Safety Requirements for Scaffolding: OSHA Standard

Similar documents
DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

Reliant Holdings Ltd Safety Management System

STANDARD PRACTICE INSTRUCTION

Sample Written Program. For. Scaffolds

Scaffolding Safety. Scaffolding

Scaffolds. OSHA Office of Training & Education 1

Document Number: HSE Created: February 21, 2013 SCAFFOLDING. Author: A Holland

SCAFFOLDING - Part 2 SELF INSPECTION CHECKLIST

SCAFFOLDING PROCEDURE

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

Citations in brackets are from Title 8 of the California Administrative Code.

Supported Scaffold Inspections

Universal Panels & Accessories

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

SCAFFOLDS Revision No: 3

OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS

Scaffolding and Raised Platforms

Scaffold Inspection Procedures for the Competent Person. Merle Errthum

Scaffolding Procedures

LEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014

Safety Policy and Procedure

Control of Hazardous Energy (Lockout/Tagout Requirements and Procedures): OSHA Standard

Section 8. Walking/Working Surfaces. 8.1 Objective. 8.2 Roles and Responsibilities. 8.3 General Requirements. Competent Person

Elevated Work Safety Meeting

Scaffolding. Safety Guide. STOP! Before you climb

NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES

Walking-Working Surfaces

BECx Construction Phase Safety

Big Ox Energy Siouxland, LLC. Safety Management System. Authority: President

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.).

Safety on Heights: Our Policy

Introduction. Estimated length: 30 minutes Audience: construction workers

Figure 5 - A shoring tower is made by assembling end frames with diagonal braces

A Guide to Safe Scaffolding

"SUPPORTED SCAFFOLDING SAFETY IN CONSTRUCTION ENVIRONMENTS"

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM

BP OIL -- TOLEDO REFINERY

SCAFFOLD REQUIREMENTS

(Insert Company Name)

OSHA Rules for Scaffolding

Course 804. Scaffold Erection and Inspection

TANK REPAIRS INCLUDING SCRAP DISPOSAL SCAFFOLDING JOBS

Scaffolding Glossary of Terms A

Systems Scaffold Tubular Scaffold Access Unit Installation Instructions

Chapter 17 - Ladders and Scaffolds

British Columbia Carpenter Apprenticeship Program

TABLE OF CONTENTS PART 10 CONSTRUCTION AND BUILDING SAFETY

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

Multi-Purpose Scaffolding Instruction Manual

EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL

Important: Before You Start

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.

CAL SCAFFOLD USER GUIDELINES COURSE SUMMARY

Typical Deck Details. Albemarle County, Virginia. Based on the 2012 Virginia Residential Code

Walking-Working Surfaces

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

INSTALLATION. General. Important Note. Design. Transport

Walking-Working Working Surfaces. OSHA Office of Training and Education 1

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE

Smarter. Safer. Leaner.

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

The original WACO RED premium frame scaffolding and shoring systems.

POST FRAME BUILDING STANDARDS

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

Span 300 Instruction Manual

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

SECTION CHAIN LINK FENCES AND GATES (PARK)

CUPLOK SGB CUPLOK SGB Group

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

As a scaffold user, Mr Scaffold recommends Method 1, but both options are suitable.

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

SECTION PLATE CONNECTED WOOD TRUSSES

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

MICHIGAN Regulatory Differences Summary.

The Art of Construction and The Design. Direct, rebar chair.

Conergy SolarFamulus II

SECTION NON-STRUCTURAL METAL FRAMING

Introduction to the Trade

SERIOUS: GENERAL RULES, PART 1, RULE 114(1): An accident prevention program was not developed, maintained, and coordinated with employees ---

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15

Scaffold Safety in the Construction Industry

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS CONSUMER AND INDUSTRY SERVICES DIRECTOR S OFFICE BUREAU OF SAFETY AND REGULATION

WORKING AT HEIGHT PROCEDURE

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

Open-Web Trusses. Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses. Design Flexibility. Outstanding Strength-to-Weight Performance

Model Safety Program

CHAPTER 21 SCAFFOLDS 21 SCAFFOLDS. Hazards. Climbing Up and Down. Planks Sliding Off or Breaking. Improper Loading or Overloading

PROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR

EXCAVATION AND TRENCHING SAFETY REQUIREMENTS

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0

Transcription:

ABE178 Safety Requirements for Scaffolding: OSHA Standard 1910.28 1 Carol J. Lehtola, William J. Becker and Chris Eversole 2 The Impact of Safety on Florida Agriculture Florida agriculture, including forestry and seafood, made an annual economic impact of $53 billion in 1998. More than 81,000 people work on the 40,000 farms in the state, and more than 50,000 are employed in other activities related to agriculture. The state's agricultural enterprises range from large citrus, vegetable and cattle operations to small family-operated farms. Over the past 10 years, there have been approximately 240 deaths related to agriculture in Florida, according to data compiled by the Deep South Center for Agricultural Health and Safety. In addition, agriculture has one of the highest injury and death rates among U.S. industries. Safety in Florida agriculture is challenging because: the state's agricultural enterprises are diverse, safety knowledge among workers varies, manual labor is used extensively, the climate creates year-round heat stress. Therefore, it is vital to assist the public in learning about OSHA documents related to agriculture. More related information is available at the Florida AgSafe Web site and at the OSHA regulations Web site. Overview This is a condensation of Standard 1910.28 of the Occupational Safety and Health Act. This document is not intended to be totally inclusive but rather to highlight the information and requirements in the complete OSHA standard that owners and managers of agricultural businesses should understand. Author's Comment: Erecting scaffolding is a common practice in construction, painting, brick laying, etc. It is less common in agriculture. However, there are times when an agricultural 1. This document is AE178, one of a series of the Agricultural and Biological Engineering Department, Florida Cooperative Extension Service, Institute of Food and Agricultural Sciences, University of Florida. Original publication date April 2000. Reviewed February 2008. Visit the EDIS Web Site at http://edis.ifas.ufl.edu. 2. Carol J. Lehtola, Assistant Professor, Department of Agricultural and Biological Engineering, and Extension Safety Specialist; William J. Becker, Professor Emeritus, Department of Agricultural and Biological Engineering; Chris Eversole, editor, Cooperative Extension Service, Institute of Food and Agricultural Sciences, University of Florida, Gainesville, 32611. The Institute of Food and Agricultural Sciences (IFAS) is an Equal Opportunity Institution authorized to provide research, educational information and other services only to individuals and institutions that function with non-discrimination with respect to race, creed, color, religion, age, disability, sex, sexual orientation, marital status, national origin, political opinions or affiliations. U.S. Department of Agriculture, Cooperative Extension Service, University of Florida, IFAS, Florida A. & M. University Cooperative Extension Program, and Boards of County Commissioners Cooperating. Larry Arrington, Dean

Safety Requirements for Scaffolding: OSHA Standard 1910.28 2 business may use scaffolding. The business may use its own employees to construct a building, replace a roof or perform some activity which may require scaffolding. The business may employ a construction or roofing crew to perform this task and put the employees on the business payroll for this period of time. The business may attempt to construct its own scaffolding or rent scaffolds. Under any of these conditions the agribusiness could be under the jurisdiction of OSHA standards and be subject to OSHA citations and fines. An agribusiness would likely use a wood scaffold or rent a metal scaffold. In this document general rules for all scaffolds are followed by specific rules for wood scaffolds and metal scaffolds. Definitions Bearer. A horizontal member of a scaffold upon which the platform rests and which may be supported by ledgers. Boatswain's chair. A seat supported by slings attached to a suspended rope, designed to accommodate one worker in a sitting position. Brace. A tie that holds one scaffold member in a fixed position with respect to another member. Guardrail. A rail secured to uprights and erected along the exposed sides and ends of platforms. Heavy duty scaffold. A scaffold designed and constructed to carry a working load not to exceed 75 Ledger (stringer). A horizontal scaffold member which extends from post to post and which supports the putlogs or bearer frming a tie between the posts. Light duty scaffold. A scaffold designed and constructed to carry a working load not to exceed 25 Maximum intended load. The total of all loads including the working load, the weight of the scaffold, and such other loads as may be reasonably anticipated. Medium duty scaffold. A scaffold designed and constructed to carry a working load not to exceed 50 Mid-rail. A rail approximately midway between the guardrail and platform, used when required, and secured to the uprights erected along the exposed sides and ends of platforms. Putlog. A scaffold member upon which the platform rests. Runner. The lengthwise horizontal bracing or bearing members or both. Scaffold. Any temporary elevated platform and its supporting structure used for supporting workmen or materials or both. Toeboard. A barrier secured along the sides and ends of a platform, to guard against the falling of material. Tube and coupler scaffold. An assembly consisting of tubing which serves as posts, bearers, braces, ties, and runners, a base supporting the posts, and special couplers which serve to connect the uprights and to join the various members. Tubular welded frame scaffold. A sectional, panel, or frame metal scaffold substantially built up of prefabricated welded sections which consist of posts and horizontal bearer with intermediate members. Panels or frames shall be braced with diagonal or cross braces. Working load. Load imposed by persons, materials, and equipment. General Requirements for All Scaffolds Scaffolds must be furnished and erected in accordance with this standard for persons engaged in work that cannot be done safely from the ground or from solid construction. (For information on ladders used for such work, see the documents "Portable Wood Ladders: OSHA Standard 1910.25," "Portable Metal Ladders: OSHA Standard 1910.26" and "Fixed Ladders: OSHA Standard 1910.27.")

Safety Requirements for Scaffolding: OSHA Standard 1910.28 3 The footing or anchorage for scaffolds must be sound, rigid, and capable of carrying the maximum intended load without settling or displacement. Unstable objects such as barrels, boxes, loose brick, or concrete blocks must not be used to support scaffolds or planks. Nails or bolts used in the construction of scaffolds must be of adequate size and in sufficient numbers at each connection to develop the designed strength of the scaffold. Nails must not be subjected to a straight pull and must be driven full length. All planking or platforms must be overlapped (minimum 12 inches) or secured from movement. An access ladder or equivalent safe access must be provided. Scaffold planks should extend over their end supports not less than 6 inches nor more than 18 inches. The poles, legs, or uprights of scaffolds must be plumb, and securely and rigidly braced to prevent swaying and displacement. Materials being hoisted onto a scaffold must have a tag line, a line from the load to the ground. The tag line must be held taut to prevent the load from swinging. Overhead protection must be provided for persons on a scaffold exposed to overhead hazards Scaffolds must be provided with a screen between the toeboard and the guardrail, extending along the entire opening, consisting of No. 18 gauge U.S. Standard Wire one-half-inch mesh or the equivalent, where persons are required to work or pass under the scaffolds. Employees must not work on scaffolds during storms or high winds.employees must not work on scaffolds which are covered with ice or snow, unless all ice or snow is removed and planking sanded to prevent slipping. Tools, materials, and debris must not be allowed to accumulate in quantities to cause a hazard. Only treated or protected fiber rope may be used for or near any work involving the use of corrosive substances or chemicals Wire or fiber rope used for scaffold suspension must be capable of supporting at least six times the intended load. Scaffolds must be secured to permanent structures, through use of anchor bolts, reveal bolts, or other equivalent means. Window cleaners' anchor bolts may not be used. Special precautions must be taken to protect scaffold members, including any wire or fiber ropes, when using a heat-producing process. Lumber sizes (when used in this standard) refer to nominal sizes except where otherwise stated. Wood Pole Scaffolds Scaffold poles must bear on a foundation of sufficient size and strength to spread the load from the poles over a sufficient area to prevent settlement. All poles must be set plumb. Where wood poles are spliced, the ends must be squared and the upper section must rest squarely on the lower section. Wood splice plates must be provided on at least two adjacent sides and must not be less than 4 feet 0 inches in length, overlapping the abutted ends equally, and have the same width and not less than the cross-sectional area of the pole. Splice plates of other materials of equivalent strength may be used. Independent pole scaffolds must be set as near to the wall of the building as practicable. All pole scaffolds must be securely guyed or tied to the building or structure. Where the height or length exceeds 25 feet, the scaffold must be secured at intervals not greater than 25 feet vertically and horizontally.

Safety Requirements for Scaffolding: OSHA Standard 1910.28 4 Putlogs or bearers must be set with their greater dimensions vertical, long enough to project over the ledgers of the inner and outer rows of poles at least 3 inches for proper support. Every wooden putlog on single pole scaffolds must be reinforced with a 3/16 x 2-inch steel strip or equivalent secured to its lower edge throughout its entire length. Ledgers must be long enough to extend over two pole spaces. Ledgers must not be spliced between the poles. Ledgers must be reinforced by bearing blocks securely nailed to the side of the pole to form a support for the ledger. Diagonal bracing must be provided to prevent the poles from moving in a direction parallel with the wall of the building, or from buckling. Cross bracing must be provided between the inner and outer sets of poles in independent pole scaffolds. The free ends of pole scaffolds must be cross braced. Full diagonal face bracing must be erected across the entire face of pole scaffolds in both directions. The braces must be spliced at the poles. Platform planks must be laid with their edges close together so the platform will be tight with no spaces through which tools or fragments of material can fall. Where planking is lapped, each plank must lap its end supports at least 12 inches. Where the ends of planks abut each other to form a flush floor, the butt joint must be at the centerline of a pole. The abutted ends must rest on separate bearers. Intermediate beams must be provided where necessary to prevent dislodgment of planks due to deflection, and the ends must be nailed or cleated to prevent their dislodgment. When a scaffold turns a corner, the platform planks must be laid to prevent tipping. The planks that meet the corner putlog at an angle must be laid first, extending over the diagonally placed putlog far enough to have a good safe bearing, but not far enough to involve any danger from tipping. The planking running in the opposite direction at right angles must be laid so as to extend over and rest on the first layer of planking. When moving platforms to the next level, the old platform must be left undisturbed until the new putlogs or bearers have been set in place, ready to receive the platform planks. Guardrails not less than 2 x 4 inches or the equivalent and not less than 36 inches or more than 42 inches high, with a mid-rail, when required, of 1 x 4-inch lumber or equivalent, and toeboards, must be installed at all open sides on all scaffolds more than 10 feet above the ground or floor. Toeboards must be a minimum of 4 inches in height. Wire mesh must be installed as indicated under the section "General Requirements for All Scaffolds." Metal Scaffold Tube and coupler scaffolds are limited in heights and working levels and must be constructed and erected to support four times the maximum intended loads. All tube and coupler scaffolds must be erected by competent and experienced personnel. Posts must be accurately spaced, erected on suitable bases, and maintained plumb. Runners must be erected along the length of the scaffold located on both the inside and the outside posts at even height. Runners must be interlocked to form continuous lengths and coupled to each post. The bottom runners must be located as close to the base as possible. Runners must be placed not more than 6 feet 6 inches on centers. Bearers must be installed transversely between posts and must be securely coupled to the posts bearing on the runner coupler. When coupled directly to the runners, the coupler must be kept as close to the posts as possible. Bearers must be at least 4 inches but not more than 12 inches longer than the post spacing or runner spacing. Bearers may be cantilevered for

Safety Requirements for Scaffolding: OSHA Standard 1910.28 5 use as brackets to carry not more than two planks. Cross bracing must be installed across the width of the scaffold at least every third set of posts horizontally and every fourth runner vertically. Such bracing must extend diagonally from the inner and outer runners upward to the next outer and inner runners. Longitudinal diagonal bracing must be installed at approximately a 45-degree angle from near the base of the first outer post upward to the extreme top of the scaffold. Where the longitudinal length of the scaffold permits, such bracing must be duplicated beginning at every fifth post. In a similar manner longitudinal diagonal bracing must also be installed from the last post extending back and upward toward the first post. Where conditions preclude the attachment of this bracing to the posts, it may be attached to the runners. The entire scaffold must be tied to and securely braced against the building at intervals not to exceed 30 feet horizontally and 26 feet vertically. Guardrails not less than 2 x 4 inches or the equivalent and not less than 36 inches or more than 42 inches high, with a mid-rail, when required, of 1 x 4-inch lumber or equivalent, and toeboards, must be installed at all open sides on all scaffolds more than 10 feet above the ground or floor. Toeboards must be a minimum of 4 inches in height. Wire mesh must be installed as indicated under the section "General Requirements for All Scaffolds." Other Scaffolds Author's Comment: There are other types of scaffolding (outrigger scaffolds, suspension scaffolds, bracket scaffolds, etc.); however, their use is less common in agriculture.