MECHANICAL DESIGN AND ENGINEERING OF THE 3.9 GHZ, 3 RD HARMONIC SRF SYSTEM AT FERMILAB

Similar documents
9. VACUUM TANK 9. VACUUM TANK

Design Progress and Analysis for ITER Thermal Shield

ASME B31.3 Process Piping

Status of XFEL Module Assembly at Saclay

ZIRCALOY WELDING IN OPAL REACTOR REFLECTOR VESSEL

Certification, Testing, Approval and R&D work on the Absorber Safety

GA A22499 TESTING OF A CRYOGENIC HEAT TRANSFER JOINT FOR OMEGA

SECTION HANGERS AND SUPPORTS FOR PLUMBING

Brazed aluminium heat exchangers (BAHXs), also referred to

The FRIB Project At MSU

INTRODUCTION TO WELDED METAL

Design for welding: Design recommendations

GTT Pluto II Subsea Cryogenic Pipeline

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Overview on Magnetic Field Management and Shielding in High Q Modules. Genfa Wu SRF 2015 September 17th, 2015

Roll Bonding or Roll Welding

Pneumatic Mortar Development for the NASA/Orion Capsule Drogue Parachute System

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

Bonded Neo Magnetization Guide

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

HDICE In Beam Cryostat Project

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PIPING SPECIALTIES (PLUMBING) A. American Society for Testing and Materials (ASTM):

Stainless Steel Aeration Equipment Specification

Joining. 10. Tool Design for Joining. Joining. Joining. Physical Joining. Physical Joining

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

MANUFACTURING PROCESSES

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Bulk Deformation Processes

CNC PROFILING PLATE ROLLING SUBMERGED ARC WELDING

Low-Cost Bioreactor to Enable Microbe Productivity Optimization

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS

Technical Specification

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S


COMPOSITE LANDING GEAR COMPONENTS FOR AEROSPACE APPLICATIONS

PULSED LASER WELDING

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

Materials & Processes in Manufacturing

RESISTANCE WELDING MANUAL

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

Connecting Coolers to Superconducting Magnets with a Thermal-Siphon Cooling Loop

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

Resistance Welding. Resistance Welding (RW)

Section 906. STRUCTURAL STEEL

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION

Sensitivity of Nb 3 Sn Rutherford-type cables to transverse pressure

Material for European XFEL Cavity Production

Metal Bellows INNOVATIVE COMPONENT AND ASSEMBLY SOLUTIONS FOR HYDRAULIC, PNEUMATIC, FUEL AND COOLING SYSTEMS

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping

Interior Hangers. Application

ISO 9001:2008 certified

Diaphragm seal with flange connection Cell-type with extended diaphragm Model

Blanket Information Day Barcelona - 19 th May 2010

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

Welding Processes. Consumable Electrode. Non-Consumable Electrode. High Energy Beam. Fusion Welding Processes. SMAW Shielded Metal Arc Welding

Extended-Frequency SMA Connectors

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

INVAR M93 PIPES AND TUBES FOR LNG TRANSFER LINES WELDING PROCESSES. Stainless & Nickel Alloys

Optimization of Laboratory and Utility Scale sco2 Microchannel Heat Exchangers Vacuum Process Engineering, Inc.

Details of technical leaflets/write-up on various pieces of equipment.

Industrial machinery and heavy equipment. With Siemens PLM Software solution, Calder saves time and money

SECTION STEEL DECKING

European Experience In Transport / Storage Cask for Vitrified Residues

INDIAN REGISTER OF SHIPPING CLASSIFICATION NOTES. Type Approval of Mechanical Joints used in Piping

Y, XY, XYZ and Sample Manipulators. MultiCentre Sample Handling Systems. MultiCentre XYZ Stages

New Developments at the XMaS Beamline For Magnetic and High Resolution Diffraction

STATUS OF THE MECHANICS. G. C. and M. Savrié on behalf of the CGEM-mechanics group

Target Inline Flowmeter

ITER Organization. Françoise Flament. Head of Procurement Arrangements & Contracts Division. Journée ITER/CEA 01/12/2010. Page 1

MANUFACTURE AND REPAIR OF AERO ENGINE COMPONENTS USING LASER TECHNOLOGY (INVITED PAPER) Paper (405)

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Diffused Aeration Piping Equipment

Module 4 Design for Assembly

SIZE REDUCTION TECHNOLOGY

Techniques for Detection of Surface Defects in Tubing and Pipe

WELDING Topic and Contents Hours Marks

Effect of Spray Quenching Rate on Distortion and Residual Stresses during Induction Hardening of a Full-Float Truck Axle

INDUCTION FOR CARS OVERVIEW OF APPLIED AUTOMOTIVE APPLICATIONS AXLE SHAFTS GEAR BOX ELEMENTS WHEEL BOLTS BRAKE FLUID CONVEYANCE PIPES

Flexible Printed Circuits Design Guide

Orbital Systems Tube Welding Made Easy

Orbital Systems. Tube Welding Made Easy. Sanitary, Ultra High-Purity and High-Pressure Welds FEATURES AT A GLANCE

RTM ACCESSORIES. MOLD SEALS ( Packing : 25LM Rolls ) Standard Dynamic Seal White. Medium Dynamic Seal Blue. Primary seal for Hollow Dynamic Seal

CONVEYOR PULLEY DESIGN Allan Lill

NUCLEAR. Nuclear Reactor Pressure Vessel Seals

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

forging machining assembly

Introduction. 1. Outline of fan case ring

DOUBLE WALLED PIPING SYSTEMS

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

Electrical Resistance Monitoring

ITER TOKAMAK VACUUM VESSEL THERMAL SHIELD ADDITIONAL NEUTRAL SHIELDING

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

With the recent proliferation of its use in

Servo electric bending technology by Prima Power. The Bend The Combi The Laser The Punch The System The Software

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Air Duct Metal Products

Aluminum Filler Metals

Transcription:

MECHANICAL DESIGN AND ENGINEERING OF THE 3.9 GHZ, 3 RD HARMONIC SRF SYSTEM AT FERMILAB D. Mitchell, M. Foley, T. Khabiboulline, N. Solyak, FNAL, Batavia, IL 60510, USA Abstract The mechanical development of the 3.9 GHz, 3rd Harmonic SRF System is summarized to include: the development of a full scale copper prototype cavity structure; the design of the niobium 3 cell and niobium 9 cell structures; the design of the helium vessel and cryostat; the HOM coupler design; and a preliminary look at the main coupler design. The manufacturing processes for forming, rolling, and e-beam welding the HOM coupler, cavity cells, and end tubes are also described. Due to the exotic materials and manufacturing processes used in this type of device, a cost estimate for the material and fabrication is provided. The 3rd harmonic design is organized via a web-based data management approach. WEB BASED DATA MANAGEMENT Throughout the entire design and engineering process, the project data is organized and tracked within Microsoft Excel and can be viewed via the internet [1]. The constantly current and easily viewed design intent is shared and discussed between collaborators from around the world. Within this database are CGM, JPEG, ASCII, PDF, DOC and VRML files as well as complete bill of materials for all assemblies. Material cost quotations, FEA reports, and general layouts are also viewable. Fig. 2). The shapes were accurately measured and compared to the theoretical profile. Small changes in the die were made and with an additional stamping and coining process, the final cell shape was a near perfect match to the theoretical profile. Brazing Figure 2: Cell die. After forming, the cells are machined and intentionally left 0.64mm longer than theoretical so that individual cell tuning can be achieved. Once the cells are tuned, two cells are mated together using a 65% copper, 35% silver slurry braze to form a dumbbell (see Fig. 3). Figure 3: Brazed, copper dumbbells. Figure 1: Internet based MS Excel database. COPPER CAVITY PROTOTYPE To verify the design parameters and to reduce costs, a nine cell, adjustable, copper cavity prototype was fabricated and tested [2]. Cell Forming Cells were fabricated from 2.8mm thick, oxygen-free, copper disks using a stamping and coining process (see HOM Prototype The HOM (Higher Order Mode) Coupler prototype is designed to be adjustable so that sufficient testing can be preformed to accurately define the position of the internal antenna and formteil (see Fig. 4). The tuning disk is fabricated from annealed copper and is adjustable to permit varying the capacitance gap (see Fig. 5). Once the operating parameters are defined by the copper model study, the niobium design is set and fabricated. Although seemingly rigid, the niobium HOM body and antenna are

designed to allow for a small adjustment to tune the capacitance. Figure 4: HOM Couplers without tuning disks. Figure 7: Copper cavity during testing. NIOBIUM RF CAVITIES The design of the niobium cavity is greatly simplified by eliminating the rotation and alignment capabilities. By studying the copper model, the operating parameters are determined and implemented in the niobium design. Although simplified in design, there are complications that arise when working with niobium and e-beam (electron-beam) welding. Figure 5: Section view of HOM Coupler. Adjustable Prototype Similar to the HOM Coupler prototype, the copper cavity assembly is designed to allow for end tube rotation. The position of the HOM couplers relative to each other (one at each end) are defined by realistic field measurements rather than determined only by analysis. The end-tubes are tightly connected to the brazed, copper, nine-cell cavity with clamps to allow for rotation and yet still provide a good RF connection (see Fig. 6). 3 Cell RF Cavity To verify that the niobium cavity design will perform as expected at cryogenic temperatures, a three-cell cavity was built (see Fig. 8). The cavity must be chemically etched and then tested in a vertical test apparatus. The fixture to mount and test this three-cell cavity was not complete at the time of this publication (see Fig. 9). Figure 8: Niobium 3-cell cavity. Figure 6: Copper cavity prototype. Cell Testing Frequency and capacitance measurements are collected as the cavity assembly is manipulated in the following manner: HOM Couplers and end-tubes are rotated. Tuning disk position in HOM Coupler is varied. HOM Coupler antenna gap is varied. HOM Coupler formteil tip is varied in length. RF cells are squeezed (see Fig. 7). Figure 9: Niobium 3-cell test fixture.

9 Cell RF Cavity The design of the nine-cell cavity is near completion. However, the design may go through another iteration based upon the results of the copper cavity model testing. Finite element analyses helped to optimize the shape of the niobium-titanium end flanges. The e-beam welding procedure is critical to insure strong joints that are vacuum tight and resistant to problems associated with chemical acid etching. Due to welding parameters, a detailed e-beam welding plan was developed to insure a proper and sequential fabrication order (see Fig. 10). process. End-tube distortion during the welding process is a major concern. Figure 12: Niobium HOM body with formteil. Figure 10: E-beam welding angles. The RF cavity cells and end-tubes are niobium while the end-cell conical flanges and standard flanges are niobium-titanium (Nb-Ti). The outer helium vessel is fabricated from titanium. The Nb-Ti parts are used as a transition for welding from niobium to Nb-Ti to titanium. Niobium is far too expensive to be used for the entire cavity and vessel assembly. Also, niobium cannot be welded directly to 316L stainless steel, hence the use of titanium and Nb-Ti (see Fig. 11). Figure 13: Nb HOM coupler and end-tube. The HOM coupler serves two purposes. The tuning disk gap can be varied to tune for a rejection frequency of 3.9 GHz while the HOM antenna adjusts the coupling of the higher frequency modes. Due to manufacturing tolerances, this gap must be adjustable. By mounting the antenna on a slightly flexible metal diaphragm, the gap can be measured and then set with the use of shims and a locking clamp (see Fig. 14). The gap is only adjustable in one direction so the initial gap is deliberately set to 1.3mm and is then adjusted accordingly to 0.8mm with the shims. Figure 11: Niobium RF cavity structure. Niobium HOM Coupler An effort was made to simplify the construction of the HOM coupler body by machining the HOM coupler body from one piece of niobium. The formed insert (formteil) inside of the HOM body is machined as a solid part and is e-beam welded into the HOM body (see Fig. 12). This welded assembly is then e-beam welded into the niobium end-tube (see Fig. 13). Testing of this concept is in Figure 14: HOM coupler with adjustable antenna.

The capacitance can be measured and altered by removing the locking clamp, resizing the shims, and reassembling. This simple design permits adjustment without compromising the vacuum seal or the interior cleanliness (see Fig. 15). unique vessel weldments, the individual vessel components are the same regardless of the configuration used. In fact, most of the vessel weldment can be fabricated prior to final welding which helps expedite the fabrication of a spare vessel assembly. To reduce costs, four spare units are not needed. However, a penalty is paid due to the time needed to complete the fabrication of a new vessel. A titanium bellows is used at the center of the vessel to allow for expansion and contraction while tuning the cavity with a DESY style bladetuner (see Fig. 17). A large flange is located on each half of the vessel for mounting the bladetuner. Each flange also has two welded lugs used for mounting and aligning the vessel into the coldmass (see Fig. 18). Figure 15: HOM coupler external view. SRF COLDMASS SYSTEM In order to develop the individual RF components, the overall system parameters were needed. These working parameters were identified early on in the development process with the general space parameters driven by the scientists at DESY. After applying realistic engineering and manufacturing constraints, a final coldmass design has been established (see Fig. 16). Figure 17: DESY style Bladetuner. Helium Vessel Figure 16: 3 rd harmonic layout at DESY. A titanium vessel surrounds the SRF cavity structure. Titanium was selected for the vessel shell for its ability to be welded to the Nb-Ti conical end flanges found at each end of the SRF cavity. The vessel has a helium supply port for two phase helium flow. The liquid helium temperature surrounding the SRF cavity is 1.8K. Although there is only one SRF cavity design, due to the mounting locations of the main couplers, the helium vessel must have four different designs. Even with four Material Costs Figure 18: Helium vessel assembly. Material to produce seven helium vessels, as shown in figure 17, has been purchased at an approximate cost of $40,000US. This price does not include the niobium to produce the mid-cells and end-cells. Currently, $200US per pound to procure niobium (RRR 300) sheet used to fabricate these cells is a good estimate. As with most projects, the material is inexpensive compared to the cost of fabrication. As an example, the e-beam welding of the 9-cell cavity shown in figure 11 is estimated at $21,000US and that does not include any machining

costs! E-beam welding for this project has been priced at $200US per hour. Also, welding fixtures alone can cost in the range of $10,000US - $12,000US; a hidden cost sometimes forgotten. Coldmass A 300mm diameter stainless steel pipe is used as a mounting point for the four helium vessel assemblies, the cryogenic plumbing, and the heat shields. The support pipe also houses the return cryogenic pipes. The basic coldmass components have been established to insure that the design of the individual helium vessels is compatible with the overall design. More work is needed to complete the coldmass assembly design. Because this system will be installed in Germany, great attention is given to the interface between this system and the connecting cryostats at DESY (see Fig. 19). CRYOSTAT ASSEMBLY A DESY style cryostat is being designed to ease the interconnection between the two systems. Due to the short length of this cryostat, ~2m, the design will rely upon the adjacent cryostats providing the cryogenic fluids needed for cool-down. The support structure for the coldmass and the cryostat will be as close to the DESY design as possible for practical reasons. One notable difference in this system design is the placement of the main couplers. At DESY, all main couplers are positioned on only one side of the beamline. However, in this design, there is not enough room to mount the main couplers on only one side. Therefore, the main couplers alternate from one side of the cryostat to the other. This actually provides a more balanced SRF design and works well for our geometry and available space (see Fig 21). The main coupler ports are also positioned 2.5mm higher than their mounting point on the helium vessels. This is very intentional so that the main coupler and the helium vessel will be aligned at cooldown. Figure 19: Cryostat/Coldmass cross-section. A long invar rod is used to minimize the thermal contraction between each vessel. One of the center vessels is locked into position while the remaining three vessels are free to shift longitudinally during cool-down. The helium supply piping is fabricated from 316L stainless steel and connects into the titanium helium vessels through a standard conflat flange (see Fig. 20). This was done to reduce the material costs associated with procuring titanium bellows. Figure 21: Cryostat with partial coldmass. MAIN COUPLER ASSEMBLY The physics behind the main coupler are well understood [2]. However, the design is in transition from an adjustable antenna to a fixed antenna (see Fig. 22). Figure 22: Main Coupler preliminary, stationary design. Figure 20: Partial coldmass. REFERENCES [1] http://www-td.fnal.gov/lc/sc/lc.html. [2] N. Solyak, Development of the 3RD Harmonic Cavity at FNAL. Status and First Results, SRF Workshop 2003.