N E W S R E L E A S E

Similar documents
AVINO SILVER & GOLD MINES LTD.

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE

TINKA RESOURCES LIMITED

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

Accelerated Exploration

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0

Suite West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: Fax: December 3, 2013 #

FIRST MAJESTIC SILVER CORP.

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

Forward Looking Statement

LUNDIN MINING ANNOUNCES UPDATED MINERAL RESERVES AND RESOURCES

Independent tests produced a concentrate with an extremely high grade of 56% copper

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

Q Preliminary Production Results, 2018 Production Guidance and Mineral Reserve and Resource Update

GB MINERALS LTD. COMPLETES POSITIVE ACID AND FERTILIZER GENERATION TEST WORK

OTTERBURN RESOURCES CORP.

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

NEWS RELEASE. Post Tax NPV 10%) Post Tax IRR (100% equity) 17.6% Probable Reserves Project Life (based on Probable Reserves)

DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

Ste De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Update of Amaruq Agnico Eagle s near-term future in Nunavut Nunavut Mining Symposium, Iqaluit, Nunavut

Confidence in Carrapateena project grows

NEWS RELEASE. Equinox Gold Begins Mining at Aurizona and Receives Award for Mining Excellence in Brazil

Joe Hamilton CEO January 2008 AIM/TSX: ACU BSE:African Copper

MINDORO DRILLS 16.9 METERS OF 1.81% NICKEL AT AGATA

CANADA S NEXT INTERMEDIATE GOLD PRODUCER. Nishnawbe Aski Development Fund Aboriginal Partnership Conference Timmins, Ontario May 30, 2013

Commerce Resources Corp. Reports Significant Increase in Resources and Grade at the Ashram Rare Earth Element Deposit, Northern, Quebec

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

Q4 & Full Year 2014 Results

PRESS RELEASE CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETING OF SHAREHOLDERS. Company Provides Corporate Update

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

Integra Gold Receives Underground Exploration Permits for Triangle Zone, Commences Surface Preparation and Provides Project Permitting Overview

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Bisha Mining Share Company

IDM MINING S RED MOUNTAIN PRELIMINARY ECONOMIC ASSESSMENT DEMONSTRATES ROBUST ECONOMICS

Skeena Announces Preliminary Economic Assessment for Spectrum-GJ Copper-Gold Project

Zinc Business. September 19, 2017 Dale Andres, Senior Vice President, Base Metals

Filtered Tailings: A Silver Bullet?

NEWS RELEASE ROXGOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR ITS BAGASSI SOUTH PROJECT

Trading Symbol: TSXV: BMC News Release No Shares Outstanding: 166,283,160 May 8 th, 2013

New Gold Announces Highest Gold Production and Lowest Cash Cost in its History and Provides 2011 Guidance

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

Champion Provides Year-End Review of the Consolidated Fire Lake North Project and Update on Feasibility Study Work

KERR MINES RELEASES HIGHLIGHTS FROM PRE-FEASIBILITY STUDY: 40% IRR, UPDATED RESOURCE AND PRODUCTION IN 2019

Quality, Diverse Group of Mining Assets. February 2018

Conference Call Arctic Project Pre Feasibility Study Results February 21, 2018

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

THE FUTURE OF TANTALUM FEBRUARY 2009

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 27 Feb 2018 CPNVF:US, FRA:79M1

Second drill rig to accelerate major drilling program at Productora

Shareholder Update. April Dear Shareholders,

Greenwood Precious Metals Project. TSX.V: GOM Frankfurt Xetra: 3G8A

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

Production Report. for the three months ended 30 September 2013

Figure 1. Location of new RC drilling at Castelo de Sonhos.

People Characteristics: A predictor of cyber security incidents?

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

JAIBARAS DIAMOND PROJECT UPDATE

Prieska Zinc-Copper Project Advanced-Stage Metallurgical Tests Achieve Impressive Recoveries to Saleable Product

Project development work focused on critical path to enable initial production of concentrate by 2022

DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD

* All figures reported are in 2015 US dollars and on a 100% Project and 100% equity basis valuation.

EXCO S PROJECT PIPELINE

Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade

Black Butte Copper Project Community Presentation

Appendix 5A. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code)

BUILDING CANADA S LARGEST GOLD MINE Production Early Mining Ready Summit October 23, 2012

For personal use only

Krasny project JORC resources update: oz of gold at 1,200 USD/oz gold price

Valdecañas Vein Deep. Corporate Presentation

Prefeasibility Study Outlines Optimisation Plan of Canadian Copper Producer with 45 per cent IRR and 21 Year Mine Life

Annual Information Form ( AIF ) Nevada Copper Corp. Suite Granville Street Vancouver, British Columbia, Canada V6C 1S4

INVESTING IN CREDIBLE HR A ANALYTICS

TRANS-SIBERIAN GOLD PLC

Australia s leading explorer in Mexico

For personal use only

RED TIGER MINING INC. Copper Production Copper and Gold Exploration

Nullagine Gold Project Life of Mine Update

For personal use only

Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer. M a y 2018

UNITED STATES SECURITIES AN D EXCHANGE COMMISSION Washington, D.C FORM SD

ecobalt SEDAR Files Positive Feasibility Study for the Idaho Cobalt Project; Pre-Tax NPV $176M 7.5%, IRR 25.1%

TSX : LUN OMX : LUMI. Total 2016 Estimated Production. Production Assets

TSX : RNX RNC MINERALS. Focused on Value Creation December 18, 2017

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

OSISKO REPORTS INCREASED GOLD RECOVERY RESULTS AT MARBAN

For personal use only

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

Hydrogen KIVI NIRIA CONGRESS. Eindhoven, 6 th November Dr. Jurgen Louis, Technology Manager Shell Hydrogen. Copyright of Royal Dutch Shell plc 1

EXCO S PROJECT PIPELINE. Unlocking the Value

Fourth Quarter Production Report. for the three months ended 31 December 2017

Joyce Lake update, the new DSO zones at Lac Le Fer to Iron Arm Range

Forward-looking Statements

Transcription:

ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 21, 2018 N E W S R E L E A S E AVINO ANNOUNCES AN UPDATED MINERAL RESOURCE ESTIMATE AT THE AVINO PROPERTY Avino Silver & Gold Mines Ltd. (ASM: TSX/NYSE American, GV6: FSE, Avino or the Company ) is pleased to announce the completion of an updated mineral resource estimate for the Company s Avino Property located near Durango in west-central Mexico (the Property ). The updated estimate encompasses the Property s San Gonzalo Mine, the Avino Mine vein systems, and the Property s Oxide Tailings. The mineral resources estimate has been included in an updated technical report prepared by Aranz Geo Ltd. under National Instrument 43-101 ( NI-43-101 ), which will be available on SEDAR (www.sedar.com) under the Company s profile and filed on Form 6-K with the SEC within 45 days. This updated mineral resource estimate includes 34 drill holes that were completed during the drill programs from 2016 to 2017. These drilling programs have significantly increased the amount of information available for resource estimation. The drill holes and assay data were incorporated into the updated mineral resource estimate. The results of the additional drilling contributed to an approximate 225% increase in tonnage in the Measured and Indicated Resource categories and a decrease of 25% in the Inferred resource due to a conversion of a portion of the Inferred Resources to the Indicated Resource category. The total measured and indicated mineral resources in all deposits totals 10.7 million metric tonnes containing 47.5 million troy ounces of silver equivalent, 26.3 million troy ounces of silver, 217 thousand troy ounces of gold, and 86 million pounds of copper. The total inferred mineral resources in all deposits totals 6,090,000 metric tonnes containing 23.2 million troy ounces of silver equivalent, 13.6 million troy ounces of silver, 109 thousand troy ounces of gold, and 33 million pounds of copper. We are very pleased with the updated mineral resource estimate, which demonstrates a significant increase in the mineral resources potentially available for mill feed said Avino President and CEO, David Wolfin. The successful drill program that started in 2016 has allowed us to evaluate the tonnage and grade in the area between the San Luis workings and the ET production area, the results of which have now been incorporated into this updated mineral resource estimate. We are confident that our 2018 exploration program will continue to build on the success of our past operations. I would like to thank the exploration team in Mexico for their continued and invaluable efforts. Avino is celebrating its 50 th year in the mining industry, and this would not be possible without the hard work and dedication of the entire Avino team. The following is a summary of current resources at the San Gonzalo and Avino Mines, as well as the updated oxide tailings resource, grouped into the measured, indicated and inferred categories. The effective date of the resource estimates is January 31, 2018. The resource estimates were prepared by Michael O Brien P.Geo., Pr.Sci.Nat., who is a Qualified Person within the meaning of NI 43-101 and who is an employee of ARANZ Geo and independent of Avino, as defined by Section 1.5 of NI 43-101.

Page 2 Avino Mine Mineral Resources Summary as at January 31, 2018 Measured & Indicated Mineral Resources Grade Metal Contents Resource Category Deposit Cut-off ( ) Metric tonnes Cu % Tr Oz* Tr oz Thousand Tr Oz Measured Avino - ET 60 3,890,000 141 71 0.54 0.55 17.6 8.9 67.4 21,000 Measured Avino - San Luis 60 650,000 142 67 0.70 0.49 3.0 1.4 14.6 3,000 Measured San Gonzalo System 130 290,000 397 314 1.65 0.00 3.7 2.9 15.4 0 Total Measured All Deposits 4,830,000 156 85 0.63 0.51 24.3 13.2 97.4 24,000 Indicated Avino ET 60 2,640,000 105 49 0.56 0.34 8.9 4.2 47.6 9,000 Indicated Avino - San Luis 60 1,620,000 126 54 0.82 0.36 6.6 2.8 42.9 6,000 Indicated San Gonzalo System 130 240,000 319 257 1.25 0.00 2.5 2.0 9.6 0 Indicated Oxide Tailings 50 1,330,000 124 98 0.46 0.00 5.3 4.2 19.8 0 Total Indicated All Deposits 5,830,000 124 70 0.64 0.25 23.3 13.1 119.8 15,000 Total Measured & Indicated 10,660,000 139 77 0.63 0.37 47.5 26.3 217.2 39,000 Inferred Deposit Cut-off ( ) Metric tonnes Cu % Tr Oz* Tr oz Thousand Tr Oz Inferred Avino - ET 60 2,380,000 111 58 0.51 0.33 8.5 4.4 39.1 8,000 Inferred Avino - San Luis 60 1,780,000 124 57 0.72 0.38 7.1 3.2 41.2 7,000 Inferred San Gonzalo System 130 120,000 262 219 0.86 0.00 1.0 0.8 3.3 0 Inferred Oxide Tailings 50 1,810,000 113 88 0.44 0.00 6.6 5.1 25.6 0 Total Inferred All Deposits 6,090,000 118 70 0.56 0.24 23.2 13.6 109.2 15,000 Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred resources as an Indicated or Measured mineral resource and it is uncertain if further exploration will result in upgrading them to the Indicated or Measured mineral resource category. Figures in the table may not add to the totals shown due to rounding. The mineral resource estimate is classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum's "CIM Definition Standards- for Mineral Resources and Mineral Reserves" incorporated by reference into National Instrument 43-101 "Standards of Disclosure for Mineral Projects". Mineral Resources are reported at cut-off grades 60, 130 and 50 silver equivalent grade for the Avino, San Gonzalo and oxide tailings respectively as indicated in the table. Cautionary Note to United States Investors - The information contained herein and incorporated by reference herein has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States securities laws. In particular, the term resource does not equate to the term reserve. The Securities Exchange Commission s (the SEC ) disclosure standards normally do not permit the inclusion of information concerning measured mineral resources, indicated mineral resources or inferred mineral resources or other descriptions of the amount of mineralization in mineral deposits that do not constitute reserves by SEC standards, unless such information is required to be disclosed by the law of the Company s jurisdiction of incorporation or of a jurisdiction in which its securities are traded. U.S. investors should also understand that inferred mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Disclosure of contained ounces is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute reserves by SEC standards as in place tonnage and grade without reference to unit measures. Cu T Cu T

Page 3 The silver equivalent was calculated using the following assumptions: For Avino (ET and San Luis), San Gonzalo and Oxide Tailings price US$1,300/oz price US$ 17.50/oz Copper price US$3/lb A net smelter return (NSR) was calculated and the silver equivalent was back calculated. For ET using the formula: = (24.06 x () + 0.347 x () + 43.0 x Cu (%) - 151.8 x Bi (%)) / 0.347 For San Gonzalo using the formula: = (0.03 x () + 0.385 x () - 4.03 / 0.385 For Oxide Tailings using the formula: = 69.37 x () + () Highlights for each deposit include the following: The Avino Mine A measured and indicated resource of 8,800,000 tonnes (at an average grade of 61 silver, 0.61 gold and 0.45% copper) containing 17.2 million troy ounces of silver, 172,500 troy ounces of gold and 39,000 tonnes copper using a cut-off grade of 60 silver equivalent. An inferred resource of 4,160,000 tonnes (at an average grade of 57 silver, 0.60 gold and 0.35% copper) containing 7.7 million troy ounces of silver, 80 thousand troy ounces of gold and 15,000 tonnes of copper using a cut-off grade of 60 silver equivalent. The measured and indicated tonnage for the Avino Vein system at the ET Mine has increased from 1.45 million tonnes to 8.80 million tonnes due to infill drilling, increased width of the vein below 11th level, and additional hanging wall units encountered between San Luis and ET. The inferred tonnage has decreased by 28% from the previous estimate mainly due to in-fill drilling conversion to indicated resources. The Avino Vein System at the ET Mine contains over three quarter of the tonnage on the Avino property and includes significant copper grades. San Gonzalo Mine A measured and indicated resource of 530,000 tonnes (at an average grade of 288 silver and 1.47 gold) containing 4.9 million troy ounces of silver and 25,000 troy ounces of gold using a cut-off grade of 130 silver equivalent. An inferred resource of 120,000 tonnes (at an average grade of 219 silver and 0.86 gold) containing 0.8 million troy ounces of silver and 3,300 troy ounces of gold using a cut-off grade of 130 for silver equivalent. The decrease in Inferred resource is mainly due to development-based conversion of inferred resource to indicated resource. The San Gonzalo Vein System is comparatively higher grade and provides flexibility to the Company s mining production during times of uncertain metal prices.

Page 4 Oxide Tailings The oxide tailings estimate has not been modified since 2016 and no further sampling or modelling work has been carried out. The indicated silver resource is unchanged and includes 1,330,000 tonnes at an average grade of 98 silver and 0.46 gold totaling 4.2 million troy ounces of silver and 19.8 thousand troy ounces of gold using a cutoff grade of 50 silver equivalent. The inferred resource is also unchanged and includes 1,810,000 tonnes at an average grade of 88 silver and 0.44 gold totaling 5.1 million troy ounces of silver and 25.6 thousand troy ounces of gold using a cut-off grade of 50 for silver equivalent. Method of Calculation The estimation methods used were substantially the same for all three deposits, providing a consistent baseline for strategic planning. Mineral resources were estimated by ordinary kriging, optimized using kriging neighborhood analysis and verified by means of nearest neighbor and inverse distance methods, swathplot comparisons of estimates and visual inspections. Block models were created for the San Gonzalo and Avino Vein Systems and the Oxide Tailings deposit and estimates were made utilizing blocks of sizes 20 m easting x 5 m northing x 10 m elevation for Avino (ET Mine), sizes 10 m easting x 5 m northing x10 m elevation for San Gonzalo and 40 m easting x 40 m northing x 2 m elevation for Oxide Tailings. Classification of the mineral resource was based on slope of regression as a measure of uncertainty, with adjustment to practical geometries using geological knowledge of the deposit. Fundamental changes since the previous mineral resource estimates are (1) depletion due to mining (over 800 thousand tonnes milled since the beginning of 2017), (2) significant new sampling information (3) changes to cut-off calculations and (4) reclassification of mineral resources in the light of improved understanding of confidence in the deposits at distances from the underground channel samples and drill hole samples. More sampling information does not always lead to direct increases in resource tonnages and contained metal. In some cases, the new information provides improved understanding (developed by variogram modelling and kriging neighborhood analysis) that may demote some portions of mineral resource from high confidence categories, such as measured and indicated, to a lower confidence category such as inferred. Currently, for the San Gonzalo and Avino Vein Systems, estimated blocks more than thirty metres from sampling are not considered to be of sufficient confidence to be included in the indicated category resources and have been classified as inferred resources. For the Oxide Tailings, estimated blocks more than fifty metres from sampling are not considered to be sufficiently confident to be included in the indicated category resources.

Page 5 Qualified Person(s) Avino's projects in Durango, Mexico are under the geoscientific oversight of Michael O Brien, P.Geo., Senior Principal Consultant, ARANZ Geo, and under the supervision and Jasman Yee P.Eng, Avino Director, who are both qualified persons within the context of NI 43-101. Both have reviewed and approved the technical data in this news release. About Avino Avino is a silver and gold producer with a diversified pipeline of gold, silver and base metals properties in Mexico and Canada employing close to 600 people, and has created over 1,600 indirect jobs in Mexico. Avino produces from its wholly owned Avino and San Gonzalo Mines near Durango, Mexico, and is currently planning for future production at the Bralorne Gold Mine in British Columbia, Canada. The Company s gold and silver production remains unhedged. The Company s mission and strategy is to create shareholder value through its focus on profitable organic growth at the historic Avino Property near Durango, Mexico, and the strategic acquisition of mineral exploration and mining properties. We are committed to managing all business activities in an environmentally responsible and cost-effective manner, while contributing to the well-being of the communities in which we operate. On Behalf of the Board David Wolfin David Wolfin President & CEO Avino Silver & Gold Mines Ltd. Renmark Financial Communications Inc. Bettina Filippone:bfilippone@renmarkfinancial.com Tel: (416) 644-2020 or (514) 939-3989 www.renmarkfinancial.com Safe Harbor Statement - This news release contains forward-looking information and forward-looking statements (together, the forward looking statements ) within the meaning of applicable securities laws and the United States Private Securities Litigation Reform Act of 1995, including the updated mineral resource estimate for the Company s Avino Property located near Durango in west-central Mexico (the Property ) with an effective date of January 31, 2018 prepared for the Company, and reference to Measured, Indicated, Inferred Resources referred to in this press release. These forwardlooking statements are made as of the date of this news release and the dates of technical reports, as applicable. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the future circumstances, outcomes or results anticipated in or implied by such forward-looking statements will occur or that plans, intentions or expectations upon which the forward-looking statements are based will occur. While we have based these forward-looking statements on our expectations about future events as at the date that such statements were prepared, the statements are not a guarantee that such future events will occur and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such forward-looking statements. No assurance can be given that the Company s Property does not have the amount of the mineral resources indicated in the updated report or that such mineral resources may be economically extracted. Such factors and assumptions include, among others, the effects of general economic conditions, the price of gold, silver and copper, changing foreign exchange rates and actions by government authorities, uncertainties associated with legal proceedings and negotiations and misjudgments in the course of preparing forward-looking information. In addition, there are known and unknown risk factors which could cause our actual results, performance or achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors include risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in metal prices; title matters; uncertainties and risks related to carrying on business in foreign countries; environmental liability claims and insurance; reliance on key personnel; the potential for conflicts of interest among certain of our officers, directors or promoters with certain other projects; the absence of dividends; currency fluctuations; competition; dilution; the volatility of the our common share price and volume; tax consequences to U.S. investors; and other risks and uncertainties. Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. We are under no obligation to update or alter any forward-looking statements except as required under applicable securities laws. Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release.