CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

Similar documents
CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED

MATERIAL SPECIFICATION FOR CHAIN-LINK FENCE COMPONENTS

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

Amendment to OPSS 772 (Nov 2012) Construction Specification for Chain-Link Fence

CONSTRUCTION SPECIFICATION FOR BORROW

MATERIAL SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

CONSTRUCTION SPECIFICATION FOR GRANULAR SEALING

CONSTRUCTION SPECIFICATION FOR BORROW

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED

Construction Specification for Utility Adjustments

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

CONSTRUCTION SPECIFICATION FOR SEWAGE FORCEMAIN INSTALLATION IN OPEN CUT

MATERIAL SPECIFICATION FOR LATEX MODIFIERS FOR USE IN CONCRETE

Construction Specification for Concrete Unit Pavers

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

Special Provision No. 405F03 March 2005

SPECIFICATION FOR REINFORCED SOIL WALL

CONSTRUCTION SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR FORMWORK AND FALSEWORK

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Helical Pile/Anchor Deep Foundation MODEL SPECIFICATION

CONSTRUCTION SPECIFICATION FOR TEMPORARY TRAFFIC CONTROL DEVICES

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

Construction Specification for Concrete Bus Pad

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

Attachment A-Flagpole(s) Specifications

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

SECTION CAST-IN-PLACE CONCRETE

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

Reinforced Earth wall Construction Manual

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

SECTION CHAIN LINK FENCES AND GATES (PARK)

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

CITY OF FARGO SPECIFICATIONS SIGNING

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

SECTION A1 EXCAVATION AND BACKFILL GENERAL

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

MATERIAL SPECIFICATION FOR SODIUM CHLORIDE SOLID AND SODIUM CHLORIDE SOLUTION

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Section 401. PIPE CULVERTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

The City of Winnipeg SECTION ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5

SECTION METAL FABRICATIONS

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SECTION METAL STAIRS

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

SECTION HANGERS AND SUPPORTS FOR PLUMBING

***************************************************************************************************************

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Special Provision No. 540S01 March OPSS 540, Construction Specification for Highway Fence, is deleted and replaced with the following:

CONDUITS AND FITTINGS

of GENERAL. A. Description

SECTION ORNAMENTAL ALUMINUM FENCING

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

MATERIAL SPECIFICATION FOR CALCIUM CHLORIDE

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL AND ROCK BY HORIZONTAL DIRECTIONAL DRILLING (HDD)

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL

CHAPTER 11 CONDUITS AND FITTINGS

***************************************************************************************************************

CW 3550 Chain Link and Drift Control Fence TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

PIPE AND TUBE RAILINGS

Introduction Introduction

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

Underground Exhaust System

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Transcription:

ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS - Not Used 616.04 DESIGN AND SUBMISSION REQUIREMENTS - Not Used 616.05 MATERIALS 616.06 EQUIPMENT 616.07 CONSTRUCTION 616.08 QUALITY ASSURANCE 616.09 MEASUREMENT FOR PAYMENT 616.10 BASIS OF PAYMENT APPENDICES 616-A Commentary 616.01 SCOPE This specification covers the requirements for the installation of footings and pads required for mounting electrical equipment. 616.01.01 Specification Significance and Use This specification has been developed for use in provincial- and municipal-oriented Contracts. The administration, testing, and payment policies, procedures, and practices reflected in this specification correspond to those used by many municipalities and the Ontario Ministry of Transportation. Use of this specification or any other specification shall be according to the Contract Documents. Page 1 Rev. Date: 11/2008 OPSS 616

616.01.02 Appendices Significance and Use Appendices are not for use in provincial contracts as they are developed for municipal use, and then, only when invoked by the Owner. Appendices are developed for the Owner s use only. Inclusion of an appendix as part of the Contract Documents is solely at the discretion of the Owner. Appendices are not a mandatory part of this specification and only become part of the Contract Documents as the Owner invokes them. Invoking a particular appendix does not obligate an Owner to use all available appendices. Only invoked appendices form part of the Contract Documents. The decision to use any appendix is determined by an Owner after considering their contract requirements and their administrative, payment, and testing procedures, policies, and practices. Depending on these considerations, an Owner may not wish to invoke some or any of the available appendices. 616.02 REFERENCES When the Contract Documents indicate that provincial-oriented specifications are to be used and there is a provincial-oriented specification of the same number as those listed below, references within this specification to an OPSS shall be deemed to mean OPSS.PROV, unless use of a municipal-oriented specification is specified in the Contract Documents. When there is not a corresponding provincialoriented specification, the references below shall be considered to be to the OPSS listed, unless use of a municipal-oriented specification is specified in the Contract Documents. When the Contract Documents indicate that municipal-oriented specifications are to be used and there is a municipal-oriented specification of the same number as those listed below, references within this specification to an OPSS shall be deemed to mean OPSS.MUNI, unless use of a provincial-oriented specification is specified in the Contract Documents. When there is not a corresponding municipaloriented specification, the references below shall be considered to be the OPSS listed, unless use of a provincial-oriented specification is specified in the Contract Documents. This specification refers to the following standards, specifications, or publications: Ontario Provincial Standard Specifications, Construction OPSS 206 OPSS 501 OPSS 507 OPSS 603 OPSS 610 OPSS 904 OPSS 905 Grading Compacting Site Restoration Following Installation of Pipelines, Utilities, and Associated Structures Underground Ducts Removal of Electrical Equipment and Materials Concrete Structures Steel Reinforcement for Concrete Ontario Provincial Standard Specifications, Material OPSS 1004 OPSS 1010 OPSS 1301 OPSS 1302 OPSS 1308 OPSS.1350 OPSS 1440 Aggregates - Miscellaneous Aggregates - Base, Subbase, Select Subgrade, and Backfill Material Cementing Materials Water Joint Filler in Concrete Concrete - Materials and Production Steel Reinforcement for Concrete Page 2 Rev. Date: 11/2008 OPSS 616

Canadian Standards Association (CSA) G40.20/G40.21-04 General Requirements for Rolled or Welded Structural Quality Steel/Structural Quality Steels G164-M92 (R2003) Hot Dip Galvanizing of Irregularly Shaped Articles W59-03 Welded Steel Construction (Metal Arc Welding) ASTM International A 53/A 53M-07 A 193/A 193M-08 A 563M-07 Pipe, Steel, Black and Hot Dipped, Zinc-Coated Welded and Seamless Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service Carbon and Alloy Steel Nuts (Metric) American National Standards Institute (ANSI) B18.22.1-1965 (R2003) Plain Washers Society of Automobile Engineers (SAE) J403 Nov. 01 Chemical Composition of SAE Carbon Steels 616.05 MATERIALS 616.05.01 Concrete Concrete shall be according to OPSS 1350 with a nominal minimum 28-Day compressive strength of 30 MPa. 616.05.02 Steel Reinforcement Steel reinforcement shall be according to OPSS 1440. 616.05.03 Granular Material Granular materials shall be Granular A or B according to OPSS 1010. 616.05.04 Sand Bedding Sand bedding material shall be according to OPSS 1004. 616.05.05 Ducts and Fittings Ducts and fittings shall be according to OPSS 603. 616.05.06 Anchorage Assemblies and Hardware All steel components shall be hot dipped galvanized according to CAN/CSA G164. 616.05.06.01 Anchor Assembly Struts Anchor assembly struts shall be grade SAE 1030 steel according to SAE J403. Page 3 Rev. Date: 11/2008 OPSS 616

616.05.06.02 Studs, Nuts, and Washers Studs shall be grade SAE C1541 steel according to SAE J403, high tensile stress proof with a yield strength of 690 MPa, and a tensile strength of 860 MPa. Hex nuts shall be steel grade B steel according to ASTM A 563. Washers shall be according to ANSI B18.22.1. 616.05.06.03 Ferrules Steel ferrules shall be grade AISI C12L14 rotoprobed bar according to SAE J403. 616.05.07 Steel Footings and Hardware Steel footings and hardware shall be grade SAE 1020 steel according to SAE J403. Steel top plates and steel equipment base plate shall be according to CSA G40.20/G40.21, Grade 260WT minimum. Steel for footing shafts smaller than 150 mm in diameter shall be according to ASTM A 53. Steel for footing shafts 150 mm and larger in diameter shall be hollow structural sections according to CSA G40.20/G40.21, Grade 350 W minimum. Welding of the top plate shall be carried out according to CSA W59 minimum. Steel footings, steel equipment base plate, and mounting hardware shall be hot dip galvanized according to CSA G164. Stainless steel bolts, nuts, and flat washers shall be according to ASTM A 193. 616.05.08 H-Section Assemblies and Hardware H-section assemblies and hardware shall be grade SAE 1020 steel according to SAE J403. Steel to plate for H-section and the H-section shall be according to CSA G40.20/G40.21, Grade 260WT minimum. H-section shall be HP200x54. All welding shall be according to CSA W59 minimum. H-section anchorage assemblies and mounting hardware shall be hot dip galvanized according to CAN/CSA G164. 616.05.09 Joint Filler Expansion joint filler shall be type A or B according to OPSS 1308. 616.05.10 Grout Grout shall consist of a mixture of one part Portland cement according to OPSS 1301 and two parts mortar sand according to OPSS 1004, wetted with sufficient water to make the mixture plastic. Water shall be according to OPSS 1302. Page 4 Rev. Date: 11/2008 OPSS 616

616.05.11 Wooden Pads Wooden pads for controller cabinet shall be according to the Contract Documents. 616.06 EQUIPMENT Equipment for the installation of steel footings shall be according to the following minimum requirements: a) Boom truck complete with hydraulic take-off. b) Hydraulically operated torque head with a minimum torque rating of 16,000 N m complete with Kelly bar drive. c) Kelly bar adapter and universal driving plate. d) Torque indicator. 616.07 CONSTRUCTION 616.07.01 General General requirements for electrical work shall be as specified in the Contract Documents. 616.07.02 Removal Removals shall be according to OPSS 610. 616.07.03 Concrete Footings and Pads 616.07.03.01 General 616.07.03.01.01 Excavation Earth excavation for footings shall be carried out by the use of an auger where practical. When additional excavation is required beyond the neat limits, such excavation shall be a minimum of 300 mm width beyond the neat dimensions of the footing to accommodate granular backfill. When unsuitable material is encountered in the excavation, it shall be removed and replaced with material approved by the Contract Administrator. Rock excavation shall be according OPSS 206. 616.07.03.01.02 Steel Reinforcement Steel reinforcing steel shall be according to OPSS 905. 616.07.03.01.03 Concrete Concrete shall be placed, finished, cured, and protected according to OPSS 904. Concrete shall be sampled and tested according to OPSS 1350. Concrete in earth shall be placed directly against the undisturbed walls of the excavation or may be formed in place providing that a minimum of 300 mm width is available for placing granular backfill. The upper portion of the footing shall be formed to a minimum of 75 mm below grade level. Page 5 Rev. Date: 11/2008 OPSS 616

When concrete is placed immediately adjacent to other concrete structures or pavement, expansion joint filler shall be installed around the abutting edge of the footing. The concrete finish for footings installed in concrete barrier wall shall match the barrier wall finish. 616.07.03.01.04 Grading The Contractor shall excavate and place fill material to finished grade elevation according to OPSS 206. 616.07.03.02 Concrete Footings 616.07.03.02.01 Sleeves and Ducts Sleeves for footings shall be accurately located to suit incoming ducts or cable systems and shall be securely tied to the steel reinforcement prior to placing concrete. All sleeves or ducts shall be cut off cleanly above the footing at the height indicated in the Contract Documents. Sleeves or ducts shall be temporarily plugged or sealed until wiring is installed. Where ducts or sleeves are indicated as spare or intended for future use, the ducts or sleeves shall be plugged with plastic plugs. The location of sleeves or ducts shall be marked on the top of the concrete footing with a 50 x 50 mm cut or formed cross. 616.07.03.02.02 Anchorage Assemblies Anchorage assemblies shall be installed using studs as specified in the Contract Documents. Anchorage assemblies of the size and type indicated in the Contract Documents shall be accurately positioned in the pole and sign footings. The alignment of the studs shall be parallel to the edge of the driving lane. Anchorage assemblies shall be securely tied to steel reinforcement. Studs shall be factory inserted in the ferrules and held in place with a pre-applied thread locking compound. A wooden template shall be provided. Nuts and washers shall be installed hand tight by the fabricator. Studs shall have the exposed threads above the ferrule coated with factory applied white lithium grease. The integrity of the compound shall be maintained throughout the installation and no attempt shall be made to remove or adjust the studs under normal circumstances. The anchorage assembly shall be installed and adjusted level in all directions on the wooden template using a carpenter's level. Upon initial concrete set, the wooden template shall be removed and the drainage channels and other surface features shall be completed. Where the removal of the studs for repair or replacement purposes is required, the ferrules and the studs shall be cleaned to remove the old thread locking compound. New thread locking compound shall be applied to the insertion length of the studs prior to tightening to full depth. 616.07.03.02.03 H-Section Assemblies H-section for barrier walls shall be accurately positioned in the concrete footings under the concrete barrier. The alignment of the studs shall be parallel to the edge of the driving lane. The plumb position of the anchorage assemblies shall be maintained during the placing of the concrete. Page 6 Rev. Date: 11/2008 OPSS 616

616.07.03.02.04 Concrete Concrete pole footings shall be placed so that the top of the footing is within ± 25 mm of the elevation specified in the Contract Documents. 616.07.03.02.05 Granular Backfill When granular backfill is specified in the Contract Documents or, when granular backfill is placed around footings, it shall be compacted according to OPSS 501. 616.07.03.02.06 Concrete Footings in Earth Concrete footings in earth are to be placed in locations specified in the Contract Documents. 616.07.03.02.07 Concrete Footings in Rock The work for concrete footings in rock shall include placing dowels and concrete. Concrete footings in rock are to be placed at locations specified in the Contract Documents. 616.07.03.02.07.01 Dowels in Rock When specified in the Contract Documents, steel dowel bars shall be installed. Dowel bars shall be grouted in holes drilled into rock using non-shrink grout. 616.07.03.03 Concrete Pads Concrete pads shall be placed at locations specified in the Contract Documents. 616.07.03.03.01 Granular Bases Granular material shall be placed as foundation for concrete pads. Granular material shall be placed in conjunction with the installation of ducts under the concrete pads. The granular base shall be compacted according to OPSS 501. 616.07.03.03.02 Sleeves and Ducts Sleeves and ducts shall be located within the concrete pads as specified in the Contract Documents so that cables may be installed vertically to the cable terminations in the pad mounted equipment. Ducts shall be installed below pads according to OPSS 603 and shall be suitably aligned for connection to exterior duct or cable systems. 616.07.04 Steel Footings 616.07.04.01 Installation The Contractor shall install steel footings larger than 150 mm diameter using the equipment as outlined in the Equipment section. Alternate methods of applying torque are permitted for 150 mm diameter or smaller steel footings. During installation, the steel footing shall be maintained in a plumb position by use of a carpenter's level or a survey instrument. In all cases, the steel footing shall be installed such that the final location of the top plate rests on or is slightly below final grade. Steel footings to be used for poles shall be oriented such that the top plate is either perpendicular to or parallel to the edge of pavement as required by duct orientation. Steel footings for other equipment mounting shall be oriented to suit the equipment to be mounted. Page 7 Rev. Date: 11/2008 OPSS 616

Steel footings shall be installed by turning the units into the earth in the locations indicated in the Contract Documents. Torque on footings larger than 150 mm in diameter shall be monitored and recorded during the turning operation and shall show a consistent and gradually increasing torque as the footing advances in depth. Where difficulties are encountered installing the steel footing due to the presence of boulders or rock fragments; or where the torque required to install the footing exceeds 20,000 N m; or where the torque is less than 5,000 N m when the shaft is fully driven into the ground, the footing shall be withdrawn and relocated 1.0 m minimum away from the original position, as approved by the Contract Administrator. If turning of the footing proves impractical, a pilot hole of 150 mm diameter may be predrilled and the footings then turned into the pilot hole. If this method proves impractical, a hole of 300 mm maximum diameter may be augured and the footing then installed into the hole. Compacted limestone screenings or expandable foam backfill shall be placed around the shaft to the bottom of the wiring aperture. Backfill of native material shall be placed above this level and compacted according to OPSS 501. If the steel footings cannot be installed due to local conditions, a concrete footing shall be installed. 616.07.04.02 Mounting Hardware and Steel Equipment Base Plate The mounting hardware and steel equipment base plate shall be installed as indicated in the Contract Documents. 616.07.05 Wooden Pads 616.07.05.01 Installation Wooden pads for controller cabinets are to be fabricated and placed at locations specified in the Contract Documents. 616.07.05.02 Granular Bases A granular base shall be installed as a foundation for wooden pads. Granular material shall be placed in conjunction with the installation of ducts under the wooden pads. The granular base shall be compacted according to OPSS 501. 616.07.05.03 Sleeves and Ducts Sleeves in wooden pads shall be located such that cables may be installed vertically to the cable terminations in the pad mounted equipment. Ducts shall be installed below pads according to OPSS 603 and shall be suitably aligned for connection to exterior duct or cable systems. 616.07.06 Quality Control 616.07.06.01 Pre-Installation Testing and Inspection Anchorage assemblies, studs or bolts, and connection components shall be inspected prior to installation to ensure that they are in accordance to the Contract Documents. 616.07.06.02 Proof of Performance Testing and Inspection The work shall be inspected to ensure that it is in accordance to the Contract Documents. The work shall be inspected to ensure that all components are installed and that all footings and pads, including anchorage assemblies, are properly oriented and in working order. Page 8 Rev. Date: 11/2008 OPSS 616

616.07.07 Temporary Electrical Work The work for temporary electrical installations shall be the same as for permanent installations of the same type of work, except the work shall include the removal of the installations when they are no longer required. 616.07.08 Site Restoration Site restoration shall be according to OPSS 507. 616.07.09 Management of Excess Material Management of excess material shall be as specified in the Contract Documents. 616.08 QUALITY ASSURANCE The Owner may perform tests for concrete according to OPSS 1350. The Owner may perform tests for compaction according to OPSS 501. The Owner may inspect each pole footing as specified in the Contract Documents. 616.09 MEASUREMENT FOR PAYMENT 616.09.01 Actual Measurement 616.09.01.01 Concrete Footings in Earth For measurement purposes, a count shall be made of the number of concrete footings installed in earth. 616.09.01.02 Concrete Footings in Rock For measurement purposes, a count shall be made of the number of concrete footings installed in rock. 616.09.01.03 Concrete Pads For measurement purposes, a count shall be made of the number of concrete pads installed. 616.09.01.04 Steel Footings For measurement purposes, a count shall be made of the number of steel footings installed. 616.09.01.05 Wooden Pads For measurement purposes, a count shall be made of the number of wooden pads installed. 616.09.02 Plan Quantity Measurement When measurement is by Plan Quantity, such measurement shall be based on the units shown in the clauses under Actual Measurement. Page 9 Rev. Date: 11/2008 OPSS 616

616.10 BASIS OF PAYMENT 616.10.01 Concrete Footings in Earth - Item Concrete Footings in Rock - Item Concrete Pads - Item Steel Footings - Item Wooden Pads - Item Payment at the Contract price for the above tender items shall be full compensation for all labour, Equipment, and Materials to do the work. When a specified steel footing cannot be placed due to local conditions and a concrete footing is installed in its place, such work shall be paid as Extra Work. 616.10.02 Concrete Footings in Earth (Temporary) - Item Concrete Footings in Rock (Temporary) - Item Concrete Pads (Temporary) - Item Steel Footings (Temporary) - Item Wooden Pads (Temporary) - Item Payment at the Contract price for the above tender items shall be full compensation for all labour, Equipment, and Materials to do the work. Progress payment for the above tender items shall be based on the following percentages of the Contract price: 80% for supply and installation 20% for removal Page 10 Rev. Date: 11/2008 OPSS 616

Appendix 616-A, November 2008 FOR USE WHILE DESIGNING MUNICIPAL CONTRACTS Note: This is a non-mandatory Commentary Appendix intended to provide information to a designer, during the design stage of a contract, on the use of the OPS specification in a municipal contract. This appendix does not form part of the standard specification. Actions and considerations discussed in this appendix are for information purposes only and do not supersede an Owner s design decisions and methodology. Designer Action/Considerations The designer should specify the following in the Contract Documents: - Wooden pad requirements. (616.05.11) - Cut-off grade for sleeves and ducts. (616.03.02.01) - Size and type of anchorage assemblies. (616.07.03.02.02) - Top of concrete pole footing elevation. (616.07.03.02.04) - Concrete footing in rock locations. (616.07.03.02.07) - Concrete pad locations. (616.07.03.03) - Steel footing locations. (616.07.04.01) - Wooden pad locations. (616.07.05.01) The designer should ensure that the General Conditions of Contract and the 100 Series General Specifications are included in the Contract Documents. Related Ontario Provincial Standard Drawings OPSD 2200.01 OPSD 2200.02 OPSD 2200.03 OPSD 2200.04 OPSD 2200.070 OPSD 2200.080 OPSD 2201.010 OPSD 2201.02 OPSD 2202.01 OPSD 2203.01 OPSD 2203.03 OPSD 2210.01 OPSD 2210.020 OPSD 2215.02 OPSD 2215.03 OPSD 2216.010 OPSD 2514.02 Concrete Footing for Base Mounted Lighting and Signal Poles Concrete Foundation for Direct Buried Lighting Poles where Rock is Encountered Concrete Foundation for Base Mounted Lighting Poles where Rock is Encountered Concrete Footing and Anchorage Assembly for 3.3m Base Mounted Metal Pole Pole Footing in Earth for Cast-in-Place Concrete Barrier Pole Footing in Rock for Cast-in-Place Concrete Barrier Steel Footing for Base Mounted Poles, 220mm Dia x 2300mm Length Steel Footing for Electrical Equipment 85mm Dia x 1830mm Length Installation for Steel Footing Mounting Hardware for Steel Footings Steel Equipment Base Plate for Controller Cabinet Local Grading at Pole Foundations Installation of Direct Buried Poles in Slopes Anchorage Assembly Pole Mounting Details for Base Mounted Metal Pole Anchorage Assembly for Pole Footing in Concrete Barrier Concrete Pad for Controller Cabinet Page 11 Rev. Date: 11/2008 OPSS 616