City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

Similar documents
Commercial Remodel Permit

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

BUILDING CODES & DESIGN CRITERIA

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

RESIDENTIAL BUILDING PLAN REQUIREMENTS

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

Residential Accessory Structures & Room Additions

Elko County Building & Safety Division

Typical Finished Basement Details

PLAN REVIEW REQUIREMENTS FOR RESIDENTIAL CONSTRUCTION

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Specific Plan Check Requirements for Residential Construction

BUILDING PERMIT APPLICATION

WINDOW AND DOOR REPLACEMENT SAMPLE PLAN

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

4. Number of drawings required: ( ) Locations of nearest streets

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

Continuing Certificate of Occupancy Pre-Inspection Checklist

Building Permit Submittal Requirements

HOW TO OBTAIN A BUILDING PERMIT

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

THE DEVELOPMENT REVIEW BOARD. 1. New construction or relocation of single-family homes, including mobile/modular and manufactured homes.

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

RESIDENTIAL BUILDING REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

One and Two Family Additions

Village of Glen Ellyn Basement Remodeling Project Guidelines

FENCE PERMIT APPLICATION

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Application for Commercial Plan Review and Building Permit. Address:

City of Rohnert Park When Permits are Required

A homeowners/applicants guide to understanding and making application for a building permit.

Applying for Permits to build a new house in Linn County

City of Donnelly. Permit Application Information and Instructions

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

Building Regulations; Construction 11

RESIDENTIAL BUILDING PERMIT PROCEDURES

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

The Homeowner s Building Application Checklist for Constructing a Residential Addition

Residential Building Permit Application

FLOODPLAIN PERMIT APPLICATION File No.

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

An Applicants Guide to Residential Building Permits City of Galt Building Department

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

BUILDING PERMIT APPLICATION

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

CAREFULLY REVIEW AND COMPLETE ALL THE ENCLOSED DOCUMENTS PLEASE ALLOW THREE (3) WEEKS FOR PROCESSING

Submittal Requirements Building Plan Check

Basement Renovation Guide For Residential Dwellings

CITY OF FORTUNA, CALIFORNIA

Residential Projects. Patio Cover. Minimum Plan Submittal Requirements

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

Each proposed project will be reviewed for compliance with the following codes as applicable.

BUILDING PERMIT BASICS

Universal Design Standards

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

2012 IBC Exit Systems

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

2015 IBC Exit Systems

INSPECTION REQUIREMENTS: FOUNDATIONS

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

Dave Harper, Building Official (509) Susan Davis, Administrative Secretary (509)

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

An Applicant s Guide to Residential Building Permits.

A/E Design Deliverable Checklist

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

All new construction, mobile home placement & additions.

Last Updated March 15, 2016

Residential Decks. NOTE: If you are in a development with a 2. Deck Plan (see below)

#402 New Residential Submittal Checklist

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

RESIDENTIAL DEVELOPMENT GUIDELINES (RF)

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

Natural Gas Service Installation and Meter Clearance Requirements

Section 1 Non-Conforming Structures and Uses Allowed to Continue. 12

Section 1 OBC FADS /13 Access to Parking Areas

Building/Zoning Permit Fee Structure

CODE COMPLIANCE PLAN REVIEW PROCEDURES

2007 Title 24 Accessibility Code Updates and ADA Issues

Transcription:

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued August 3, 2011 Information Bulletin No. IB-002 Submittal Requirements for Creating or Altering Residential Care Facilities for the Elderly This information bulletin outlines the submittal requirements for converting existing single-family residences to Residential Care Facilities for the Elderly (RCFE) or altering existing legally converted RCFE facilities. See also Submittal Requirements for Single Family Residential Additions and Alterations for additional submittal requirements relavent to such convertions. This information bulletin outlines drawing requirements and specific code requirements for these unique conversions. Definitions Used in this Information Bulletin CBC = California Building Code CPC = California Plumbing Code CEC = California Electrical Code CMC = California Mechanical Code CCCFPD = Contra Costa Consolidated Fire Protection District CO = certificate of occupancy HCD = Housing and Community Development Department, State of California RCFE = Residential Care Facilities for the Elderly Required Exit = A complete CBC defined means-of-egress system, including Exit Access, Exit, and Exit Discharge SFR = Single-Family Residence (includes Duplex Residential) Required Drawings (Submit 4 sets of drawings and 2 sets of all other documents to the City of Walnut Creek.) 1. Plot Plan/Title Sheet (use 1/4 per foot scale) 1.1. List the maximum number of clients to be located at the facility at any given time. List the maximum number of non-ambulatory clients, ambulatory clients, and bedridden clients that the facilities will be used for to define the occupancy group. State the CBC Occupancy Group(s) on the plan for reference. It will be in the form of R3 and R2.x, where x will be either a single or two-digit number. 1.2. Identification of the address and owner of the property 1.3. Building footprint and projections 1.4. Location and routing of decks, ramps, landings, walkways and gates, all dimensioned relative to the real property lines 1.5. All existing buildings and accessory building footprints 1.6. All trees and their associated drip lines, including trees from adjacent property which have drip lines projecting over property lines onto the subject property 1.7. Location and layout of any private sewer disposal system, including septic tank and leach field routing Revised April 23, 2014 Page 1 of 6

1.8. Location of any potable water wells 1.9. Property lines defining the parcel 1.10. Zoning Set Backs relative to actual property lines 1.11. North arrow 1.12. All Easements 2. Architectural Plans 2.1. Floor Plan (use 1/4 per foot scale). 2.1.1. Draw floor plan using double lines to represent walls. 2.1.2. Define different wall symbols to represent existing, removed and proposed new walls. 2.1.3. If the permit application is to legalize work without a permit, define also a wall symbol to represent walls that were installed without permits or inspections so these are clear on the plans. 2.1.4. Label the use of each room. 2.1.5. Provide sizes and opening dimension and sill height of each window in each bedroom that is used for emergency egress. Plans must provide upgrades for emergency egress if it does not comply with the current code. 2.1.6. Show all doors and indicate their size and minimum clear width opening and their associated landing dimensions and slopes. Exterior landings may slope a maximum of ¼ per foot for drainage. Interior door landings must be horizontal. 2.1.7. Include all exterior decks, ramps and stairs. 2.1.8. Identify and detail all CBC required exits. 2.1.9. Dimension all exterior decks, stairs, and ramps relative to property lines. 2.1.10. Detail all exterior gates associated with required exits, their hardware to open, and their landings on each side of the gate. The hardware must meet CBC Chapter 10 requirements. Exterior landings may slope up to ¼ per foot maximum for drainage. 2.1.11. Show all plumbing fixtures. Number of plumbing fixtures shall match that shown in the required water service piping size calculations and in the required water heater sizing analysis, as discussed herein. 2.1.12. Show location of electrical main and electrical distribution panels. 2.1.13. Show location of gas service main. 2.1.14. Show location of furnace and show heater duct vent locations within all habitable rooms. Heating system shall be sized sufficiently to provide heating per HCD regulations. 2.1.15. Show location and size of water heater. Specify appropriate first-hour rating (recovery) size based upon hot water demand per CPC. The first-hour rating may be obtained from the water heater s EnergyGuide Label at the top-left corner. Provide seismic strapping of water heater per CPC. 2.1.16. Show location of new or relocated light fixtures and switches. Specify appropriate dimmers, motion sensors, and/or timers on switches serving light systems in accordance with the current Title 24 energy regulations. 2.1.17. For kitchen or bathroom remodels, for alterations to washer and dryer locations, and for wall and window changes refer to the City of Walnut Creek s information bulletins for additional drawing and code requirements. Incorporate into the plans the submittal requirements outlined in these information bulletins. 2.1.18. Specify smoke detectors to be installed in each bedroom, in each corridor/hallway/intervening room leading to bedrooms, and at each story level where more than 1 story exists. 2.1.19. Specify arc-fault circuit interrupters within new bedrooms and within existing rooms that have been converted to bedrooms. Page 2 of 6

2.2. Ramp Details 2.2.1. Fully detail and dimension ramps with slopes greater than 1:20. 2.2.2. Ramps shall not exceed 1:8 slope. 2.2.3. Fully detail and dimension the landings at the top and bottom of each ramp. Exterior landings may slope a maximum of ¼ per foot for drainage. Landings at the top of ramps and intermediate landings serving two ramps shall have a dimension of 5 feet in the direction of ramp run. Landings at the bottom of the ramps shall have a dimension of 6 feet in the direction of the ramp run. 2.2.4. Provide complete handrail details (mounting, configuration and dimensions). 2.3. Stair Details 2.3.1. Fully detail and dimension all stairs. 2.3.2. Provide rise and run dimensions. 2.3.3. Fully detail and dimension the landings at the top and bottom of each stair run. Exterior landings may slope a maximum of ¼ per foot for drainage. 2.3.4. Provide complete handrail details (mounting, configuration and dimensions). 3. Structural Plans 3.1. Fully detail and dimension new foundations for decks, ramps and stairs. 3.2. Fully detail and dimension framing layout of decks, stairs and ramps. 3.3. Provide specific details for prefabricated hangers and post bases and connection details. 3.4. Provide all material specifications for lumber, concrete and plywood. Specific Code Compliance Information a. RCFE facilities are regulated, in part, by the California Health and Safety Code, Section 1566. Per Section 1566.3, conversions of SFR (R-3 occupancy) to RCFE (R2.x occupancy) are NOT considered a change in occupancy. b. If the plans submitted demonstrate a lack of knowledge of the code requirements for either of these occupancy groups, the plans and specifications may be required to be prepared by, and signed and stamped by, a California licensed architect or registered engineer to address fire- and life-safety or structural aspects of these occupancy groups and to evaluate any upgrade requirements within the plumbing, mechanical, and electrical systems due to the scope of expansion or alterations needed for the project. c. Applicants may be asked to submit a copy of their license issued from the State of California to clearly establish the occupancy group for the project. d. CCCFPD review and approval is required 1) prior to issuance of any permits affecting R2.x occupancy groups and 2) prior to final of a permit that affects an R2.x occupancy group. It is the applicant s responsibility to submit to CCCFPD in a timely manner for review of plans and for arranging in-progress CCCFPD inspections, including the final inspection. Applicant shall submit three sets of plans directly to the CCCFPD. e. Applications for converting SFR (R3 occupancies) to RCFE (R2.x occupancies) will be required to fully identify, detail and include in the permitted work their required exit(s) from the residence to the Public Way or to a Safe Dispersal Area (as these two terms are defined in the CBC). Thus, even if a deck serving as a required exit is less than 18 inches above grade, the deck must be fully detailed, designed and permitted as a required exit, including any stairs or ramps leading from the deck to grade. Required exits must be designed to handle live load per Chapter 16 of Page 3 of 6

the CBC. Deck height shall be measured from any point on the deck to the grade directly under said point. f. The use and arrangement of a Safe Dispersal Area for exiting must be approved by the Building Official. g. If a required exit leads to a deck that provides multiple paths to exit from the deck, at least one fully code-complying path must lead from the deck to the Public Way or to a Safe Dispersal Area. The remainder of the paths do not need to be treated as required exits but must meet building code provisions for ramps or stairs from the deck to finished grade. Beyond that there are no additional provisions. h. The entire path along the means of egress (exit access, exit, and exit discharge) of each required exit must be fully detailed and shown to meet code requirements, including doors, landings, stairs, and ramps, and their corresponding landings, and walkways to the public way or to a safe dispersal area. This will require handrails to be placed in the required front yard and/or side-yard setback area for sites needing ramps or stairs in that area due to the slope of the terrain. i. If the public sidewalk has a slope in any direction more than ¼ per foot, then it may not be used as a landing, or portion of a landing, for either a stair or a ramp. In this instance, an independent landing must be provided prior to reaching the public sidewalk. j. For construction of structural systems that are associated with non-required exits (decks, stairs, or ramps with walking surfaces less than 18 inches above grade, no permit is required for their construction and they do not require detailing on the plans. This does not exempt them from having to meet building code regulations for required design loading or for required widths or required handrails. The owner is still obligated to meet the code for these systems. Deck height shall be measured from any point on the deck to the grade directly under said point. k. Where an existing residence is being converted to an RCFE, or for new bedrooms created due to additions or conversions of existing uses, the bedrooms must provide current code-conforming emergency-egress openings. These must be retrofitted where the emergency-egress opening dimension(s) or sill height does not meet current code. CBC requires the net opening to be a minimum of 20 inches wide by 24 high, with a minimum opening area of 5.7 square feet, and the sill height cannot exceed 44 inches from the finished floor level. l. Water supply piping shall be upgraded where added demand requires upgrades per the CPC. Water service meters will not be required to be upgraded unless required by the water service provider. The water supply pipe from the meter to the fixtures shall be upgraded when it is required per CPC. The permit application must provide a complete analysis of the water service demand. A piping diagram shall be submitted indicating pipe lengths and sizes from the main water meter to each fixture. The diagram must be sufficient to allow evaluation of the pipe system using the CPC methodology. m. Sanitary sewer systems shall be upgraded where added demand requires upgrades per CPC. n. Water heaters shall be upgraded where added demand requires upgrades per CPC. o. Electrical systems shall be upgraded where added demand requires upgrades per the CEC. Where added electrical loads are being proposed, an electrical load calculation shall be submitted to the City for review/approval. p. Driveways cannot be used as part of a required exit system, as cars may block the egress path. A non-required exit may terminate at a driveway. However, a driveway cannot be used for a landing of a stair or ramp due to the potential of a vehicle blocking the landing. In this instance, the landing shall be provided independently of the driveway. Page 4 of 6

Waste Management Program A Construction and Demolition Debris Recycling Plan may be required. Please see the City of Walnut Creek website for applicable projects and additional information: http://www.walnutcreek.org/citygov/depts/cd/building/waste_management.asp If applicable, a completed Waste Management Plan must be submitted and approved by the City before permit issuance. A final waste management report is required prior to final of a permit. Current Codes Refer to the City of Walnut Creek s Building Division website for the current codes: http://www.walnutcreek.org/citygov/depts/comm_dev/building_div/current_building_codes.asp Page 5 of 6

Policy for Construction of Decks and Ramps within Required Yards For new construction or alterations to existing single-family or duplex residential: 1. Decks and non-required exit stairs and ramps installed in residential occupancies for purposes of providing building code required exits or non-building code required disabled access may encroach up to 4 feet into required front yards and not more than 40% into side yards. 2. Required exit stairs or ramps from these decks, and their associated handrails, may encroach into any required setback. Note: Required exits only need to be 3-feet clear in width along its path. A required exit is an exit that is mandated by the California Building Code. See Municipal Code Section 10-2.3.110 Building Projections into Yards. Side yard Setback Deck See Note 1. House Front yard Setback Sidewalk Stairs/Ramps/Handrails See Note 2. Driveway Page 6 of 6