Septic Permit Application

Similar documents
Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

SEWAGE SYSTEM PERMIT GUIDELINES

Application for a Sewage System Permit

Building Permit Requirements Septic System

BUILDING DIVISION SEPTIC SYSTEM APPLICATION / INFORMATION PACKAGE. Septic System Info. 8 Schellburg Avenue 22 Albert Street, P.O.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

Application for a Sewage System Permit

BUILDING PERMIT GUIDELINES - RESIDENTIAL

Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed

Building number, street name Unit no. Postal code

Procedures for an Application For Septic Permit

Application for a Permit to Construct or Demolish - SEPTIC

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances

TITE CORPORATION OF THE TOWN OF LAKESHORE. Application for a Permit to Construct or Demolish

Building Permit Requirements Custom Built Homes

Procedures for an Application for a Sewage System Permit

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

SEWAGE PERMIT APPLICATION

- A Notice - To all Building Permit Applicants choosing to commence Construction prior to the issuance of a Permit

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Important Notice To Building Permit Applicants and Designers

GUIDE FOR APPLYING FOR A BUILDING PERMIT

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

Building Permits A Guide for Homeowners

The following is required for a complete permit submittal for each unit.

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Building/Zoning Permit Fee Structure

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

A homeowners/applicants guide to understanding and making application for a building permit.

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Commercial Remodel Permit

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

The following is required for a complete permit submittal for each unit.

Drainage By-law. WM-4 Consolidated as of April 18, 2011

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

June 18, 2008 TO: BUILDING CODE USERS

BUILDING PERMIT APPLICATION

HOW TO OBTAIN A BUILDING PERMIT

Civic Address (Street No. & Name):

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

BY-LAW NO THEREFORE the Council of the City of Ottawa enacts as follows: PART I DEFINITIONS AND INTERPRETATION

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

Last Updated March 15, 2016

WARWICK TOWNSHIP Dept. of Planning & Zoning

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE

A Guide to Building Permits for Home Owners / Renovators

Questions and Answers Questions et réponses

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

The following materials and documents are required in order for you to obtain a Building Permit:

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

BUILDING CODES & DESIGN CRITERIA

Fill out all sections or mark with N/A (not applicable)

RESIDENTIAL BUILDING PERMIT INFORMATION

Application for Commercial Plan Review and Building Permit. Address:

SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM

PIKES PEAK REGIONAL BUILDING DEPARTMENT

Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program

Private Sewage Permit Application

- Introductory Provisions

STORMWATER AND EROSION CONTROL PERMIT

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

BUILDING PERMIT APPLICATION PACKAGE

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

TOWN OF CHEEKTOWAGA BUILDING PERMIT FEE SCHEDULE

CITY OF POMONA DEPARTMENT OF COMMUNITY DEVELOPMENT SHOW AND EXHIBITION INSPECTION

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

RESIDENTIAL BUILDING PERMIT INFORMATION

Building Permit Bundle Package

Building Permit Documentation Required:

Application Requirements for obtaining a Building Permit

RESIDENTIAL BUILDING PERMIT

Title 15 BUILDINGS AND CONSTRUCTION

City of Jacksonville Development Guide Building Permits

City of Centerville Building, Zoning & Code Enforcement Department

STORMWATER MANAGEMENT PROGRAM & ILLICIT DISCHARGE DETECTION AND ELIMINATION

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

This document can be made available in other accessible formats as soon as practicable and upon request

3. Sanitary Plumbing Single Stack System

Construction Application for Permit (CAP) Instructions

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

CODE OF ORDINANCES, DENVER, IOWA

Commercial Permit Applications and Forms City of Alpharetta. Commercial Building Permit Applications and Forms

District of Barriere A GUIDE TO BUILDING PERMITS

Residential Sewer Backup Prevention Program

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Ordinance No Lot Surface Drainage

BUILDING AND DEVELOPMENT AUTHORIZATION ACT

CLAY TOWNSHIP BUILDING DEPARTMENT

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

Building Bylaw Bylaw No. 4400, 2004

NATIONAL BUILDING REGULATIONS AND BUILDING STANDARDS ACT, 1977 (Act No. 103 of 1977)

Ontario Regulation 98/12 Environmental Compliance Approval Application for Vertical Closed Loop Ground Source Heat Pumps

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

Transcription:

Building Services Department 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519-845-5420 Toll-free: 1-866-324-6912 Fax: 519-845-3817 Septic Permit Application a) This application applies to buildings that require sewage systems with a maxium total daily design sanitary sewage discharge not exceeding 10,000 litres/day. January 2017 www.lambtononline.ca

Septic Permit Application A. Time Frame for Septic Permit Issuance This table is for information only to explain the time allowed for review of a septic permit application for a permit to be issued or refused. B. Checklist for Septic Permit Applications Review the Checklist For Septic Permit Applications. Missing information or incomplete applications may result in a delay of the issuance of the permit. C. Declaration of Applicant The Declaration of Applicant must be completed to obtain a permit. D. Application for a Permit to Construct The Application for a Permit to Construct or Demolish must be completed. Also required are one copy of a site plan, & one complete set of construction drawings. E. Schedule 2 & 2a: Sewage System Install Permit This schedule, as well as the Application for a Permit to Construct or Demolish, must be completed to obtain a sewage system permit. Licensed Sewage System Installers must ensure that their registration number is recorded in Section C of Schedule 2. F. Plumbing Permit Information This schedule, as well as the Application for a Permit to Construct, must be completed to obtain a septic permit. G. Site Diagram Information Please complete attached form and include all information as listed on sheet and as appropriate.

A. TIME FRAME FOR THE ISSUANCE OF BUILDING PERMITS A building permit shall be issued in accordance with Table 2.4.1.1B of the Building Code unless: (a). (b). (c). (d). (e). (f). the proposed building, construction or demolition will contravene the Building Code Act, the Building Code, or any other applicable law; the applicant is a builder or vendor as defined in the Ontario New Home Warranties Plan Act and is not registered under that Act; a person who prepared drawings, plans, specifications or other documents or gave an opinion concerning the compliance of the proposed building or construction with the building code does not have the applicable qualifications, if any, set out in the building code or does not have the insurance, if any, required by the building code; the plans review certificate, if any, required for the application does not contain the prescribed information; the application for the permit is not complete; or any fees due have not been paid. Table 2.4.1.1B The period within which a building permit shall be issued or refused. Row Class of Building Number 1 (a). A detached house, semi-detached house, townhouse or row house where no dwelling unit is located above another dwelling unit. (b). A detached structure that serves a building described in Clause (a) and does not exceed 50 m 2 in building area. (c). A tent to which Section 3.13 of the building code applies. Time Period 10 days (d). A sign to which Section 3.14 of the building code applies. 2 (a). Buildings described in Clauses 2.1.1.3.(1)(a),(b) and (c) (Part 9 buildings) other than buildings described in Column 2 of any of Rows 1 and 4 of this table. (b). Farm buildings that do not exceed 600 m 2 in building area. 3 (a). Buildings described in Clause 2.1.1.2.(1)(a) or (b) (Part 3 buildings), other than buildings in Column 2 of any of Rows 1 and 4 of this table. 15 days 20 days (b). Farm buildings exceeding 600 m 2 in building area. 4 (a) Post-disaster buildings. 30 days (b). Buildings to which Subsection 3.2.6. (high buildings and Group B buildings) or any provision in articles 3.2.8.2 to 3.2.8.11 applies. Column 1 Column 2 Column 3 The time period above begins on the day on which a permit for the construction of a sewage system serving the building (if required) is issued as per 2.4.1.1B. (9)(c). The period within which a permit for a septic system shall be issued or refused is based on the class of building in the above table as per 2.4.1.1B. (8)(b).

B. Septic Permit Application To be completed by the Applicant: PROJECT ADDRESS Building No. Street Name: Unit No.: DATE: PROJECT DESCRIPTION: The Applicant must check the following items: Is the application for the permit completed fully and signed? Is the Plumbing Information completed fully, if applicable? Is Schedule 2 Sewage System Installer and Schedule 2a Septic Information completed fully and signed, if applicable? Are 2 copies of a site plan attached showing lot umber, address, building location, setbacks, lot dimensions, septic system, water well, easements and right-of-ways, driveway entrance, utilities, topographical features, etc? Are 2 copies of the architectural drawings attached? Floor plan of each floor, foundation plan, elevations, finished basement plan if applicable. External approvals attached? Minor variance, zoning approval, if applicable Conservation Authority approval, if applicable Site plan approval from planning department, if applicable. Incomplete or missing items may cause delay in the processing of your permit. BUILDING INSPECTOR'S COMMENTS: DATE APPLICATION RECEIVED:

C. Declaration of Applicant Section A Is this project a commercial, agricultural, or industrial application? Yes No Does the proposal involve fuel handling/storage 15,000 litres? Yes No Section B Are there any hydro poles/hydro easements on this property? Yes No Is there any gas or oil or any other utility easement on this property? Yes No Are there any Right-of-Way accesses on this property? Yes No Are there any easements (of any nature) on this property? Yes No Are there any closed private/municipal drains on this property? Yes No Are there any agreements/leases attached to title (i.e. wind, gas/oil etc.)- Yes If you answered YES to any of the questions in Section B - you are required to clearly indicate on your site/plot/lot diagram the location of such items and provide sufficient documentation where applicable/requested. Section C I understand that property locates are my sole responsibility. Yes No I understand it is my sole responsibility to ensure all substantial completion inspections (as outlined in the issued permit) are requested with 48 hours' notice, carried out and approved prior to proceeding to the next stage of construction. Yes No I understand that I will be responsible to remit all applicable fees prior to my permit being officially issued and further I may be subject to the said fees if my application is denied, revoked or cancelled (by myself), as per the applicable building permit by-law. Yes No No I, certify that: (Print name) 1. The information contained in this declaration, application, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. As the Owner/Agent/Contractor I take responsibility to ensure compliance to all federal, provincial and municipal legislation and or regulations prior to, during and after construction. 3. I will not hold The County of Lambton or its employees liable for any actions by myself resulting in; non-issuance of a permit, revoking of a permit, civil action and or possible fine. 4. I have authority to bind the corporation or partnership (if applicable). (Date) (Signature of Applicant) Personal information contained in this form and schedules is collected under the authority of Section 7 Subsections 8(2) of the Building Code Act, and will be used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality to which this application is being made. Please Note: This declaration must be completed in its entirety prior to the issuance of a building/plumbing/septic permit, no exceptions.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application number: For use by Principal Authority Permit number (if different): Date received: Roll number: Application submitted to: (Name of municipality, upper-tier municipality, board of health or conservation authority) A. Project information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/other description Project value est. $ Area of work (m 2 ) B. Purpose of application New construction Addition to an Alteration/repair Demolition Conditional existing building Permit Proposed use of building Current use of building Description of proposed work C. Applicant Applicant is: Owner or Authorized agent of owner Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number D. Owner (if different from applicant) Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number Application for a Permit to Construct or Demolish Effective January 1, 2014

E. Builder (optional) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number F. Tarion Warranty Corporation (Ontario New Home Warranty Program) i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G. Yes No ii. Is registration required under the Ontario New Home Warranties Plan Act? Yes No iii. If yes to (ii) provide registration number(s): G. Required Schedules i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. H. Completeness and compliance with applicable law i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the Yes Yes No No application is made. ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992. Yes No iii) This application is accompanied by the information and documents prescribed by the applicable bylaw, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable Yes No the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law. iv) The proposed building, construction or demolition will not contravene any applicable law. Yes No I. Declaration of applicant I (print name) declare that: 1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G 2E5 (416) 585-6666. Application for a Permit to Construct or Demolish Effective January 1, 2014

Schedule 2: Sewage System Installer Information A. Project Information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/ other description B. Sewage system installer Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or emptying sewage systems, in accordance with Building Code Article 3.3.1.1, Division C? Yes (Continue to Section C) No (Continue to Section E) Installer unknown at time of application (Continue to Section E) C. Registered installer information (where answer to B is Yes ) Name BCIN Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax D. Qualified supervisor information (where answer to section B is Yes ) Cell number Name of qualified supervisor(s) Building Code Identification Number (BCIN) E. Declaration of Applicant: I (print name) _declare that: OR I certify that: I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall submit a new Schedule 2 prior to construction when the installer is known; I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is known. 1. The information contained in this schedule is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Application for a Permit to Construct or Demolish Effective January 1, 2014

E. SCHEDULE 2 (a) Residential Septic System Building Permit Application Information To be completed by Licensed Installer or Owner Property Location (9-1-1 Address) Date i) Number of bedrooms, all floors, including unfinished bedrooms ii) Total Fixture Units Use Total Fixture Unit Count number from Plumbing Permit Application iii) Total Finished Floor Area Sum of all floors excluding basement m 2 iv) Water Supply: Private Well Municipal Waterline Soil Type Depth of Water Table Depth of Clay Class of Sewage System Other Than Class 4 Specify Class: Design: Class 4 Filter Bed Class 4 Trench Bed Class 4 Treatment Unit Raised Raised Type Partially Raised Inground Partially Raised Inground Manufacturer s Information Attached Yes No Tank Size L Tank Size L Tank Size L Bed Size M 2 Trench Number Trench Length M Please note: A site inspection of a test pit by a County sewage system inspector is required before a septic system building permit may be issued. The applicant must post the attached Lot Identification Card in a visible location close to the test pit on the subject property. Provide a site plan showing lot number, address, building location, setbacks, lot dimension, septic system layout, water well location, driveway entrance, utilities and topographical features. Provide diagram of system (including dimensions, cross section & elevation of bed & contact area) Note: A sewage system permit will be revoked after twelve months if the system has not been completed and approved. One extension may be granted at the discretion of the Building Services Department, provided the extension is requested prior to date of expiry. Septic systems shall not be installed from December 15 th to April 1 st, unless approval is given by the Chief Building Official.

F. Owner Name: Plumber: PLUMBING INFORMATION Address of Proposed Work: Municipality: Please list the number of fixtures per floor on the following chart. FLOOR Basement 1 2 3 4 Total Number X Fixture Units Total Fixture Units Water closet X 4 Bath tub X 1.5 Wash basin X 1.5 Kitchen sink X 1.5 Laundry tubs X 1.5 Floor drain X 2 Showers X 1.5 Urinal X 1.5 Clothes washer X 1.5 Dish washer domestic X.5 Other sinks X 1.5 Drinking fountain X.5 Hot water heater Sewage Pump Grease Interceptor Other fixtures X X X X TOTAL Total Fixture Unit Count No. of Dwelling Units R.W.L. Water Lines Soil Vent Stacks Sanitary Lateral Oil Interceptor Catch Basin Storm Lateral Backflow Preventer Lawn Sprinkler System Signature Date

G. LOT DIAGRAM AND SEWAGE SYSTEM PLAN: Draw to scale and indicate the direction of north. Please demonstrate: 1) Location of sewage system components (i.e. tanks, leaching beds) 2) Horizontal distances from system to adjacent existing or proposed buildings, well water supplies (including neighbours'), existing on-site sewage systems, driveways, property lines, swimming pools and watercourses (including ditches). 3) Lot dimensions, roads and topographic features (i.e. steep slopes, swamps)