Final Project Review. Dresser- Rand : Rotor Cell Improvement Project. Topics: Last Quarter Review: This Quarter: Multi-Disciplinary Senior Design

Similar documents
Pick Smarter. Pick Better. Pick UNEX. MODULAR FLOW-THROUGH WORK STATIONS FOR ASSEMBLY AND LINESIDE STORAGE

NSN WEAPON STORAGE CATALOG CAGE: 3BSY8 DUNS:

MECHANICAL ASSIST SYSTEMS. S t o r a g e S o l v e d.

FlowCell. Carton Flow Track. The Patented, Original Full-Width Roller Carton Flow Track SPAN-TRACK

mediatek mediatek Library and archive shelving systems Taking shelving to the next level BC004.03

MANUFACTURING TECHNOLOGY

Record Master SHELVING SYSTEMS

Dual Purpose Wheelchair-Platform Swing

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

JORACK. Storage Solutions from Design to Installations.

SECTION Summit Phenolic Lockers (Solid Phenolic Lockers)

Industrial Shelving. Q Line, Z-Line/Steel Shelves, Bulk Storage and Heavy-Duty Reinforced Shelving SYSTEMS FOR SUCCESS

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

storage solutions storage solutions ibrary

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION

VERTICAL TILLAGE. Viking

EVERYONE'S RESPONSIBILITY

TECHNICAL SPECIFICATION

Box Rail. Single Box Rail Bracket

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Mini-Racking Proposals

4400 Series UPS Seismic Adapter Kit Installation Instructions

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SUGGESTED SPECIFICATIONS Pump Frames through 64132

DIVISION 10 SPECIALTIES SECTION OPERABLE PARTITIONS

CANTILEVER SHELVING SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

Design and Rating of Steel Bridges

Safety on Heights: Our Policy

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

Mini-Racking Proposals

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

RETAIL BACKROOM MATERIAL HANDLING & STORAGE SOLUTIONS. Gillis Jarke. The best storage systems for your stores.

Storage & Handling for Tables and Chairs

Keylar Shelving (QLD) Pty Ltd

Com-Tray. Under Floor

DataComm Seismic Solutions OSHPD pre-approved numbers

The S.10 ALL ALUMINUM LIFT & SLIDE DOOR SYSTEM. Expanding spaces to the extraordinary

Trench Duct Class Catalog 5230CT9601R10/08

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Smarter. Safer. Leaner.

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

S h e l v i n g CANTILEVER S H E L V I N G S Y S T E M S S t o r a g e S o l v e d

CLS. Carton live storage. EASY-TO-VIEW PRODUCT PRESENTATION

TEST REPORT. Rendered to: KEYLINK FENCING & RAILING, INC. For: PRODUCT: Lancaster Series. TYPE: Aluminum Level Guardrail System

PUSH-BACK. storage rack systems EXCEL STORAGE PRODUCTS EXCEL STORAGE PRODUCTS EXCEL STORAGE PRODUCTS EXCEL STORAGE

An innovative and versatile concept offering countless solutions for all your storage needs from simple single bays to multi-tier installations.

Metric Storage Systems. Mississauga, Ontario

Post Style with ABS Real Tuff

CNC Tool Storage Solutions

CLINICS. LABS. PHARMACIES. PREP AND PACK.

Overview. Sigma Flex SIGMA FLEX ADAPTABLE LABORATORY FURNITURE SOLUTIONS. The Sigma Flex System. Designed for the Lab of Tomorrow...

LateralFile two door units

HELLE SAWMILL EQUIPMENT

Fig. 1 - Standard Clevis Hanger

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

HC-Omega (Sinus Slide ) armour joints

Product Specifications MRI Trench Duct

Coolville Display Co., LTD. Add: NO.17, North District, Lingdou, Xiamen, China

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

Metallurgy 101 (by popular request)

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

P a c k a g i n g s o l u t i o n s f o r e l e c t r o n i c s

Concrete Inserts. B Adjustable Metal Deck Ceiling Bolt

BID # ELLIS MIDDLE LOCKERS

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS

Where to Use Automated Production Lines. Automated Production Lines. Benefits of Automated Production Lines. Automated Production Line - Defined

M-Span Shelving. Distributed by R.J. Cox Engineering

Vertical Offset Conveyors

W ARR A NTY FAIRBANKS NIJHUIS 1600 SERIES SINGLE STAGE END SUCTION PUMPS. Certified to NSF/ANSI 372.

PAINT BOOTHS GENERAL PURPOSE

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system.

I. Overview. General Considerations

H i g h - D e n s i t y M o b i l e S t o r a g e MANUAL SYSTEMS. S t o r a g e S o l v e d

FORECAST JANUARY 2017

SECTION SECTIONAL OVERHEAD DOORS

A Weapons Rack Comparison from Spacesaver

CITY OF FARGO SPECIFICATIONS SIGNING

Architectural Specifications, Section Phenolic Lockers

RIDG-U-RAK. Drive-In & Drive-Thru Storage Systems Maximum Density Storage LIFO & FIFO Pallet Storage Easy Lift Truck Access

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION ORNAMENTAL ALUMINUM FENCING

Metal Door Frames & Meter Boxes

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Standard Duty Cantilever Rack Installation and Assembly Guide

Drive-In Rack A Low Cost, Versatile Solution for High Density Pallet Storage

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

SECTION HEALTHCARE CASEWORK (SYNTHESIS CASEWORK COLLECTION BY MIDMARK)

FACT SHEET #2 DECK INFORMATION

Galvanised Longspan Shelving

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

Whether you have. Merchandisers

MODEL: SIGHT-LINE- COMMAND CENTER CONSOLES

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

Provide a complete office solution

Transcription:

Final Project Review Dresser- Rand : Rotor Cell Improvement Project Multi-Disciplinary Senior Design Project: P13457 Topics: Last Quarter Review: Heat treat B & OS This Quarter: Arena Model Status Scheduling System Vectra Table Concept

Potential Project Concepts The goal of this project was to help the Dresser-Rand Rotor Cell increase productivity. Multiple improvement project were suggested to the RIT team, including: Develop a production model for scheduling and capacity Design storage racks Develop tools to visualize part flow Optimize use of flow lanes Methods for space utilization Production status visual (ahead, behind, on-time..)

Project Synopsis Layouts: Heat Treat and B&OS Shelving choices Quotes and Lead Times Layout Configurations DR s status? Capacity Determination through Arena Data Issues Scheduling Screens for Production Area Bill of Materials Vectra Table CAD model of Concept Risk assessment Design Considerations

Roll-Out Racks Heat Treat 3 racks for the Heat Treat area 3 adjustable shelves per rack B & OS 1 rack for Finger Mandrels Recommend additional shelf to increase capacity Rack Specs 2,000lbs /shelf 48 x 48 shelf space 15 lbs of force to pull-out fully loaded rack

Layout in Heat Treat Layout Option: 3 Large Racks- Straight Line Most viable given constraints Can t move office Can t block door 24-40 impellers

B&OS: Standard Racks 6 racks should fit all parts Modeled all sizes in Auto-CAD 5 storage shelves/rack 6 th shelf as cover for dust? Very low, if any, maintenance Consistent with current shelving Layout of plates will remain the similar

Standard Racks Specifications 3000lbs per shelf Heavy gauge steel 72-L x 24-W x 60-H 72 x 24 x 72 (Second Option) Versatility Shelves can be adjusted in 1 inch increments Not bolted to the floor so they can be rearranged Accessible on both sides

Layout in B&OS

Status? Are there any plans to implement the shelves?

Arena Model Status Goal: Determine the Capacity of the Plant How: Complex routings require use of Arena Simulation Plan: Use historical process times for parts that vary in: Size Complexity Heat Treatment Etc Calculate Statistical variables to input to Arena RIT: Data Analysis DR: Arena Model Architecture (Sean Frier) Issues: Data not complete enough to make conclusions

Arena Model Status Status: Sean Frier has initiated a survey for process time approximations ( High, Medium, Low Triangular Distribution) Manually look up individual work orders too time consuming Sean has outlined the model, just needs data

Scheduling System Objective Reduce communication redundancies in scheduling Allow supervisors to spend time more efficiently Communicate daily scheduling in a more timely manner Present daily schedule so that it is visible to everyone walking the floor

Scheduling System Requirements Manage Remotely Microsoft Compatible Real time schedule to each cell- continuously updating Each cell will have its own display Specific spreadsheet schedules display to cell specific monitors All displays can be managed from the same source System needs to be able to expand and add more displays and schedules as they are added to each cell

Scheduling Solution Use Hiperwall software to input a daily schedule to display on screens on the manufacturing floor. Work with DataBranch to continue to expand the new scheduling system.

Vectra Table Task Design a system for the current table so it is capable to do run-out measurements while the fins are being installed. This will eliminate wasted time as a result of needing to relocate the rotor horizontally for run-out measurements on the fins.

Vectra Table Other Criteria: Eliminate use of the collar Tolerance ±.0001 Supports up to 2000 lbs Makes use of current table Eliminate horizontal transfer

Vectra Table Concept Development Initial design concepts

V-Block Mounts Mounted under the table One fixed One linear motion Four 5 inch diameter feed blocks

V-Block Mounts: Rail System Similar to current system on the table for the vertical rods Still need a rail system for the v- blocks to move Electric rail system Mount v-blocks right on the block of the rail system Manual movement rail system that locks in place Could be used on the permanent side to adapt to any sized shaft diameter

Rotational Base Rotary Bearing Needs Testing for sizing Smaller diameter may allow easier turning Needs to handle large loads Face Plate Face plate has a dome center Align center of Rotor with center of rotation Maintain vertical position Avoid Walking-Effect Size Uncertain although shaft has a pivot hole on bottom True surface from Manufacturing

Rotational Base: Center Centered ** Critical to design Align Center of dome with center of rotor Center of V-Blocks Would need to outline process for initial alignment Re-alignment Procedure Fine tune placement of V- blocks or build adjustments so base can be moved in small increments

Rotational Base: Center Centered ** Critical to design Align Center of dome with center of rotor Center of V-Blocks Would need to outline process for initial alignment Re-alignment Procedure Fine tune placement of V- blocks or build adjustments so base can be moved in small increments

Next Steps: Vectra Table Things to Consider: Linear Drive would need locking mechanism Electric linear drive might lock in place Needs to support weight Base plate nose size could be smaller Wearing out the plate V-block configuration 2 x 2 (top-bottom) keeps shaft vertical Could use 3 v-blocks in triangular pattern Centers like drill chuck with electric linear drives Procedure for alignment

Next Steps Arena Model: Assess process times Evaluate and build into the Arena model Finish the model so that it can be used and integrated in the facility Scheduling Work with vendor to create steps of how the system will be implemented along Gain more technical knowledge of the system to dig deep into the pro s and con s of each implementation in a cell Vectra Table This was only one design concept so more could be developed and improved upon Accumulate more precise implementation along with mathematical calculations Pass Vectra Table Work to new Senior Design Team

RIT Team Reflection Overall, the project allowed the team to explore diverse opportunities for improvement Layouts Evaluating capacity Visual systems integration Process improvement through tool re-design Possible Drawbacks: Vectra table was great project- disappointed it was so late Would have been good as a full project on its own- design and implementation Enjoyed the diversity, but lack of one clearly defined project Hard to fully develop every concept within the time Would have been nice to have a build/ prototype associated with the project