Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes;

Similar documents
DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

Activities Report Quarter Ended 31 st March 2015

For personal use only

ABM Hits 3000 Ounce Target from Trial Mining

Azure Minerals Ltd ASX Code:

For personal use only

Gum Creek Gold Project Free Milling Scoping Study

ASX Release ASX Code: YTC

2014 MINERAL RESOURCES AND ORE RESERVES

For personal use only

ASX ANNOUNCEMENT 12 MAY 2016

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Second drill rig to accelerate major drilling program at Productora

Awak Mas DFS Optimisation - Metallurgical Breakthrough

EXCO S PROJECT PIPELINE

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

For personal use only

For personal use only

Tri-K feasibility study update

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

AGM - Lorena Gold Project

Nullagine Gold Project Life of Mine Update

Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project

For personal use only

For personal use only

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

For personal use only

For personal use only

QUARTERLY REPORT March 2011

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Horseshoe Metals Limited (HOR)

For personal use only

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

For personal use only

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

209 million 36.1% Fe

EXCO S PROJECT PIPELINE. Unlocking the Value

For personal use only

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 DECEMBER 2017

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 MARCH 2018

ANNUAL GENERAL MEETING. 26 November 2010

Kibali Mine Development

For personal use only

For personal use only

MINERAL RESOURCES LIMITED

For personal use only

For personal use only

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

For personal use only

For personal use only. Minerals Explorer in South Korea

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

Q Preliminary Production Results, 2018 Production Guidance and Mineral Reserve and Resource Update

For personal use only

For personal use only

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

Grange Resources Australia s leading magnetite producer

Maiden Inferred Iron Ore Resources for Gum Flat

For personal use only

Major Capital Cost Reductions Reposition Wa Gold Project, Ghana

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

8 January UPGRADED ORE RESERVE and EXTENDED MINELIFE MOLYHIL TUNGSTEN PROJECT

For personal use only

Australia s leading explorer in Mexico

For personal use only

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

Ore Reserves and Mineral Resources Statements 30 June 2013

Krasny project JORC resources update: oz of gold at 1,200 USD/oz gold price

WPG TO ENTER THE IRON ORE INDUSTRY

QUARTERLY ACTIVITIES REPORT PERIOD ENDING 30 JUNE 2016

Study on Gonka Deposit and Taurus Extension

Maiden Ore Reserve for Anglo Saxon Gold Project

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

For personal use only

For personal use only

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011

Prieska Zinc-Copper Project Advanced-Stage Metallurgical Tests Achieve Impressive Recoveries to Saleable Product

For personal use only

Quarterly Report 30 June 2011

Aitolampi Drilling Results Update

23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited

For personal use only

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

For personal use only. Cummins Range Rare Earths Project

For personal use only

AGREEMENT TO CO-INVEST IN SOUTH AUSTRALIAN COPPER PROJECT EARNING MAJORITY INTEREST NEW COPPER FOCUSED COMPANY

CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines

NEWS RELEASE ROXGOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR ITS BAGASSI SOUTH PROJECT

Quarterly Activities Report September 2013

For personal use only

Geology and mineral resources of the Kylylahti Mine

16 July 2013 AIM:AMA / TSX:AMZ. Amara Mining plc ( Amara or the Company )

Developing the +1.2Moz Pilbara Gold Project. Investor Presentation November Pilbara Gold Project Unlocking Shareholder Value

121 MINING INVESTMENT CONFERENCE HONG KONG

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

PILOT SOLAR EVAPORATION PONDS COMMISSIONED AT LAKE WELLS POTASH PROJECT, WA

Developing High Grade Projects in Mexico

Transcription:

24 th July 2009 June December 2009 Quarterly Report Report 2008 Highlights Wa Project Scoping studies on the Julie West gold vein were completed with the following outcomes; 250,000 tonnes @ 4.9g/t gold captured in US$600 Whittle shell Leach processing scenario generates operating surplus of A$23M Cash costs under A$375 per ounce Waste to ore ratio of 6.6:1 Max pit depth of 50m Exploration defines three new gold veins Option exercised to formerly acquire 100% of Wa Project Ground position increased by 3,000km 2 Castle Minerals Limited Level 3, 10 Outram St West Perth WA 6005 ACN 116 095 802 PO BOX 437 West Perth WA 6872 Tel: +618 9322 7018 Fax: +618 9481 2335 www.castleminerals.com Email: info@castleminerals.com Registered Office 23 Altona St West Perth WA 6005 Ghana Office PO Box CT9 East Cantonments, Near NAFTI Accra, Ghana Tel: +233 21 771 889 Share Registry Enquiries Security Transfer Registrars Pty PO Box 535 Applecross WA 6953 Tel: (08) 9315 2333 Fax: (08) 9315 2233 www:securitytransfer.com.au Akoko Project JORC Code Mineral Resource estimates for Akoko North and South deposits total 2mt @ 1.6g/t gold for 102,000 ounces Infill, step out and deeper drilling proposed for Akoko North, South and West targets Akoko granite style target with soil values up to 25g/t gold proposed to be drilled Capital Structure Quoted: 58.90 million Unlisted Options: 6 million 35c 1 million 25c ASX Code: CDT Board Members Michael Ivey Chairman, MD & CEO Campbell Ansell Non Executive Director Michael Ashforth Non Executive Director Dennis Wilkins Company Secretary Castle Minerals Limited June 2009 Quarterly Report

WA PROJECT (Castle Minerals 100%) The Julie West gold vein was discovered by Castle in June 2008, exploration since then has led to a gold resource of 415,000 tonnes @ 4.2g/t gold being established for a total of 56,200 ounces. A scoping study including open pit optimisation using Whittle Four-X software captured 250,000t @ 4.9 g/t gold within an open pit to a maximum depth of 50m. The project generates a $23 million operating surplus assuming a heap leach processing route with the high grade quartz ore being crushed and stacked on site and achieving 70% recovery. The very fine and disseminated nature of the gold along laminations in the quartz vein provides encouragement that this process route may be economically feasible, certainly the crushed quartz ore should provide excellent permeability. Key assumptions and outcomes for the scoping study are presented below: $US600 shell captures 250,000 tonnes @ 4.9g/t gold Cash Cost US$285/oz (A$ 356/oz) Operating Surplus US$ 18.4M (A$23M) sale price US$ 950 per ounce Processing Cost and Admin US$16.25/tonne ore Mine supervision, haulage, rehab, grade control and Load and Haul, Drill and Blast US$12.24/tonne ore Process recovery Surface to 245m RL 80% Below 245m RL 56% Overall slope angles 60 0 Mining dilution 20% Govt. royalty 3% This development and processing scenario indicates robust cash flows and whilst highly sensitive to metallurgical recovery, a processing recovery of 20% produces a break even operating result. Detailed process metallurgical testwork is proposed to be undertaken in tandem with applications to the Ghana Minerals Commission for mining and processing approvals. $35 $30 $25 Recovery (%) versus Operating Cashflow (A$M) A$ Millions $20 $15 $10 $5 $0 85% 80% 75% 70% 65% 60% 55% 50% 45% 40% 35% 30% 25% 20% Target Recovery @ 70% generates $23M Recovery (%) Julie West gold recoveries versus operating cashflow

Isometric images of Julie West quartz vein (red) and US$600 Whittle Shell outline (gold) Three new gold veins defined Exploration drilling during the quarter confirmed the presence of three mineralised open ended quartz reefs 2km south west of the Julie West vein. Thirty six holes were drilled for a total of 2,059m testing a number of vein targets and soil anomalies. Julie West Vein 415,000 tonnes @ 4.2g/t gold (56,000 ozs) Three quartz veins (Alpha, Bravo and Charlie) have been confirmed to host high grade gold mineralisation that outcrops or commences very close to the surface. All veins are open ended and are similar in style to the Julie West vein. Down dip and strike extents remain to be tested. The new veins are interpreted to strike over a 1,200m long area before disappearing under thin soil cover. It is likely that the veins either continue under cover and/or other veins exist in the project area. ALPHA BRAVO The area is known to host numerous other veins that on preliminary evaluation appear to be of similar style and provide further valid exploration targets. N 250m CHARLIE Castle Minerals Limited WA PROJECT

Drilling the on-strike extensions to the Julie West vein intersected varying amounts of vein material; however gold mineralisation reported was of low tenor. The vein remains open along strike and drilling has yet to determine the limits of the vein. 2m/5.33 6m/2.39 ALPHA 3m/2.30 Veins under thin soil cover BRAVO Castle Minerals Limited WA PROJECT ALPHA, BRAVO & CHARLIE VEINS RC drill hole Quartz Vein trend Drill intercept m@g/t gold 2m/5.33 2m/3.97 2m/10.85 5m/5.12 5m/6.08 5m/1.33 4m/1.50 300m CHARLIE 1m/11.82 5m/3.01 Exercise of Option with Newmont Ghana In 2007 Castle signed an option agreement with Newmont Ghana Limited (NGGL) to acquire a 100% interest in the 8,200 km 2 Wa project. Castle was required to spend a minimum of US$300,000 on project expenditure within 12 months of the approval of the agreement by the Ghana Minister of Mines. Castle met the minimum work expenditure within the time provided in the agreement and during the quarter exercised its option to acquire a 100% interest in the project by meeting the expenditure commitment and issuing 600,000 options in Castle Minerals Ltd with an exercise price of $0.30 per share to NGGL. Metallurgical Testwork Metallurgical testwork was completed on Julie West oxide and primary samples. The metallurgical testwork was developed by METS and performed by Australian Metallurgical & Mineral Testing Consultants (AMMTEC) in Perth. The testwork programme was performed on five reverse circulation (RC) drilling chips. Two RC composite samples were formed from the samples supplied representing an oxide and primary sample. Head assay gold analysis was performed for each composite and the composite treated to evaluate the gold recoverable by gravity and the gold recoverable by carbon in leach (CIL) processing.

Julie West Project Testwork summary Head Assay, g/t Calculated Head Assay, g/t Gravity Recovery, % Gravity plus 24 hour leach, % Gravity plus 48 hour leach, % Element Oxide Primary 44.8 10.2 7.5 <2 49.2 6 8.11 8.04 94.7 90.7 96.4 93.3 8.3 1.7 18.2 16.2 62.7 70 69.7 71.2 This testwork indicates that the oxide ore is free milling and presents few issues, however the primary ore may have a refractory component and should be subject to more testwork. Bulk Leach Extractable (BLEG) testwork by Castle on 20 individual drill samples (oxide and primary) reported an average recovered grade of 92.3% for a 24 hour leach. Further testwork is required to establish the exact metallurgical characteristics of the primary mineralisation. New Ground Acquired An application (Jang RL) was made over a 2,000km 2 area north of Wa covering 80 strike kilometres of the Jang Fault. The Jang Fault extends north from the Julie West gold deposit and is not known to have been previously explored for gold mineralisation. It forms a highly prospective structural corridor considered capable of hosting high grade quartz vein hosted gold mineralisation. An application was also made along the western margin of the Wa project. Known as Wonachiyiri, this application covers Birimian greenstone rocks of the Wa-Lawra belt and interpreted extensions of structures associated with gold mineralisation in neighbouring Burkina Faso, including possible strike extensions of Ampella Minerals Batie West project. The Wonachiyiri RL along with the Company s Wa RL provides over 100 strike kilometres of Birimian greenstone that has very limited exploration undertaken to date. It represents a highly prospective target capable of hosting large scale gold deposits.

AKOKO PROJECT (Castle Minerals 100%) During the quarter a total JORC Code compliant Resource Estimate for the Akoko project was completed totalling 2mt @ 1.6g/t gold for 102,000 ounces. The Akoko Project is located 25km south of Tarkwa in south west Ghana in the prolific gold producing Ashanti belt. mineralisation was first discovered on this greenfields project by Castle in late 2007. Since that time Castle has undertaken five RC drill programs and defined substantial oxide gold mineralisation. Runge Limited (Perth) has completed an independent resource estimate for the Akoko South and Akoko North gold deposits and estimated a total Indicated and Inferred Mineral Resource of 102,000 ounces. The Akoko gold resources have excellent potential to be substantially increased. Potential for additional oxide mineralisation exists along strike of each deposit and testing for primary mineralisation has yet to be undertaken. Additionally a number of soil anomalies remain untested including a significant anomaly straddling a granite greenstone contact that has reported soil values up to 25 g/t gold. Akoko Project Total - Akoko North and South Deposits Indicated Inferred Total Deposit Tonnes Au Tonnes Au Tonnes Au Au t g/t t g/t t g/t ozs Akoko South 610,300 1.3 610,300 1.3 25,900 Akoko North 358,000 1.8 1,076,000 1.6 1,434,000 1.7 76,100 Total Akoko Project 358,000 1.8 1,686,300 1.5 2,044,300 1.6 102,000 The Akoko North resource is shallow and either outcrops or comes within a few metres of the surface and 80% is within 50m of surface. Castle is planning to complete further drilling on all its Akoko prospects in the September quarter. In March this year Castle completed an open pit optimisation on the Akoko North deposit with the US$800/ounce shell capturing an Indicated and Inferred Resource Estimate totalling 1.22 million tonnes @ 1.58g/t gold containing 58,000 ounces. Using a sales (revenue) price of US$950 per ounce and after allowing for an estimated toll milling fee, the optimisation generated a gross surplus of US$17 million (refer CDT ASX release of 31 March 2009). Optimised Pit Shell

CORPORATE Castle Minerals Limited is a gold exploration Company with eight projects in Ghana covering more than 9,000km 2. Castle maintains a very active in-country exploration program, aggressively exploring its gold properties with the aim of discovering and developing a world class gold deposit. Exploration activities for the September quarter will focus on; RC drilling at Akoko Project Metallurgical testwork and feasibility studies on Julie West Permitting for Julie West Castle Minerals Limited has 58.90 million fully paid shares, 6 million 35c options and 1 million 25c options on issue as at the date of lodgement of this report. Cash reserves at 30 June 2009 were $0.8 million. For further information please contact: Michael Ivey Managing Director & CEO +61(8) 9322 7018 +61(0)419 868 787 www.castleminerals.com The information in this announcement that relates to Mineral Resources is based on information compiled by Mr Paul Payne, who is a Member of The Australasian Institute of Mining and Metallurgy and is a fulltime employee of Runge Limited. Mr Payne has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting Mineral Resources. Mr Payne consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this announcement that relates to Exploration Results is based on information compiled by Michael Fowler, Castle Minerals Limited Exploration Manager, who is a Member of The Australasian Institute of Mining and Metallurgy. Michael Fowler is a permanent employee of Castle Minerals Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 JORC Code. Michael Fowler consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears. = == == == ==