO 2 /year ~30 MWe cogeneration unit to supply makeup steam to SMRs and operate VSA and compression equipment CO 2 to Denbury Green pipeline for EOR in Texas at West Hastings oil field Total Project: $431 MM; DOE Share: $284 MM (66%) Key Dates Phase 2 Awarded: Jun 15, 2010 FEED completed: Nov 2010 Permit By Rule (PBR) and Standard Air Permits issued: May 2011 NEPA FONSI: Jul 2011 Construction started: Aug 2011 Operation started: Dec 2012 Status PA-1 initiated operation: Mar 3, 2013 PA-2 initiated operation: Dec 16, 2012 Full capacity achieved: Apr 2013 CO 2 compressor trip; damage to internals; May 29, 2013; CO 2 compressor restart: July 1, 2013 Has operated at >100% of design when necessary 1MM tonnes CO 2 delivered on 4/24/14 1,111,076 tonnes CO 2 delivered as of 6/9/14

Existing SMR Co-Gen Unit CO 2 Compressor & TEG Unit CO 2 Surge Tanks Blowers VSA Vessels Air Products and Chemicals, Inc. - Port Arthur 2

CO 2 Transportation to Sequestration Site (from Final Environmental Assessment) (from Final Environmental Assessment)

US Industrial CCS Drivers

CO2-EOR Driving Expansion Of Industry CCS.

ESI CCS Project Technical Overview 13

Abu Dhabi CCS: Future Potential CO 2 as an EOR agent has been endorsed: Success of the ESI CCS Project and Rumaitha / Bab Injection are key to future development. Changing landscape in Abu Dhabi with potential CO 2 targets for field testing and development: CO 2 capture linked to ADNOC field demand and performance; Whilst preliminary, the EAA CCS Value Proposition study forecast a growing CO 2 demand in the next 25-30 years, based on ADNOC estimations. 14

Some Examples of CCS Research in Steel Industry ULCOS Project - Europe Developing oxy blast furnace with top gas recycle and capture pilot scale blast furnace Japan - COURSE 50 Project Demonstrate post combustion capture from blast furnace 30tpd pilot scale Korea Demonstrate ammonia scrubbing of blast furnace gas, 2 nd stage pilot testing (~10tpd)

Oxy-Blast Furnace Operation (Picture of OBF courtesy of Tata Steel) Nitrogen 5 Nm3 Raw Materials Coke 253 kg Sinter 1096 kg (70%) Pellets 353 kg (22%) Lump 125 kg (8%) Limestone 6 kg Quartzite 3 kg OBF Screen Undersize 21 kg DRR: 11% FT: 2140oC TGT: 170oC HM Si: 0.5% HM C:4.7% Air CO2 avoided $56/t Top Gas Cleaning 332 Nm3 18 Nm3 Natural Gas 563 Nm3 900oC BF Dust 15 kg BF Sludge 4 kg OBF Top Gas 1385 Nm3 OBF Process Gas Fired Heaters Steam 2.0 GJ CO2 Capture & Compression Plant Flue Gas 352 Nm3 Carbon Dioxide 867 kg OBF Process Gas 938 Nm3 Oxygen 253 Nm3 Nitrogen 5 Nm3 PCI Coal 152 kg 205 Nm3 41oC BF Slag 235 kg Hot Metal 1000 kg 1470oC OBF-PG to Steel Works 171 Nm3

CCS Research in Cement Industry European Cement Research Association (ECRA) Phased development project for pilot scale demonstration of oxy fuel firing of cement kiln in late 2013. NORCHEM/CLIMIT & ECRA Pilot scale project for post combustion capture on cement kiln in 2013/14 o Also testing: Fixed bed absorbers & Membranes

CO 2 Capture at Cement Plants Oxy-combustion Pilot Plant Project Feasibility of oxy-combustion at cement plants investigated by Lafarge, FLSmidth and Air Liquide Pre-calciner pilot plant at Dania, Denmark successfully modified and operated with oxy-combustion 2-3t/h raw meal (~1t/h CO 2 ) Pre-calciner accounts for 90% of CO 2 from carbonate decomposition and 60% of fuel-derived CO 2 from a cement plant Feasibility and costs of retrofitting oxy-combustion calciner to Lafarge commercial cement plant at Le Havre was assessed 62/t CO 2 captured (consistent with IEAGHG studies) Technology now ready to move into the demonstration phase Next stage would be a 1-2 year FEED study Currently no viable business case for CCS at European cement plants

www.ghgt.info Technical Programme Two technical sessions 10 papers on CCS in Industry 20 industry CCS papers in poster sessions One panel discussion session on Industrial CCS October 5-9 TWO THOUSAND FOURTEEN AUSTIN, TX USA Key dates Registration opened 7 th March 2014 Early bird closes 13 th June 2014

Thank you, any Questions? Contact me at: john.gale@ieaghg.org Website: LinkedIn: Twitter: Facebook: www.ieaghg.org www.linkedin.com/groups/ieaghg-4841998 https://twitter.com/ieaghg www.facebook.com/pages/iea-greenhouse-gas- RD-Programme/112541615461568?ref=hl