Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

Similar documents
Willamette River Bridge Advisory Committee

From the ADA and ABA Accessibility Guidelines for Buildings and Facilities

A long-term, comprehensive solution

Sunrise Project South I-205 Corridor Improvement Project

I-10 Mobile River Bridge. & Bayway Widening

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

Federal Way Transit Center to Tacoma Dome Light Rail

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Grade-Separated Trail Crossings How Do We Get Over There?

Barriers, Parapets, and Railings

5 Recommendations 5.1 LONG-TERM ALTERNATIVES CONSIDERED

Project Initiation Form

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Chapter 10 Corn Futures

Several intersection improvements, bicycle-pedestrian improvements, and ITS/signage improvements are recommended for the short- and medium-term.

Waterways 1 Water Transportation History

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Columbia River System Operations Environmental Impact Statement Newsletter

CITY OF LOS ANGELES Sidewalk Repair Program. Amber Elton, PE

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007

Small. Application. Regulation Reference: (see page 23 for link to the regulation)

Mobility and System Reliability Goal

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

RESOLUTION NO

LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017)

Challenges of Sustainable Infrastructure AAEES UCI

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

Port of Long Beach Port Master Plan Overview December 22, 2008

Use of Grade 80 Reinforcement in Oregon

FINAL ENVIRONMENTAL IMPACT STATEMENT/RECORD OF DECISION AND SECTION 4(F) EVALUATION

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Freight Movement Element

Executive Summary. ES-1 Introduction. ES-2 Background

Design, installation and management of remote pedestrian structures in Tasmania. Tim Chappell, Senior Engineer Tasmania Parks & Wildlife Service

Society of Women Engineers Region H Conference

J O I N T P U B L I C N O T I C E

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Current Trends in Marina Planning and Design

Enhancing Data Resolution to Improve Maritime Safety

TECHNICAL MEMORANDUM

Chapter 1 Introduction

Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

ATTACHMENT 13 NORTHEAST-POCONO RELIABILITY PROJECT PPL DESIGN CRITERIA AND SAFETY PRACTICES

Metro Blue Line Improvements & Project Update

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

New York State Freight Transportation Plan. NYSAMPO Meeting. NYSAMPO Meeting June 21, 2017

Environmental Reviews and the State Environmental Policy Act (SEPA) Process. November 2014

I-70 East PACT DRAFT EVALUATION DATA

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

Waterway Suitability Assessments: Risk Management Considerations for New Products

PROPERTY OVERVIEW HEAVY INDUSTRIAL LIGHT INDUSTRIAL TRANSPORTATION AMENITIES LOCATION WHERE BUSINESS HAPPENS

Project Evaluation Criteria

Neptune Cargill Overpass Extension

Greenfield Pond B Rehabilitation

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

DECEMBER 2017 LRFD BRIDGE DESIGN 2-1

Florida Accessibility Code for Building Construction

3.6 Construction Methods

MIC Core Pre-Schematic Program Analysis

Eric Thomas Benchmark River and Rail Terminals

Chapter 11 Culverts and Bridges

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts

Council Agenda Report

TRANSPORTATION PLAN Donald Vary

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

DURISOL PRECAST NOISE BARRIERS PRODUCT GUIDE

Stairs have many potential violations this Newsletter is Part 1 of two parts.

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Load Transfer Sequencing for Maintenance of Lift Span Bridges

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

S-09: Auburn Station Access Improvements

Seismic Design of Long-Span Bridges

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Chatham County EMERGENCY OPERATIONS Plan INCIDENT ANNEX C BRIDGE DISRUPTION

Pacific Northwest Challenges and Opportunities

Accessible Parking. Scoping and Technical Requirements

What Does the MTS Mean to Me?

Chapter 3 - Goals, Objectives, & Strategies

Facts that provide correct decision-making input

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017

ODOT ADA Program 10/31/2017. Recent ADA outcomes. What you need to know. Settlement Agreement approved. Updated Transition Plan

Ballard-Interbay MIC Summary Statistics

Delaware Valley Goods. July 15, 2009

Process for Port Master Planning

Selecting Projects for Accelerated Bridge Construction

MONITORING IMPLEMENTATION AND PERFORMANCE

DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS. Public Safety Services ADA-ABA COMMENT ASSISTANCE GUIDE

Work Group Item Stairways serving an occupant load of less than 50 shall have a width of not less than 36 inches (914 mm).

STRATEGIC ASSET MANAGEMENT: AN EMERGING PORT MANAGEMENT IMPERATIVE

KIEWIT FOUNDATIONS CO.

Transcription:

Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee 08.11.09

Vertical Clearance Tower Design Refinements Pathway Routing at Tower

Vertical Clearance

Vertical Clearance Update 4.75% 4.75% ± 75 Additional analysis on vertical clearance to occur during Preliminary Engineering

Vertical Clearance Presentations 5/4/09: FTA and US Coast Guard 5/7/09: River Users and Landside Stakeholders 5/13/09: Lower Columbia Region Harbor Safety Committee Assembled and analyzed data Interviewed river users who might be impacted

Vertical Clearance Update Climate Change Research Findings 1.9 3.5 increase due to flow by 2099 Increases occur mainly during winter months Does not consider possible flow management mitigation - dams

Vertical Clearance Update Allowance added for Safety and potential climate change impacts 3 and 3.5 were used Analysis done with and without allowance to determine implications

Vertical Clearance Update Analyzed River Data Analyzed a wide range of vertical clearance alternatives (17) 65.00 80.00 72.00 81.00 75.00 82.00 76.00 83.00 77.00 84.00 77.36 78.00 78.36 79.00 85.00 90.00 120.00 Example

Vertical Clearance Update Portland Spirit s Vessels Air Draft: 58 Air Draft: 44 Columbia Gorge (Copied from: http://www.portlandspirit.com/sternwheeler.php Portland Spirit (Copied from: http://www.portlandspirit.com/spirtech.php)

Vertical Clearance Update Results Analyzed Graphed percent passage in December Graphed the change in % between clearances for December Determine point of diminishing return

Vertical Clearance Update Vertical Clearance Alternatives Analysis Portland Spirit's Columbia Gorge: 58' Air Draft Change in % Passing Between Clearance Alternatives 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 97.6% 46.8% 99.4% 99.8% Graphed percent passage in December 0.0% 65.00 72.00 75.00 76.00 77.00 77.36 78.00 78.36 79.00 80.00 81.00 82.00 83.00 84.00 85.00 90.00 120.0 Vertical Clearances Change in Percent Passage Between Clearance Alternatives for December Percent Passing for December

Vertical Clearance Update Vertical Clearance Alternatives Analysis Portland Spirit's Columbia Gorge: 58' Air Draft Change in % Passing Between Clearance Alternatives 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 97.6% 46.8% 99.4% 99.8% Graphed percent passage in December Graphed the change in % between clearances for December 0.0% 65.00 72.00 75.00 76.00 77.00 77.36 78.00 78.36 79.00 80.00 81.00 82.00 83.00 84.00 85.00 90.00 120.0 Vertical Clearances Change in Percent Passage Between Clearance Alternatives for December Percent Passing for December

Vertical Clearance Update Without Allowances for Safety or Climate Change Vertical Clearance Alternatives Analysis Portland Spirit's Columbia Gorge: 58' Air Draft Change in % Passing Between Clearance Alternatives 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 97.6% 46.8% 99.4% 99.8% Beyond 77.36 there is No Change In % Passing 100% 0.0% 65.00 72.00 75.00 76.00 77.00 77.36 78.00 78.36 79.00 80.00 81.00 82.00 83.00 84.00 85.00 90.00 120.0 Vertical Clearances Change in Percent Passage Between Clearance Alternatives for December Percent Passing for December

Vertical Clearance Update With Three Foot Allowance for Safety Climate Change Vertical Clearance Alternatives Analysis With Three Foot Allowance for Climate Change and Safety Portland Spirit's Columbia Gorge: 58' Air Draft Change in % Passing Between Clearance Alternatives 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% 0.8% 97.6% 98.0% 98.7% 91.9% 99.7% 99.4% 98.9% 99.8% Beyond 77.36 there is Nominal Change In % Passing 98.9% vs 100% Dec: 10 days out of last 30 years All year: 55 days out of 10,663 65.00 72.00 75.00 76.00 77.00 77.36 78.00 78.36 79.00 80.00 81.00 82.00 83.00 84.00 85.00 90.00 120.0 Vertical Clearances Change in Percent Passage Between Clearance Alternatives for December Percent Passing fro December

Vertical Clearance Update With 3.5 Allowance for Safety Climate Change Vertical Clearance Alternatives Analysis With 3.5' Foot Allowance for Climate Change and Safety Portland Spirit's Columbia Gorge: 58' Air Draft Change in % Passing Between Clearance Alternatives 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% 0.1% 97.0% 97.9% 98.3% 98.6% 98.9% 90.0% 99.9% 99.7% 99.3% Beyond Beyond 77.36 77.36 there there is is Nominal Nominal Change Change In % In Passing % Passing 98.9% 98.6% vs 100% vs 100% Dec: 13 days out of last 30 years All year: 68 days out of 10,663 65.00 72.00 75.00 76.00 77.00 77.36 78.00 78.36 79.00 80.00 81.00 82.00 83.00 84.00 85.00 90.00 120.0 Vertical Clearances Change in Percent Passage Between Clearance Alternatives for December Percent Passing fro December

Vertical Clearance Update Draft Findings Additional vertical clearance provides diminishing benefit to existing commercial river users at about 77.36

Analysis of Landside Implications Provide for stations at grade

Analysis of Landside Implications Provide for stations at grade Supports landside development Increases public access to transit system Improves station safety and security - Crime prevention through environmental design (CEPTED)

Analysis of Landside Implications South Waterfront North District Provide for stations at grade

Analysis of Landside Implications

Analysis of Landside Implications Provide for stations at grade

Analysis of Landside Implications

Analysis of Landside Implications Analyzed a wide range of vertical clearance alternatives (10) 65.00 80.00 72.00 85.00 75.00 85.00 with ADA compliant ramps and landings 77.36 90.00 78.36 120.00

Analysis of Landside Implications Plans Developed

Analysis of Landside Implications Implications Tabulated

Analysis of Landside Implications Relative Landside Implications for Bridge Clearance Alternatives Relative Landside Implications $80,000,000 $70,000,000 $60,000,000 $50,000,000 $40,000,000 $30,000,000 Costs used as a Proxy to graphically illustrate the composite landside implications analyzed $20,000,000 $10,000,000 $0 75 77.36 78.36 80 85 90 120 Bridge Clearance Alternatives Relative Landside Implications for Bridge Clearance Alternatives

Analysis of Landside Implications Relative Landside Implications for Bridge Clearance Alternatives Relative Landside Implications $80,000,000 $70,000,000 $60,000,000 $50,000,000 $40,000,000 $30,000,000 Beyond 77.36 Landside Impacts Change from Nominal to Significant $20,000,000 $10,000,000 $0 75 77.36 78.36 80 85 90 120 Bridge Clearance Alternatives Relative Landside Implications for Bridge Clearance Alternatives

Vertical Clearance Update Draft Findings Additional vertical clearance provides diminishing benefit to existing commercial river users at about 77.36 Moderate to significant landside impacts for incremental increases in bridge vertical clearance occurs at about 77.36

Analysis of Landside Implications Analyzed a wide range of vertical clearance alternatives 65.00 80.00 72.00 85.00 75.00 85.00 with ADA compliant ramps and landings 77.36 90.00 78.36 120.00 Portland Spirit request Analyze vertical clearance using ADA ramps and landings

Analysis of Landside Implications 77.36 Vertical Clearance 77.36

Analysis of Landside Implications 77.36 Vertical Clearance Add ADA Ramps and Landings 77.36

Analysis of Landside Implications 85.00 with ADA compliant ramps and landings Changes running slope 4.75% to 5.85% 23% Increase in slope 85.00 7.64 Additional clearance 77.36

Analysis of Landside Implications 5.85% running slope Exceeds LRT maximum design standards

Analysis of Landside Implications 5.85% running slope Exceeds LRT maximum design standards Reduced service reliability during inclement weather

Analysis of Landside Implications 5.85% running slope Exceeds LRT maximum design standards Reduced service reliability during inclement weather Reduced service level single track operations for bridge inspection and maintenance

Analysis of Landside Implications 5.85% running slope Exceeds LRT maximum design standards Reduced service reliability during inclement weather Reduced service level single track operations for bridge inspection and maintenance Reduced average speed

Analysis of Landside Implications 5.85% running slope Exceeds LRT maximum design standards Reduced service reliability during inclement weather Reduced service level single track operations for bridge inspection and maintenance Reduced average speed Increased vehicle maintenance

Analysis of Landside Implications 5.85% running slope Exceeds LRT maximum design standards Reduced service reliability during inclement weather Reduced service level single track operations for bridge inspection and maintenance Reduced average speed Increased vehicle maintenance Draft Cost Estimate $17.2M

Vertical Clearance Update Continuing Research on Future River Navigational Needs Marine Highway Act of 2007 Access to Willamette Falls Locks require passage under four bridges with lower vertical clearances than 77.36 Sellwood Bridge........................72 Southern Pacific Railroad Bridge..........74 I-205 Bridge............................76 Oregon City Bridge......................74

Vertical Clearance Update Continuing Research on Future River Navigational Needs Marine Highway Act of 2007 Land Use changes City of Portland s Industrial Districts Atlas of 2004 Central Portland Plan Update (2008 2011)

Vertical Clearance Update Continuing Research on Future River Navigational Needs Marine Highway Act of 2007 Land Use changes US Coast Guard rule changes Are there trends, codes, or regulation changes that may affect future vessel height? Meeting set with USCG later this month to review Scheduling meeting with Marine Architect to review

Vertical Clearance Update Continuing Research on Future River Navigational Needs Marine Highway Act of 2007 Land Use changes US Coast Guard rule changes Implications if changes are made to regions dam system Future dredging of navigational routes

Vertical Clearance Update Future Dredging of Navigational Routes Current research indicates that Army Corps of Engineers only has plans to dredge the area north of the Broadway Bridge to support the Working Harbor Steel Bridge Copied from Working Harbor Reinvestment Strategy Report December 2006

Vertical Clearance Update Next Steps Continue research on implications of future river navigation Staff recommendation to Steering Committee scheduled for October Discussion - Questions?

Vertical Clearance Tower Design Refinements

Cable Stayed Refined

Next Steps Refinement of significant elements Tower pier walkway Railing Lighting and OCS integration Greenway Programming bicycle and pedestrian path Cable Stay - Refined

Program Pathway

7/2/09 Working Group Meeting SCHEME A Inclined Tower SCHEME B V Tower with Strut SCHEME C Split V Tower with Strut SCHEME D H Tower SCHEME E Steel Tower

Working Group Recommendation SCHEME A Inclined Tower SCHEME B V Tower with Strut SCHEME C Split V Tower with Strut SCHEME D H Tower SCHEME E Steel Tower

7/24/09 Working Group Meeting Tower Plan Views Tower Articulation Options

7/24/09 Working Group Meeting Edge Articulation - Concept

Edge Articulation - Developed

Edge Articulation - Illustrated

Edge Articulation - Illustrated

Form Articulation - Concept

Form Articulation - Developed

Form Articulation - Illustrated

Form Articulation - Illustrated

Rounded - Concept

Rounded - Developed

Rounded Illustrated

Rounded Illustrated

Tower Articulation Comparison Alternative: Edge Form Rounded Cost Premium: $1.7 M $1.7 M $5.4 M Steel tower cost was explored $20.9 M premium

Vertical Clearance Tower Design Refinements Pathway Routing at Tower

Pathway Routing at Towers

Pathway tight at Tower

Pathway tight at Tower

Pathway extended from Tower

Pathway split at Tower

Pathway split at Tower

Pathway tight at Tower

Pathway tight at Tower

Pathway extended from Tower

Pathway split at Tower

Pathway split at Tower

8/7/09 Working Group Meeting Analyzed each mode Pedestrian Bicycle Service Vehicles

8/7/09 Working Group Meeting Analyzed each mode for each alternative Base case: pathway tight to tower Joint path extended from tower Separated (split) pathway extended from tower

8/7/09 Working Group Meeting Reviewed characteristics that vary between alternatives Security Out of direction travel Maintenance

8/7/09 Working Group Meeting Reviewed characteristics that vary between alternatives Being on the bridge: Experiencing the bridge Being on the bridge: Experiencing the river Being near the bridge Transparency

8/7/09 Working Group Meeting Reviewed characteristics that vary between alternatives Mode conflict Stormwater and shading Accidents emergency response

Working Group Recommendation Alternative: Base Joint Path Separate Path

Working Group Recommendation Alternative: Base Joint Path Separate Path Total score: 71 53 38 78 Maximum Points Available

Working Group Recommendation Alternative: Base Joint Path Separate Path Total score: 71 53 38 Percent of total: 91% 68% 49%

Working Group Recommendation Alternative: Base Joint Path Separate Path Total score: 71 53 38 Percent of total: 91% 68% 49% Base case has the most technical merit

Working Group Recommendation Cost Premium: $0 $4.2 M $5.1 M Alternative: Base Joint Path Separate Path Total score: 71 53 38 Percent of total: 91% 68% 49% Base case has the most technical merit

Path Routing Discussion Cost Premium: $0 $4.2 M $5.1 M Alternative: Base Joint Path Separate Path Total score: 71 53 38 Percent of total: 91% 68% 49% Base case has the most technical merit

Tower Articulation Discussion Alternative: Edge Form Rounded Cost Premium: $1.7 M $1.7 M $5.4 M Steel tower cost was explored $20.9 M premium

Questions? Vertical Clearance Tower Design Refinements Pathway Routing at Tower

Program Pathway

Thank you For more information, visit: trimet.org/pm