Drainage Services Flood Prevention Program. Lynnwood/Elmwood Community Consultation

Similar documents
Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

LOT GRADING GUIDELINES

LOT GRADING GUIDELINES

Village of Arlington Heights. Sewer Back-up Rebate Program

Backwater Valves and Sewage Backflow Prevention

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

PROTECTIVE PLUMBING PROGRAM (3P)

DRAINAGE AND FLOODING INFORMATION BOOKLET

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

Basement Flooding Protection Subsidy. Program. Program Information. and Application

Index. Composition and Order of Plan Set. Utility Plan... 5

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

City of Grosse Pointe Park Sanitary Sewer System Inflow and Infiltration Investigation Smoke Testing

System Evaluation and Capacity Assurance Plan

Flooding, Drainage, and Sewer Problems in the City of Valparaiso

SUPPLEMENTAL 2011 PLUMBING CORRECTION SHEET FOR HIGH-RISES

Ordinance No Lot Surface Drainage

Residential Sewer Backup Prevention Program

This policy will generally explain the following in regards to the City sewerage collection systems:

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

SEWAGE TREATMENT AND DISPOSAL

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

SFPUC Flooding Workshop Tuesday, February 9, 2016

Storm Water and Sanitary Sewer

Sewer System Flood Reduction Measures in the Rockcliffe Area

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

STORM DRAINAGE CHAPTER 11

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

4.8. Subsurface Infiltration

Business Plan: Wastewater Removal and Stormwater Management

Stormwater line will be ABOVE ground corrugated pipe (No need to bury) running down to basin on NW 99 th St. It is simple and approved.

10.0 Storm Sewer Systems

WinSLAMM v 10.0 User s Guide. Stormwater Control Devices

4.8. Subsurface Infiltration

TABLE OF CONTENTS SECTION 700 STORM DRAINAGE STANDARDS...

DEVELOPMENT ENGINEERING MANUAL VERSION 1.0 NOVEMBER City of Guelph Engineering and Capital Infrastructure Services

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

Basement Flooding Loan Program Resulting From a Sanitary Sewer Backup

DIVISION 33 UTILITIES

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 11 - STORM DRAINAGE

WEAO STUDENT DESIGN COMPETITION 2018 PROJECT STATEMENT

2017 Wet Weather Flow Master Plan Implementation Status Update

FY2018 CIRP Detailed Summary

City of Tacoma Surface Water Management Manual

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

TOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S.

RECOMMENDATION: Staff recommends approval and provides the following motion for the commission s consideration:

NY Rising Reconstruction Program Project Update

Appendix J: Storm Conveyance Design Parameters

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

PART A4 STORM DRAINAGE SYSTEM

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

BMP #: Water Quality Inserts

PORT OF SAN FRANCISCO PLUMBING CODE. Based on the 2010 California Plumbing Codes

Changes in Assessment Report for the Labatte-Mastronardi Drain

NOVATO WATERSHED PROGRAM

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Infiltration Trench. Image: Cahill Associates, Inc.

8 Infrastructure and Utilities Framework

Northfield Township WWTP Capacity Evaluation Report

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division

Engineering Department

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

DIVISION 5 STORM DRAINAGE CRITERIA

OWNER S GUIDE TO A BETTER FOUNDATION

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

Preliminary Drainage Analysis

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS

PART 5 WATER SYSTEMS

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Premier Architectural Guidelines May 22, Stage 8 Block 6, Lots

Chapter 3: Permit Procedures and Requirements

Project Need and Evaluation

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Streamlining I/I Repairs in Berlin Charter Township

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background

SECTION 2 DESIGN CRITERIA

Appendix G Preliminary Hydrology Study

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT

Chapter 5 Hydraulic Structures

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Evaluation of Collection System Design Standards

The following is required for a complete permit submittal for each unit.

Sewage Back-Ups: Information for Residents

CITY OF BURLINGTON REGENT STREET ALLEY SEWER AND STREET IMPROVEMENTS

Transcription:

Drainage Services Flood Prevention Program Lynnwood/Elmwood Community Consultation

Flooding in Edmonton Recurring problem in many areas Causes disruptions; cost time and money Flood prevention top priority Flood prevention program goals: Find primary causes Identify options Work with communities/other stakeholders to implement viable solutions that improves flood prevention

Actions Since the Flood Emergency response in July Homeowner subsidy program for backwater valves: $3M committed to date Public meetings in Sept./04 Engineering studies of high risk neighbourhoods completed Feb./05

Actions Since the Flood Commitment to public consultation and education Share knowledge and information Stay in touch through regular communications Consult the community before taking further action Reflect community needs and preferences in the action plan

Today s Meeting 1. Share engineering findings 2. Lay out various options 3. Get community input and feedback to help define best outcomes for homeowners and City No final decisions tonight

After Today s Meeting 1. Summarize and share input 2. Incorporate input into action plan recommendations 3. Come back to the community to discuss plan and get feedback 4. Report progress Consultation will continue as required

Why a Joint Meeting? Drainage patterns and trouble spots common to both communities Similar causes for flooding Options to improve flood prevention have impacts on both communities

July Flood Impact Lynnwood 237 homes flooded in 2004 floods 78 homes flooded before 2004 775 homes Elmwood 269 homes flooded in 2004 floods 50 homes flooded before 2004 930 homes

Typical New Home Servicing

Quesnell Storm Basin

QUESNELL STORM BASIN

EDMONTON S SANITARY TRUNK SEWERS

Lynnwood/Elmwood Findings Water volume exceeded storm sewer capacity Stormwater got into sanitary system via: Flooded manhole covers Weeping tile connected to home s sanitary sewer Most flooded basements caused by sanitary sewer backup

Lynnwood/Elmwood Findings Common characteristics of flooded homes 60% had yard elevations above the street curb of 0.5 metres or less 37% had landscaping or lot grading that caused water to drain toward the house 30% had no roof leader or extensions were less than recommended length Only 3% had backflow prevention valves

What Does it Mean? Better flood prevention requires joint effort from homeowners and City System improvements needed; involves significant time and expense Cooperation needed from others who manage or own private property Support needed from community to move ahead

Elmwood Reconnect Catch Basins to Storm Sewers Sanitary Sewer Upgrade Legend Main Trunk (Sanitary) Low Areas Surface Storage New Sanitary System New Storm System Proposed Dry Ponds Proposed Storm Sewer Reconnect Catch Basins to Storm Sewers

Sanitary Sewer Upgrade Lynnwood Reconnect Catch Basins to Storm Sewers Proposed Sanitary Sewers Legend Overflow to Ravine Storm Sewer Upgrade Main Trunk (Sanitary) Low Areas Surface Storage New Sanitary System New Storm System Proposed Street Regrading Proposed Sanitary Sewer Proposed Storm Sewer Proposed Storm Sewer

Improvement Options Sanitary sewer upgrades $3,540,000 Storm sewer upgrades $1,000,000 Build dry ponds in Elmwood $206,000 Do street grading/redirect catchbasins $150,000 Total $4,896,000 Twin the Quesnell Storm Trunk $5,800,000

Homeowner Options Improve lot grading to get surface water away from house Install/maintain adequate eavestroughs: 6 inch wide trough recommended Set in place downspouts: 1.5 metre extensions Install backflow prevention valve Install sump pump

What are the Benefits? Quicker overall drainage Less pooling of water on the surface Less likelihood of basement flooding Less property damage Savings of time, money and inconvenience

Discussion and Feedback Clarifying Questions? Issues, comments, concerns? Ideas and suggestions? Preferred options?