Procedures for an Application For Septic Permit

Similar documents
Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed

BUILDING DIVISION SEPTIC SYSTEM APPLICATION / INFORMATION PACKAGE. Septic System Info. 8 Schellburg Avenue 22 Albert Street, P.O.

Application for a Sewage System Permit

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Sewage System Permit

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

SEWAGE SYSTEM PERMIT GUIDELINES

Building number, street name Unit no. Postal code

Building Permit Requirements Septic System

Application for a Permit to Construct or Demolish - SEPTIC

BUILDING PERMIT GUIDELINES - RESIDENTIAL

Septic Permit Application

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Procedures for an Application for a Sewage System Permit

SEWAGE PERMIT APPLICATION

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances

Building Permit Requirements Custom Built Homes

TITE CORPORATION OF THE TOWN OF LAKESHORE. Application for a Permit to Construct or Demolish

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT

- A Notice - To all Building Permit Applicants choosing to commence Construction prior to the issuance of a Permit

HOW TO OBTAIN A BUILDING PERMIT

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

GUIDE FOR APPLYING FOR A BUILDING PERMIT

A homeowners/applicants guide to understanding and making application for a building permit.

Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program

DOCK CONSTRUCTION GUIDE

Last Updated March 15, 2016

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

GUIDE TO APPL YING FOR A BUILDING PERMIT:

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

West Virginia Department of Health & Human Resources Department of Health

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Building Permit Documentation Required:

Important Notice To Building Permit Applicants and Designers

Application Requirements for obtaining a Building Permit

Commercial Remodel Permit

To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming

The following materials and documents are required in order for you to obtain a Building Permit:

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Fill out all sections or mark with N/A (not applicable)

Building/Zoning Permit Fee Structure

RESIDENTIAL BUILDING PERMIT INFORMATION

SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM

RESIDENTIAL BUILDING PERMIT INFORMATION

BUILDING PERMIT APPLICATION

GUIDELINES FOR SEPTIC SYSTEM DESIGN

Building Permits A Guide for Homeowners

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

PROCEDURE FOR REQUESTING A BUILDING PERMIT

ONSITE SEPTIC DISPOSAL PERMIT APPLICATION

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

B U I L D I N G P E R M I T A P P L I C A T I O N

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

TABLE 1 OAR MINIMUM SEPARATION DISTANCES

Date of Authorization April 29, 1999 BMEC Authorization Number BMEC Application A

Permit: *Inspection Scheduling: * Monday thru Friday Receipt #: Between And Property Code#

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

Content Copy Of Original

CLAY TOWNSHIP BUILDING DEPARTMENT

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

BUILDING PERMIT APPLICATION PACKAGE

All new construction, mobile home placement & additions.

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000)

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Application for Zoning Certificate and/or Building Permit

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE

The following is required for a complete permit submittal for each unit.

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

CONTRACTOR INFORMATION NAME, ADDRESS, CITY, STATE, ZIP LICENSE# 058- LICENSE# SIGNATURE OF APPLICANT ADDRESS PHONE NUMBER

The following is required for a complete permit submittal for each unit.

RESIDENTIAL BUILDING PERMIT

DOUGLAS COUNTY BUILDING PERMIT APPLICATION

WARWICK TOWNSHIP Dept. of Planning & Zoning

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

Residential Building Permit & Inspection Procedures

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2012)

One and Two Family Additions

Civic Address (Street No. & Name):

District of Barriere A GUIDE TO BUILDING PERMITS

Residential Building Permit Application

Detached Garage Construction Information

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

Bureau Policy for Tent Permit

Administrative Fees Approved

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

A HOMEOWNER S GUIDE TO ACCESSORY DWELLING UNITS

- Introductory Provisions

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

Demolition Permit Procedure

Transcription:

Updated October 1, 2014 Procedures for an Application For Septic Permit The following items are required and form part of a complete application: 1. If you are doing any new construction or additions to an existing structure within the shoreline activity area, you will require a Development Permit; 2. A Ministry of Municipal Affairs and Housing application fully completed including Roll No.; 3. You will be required to submit the following plans: o Site plan showing all structures, proposed structures, wells, and septic system, with dimensions and setbacks; o Building plans (2 sets of each) including o Cross section of septic bed o Any engineered documents o Samples of the above are available at the Township office or on our web page at www.lakeofbays.on.ca under Building Department. 4. Ensure that the Schedule 1 Designer sheet is completed by each individual who has completed any of the above noted designs, ie) plumbing, heating, floor plans, etc. 5. Permit fees; 6. A completed septic calculation sheet, if applicable. The performance level of a septic system must be evaluated if one or more of the following are proposed; 1. Adding bedrooms, 2. Adding fixtures, or 3. Increasing floor area by 15% or greater. The daily design flow of the septic system must meet Division B 8.2.1.3. of the Ontario Building Code. And 7. Development charges, if applicable. The Building Department can only accept and review complete applications and plans. The review is to ensure that they meet Ontario Building Codes, Municipal by-laws and other applicable law. If the project requires a septic approval, the building permit will not be issued until such approval is granted.

TOWNSHIP OF LAKE OF BAYS PERMIT APPLICATIONS WORK SHEET Project: Address: Date of Application: 2 nd 3 rd 4 th The following documents must be provided with your completed permit application. To ensure that the permit can be processed as efficiently as possible, the application will not be accepted if any documents are missing or incomplete. For further clarification, reference can be made to the Building Code Act. ALL FIELDS OF APPLICATION ARE FILLED IN YES or NO and REASON DESIGNER SHEET YES NO REASON HOUSE PLUMBING HVAC OTHER: Incomplete drawings create long delays in obtaining a building permit. Please ensure that all the drawings provide sufficient detail to allow the design to be assessed for compliance with the Building Code Act and Ontario Building Code. [BCA S. 1.1(2)] Drawings must be to scale and accurately dimensioned. Below is a checklist to help ensure that the drawings are complete. DESIGNER SHEET YES NO REASON Site plan to scale (2 copies) House drawings (2 copies) Plumbing drawings (2 copies) HVAC design and drawings (2 copies) Complete floor plans with all rooms labeled Foundation plans detailing all footings and foundations with reinforcing details. Cross section detailing all building elements, identify the air barrier. Framing plans for all floors and roof Engineered product layout and design Building elevation drawings Electrical information OTHER REQUIRED DOCUMENTS YES NO REASON Deed or survey Entrance permit Sewer/sewage permit (Permit # ) OHHWP (if new home) Zoning compliance Site plan control applies Compliance with other applicable law Fees Refer to attached Fee Schedule By-Law #12-142 Civic Address Fee (If required) $60 + HST District Development Fee (If required) Township Development Fee (If required) 10/1/2014

THE CORPORATION OF THE TOWNSHIP OF LAKE OF BAYS FEES & CHARGES BY-LAW 13-152 SCHEDULE D TO BY-LAW NUMBER 13-152 BUILDING DEPARTMENT PERMIT FEES Construction (new, addition, renovations, plumbing, heating etc.) Per Sq.Ft. Minimum Charge Building Permit $135.00 The greater of $12/$1,000 of estimated construction value or per sq.ft. New or addition(s) less than 3000 sq. ft. in gross area as defined in OBC New or addition(s) larger than 3000 sq. ft. or log structure floor area as defined in OBC Group C Occupancies (single family dwellings) $1.50 $1.85 Internal renovations $0.65 Decks $0.50 Garages $0.75 Muskoka/ Screen Room $0.60 Bunkie s $1.10 Car port and storage buildings $0.50 Replacement or repair of foundation and roofs $500.00 flat rate Shoreline Structures Floating or post dock $0.50 Crib Dock $0.50 Steel Dock $0.75 Boat port $0.60 Boathouse $0.85 Group C Occupancies (other than single family dwellings) $1.60 All other Occupancies, New or Addition and Renovation (i.e. commercial, industrial and institutional) An additional fee for each required inspection may be require for water access properties at the discretion of the Chief Building Official Foundation permit $1.60 Flat fee $25.00 $300.00 above the normal fees Inspection fee for re-inspection $75.00 to $150.00 Special inspection: fee to inspect buildings or structures where a request has been made for a final inspection or for an Occupancy/Use where the permit has been inactive for one year and/or the permit three years or older. $150.00 Demolition of building or structure Part 3 buildings Part 9 buildings $250.00 $100.00 Outdoor swimming pools together with the required fencing $125.00 Tents (over 645 square fee) and temporary structures such as greenhouses or other $125.00 temporary special event structures Change of Use Permits (Non-Refundable) Part 9 of OBC Part 3 of OBC $100.00 $150.00 Transfer of Active Permit $100.00 Completion Permit Double the above fees Min. $270.00 Conditional Permit Double the above fees Min. $270.00 Demo Permit for a dwelling or cottage which will remain until the replacement new structure is habitable. Signed agreement, letter of credit and a Remedy Unsafe permit Review fee for permits which are denied or submitted incomplete fee of $270.00 Double the above fees Min. $270.00 50% of permit fee max of $1,000.00 Cont d

ADMINISTRATION FEES Application for alternative design $200.00 Review revised plans or application $50.00 per page or $100.00 per page if required after an inspection Liquor license (2 inspections) and completion of form $200.00 Building, septic and zoning information reports $100.00 (for non property owners) Faxed reply requested $5.00 General Inquiry letter $50.00 Non compliance with the Building Code Act Administration fee, plus any funds spent by the $360.00 municipality for it s investigation If other administrative action is required exceeding the initial fee, an additional hourly fee will $100.00 be applied (per hour). Abatement for septic systems (per hour) $100.00 SEPTIC SYSTEM PERMIT FEES New or Replacement Class 1 System NO CHARGE (Privy) Code Section 8.3 (no permit required) New of Replacement Class 2 System $250.00 (Greywater System) Code Section 8.4 (2 inspections) New System Class 4 System (3 inspections) $450.00 Existing System Repairs Class 4 System Tank Replacement (min. tank size 3600 L) 800 Gal (2 inspections) $250.00 Bed Replacement (3 inspections) $400.00 Extension of Bed (2 inspections) $350.00 Lot Suitability $200.00 New or Replacement Class 5 System Pre-Inspection per lot $50.00 Water and sewage connections $175.00 CIVIC ADDRESSING SIGNAGE (subject to HST) New $60.00 Replacement sign $50.00 Replacement post $20.00 Note: All fees are at the discretion of the Chief Building Official.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For use by Principal Authority Permit number (if different): Date received: Roll number: Application submitted to: Township Of Lake of Bays 1012 Dwight Beach Rd. Dwight ON. P0A 1H0 705 635-2272 Fax 705 635-2132 Building Code Identification Number 16233 A. Project information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/other description Project value est. $ Area of work (m 2 ) B. Purpose of Application New construction Proposed use of building Addition to an existing building Alteration/repair Demolition Conditional Permit Current use of building Description of proposed work C. Applicant Applicant is: Owner or Authorized agent of owner Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number D. Owner (if different from applicant) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number Application for Permit to Construct or Demolish Effective January 1, 2011

E. Builder (optional) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/Con. Municipality Postal code Province E-mail Telephone number Fax Cell number F. Tarion Warranty Corporation (Ontario New Home Warranty Program) i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G. Yes No ii. Is registration required under the Ontario New Home Warranties Plan Act? Yes No iii. If yes to (ii) provide registration number(s): G. Required Schedules i. Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. ii. Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. H. Completeness and compliance with applicable law i) This application meets all the requirements of clauses 1.3.1.3(5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fess that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, ii) iii) iv) to be paid when the application is made. This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992. This application is accompanied by the information and documents prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law. The proposed building, construction or demolition will not contravene any applicable law. I. Declaration of applicant Yes Yes Yes Yes Yes No No No No No I declare that: (print name) 1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Application for Permit to Construct or Demolish Effective January 1, 2011

Schedule 1: Designer Information Use one form for each individual who reviews and takes responsibility for design activities with respect to the project. A. Project Information Building number, street name Unit no. Lot/con. Municipality Postal code Plan number/ other description B. Individual who reviews and takes responsibility for design activities Name Firm Street address Unit no. Lot/con. Municipality Postal code Province E-mail Telephone number Fax number Cell number C. Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of Division C] House Small Buildings Large Buildings Complex Buildings Description of designer s work HVAC House Building Services Detection, Lighting and Power Fire Protection Building Structural Plumbing House Plumbing All Buildings On-site Sewage Systems D. Declaration of Designer I declare that (choose one as appropriate): (print name) I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories. Individual BCIN: Firm BCIN: I review and take responsibility for the design and am qualified in the appropriate category as an other designer under subsection 3.2.5.of Division C, of the Building Code. Individual BCIN: Basis for exemption from registration: The design work is exempt from the registration and qualification requirements of the Building Code. Basis for exemption from registration and qualification: I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. I have submitted this application with the knowledge and consent of the firm. Date Signature of Designer NOTE: 1. For the purposes of this form, individual means the person referred to in Clause 3.2.4.7(1) d). of Division C, Article 3.2.5.1. of Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Divison C. 2. Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario. Application for Permit to Construct or Demolish Effective January 1, 2011

Schedule 2: Sewage System Installer Information A. Project Information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/ other description B. Sewage system installer Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or emptying sewage systems, in accordance with Building Code Article 3.3.1.1, Division C? Yes (Continue to Section C) No (Continue to Section E) Installer unknown at time of application (Continue to Section E) C. Registered installer information (where answer to B is Yes ) Name BCIN Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number D. Qualified supervisor information (where answer to section B is Yes ) Name of qualified supervisor(s) Building Code Identification Number (BCIN) E. Declaration of Applicant: I declare that: (print name) I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall submit a new Schedule 2 prior to construction when the installer is known; OR I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is known. I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Application for Permit to Construct or Demolish Effective January 1, 2011

SEWAGE SYSTEM INSTALLATION PROPOSAL TOTAL # OF BEDROOMS : TOTAL FLOOR AREA : m² TOTAL PLUMBING FIXTURE UNITS: TOTAL DAILY DESIGN FLOW RATE (Expressed in Litres/day): Q = Calculations for proposal must be provided on a separate sheet TEST HOLE Sub-surface conditions encountered Rock & G.W.T. Depth (m) - 0 - - 0.25 - - 0.50 - - 0.75 - - 1.00 - - 1.25 - - 1.50 - Soil Type T Time PROPOSE TO CONSTRUCT: CLASS 4 FILTER BED Dug Into Existing Soil Raised PROOF OF APPROVED FILTER MATERIAL MUST BE PROVIDED PRIOR TO FINALINSPECTION If Raised, How Far Above Existing Soils? m Contact Area m² CLASS 4 TRENCH BED Dug Into Existing Soil Raised If Raised, How Far Above Existing Soils? # Of Runs Of Tile Length of Runs m m Total length of Tile m CLASS 2 GREY-WATER PIT or CLASS 3 CESSPOOL Wall Structure -- Concrete Block Rock Other: Dimensions Of Pit: Length: Width: Height: Type Of Cover: Type Of Class 1 To Be Used Privy Composting Chemical Electrical Other: CLASS 5 - HOLDING TANK - PUMP OUT CONTRACT MUST BE PROVIDED (District Approval Required) Concrete Polyethylene Other: Size (L) Alarm Is Audio And Visual Describe Platform: IS A PUMP REQUIRED? Yes No Raw Sewage Effluent

SEWAGE SYSTEM CALCULATIONS (to be submitted with application)(see Chart on reverse) Q = Total Daily Design Sewage Flow in Litres T = Percolation Time of Soil SEPTIC TANK SIZE = Note: Working Capacity of Septic Tank Residential = Q x 2 = Litres Commercial = Q x 3 = Litres In no case shall the working capacity of septic tank be less than 3600 litres. ABSORPTION TRENCHES = L = Q x T 200 = x Length of Distribution Pipe (for systems with septic tank) 200 = Metres Note: The total length of distribution pipe shall be not less than 40 metres. Loading Rate Area (unsaturated suitable soil in area of bed and mantle) Loading Rate Area required = Q 6 = 6 = Sq. Metres FILTER BED = Size of filter required If Q is 3000 litres or less = Q 75 75 = Sq. Metres If Q is more than 3000 litres = Q 50 50 = Sq. Metres Base of Filter Medium - shall extend to a thickness of 250mm over the following area: AREA = Q x T 850 x _ 850 = Sq. Metres NOTE: T is the Percolation Time of the Native Soil upon which the filter material is placed. Loading Rate Area (unsaturated suitable soil in area of bed and mantle) Loading Rate Area Required = Q Loading Rate (based on T Time of native soil) = Sq. Metres NOTE: Suitable soil, existing or imported, in the loading rate area must have a T of 15 minutes or less, if imported material is used for the leaching bed or filter.

You Should Always Refer To The Ontario Building Code For Current Regulations TOTAL DAILY DESIGN FLOW RATES FOR RESIDENTIAL OCCUPANCY Q (Litres/Day) Example of how to determine daily design flow rate: Dwellings: a) 1 bedroom dwelling b) 2 bedroom dwelling c) 3 bedroom dwelling d) 4 bedroom dwelling e) 5 bedroom dwelling f) Additional flow for i) each bedroom over 5 ii) A) each 10m² (or part thereof) over 200m², up to 400m²(³) B) each 10m² (or part thereof) over 400m² up to 600m²(³)and C) each 10m² (or part of it) over 600m²(³), or iii) each fixture unit over 20 fixture units (³) Total finished area, excluding the area of the finished basement. 750 1100 1600 2000 2500 500 100 75 50 50 Using a 4 bedroom, 235m² home with 22 fixture units. From Chart on left: 4 bedroom home > 200m² or > 20 fixture units = 2,000 /day additional 35m² = 400 /day (additional 2 fixture units = 100 /day) Q (total daily design flow rate) = 2,400 litres/day If, as in the example above, there is a choice in arriving at the flow rate (e.g., fixture units vs. floor area) use the one calculation that provides the greatest daily flow rate value. APPROXIMATE SOIL PERCOLATION RATES T The following are estimated typical ranges of T times. Actual T times may vary significantly due to on-site soil conditions. Soil Type Clean Med - Course Sand Silty Gravely Sands Silty Sands Sandy Silts Sandy Silty Clays Silty Clays Clay T (min/cm) 1 3 6 8 10 16 20 25 29 33 38 44 50+ CLEARANCE DISTANCES FOR COMPONENTS OF SEWAGE SYSTEMS (metres) If the bed is raised, add 2 metres for every 1 metre of rise Wells (with 6 m casing) Wells (not 6 m casing) Springs Potable Springs Not Potable Surface Water (lake, river, etc.) Property Lines Dwellings Structures Class 4 Distribution Pipe 15 30 30 30 15 3 5 Class 4 Septic Tank 15 15 15 15 15 3 1.5 Class 5 Holding Tank 15 30 30 15 3 1.5 Class 1 Privy 15 30 30 30 15 3 Class 2 Grey-Water Pit 15 30 30 15 15 3

SAMPLE of a Tile Bed Cross Section 100mm Topsoil & Grass 300mm Porous Backfill 75mm Perforated Distribution Piping 1.2m (max) spacing 50mm Distribution Pipe 300mm Clear Stone Layer 150mm Approved Filter Sand 750mm Existing Medium Sand 900mm Water Table 50mm = 2 Backfill to Distribution Piping 75mm = 3 Perforated Distribution Piping 100mm = 4 Top Soil/Grass 150mm = 6 Clearance for Distribution Piping to Clear Stone 300mm = 1 Clear Stone 750mm = 2 6 Approved Filter Sand 900mm = 3 Clearance to Water Table 1.2m = 3.93 Maximum Typical Spacing for Distribution Piping

RESIDENTIAL PLUMBING WORKSHEET Description # Units per Fixture DWELLING #1 # of Fixtures Fixture Units DWELLING #2 # of Fixtures Fixture Units SLEEPING CABIN # of Fixtures Fixture Units OTHER # of Fixtures Fixture Units Bathroom Group 6 Toilet 4 Wash Basin (Lavatory) 1.5 Bathtub or Shower 1.5 Bidet 1 Kitchen Sink (single or double) 1.5 Bar Sink 1.5 Washing Machine Domestic 1.5 Other TOTAL FIXTURE UNITS FINISHED FLOOR AREA # OF BEDROOMS Table 8.7.4.1. Loading Rates for Fill Based Absorption Trenches and Filter Beds Forming Part of Sentences 8.7.4.1.(1) and 8.7.5.2.(2) Percolation Time (T) of Soil (min/cm) Loading Rates (L/m 2 /day) 1 < T < 20 10 20 < T < 35 8 35 < T < 50 6 T < 50 4 Column 1 2