Landfill Gas (LFG) Clean Development Mechanism (CDM) Projects in China Case Study: Tianjin. Washington International Renewable Energy Conference

Similar documents
Key Planning Factors for Waste Sector in Developing Countries

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

China Emission Trading Scheme : Policies and Challenges

Workshop Management Office: Fairlink Exhibition Services Ltd.

Strategy for Archival Management in the Digital Age

China s Electric Power Industry and Its Trends

The Austrian JI/CDM Programme

Clean Development Mechanism (CDM)

Energy Consumption, CO 2 Emissions of Urban Residential Buildings in China and Their Modelling

Clean Development Mechanism

Method for Calculating CO 2 Emissions from the Power Sector at the Provincial Level in China

Low Carbon City Initiatives in the People s Republic of China (PRC)

Small-Scale CDM & Bundling: Criteria, Advantages & Status

Clean Development Mechanism & Carbon Market

200 Chinese universities under the light of the Shanghai ranking

Sustainable Energy Development Coal Mine Methane in China

An update on the transport infrastructure development in China: Railway transportation (2010)

Emissions Trading in China Progress on the Path towards a Unified National System

China Renewable Energy and Sustainable Development Report 1

EMAN- Sustainable Supply Chains Finland The role of risk related to carbon finance in CDM projects

Suzhou Qizi Mountain Landfill Gas Recovery Project 17/06/2010 Gold Standard China Suzhou Qizi Mountain Landfill Gas Recovery Project Profile

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations

Clean Development Mechanism (CDM) Registration for the Gianyar Waste Recovery Project

Validation Report. Datang Zhangzhou Wind Power Co., Ltd. VALIDATION OF THE CDM-PROJECT: Fujian Zhangpu Liuao 45MW Wind Power Project.

CDM projects development activities in India. Vivek Kumar TERI 26 July 2005

Energy and Pollution Efficiencies of Regions in China

Climate Change Mitigation through the Carbon Finance Support Facility (CFSF) in the Philippines

Shanghai Environment & Energy Exchange and Shanghai ETS Pilot. SEEE Co. Ltd Sept 27th, 2012

CDM Experience: QUEZON CITY (PAYATAS) Controlled Disposal Facilities

Introduction to Climate Change & CDM

Analysis of air quality trends in 2017

Supplement of Inventory of anthropogenic methane emissions in mainland China from 1980 to 2010

The Development of Smallholder Inclusive Business Models in China. Prepared by Gu Rui AII/CAAS December,2015. Hanoi

China s Energy Management System Program for Industry

China. Key Industrial Parks. in the Yangtze River Delta

districtcooling2016 A Climate Solution CLEAN DEVELOPMENT MECHANISM (CDM) in DISTRICT COOLING Environmental Finance

China s new growth? March 2014

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

Polyamide & Intermediates

China Distribution & Trading Issue 45 August 2007

The Voluntary Carbon Market: Status & Potential to Advance Sustainable Energy Activities

Population Exposure to Ambient PM 2.5 Pollution in China. 4 Results. 4.1 Overall pattern

Development and Implementation of Energy Efficiency Resource Standards in China and Australia

Fact Sheet: Demand under the Ban China Ivory Consumption Research

Report No: QT-CDM /11

Validation Report VALIDATION OF THE CDM-PROJECT: SHABA 30MW HYDRO POWER PROJECT IN GUIZ- HOU PROVINCE CHINA REPORT NO

Carbon Resource Management Ltd. IN CHINA. 2008, October May 0624

Introduction to the Clean Development Mechanism

National Strategy for Incorporation of the Republic of Serbia into Clean Development Mechanism. -Waste Management, Agriculture and Forestry Sector -

Climate Change Policy Target Setting and Implementation Process in Japan and China

Over Expectations of Emission Reductions from Landfill Gas Recovery Projects

1. Progress on Energy Efficiency and Pollution. 2. EV Development in China. 3. China s approach to Green and Low Carbon

Bulgarian JI Guidelines. 2006, September

WORLD BANK CARBON FINANCE UNIT 2011 ANNUAL MEETING CPF TRANCHE I PIPELINE CARBON PARTNERSHIP FACILITY 1

The First Year of China s Twelfth Five Year Plan: Success or Failure for Climate Change Efforts?

Thermo-Printer Export to China Guidlines Report. Sample ETCN

Announcements. Homework 8 - due today Midterm Paper 2 - due Tuesday, Nov. 20

2013Q3 Bamboo Floor Produced by IAR Team Focus Technology Co., Ltd.

Clean Development Mechanism(CDM) The Basics. Atul Raturi

The World Bank s Carbon Finance Business Options for Thailand. September 29, 2004

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

Deepening Reform in China s Economy, Breakthrough in Aquaculture Farming Science/Technology and Outlook on Future Fishmeal Consumption

Keywords: CDM (Clean Development Mechanism) case analysis, city wastes, generation-by-waste-incineration, GHG, mitigation cost

Memorandum of Understanding on cooperation regarding Clean Development Mechanism project activites and climate policy issues.

Research on the Ability of Regional Industrial Sustainable Development

Global Warming and CDM Implementation in Thailand

VALIDATION REPORT. Liaoning Changtu Quantou Wind Power Project in China. REPORT NO REVISION NO. 03 Deleted: 2

Energy-saving Potential Study on Telecommunication Base Station Free Cooling With a Thermosyphon Heat Exchanger in China

CDM project review - technology and regulation aspects

Investment Opportunities in the Carbon Sector. Michiel Tijmensen - Risk Manager December

China National Renewable Energy Centre

American Carbon Registry

Towngas China (1083.hk) 2016 Final Results Presentation

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Carbon Finance Opportunities for Africa. Maputo, 11 June 2009 Dr Charlotte Streck

Emissions trading in China: Progress and prospects*

Environmental Impacts and Benefits of Regional Power. Grid Interconnections for China

Feasibility Study United Nations Asian and Pacific Centre for Agricultural Engineering and Machinery (UNAPCAEM)

Your reference/letter of Our reference/name Tel. extension/ Fax extension Date/Document Page

CLEAN DEVELOPMENT MECHANISM IN CHINA

CHINESE AQUACULTURE: A COMPARATIVE ANALYSIS OF THE COMPETITIVENESS OF REGIONAL AQUACULTURE INDUSTRIES

Climate Financing CDM and NAMA in Rwanda

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

Dimerco Express Group Overview

APEC Low Carbon Model Town Project China Development Report

Overview of the CDM in the agriculture sector

IMPACTS OF CLIMATE CHANGE AND GRAIN SECURITY IN CHINA

VALIDATION REPORT HUANENG NEW ENERGY INDUSTRIAL CO. LTD. VALIDATION OF GUANGDONG NAN AO MW WIND FARM PROJECT

Zafarana Wind Power Plants AS CDM Projects. Eng. Rafik Youssef Georgy Consultant, NREA

4. The Clean Development Mechanism for Biomass projects in Asia

BASF our experience in China. Joerg Wuttke, BASF China April 2005

Overview of CDM Documentation and Procedures

Working Paper Summary

Type of the Seminar. Types Category language Sector

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

J-Credit Scheme. August 2017

Current Nippon Express and Our Management Plan. President and Chief Executive Officer Masanori Kawai March 2008

CHINA TUNGSTEN MARKET UPDATE

The Status of Distributed Generation in China

Transcription:

Landfill Gas (LFG) Clean Development Mechanism (CDM) Projects in China Case Study: Tianjin Washington International Renewable Energy Conference March 4, 2008

Presentation Topics Global Warming - Greenhouse gas Methane - Kyoto Protocol - Clean Development Mechanism (CDM) Case Study: Tianjin Shuangkou landfill

Greenhouse Gases (GHGs) - Methane 23% GHGs from non-co 2 emissions - Human related activities 15% of GHGs from methane - Global warming potential: 21 times CO 2 Landfills: 4 th largest contributor to non-co 2 GHGs

Kyoto Protocol GHG emissions control through 2012 by Annex 1 countries (industrialized) Clean Development Mechanism (CDM) allows Annex 1 countries to buy emission reductions in developing countries

CDM Project Development Stages Project Idea Note (PIN) Letter of Intent (LoI) Project Design Document (PDD) Validation Emission Reduction Purchase Agreement (ERPA) Registration

CDM Projects Registered projects: 948-74 LFG projects, registered (7.1%) China - Registered: 8 - Requesting Registration: 2 - Validation: 12

Registered - CDM Projects (LFG), China Project Name Province tco 2 e / yr REGISTERED Nanjing Tianjingwa LFG to Electricity Project Jiangsu 246,107 Meizhou LFG Recovery and Utilization as Energy Guandong 286,525 Anding LFG Management and Utilisation Project Beijing 75,557 Wuxi Taohashan LFG to Electricity Jiangsu 75,343 Shenzhen Xiaping LFG Collection and Utilization Project Guangdong 471,619 Jinan LFG to Energy Project Shandong 112,908 Guangzhou Xingfeng LFG Recovery / Electricity Generation CDM Project Guandong 909,857 Jiaozishan Landfill Gas Recovery and Utilization Project Jiangsu 153,244 REQUESTING REGISTRATION Tianjin Shuangkou LFG Recovery / Electricity Generation Tianjin 130,444 Nanning LFG to Energy Project Guangxi 188,195

Seeking Validation - CDM Projects (LFG), China Project Name Province tco 2 e / yr Kunming-Wuhua LFG to Energy Project Yunnan 142,909 Nanchang Maiyuan LFG Extraction and Power Project Jiangxi 193,500 Fuzhou Hongmiaoling LFG to Electricity Project Fujian 144,325 LFG Extraction Shenyang Laohuchong MSW Landfill, NE China Liaoning 124,106 Xuzhou LFG Utilisation Project Jiangsu 215,908 Huai an Wang Yuan LFG Utilisation Project Jiangsu 190,016 Kuming Guandu Landfill Site LFG, CDM Project Yunnan 62,891 Shenyang Daxin LFG to Electricity Project Liaoning 163,203 Hunan Changsha Qiaoyi LFG Recovery / Electricity Gen Project Hunan 238,319 Mianyang LFG Utilisation Project Sichuan 167,387 Suzhou LFG Utilisation Project Anhui 315,804 Xiamen Dongfu LFG to Energy Project Fujian 101,736

China / Tianjin

Case Study - Tianjin Shuangkou Landfill Construction: 1999 - Finance: World Bank loan Operations: 2001 Waste receipts: 1,300 tons per day - In-place Waste: 2.0 million tons (Dec 2006) Disposal capacity (future): 5.4 million tons Site life remaining: 14 years

Tianjin Shuangkou Landfill

Tianjin Shuangkou LFG Carbon Finance Project CDM project ( Carbon Finance ) LFG to electricity Tinajin Clean Energy and Environmental Engineering Co., Ltd.(TCEEE) to sell 635,000 tco 2 e to World Bank with option for 470,000 tco 2 e Bank trustee for 10 funds, including the Spanish Carbon Fund, the buyer

Critical Activities / Milestones Critical Activities / Milestones Date PIN (Project Idea Note) Submitted by TCEEE approved by the Bank LoI (Letter of Intention) signed between TCEEE (project sponsor) and the Bank EIA (Environmental Impact Assessment) completed, Nankai University Approval by Tianjin Environmental Protection Board PDD (Project Design Document), prepared by Shanghai JEC Environmental Consultant Co., Ltd. initial PDD prepared in 2006, required revisions June 2005 Jan 2006 June 2006 Oct 2006 April 2006- June 2007

Critical Activities / Milestones Critical Activities / Milestones Date BOT contract and Nanjing Long Term Environment Technology and Development Co., Ltd., former Brambles LFG company (Australian) that withdrew from the China market Grid connection approval from the North China Power Grid Company and the Tianjin Electric Power Corp. Jan 2006 Feb 2006 ERPA negotiation: TCEEE and Bank May 2007 ERPA signing June 2007 LOA (Letter of Approval) from the Chinese DNA (Designated National Authority) NDRC (National Development and Reform Commission) July 2007

Critical Activities / Milestones Critical Activities / Milestones LOA (Letter of Approval) received from the Spanish Carbon Fund (SCF), one of the funds for which the Bank is the trustee. The SCF was created in 2005 with a capital base of US$202.7 million Validation process completed by the Designated Operational Entity (DOE): Japan Quality Assurance Organization (JQA) after the LOA was received from the SCF Public comment period (two months) after validator submits a request for registration Date Nov 2007 Dec 2007 Jan - Feb 2008

Key Future Activities, Feb. 2008 Critical Activities / Milestones Registration as a CDM project to be completed by the UNFCCC s (United Nations Framework Convention on Climate Change) CDM Executive Board Expected Date March 2008 LFG recovery operations start-up April 2008 Verification and first issuance (expected) of Certified Emission Reductions (CERs) April 2009

LFG Header Pipe

Construction of Combustion Engine / Generator Building

Conclusions Strong communications Trust between the project client (TCEEE) and buyer (World Bank, as trustee) - Long-term relationship between Tianjin and Bank important

Thank you Information Contact Charles Peterson - cpeterson@worldbank.org