WESTERN UNDERGROUND COMMITTEE GUIDE 3.4 (3.4/00/0565)

Similar documents
Specifications and Installation Requirements for Underground Service for Residential Developments

Multi-Gard PVC Assembly/ Field Cuts

Section 2: Underground

UNM IT/Telecommunications Guide Specification Communications Underground Ducts, Raceways and Structures /27/06

Specifications for Electrical Underground Residential Distribution Systems

Please check with your local inspection authority for any additional requirements before installation.

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe

Specifications for Residential Underground Electric Service Installation

CHAPTER 11 CONDUITS AND FITTINGS

CONDUITS AND FITTINGS

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

1.02 RELATED WORK: Refer to the following sections for related work:

SECTION A1 EXCAVATION AND BACKFILL GENERAL

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

To consistently make good joints, the following should be carefully understood:

Specifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

UNDERGROUND SERVICES SECONDARY

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

PVC CEMENTS PRIMER 8155 CLEANER 7120

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 26 ELECTRICAL SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Vikimatic MultiCell Conduit Systems

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

h Installation Manual

SECTION CHAIN LINK FENCES AND GATES (PARK)

C. Foundation stabilization for pipe and utility structures.

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal.

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

INSTALLATION STANDARD FOR PVC COLD WATER BUILDING SUPPLY AND YARD PIPING IAPMO IS

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

A. Submittal Procedures: See Article 13 of the General Conditions.

Installation Standard For PVC BUILDING DRAIN, WASTE AND VENT PIPE AND FITTINGS IAPMO IS

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Ohio

CHAIN LINK FENCES AND GATES

ITEM 458 WATERPROOFING FOR STRUCTURES

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site

CW 3550 Chain Link and Drift Control Fence TABLE OF CONTENTS

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Telephone Duct Type B

SECTION REINFORCING STEEL

SOLVENT CEMENT WELDING

SPECIFICATION : BORING AND JACKING

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

SOLID WALL PVC SEWER PIPE

SECTION UTILITY MANHOLES AND STRUCTURES

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

Municipality of Waterville Public Sidewalk Repair Policy

SOLID WALL PVC SEWER PIPE

Underground Service Requirements and Instructions

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

HEKAPLAST. PE-HD twin wall cable ducts and cable protection pipes for underground installation. Corrugated and Twin Wall Pipes of Plastics

TYPE 1 TYPE Kruse Drive San Jose, CA Toll-Free:

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

SECTION FOUNTAINS

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

TECHNICAL PROCEDURE TABLE OF CONTENTS

Advisory Circular PAGECONTROLCHART. Remove Pages Dated II Inscr t Pages Dated l/2/ thru 258-l 7/6/ l/2/90

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

Section 401. PIPE CULVERTS

WIRING METHODS CHAPTER 38

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

***************************************************************************************************************

1. Cast-in-place concrete is specified in Section

Home Stretch Liquid Waterproofing Fluid Applied Waterproofing Membrane

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

SPECIFICATION FOR REINFORCED SOIL WALL

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

TYPE "A" CATCH BASIN

Electric Service Standards

TYPICAL INSTALLATION INSTRUCTIONS

Reinforced Earth wall Construction Manual

TRANSPORTATION AND OTHER DAMAGE

City of Brandon Division 2 Standard Construction Specifications Section January 2007 (Revision 2) Page 1 of 21 CONCRETE CONSTRUCTION

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

***************************************************************************************************************

Transcription:

WESTERN UNDERGROUND COMMITTEE GUIDE 3.4 (3.4/00/0565) PLASTIC CONDUIT AND FITTINGS PLACING INSTRUCTION NOTE: This "Guide" summarizes the opinions, recommendations, and practices of the Western Underground Committee members and is issued only to assist these members in preparing their own specifications, or in making recommendations to specification agencies. Thus, this "Guide" may not reflect the complete requirements of each individual utility and is not binding upon them. 1.0 SCOPE This standard provides placing instructions for plastic conduit and fittings. 2.0 BASIC MATERIALS The plastic conduit and fittings used in this standard are those designed to meet Western Underground Committee Model Specification No. 3.1, Plastic Conduit and Fittings. Refer to the latest issue of this standard. 3.0 INSTALLATION 3.1 Preparation a) Make certain that all foreign matter has been wiped from both the conduit and the fittings at the joints. b) The conduit should not insert over ¾ way into fitting to make a good interference cement weld. c) Where practical to do so, change conduit sizes at manholes, splice boxes, pull boxes, etc. (See section 8.1) 3.2 Cutting Use a hacksaw to cut conduit ½ to 1 ½ diameter, or fine tooth wood saw on sizes over 2 diameter. A hacksaw can be used on all sizes. The conduit must be cut straight. Clean off burrs. 1

3.3 Mechanical Damage Minimization a) Conduit should not be left exposed in an open trench longer than absolutely necessary. b) Provide support for the full length of conduit when transporting long lengths. c) Do not permit unsupported overhangs. 3.4 Cementing Conduit a) Apply a liberal and uniform coat of cement to the conduit for the full length of the depth of the socket and apply a uniform coat to sufficiently wet the socket of the fitting. Excess cement on the fitting should be avoided as it is wiped into the joint and tends to weaken the pipe. b) Work fast. c) Slip conduit straight into the fitting with a slight twist until it bottoms. Hold the joint for 15 seconds, (1 minute in extreme cold weather), so that the conduit does not push out of the fitting. Do not twist or drive conduit after inserting is complete. d) The joined members shall be cured undisturbed for five minutes or more before they are handled or transported. After this initial cure, care must be exercised in handling or transporting to prevent twisting or pulling the joint. (In cold or damp weather, this interval should be increased to allow for the slower evaporation of the solvent.) All ducts should be assembled above ground and allowed to lay undisturbed for the weld cure before being lowered into the ditch. e) Be sure to wipe off the excess solvent that is left on the outer shoulder of the fitting. Plastic bristle brushes should not be used. On large diameter conduit, the brush should be a minimum of 1 inch wide. 2

4.0 TEMPERATURE f) Use only small cans of cement since it dries rapidly. Keep container covered when not in use and away from excess heat and flames. g) Another fitting or duct section can be added to the opposite end within two or three minutes if care is exercised in handling so that strain is not placed on the previous assembly. h) Any joint included in section of conduit to be bent in ditch may be made up above ground and allowed to lay undisturbed for 12 hours or more before installation. i) The plastic joint must be held rigid after insertion for the cure period. In cases where a plastic connection is made with the union under stress due to misalignment or other factors. This will relieve stress on the joint until the conduit is backfilled or encased. 4.1 All plastic conduit and fittings to be joined should be exposed to the same temperature conditions for a reasonable length of time before assembly. 4.2 Precautions Due to expansion and contraction of plastic duct of 1 ½ per 100 for every 20 F change in temperature, the following precautions should be taken: a) Allow extra conduit footage at each tie-in for contraction when duct temperature is higher than that of earth; or extra room for expansion, if the reverse condition exists. b) Backfill from center of ditch toward ends or from one tie-in point toward the other end of duct run. c) After ditch is backfilled and compacted and duct temperature is the same as that of surrounding soil, lines may be cut off and matched up for connections with tie-ins. All conduit tie-ins entering manhole, vault, or handhole walls shall be grouted into walls and concrete encased for a minimum distance for 15 outside of walls. 3

5.0 TRENCH 5.1 The trench must be uniformly graded and the bottom rock free, and of select material. The backfill shall be: a) Type A select fill 6 or more surrounding and above direct buried conduit. 1) Sand or sand slurry. 2) Decomposed granite 3) Rock free sandy loam b) Type B select fill for the remainder of the backfill. 1) Mixture of sand or earth and rock, rock not to exceed 1 in diameter and not to comprise more than 50% of material by volume. All backfill should be placed and compacted in layers. c) Earth or sand or a mixture may also contain rock not to exceed 1 inch in diameter and not more than 50 percent by volume. 5.2 Backfill shall be made in layers of 6 and tamped or flooded after a 6 cover is in place. It shall be dense and compacted sufficiently to prevent future settling. It must meet local ordinances. 6.0 CONCRETE ENCASEMENT 6.1 Tie and fasten all conduit to prevent floating. 6.2 Spacers shall be placed at 10 intervals or less for all sizes of conduit (see section 10.1). 6.3 Minimum spacing of conduit as required. 6.4 Minimum concrete coverage shall be 3 on top, bottom and sides of conduit. 6.5 Backfill will be as specified in this standard after concrete has cured. 4

6.6 Conduit is subject to temperature rise as concrete cures. Therefore, allow free end to expand. This can be accomplished by pouring concrete from center of run or from one tie-in point. 7.0 CEMENT AND THINNER 7.1 Use only furnished or recommended cement from conduit fabricator. 7.2 Do not use thinner. 8.0 CONDUIT FITTINGS 8.1 Use approved male-male reducer coupling when changes in conduit sizes are required. 8.2 Use approved adapter coupling to convert to other types of conduit. 9.0 CONDUIT TERMINATION 9.1 Cap free end of conduit terminated in ground with a plastic cap. 9.2 Terminated ends of conduit must be free of support into the manhole for a distance of at least 10 feet. This is to permit alignment of the conduit and the knockout opening. The conduit will be supported inside the manhole with proper spacing and will be cut to length after the concrete envelope has cured. 10.0 CONDUIT SPACES 10.1 Duct spacers should be of the type recommended by conduit manufacturers and approved by the utility. Horizontally and vertically, spacers should be placed as follows: Duct Size Spacing 0 to 2 10 feet 3 & 3-1/2 8 feet 4 to 6 6 feet 5

10.2 Base spacers are to be used. 10.3 Grid spacers when used must be 12 inches or more distance from any coupling or joint. When conduit is assembled above ground, the grid spacer may be supported in vertical position by use of a bent re-bar inserted in holes top of adjacent spacers. 10.4 Grid spacers should not be located at the center of a radius bend: (1) On fabricated bends, locate the spacer in the tangent free of the coupling, (2) On trench formed radius, place the spacer midway between the tangent and center of the bend. 11.0 REVISIONS 11.1 Suggestions for revision and correspondence concerning this specification should be addressed to the: Chairman, Western Underground Committee. (For address, see any member of the committee) 11.2 This specification may be reproduced in whole provided proper credit is given the Western Underground Committee. 6