A PPEARANCE REVIEW BOARD

Similar documents
Appearance Review Board Staff Report

A PPEARANCE REVIEW BOARD

APPEARANCE REVIEW BOARD

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

APPEARANCE REVIEW BOARD

MIAMI 21 ARTICLE 5. SPECIFIC TO ZONES PUBLIC HEARING-FIRST READING TABLE OF CONTENTS

Fence, Wall & Column Information Packet

Residential Design Standards Draft 9 August 2013

BULLARD STREET HEYWOOD AVENUE 40' PUBLIC R/W 40' PUBLIC R/W MARKED CROSSWALK FUTURE B.O.C. LANDSCAPE SCREENING (USDG U-03 RESIDENTIAL WIDE)

A. Applicability and Review Authority.

Commercial Medical Marijuana Operation Design Guidelines

4) Garage placement must be in compliance with Sec. 6.3.G.2 below.

Fences. Facts to Know

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

A PPEARANCE REVIEW BOARD

Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara

RESIDENTIAL DEVELOPMENT GUIDELINES (RF)

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

FENCE PERMIT APPLICATION

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Light Industrial (I)

CITY OF ST. PETERSBURG PLANNING & ECONOMIC DEVELOPMENT DEPT

Staff recommends the Commission approve the administrative design review for Burrito Parilla Mexicana with the following conditions:

5 February 12, 2014 Public Hearing APPLICANT AND PROPERTY OWNER: ERIK HOMES, L.L.C.

Residential Uses in the Historic Village Core

Architectural Review Board Report

Click to edit Master text styles

Section , Article 4 of the Zoning Ordinance December 14, 2012 Page 1 of 8

SECTION 5 EXCEPTIONS AND MODIFICATIONS

MIAMI 21 AS ADOPTED JANUARY 2011

ONLY ONLY BUILDING AND PARKING ENVELOPE RAMP STAIRS NEW SURFACE PARKING PROPOSED HOTEL PROPOSED TWO STORY PARKING STRUCTURE NEW SURFACE PARKING

Legacy Existing Homes Design Guidelines and Submittal Requirements

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

City of Valdosta Land Development Regulations

Gingellville Village Center Overlay District

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

City of Oxnard Central Business District. Design Criteria For Over-The-Counter Downtown Design Review Permits

Architectural Review Board Report

(b) Within the front setback area, no wall, fence or hedge shall exceed three feet six inches (3'6").

COLFAX MAINSTREET OVERLAY DISTRICT

City of Richmond Zoning Ordinance Page 12-1

Creative Village Design Review Committee

ARTICLE VII. CORE CITY ZONING & DESIGN STANDARDS

For Duplicate Buildings and Buildings of 60,000 Gross Square Feet or Greater

CEMENTITIOUS SIDING NORMAN BRICK VENEER SET AT 1/3 COURSING CEMENTITIOUS LAP SIDING (PAINT TO MATCH BRICK COLOR) CEMENTITIOUS SIDING ALUMINUM CANOPY

Neighborhood Traditional Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Facade Grant Program

Submittal Requirements for Administrative Design Review of Signage

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Commercial Tax Abatement

Rules and Regulations


CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

MERRIMAC Homeowner s Association Architectural Control Committee Guidelines

Holdener Farm Area P.U.D. Enumclaw,Washington DESIGN STANDARDS PHASE ONE

MASTER SIGN PLAN BRADFORD

LDR RESIDENTIAL LAND DEVELOPMENT REGULATIONS (LDRs) CODE UPDATE D.R.C. June 7, 2017

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r

a. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards:

Article 5: Supplemental to Zones

#21 ) FDP Covenant Group FINAL DEVELOPMENT PLAN

11 April 8, 2015 Public Hearing

Appendix F CORRIDOR OVERLAY DISTRICT STANDARDS. LAST UPDATE: July 18, 2017 CASE NUMBER: TA ORDINANCE NO

8.6 EXTERIOR LIGHTING

ARTICLE 9 INDUSTRIAL

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

Pueblo Estrella Homeowners Association Architectural Guidelines

City of Rowlett 6 November 2012 Form Based Code ARTICLE 5 SIGNS 5.1 INTENT.

CHAPTER R-6,000 Single-Family Residential. 6,000 Square Foot Minimum Lots

Architectural Control Guidelines

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

11.0 Commercial Infill

Architectural Guidelines

HISTORIC LANDMARK COMMISSION STAFF REPORT

City of Surrey PLANNING & DEVELOPMENT REPORT File:

DISTRICT DESIGN STANDARDS

# Mercyhealth Hospital Project Review for Planning and Zoning Commission

GREEN PASTURES - RESIDENTIAL ARCHITECTURAL REVIEW GUIDELINES

Architectural Review Board Application Information & Criteria

Department of Planning and Community Services Recommendation. Community Zoning Board Recommendations February 21, 2012

ARCHITECTURAL GUIDELINES HOLLYBROOK COVES HOA

Fence and Wall Requirements

Architectural and Landscape Guidelines

That the Planning Commission of the City of El Paso de Robles does hereby make the following findings:

Introduction. Massing and Overall Form. Catalina. Catalina is a 111 lot, single-family home community by Costain Arizona, Inc.

Project Location: 384 Railroad Avenue, Pittsburg, CA. APN:

ARTICLE VIII. (SF-A, SF-TH) SINGLE-FAMILY ATTACHED AND TOWNHOUSE RESIDENTIAL DISTRICTS

MEMORANDUM. DEVELOPMENT REVIEW BOARD Design Review Application #DR Dorset Street

SECTION 832 "C-P" - ADMINISTRATIVE AND PROFESSIONAL OFFICE DISTRICT

Request. Staff Recommendation. Options. Planning Division Department of Community and Economic Development

CITY OF WINTER PARK SETBACK/COVERAGE WORKSHEET GUIDE FOR SINGLE FAMILY ZONING

2451 Bert Drive, Hollister, CA

RESIDENTIAL FENCE STANDARDS

Downtown Design Guidelines

REQUEST FOR ARCHITECTURAL REVIEW AND HOA APPROVAL - PHEASANT WALK HOMEOWNERS ASSOCIATION, INC.

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

Transcription:

Staff Report A PPEARANCE REVIEW BOARD FEBRUARY 19, 2015 Case Number AGENDA ITEM 2 100 W. LIVINGSTON ST. ACE CAFÉ RENOVATION ARB2015-00007 Applicant Tim Lemons, AIA L2 Studios, Inc. Property Location 100 W. Livingston St. Requested Action The Applicant is requesting a Major Certificate of Appearance Approval for the Phase Two elevations and site plans for the development of an Ace Café retail and entertainment complex that includes the renovation and repurposing of the barn and restroom building, event lawn plus associated site features and amenities. Recommendation Staff recommends APPROVAL based on the Conditions of Approval in this Staff Report Project Planner Doug Metzger, AICP, LMT Updated: February 13, 2015 Aerial Photograph S UMMARY Project Description The subject site is bounded on the east by the CSX railroad tracks and Banks of America Building, on the north by Livingston St. and the Lynx terminal and headquarters building, on the west by Garland Ave. and Interstate 4; and on the south by vacant land and an OUC substation. This is a Courtesy Review for the phase one elevations and site plans for Ace Café, a 2.94- acre retail and entertainment complex that includes the renovation and re-purposing of two existing buildings into 18,000 s.f of retail space and 14,000 s.f. of restaurant plus associated site features and amenities. Project History 1904 Existing 6,800 s.f. corrugated metal storage building/barn constructed [potential renovation is part of Phase 2] 1926 18,000 s.f. cement brick building constructed, the Harry P Leu Supply building that fronts onto W. Livingston St.. 1937 14,000 s.f. concrete/cinderblock warehouse building constructed, currently the H2O Church building that sits to the south of the Harry P Leu building. 2014 PD re-zoning approved by MPB [ZON2014-00019]; Approval of PD Ordinance pending City Council approval. December 2014 Ace Café receives ARB Final Approval of the Phase One development plans [ARB2014-00067 Public Notice A poster was posted on site, as of December 12th, no inquiries from the public have been received regarding this site.

Page 2 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two OVERVIEW P ROJECT OVERVIEW Ace Café is a destination oriented retail, restaurant and event facility with an automotive theme located at the corner of Livingston and Garland Streets in Downtown Orlando. In December of 2014 the ARB approved Phase One of the development that included the renovation of the 18,000 s.f Harry P. Leu building into approximately 6,000 s.f of retail on the ground floor 6,000 s.f of 2nd floor office and 2,000 s.f of support uses. The 18,000 s.f warehouse building adjacent to the Leu building will be converted into a two story restaurant with an outdoor bar area. Phase One also included a courtyard event area with a removable stage to the south of the restaurant; and a large automotive display/exhibit/parking area in the center of the property; additional vehicle exhibit areas around the perimeter. There are two access points for the property, one on N. Garland Ave. and one on W. Livingston St. The W. Livingston entry will be the primary entry. A 24-inch brick, opaque streetwall with a 36-inch aluminum picket top is proposed around the perimeter of the site. The proposed Phase Two plan includes the renovation and conversion of the existing on-site barn into an event space that will open on to the event lawn; the renovation of an existing concrete structure into a restroom facility and; the construction of a container structure that will provide seating, shelter and patron service areas along the eastern side of the event lawn. Phase Three of the project, a proposed retail container structure is shown on some of the exhibits in the application package but is not part of this ARB Phase Two approval.

Page 3 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two ARB CONDITIONS OF APPROVAL ARB Staff has reviewed the Phase Two Ace Cafe application and recommends the following Conditions of Approval: 1. General a. ARB Staff supports the redevelopment and re-use of the existing structures on-site as part of Phase Two. b. Phase Three of the project will require an additional and separate Major Certificate of Appearance Approval. 2. Architecture a. Elevations Architectural renovations, elevations, plans, materials and colors of the barn and restroom facility are approved as submitted. b. Container Structures The general design of the container structure on the Event Lawn is acceptable. However, since the facility is specified as design/build the final plans, materials and colors shall require an ARB Minor Review prior to submittal of building permits. c. Barn Deck Final design, materials and colors for the barn deck shall be submitted for ARB Minor Review prior to submittal of building permits for the structure. d. Dumpster Enclosure The proposed design and materials of the proposed dumpster enclosure is approved. However a man-door or pedestrian gate access shall be incorporated into the enclosure design to accommodate employee access to the dumpster enclosure for future re-cycling programs currently being developed by City Staff. e. ARB Approval Final Architectural elevations for all Phase Two structures shall be submitted for ARB Minor Review prior to issuance of building permits. Elevations shall include the location of all proposed exterior signage, lighting fixtures, architectural ornamentation, mechanical equipment, venting and exhaust fixtures. 3. Site Plan a. Streetwall The 5-foot tall street wall design with a 2-foot masonry and brick base, 2.5 foot tall aluminum picket fencing and 5-foot tall brick with masonry cap column is approved as submitted. b. Perimeter Walls The proposed streetwall design can be increased to 6-feet in height along the east property boundary and on the south property boundary from Garland Avenue to the corner of the structure on the adjacent property. The southern wall may be opaque to 6-feet for all or a portion of the remaining south boundary at the Applicant s discretion in order to screen the adjacent uses. The perimeter wall shall be constructed with the Phase One development of the project. c. Dumpster Location The dumpster location which has been a concern in previous submittals is approved in its proposed location. The west side of the drive aisle leading to the dumpster enclosure and the dumpster enclosure shall be screened with a 3-foot tall hedge. Understory trees shall also be utilized to help screen views of the enclosure from Garland Avenue. d. Fencing All fencing on site shall be decorative, open, CPTED-approved fencing, such as aluminum or wrought-iron picket, excluding fences or walls that are used to buffer impacts of or to adjacent properties. Chain link fencing is prohibited. e. Phase Three The undeveloped area of Phase Three shall be seeded or sodded with bahia grass at a minimum. Until a building permit is issued for Phase Three the undeveloped area shall be secured with a post and rope or chain system in order to prohibit parking on the undeveloped site. 4. Mechanical Equipment a. Venting and Exhaust All restaurant venting and restaurant exhaust shall be directed to the roof of the building(s), and shall not be visible from the public right-of-way. Restaurant venting is not permitted on any façade of the building. All other venting and exhaust for mechanical systems and utilities shall be a minimum of 10 ft. above grade, and shall be designed and integrated with the building so as to be seamless with the overall architecture of the building. b. Mechanical Equipment - All ground and roof mounted mechanical equipment and transformers shall be screened from view with parapets, fencing and/or landscaping to meet the requirements of the Land Development Code. c. Backflow Preventer - Backflow preventer/s shall be located so as not to be directly visible from the right-of-way and should be screened from view where necessary. They shall be clearly identified on the final site plan. d. ARB Approval A final mechanical equipment, venting and roof plan including architectural elevations with venting shall be submitted for an ARB Minor Review prior to submittal for exterior building permits. 5. Landscape a. Tree Mitigation There are several substantial existing trees on the Phase 2 site. A report from the City Arborist on the health and viability of the existing trees is required. Removal of existing healthy specimen trees will require mitigation based on the recommendation of the City Arborist.

Page 4 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two STAFF REVIEW COMMENTS [CONT.] ARB CONDITIONS OF APPROVAL [CONT.] b. ARB Approval Final landscape and hardscape plans shall be submitted for ARB Minor Review prior to submittal for exterior building permits for Phase One. 6. Lighting a. Lighting Standards Lighting shall comply with the City s Land Development Code. A signed and sealed lighting plan with photometrics consistent with the lighting ordinance is subject to approval by the Planning Official and ARB Minor Review. The submittal shall also include details of all proposed lighting fixtures on the exterior of the site. The final lighting and photometric plan shall be submitted for an ARB Minor [Staff] Review prior to submittal of final building permits. b. Security Lighting - Security lighting shall not be substituted for parking or pedestrian area lighting fixtures. Security lighting is restricted to lighting service, storage, loading and other similar uses. Security lighting shall not extend beyond the fascia or roofline of any building. c. Light Shields - Security lighting and pedestrian area lighting fixtures shall be fully shielded and similar in color with the surface to which the fixture is attached. d. Service Areas - Lighting under awnings, canopies, and porte-cocheres should be recessed. If not recessed, the box type or other lighting fixture shall be opaque on all sides (no light shall emanate from any side of the fixture). e. Pedestrian Areas Pedestrian area lighting fixtures should be pedestrian in scale, as well as decorative in appearance, style and finish. 7. Signage a. Master Sign Plan A Master Sign Plan shall be submitted for review and approval by the planning official and ARB prior to obtaining a building permit for any new signs. The sign plan shall be approved, denied, or approved with conditions by planning official letter of determination and ARB Major Review. The sign plan must include, at a minimum, the locations, dimensions, areas, and types of each sign, and must conform to applicable provisions of the Orlando City Code and PD ordinance. The Property must be built and maintained in accordance with the approved sign plan. The Master Sign Plan must conform to the architectural elevations. The Master Sign Plan shall be updated prior to issuance of a Certificate of Occupancy for Phase Two. b. Downtown Special Sign District This project is located in the Downtown Special Sign District and shall comply with all the rules and regulations of the district. 8. Model Prior to permitting, a physical 1"= 100' model of the project (or each building as it s developed) should be provided for the DDB/CRA model.

Page 5 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two O VERALL MASTER PLAN

Page 6 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two P HASE TWO PLAN

Page 7 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two C ONTAINER STRUCTURE ELEVATIONS

Page 8 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two E LEVATIONS North Elevation West Elevation

Page 9 SITE DETAILS Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two

Page 10 Case Number ARB2015-00007 100 W. Livingston St. Ace Café Phase Two S ITE FENCING AND WALLS