STANDARD PLAN FOR MINOR EARTH DISTURBANCES

Similar documents
Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Ordinance No Lot Surface Drainage

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

STORMWATER AND EROSION CONTROL PERMIT

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Chapter 21 Stormwater Management Bylaw

Water Quality: 1.0 Water Quality Protection Volume and Peak Flow 2.0 Construction SWP3 Guidelines and Form

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

SECTION 17.1 STORMWATER MANAGEMENT AND EROSION CONTROL

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

ARTICLE A. POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

S.O.P. No. HMD

RESIDENTIAL BUILDING PERMIT

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Fence and Wall Requirements

Soil Erosion and Sedimentation Control Compliance Form

Stormwater Local Design Manual For Houston County, Georgia

E. STORMWATER MANAGEMENT

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

MODEL Stormwater Local Design Manual. City of Centerville

SACHSE EROSION CONTROL GUIDELINES

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

Construction Application for Permit (CAP) Instructions

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Cass County Soil Erosion & Sedimentation Control Program

JEFFERSON COUNTY STORM WATER MANAGEMENT

DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE , 6206, 6207, /09/03

WOODFORD COUNTY, ILLINOIS EROSION, SEDIMENT AND STORM WATER CONTROL ORDINANCE

Erosion & Sedimentation Control Policy

Small Site Stormwater Quality Permit Application

Chapter 3 Dispersion BMPs

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

CHAPTER 9 STORMWATER MANAGEMENT PLAN REQUIREMENTS

UC SANTA CRUZ EROSION AND SEDIMENT CONTROL STANDARDS FOR PROJECTS UNDER ONE ACRE

Property Address: Builder: Phone #: Address:

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

Review of State and Federal Stormwater Regulations November 2007

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Municipal Stormwater Ordinances Summary Table

N.J.A.C. 7:8 Stormwater Management Rules - Design and Performance Standards. Nonstructural Strategies Assist with Strategy #2; See Page 3

Sub-Chapter B To Chapter 14, Building Code

SECTION 903 EROSION CONTROL

MONROE COUNTY ZONING OFFICE

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE

7/16/2012. Post Construction Best Management Practices (PCBMPs) Article VIII: Post Construction Best Management Practices

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

4.8. Subsurface Infiltration

All new construction, mobile home placement & additions.

Shelbyville, KY Stormwater Best Management Practices January Appendix F EPSC Qualified Contractor Forms

Title 15 BUILDINGS AND CONSTRUCTION

FENCE PERMIT APPLICATION

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES

Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act Application

Article 5: Conservation Overlay Districts

2011 Guidance Manual for Development Stormwater Quality Control Measures

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

Chapter 2 ADMINISTRATIVE PROCEDURES

Infiltration Trench. Image: Cahill Associates, Inc.

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

4.8. Subsurface Infiltration

General Permit No.: OHR Page 53 of 146

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

STORMWATER DEVELOPMENT GUIDELINES

3.0 Planning and Submittal Requirements

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Private Sewage Permit Application

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Pre-Application Checklist. Pre-Application Optional Checklist. Application Checklist

Center for Watershed Protection Howard County Planning & Zoning Stormwater Maintenance, LLC

SoPo s SW Management Approach Purpose of SW Standards

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

Richland County Department of Public Works Engineering (Land Development) Division

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Transcription:

Allegany Soil Conservation District 12407 Naves Cross Road, NE Cumberland, MD 21502 Phone: 301.777.1747 Fax: 301.777.7632 Permit #: Allegany County City of Cumberland City of Frostburg Other Date: STANDARD PLAN FOR MINOR EARTH DISTURBANCES Plan prepared for: Sediment & Erosion Control (SEC) Stormwater Management (SWM) single family dwelling applications only Zoning (Setback Requirements) PROJECT INFORMATION (Reference Land Use Permit # above if left blank) Location: Owner: Phone: Alt. Phone: Developer/Builder: Phone: Alt. Phone: Total Lot Area: sf Total Area of Disturbance: sf ac Total Impervious Area: sf Distance between disturbed area and any free flowing stream: feet CERTIFICATION: I hereby certify that I have the authority to make application to this Standard Plan; that the information contained herein is correct and accurate; and that all clearing, grading, construction, and development will be conducted according to the project information, limitations and conditions set forth by this agreement. I understand that Allegany County and Allegany Soil Conservation District assume no liability for the accuracy of information provided or performance of the practices noted on these plans. Owner/Applicant Signature Date Signature (check one) Developer Builder Date Developer/Builder Company Name: APPROVED FOR: SEC SWM By: Allegany Soil Conservation District Date Expiration Date Page 1 of 5

This Standard Plan may be used in lieu of a professionally-engineered site plan to meet the requirements for sediment & erosion control (SEC) and stormwater management (SWM), as applicable per checked items on page 1, provided that all of the following limitations and conditions are met. LIMITATIONS: General 1. Total land disturbed during construction shall be less than 30,000 square feet or 250 cubic yards. 2. Note: projects that cumulatively disturb less than 5,000 square feet are exempt from stormwater requirements per the Allegany County Stormwater Ordinance. 3. Land area that is disturbed for septic system construction may be subtracted from the total disturbed area provided it is revegetated. 4. The owner, builder, or developer is not the same owner, builder, or developer of any contiguous lots undergoing development. 5. This Standard Plan shall not be used in areas of special concern (e.g. karst geology, sinkhole activity, surface water supply reservoirs, wellhead protection areas, etc.) or if site conditions such as slope (>25%), soil type, high groundwater, floodplain, previous mining activity, etc. present a challenge. 6. Projects that involve a waterway construction permit from Maryland Department of the Environment (MDE) will not be issued a building permit under this Standard Plan until MDE permit has been issued. Any engineering required for MDE permit will not be provided under this Standard Plan. Sediment & Erosion Control (SEC) 7. No slopes steeper than 2:1 (horizontal:vertical) will be created. 8. Cuts and/or fills will not exceed ten (10) feet in depth or height. Stormwater Management (SWM) 9. The project is a single lot residential construction, not within a developing subdivision, and there is no contiguous land undergoing development by the same owner, builder, or developer. 10. Total site impervious cover shall not exceed 20% of the lot size. 11. Documentation must be submitted to show that Environmental Site Design (ESD) has been implemented to the maximum extent practicable (MEP) per the 2000 Maryland Stormwater Design Manual (Manual) before structural practices found in the Manual and specified by Allegany Soil Conservation District (ASCD) are used. 12. An Operation & Maintenance Agreement must be signed (but not recorded) prior to permit issuance for any structural stormwater practices. REFERENCES: 1. 1994 Maryland Standards and Specifications for Soil Erosion and Sediment Control, including all subsequent revisions. 2. 2000 Maryland Stormwater Design Manual, Volumes I and II, including all subsequent revisions. Page 2 of 5

CONDITIONS: Grading 1. Initial earth disturbance shall be limited to that necessary to install sediment & erosion control measures, as specified on the attached sketch. 2. The permanent driveway or entrance location shall be used as a stabilized construction entrance. Two inch stone shall be placed at least 6 inches deep, 30 feet long, and 10 feet wide. The entrance shall be top dressed with stone as necessary to prevent tracking of sediment onto public streets or rights-of-way. 3. Silt fence shall be installed at any location where surface runoff from disturbed or graded areas flows off the property to prevent sediment from being transported off-site. See attached sketch. 4. Swales or other areas that transport concentrated flow shall be protected with erosion control matting or sod. 5. Downspouts shall be protected by splash blocks. 6. Grading shall not impair existing surface drainage, create an erosion hazard, or create a source of sediment to any adjacent watercourse or property. 7. Any grading which requires relocation, piping or diversion of an existing drainway with a watershed exceeding 5 acres shall require an engineered plan. Stabilization Following initial soil disturbance or redisturbance, permanent or temporary stabilization shall be completed within: 1. Seven calendar days for the surface of all perimeter controls, and all perimeter slopes. 2. Fourteen calendar days for all other disturbed or graded areas. Stormwater Design The following conditions for design and construction shall be met and maintained. All stormwater management systems shall be designed by integrating site design, natural hydrology, and smaller controls to capture and treat runoff onsite. The standard for characterizing predevelopment runoff characteristics for new development projects shall be woods in good hydrologic condition. If the following design conditions are met, all stormwater management obligations will be satisfied. 1. A sketch at an appropriate scale with the following information must be attached to this application for coverage under the Standard Plan: a. Property lines with dimensions b. Access road(s)/driveway (existing and/or proposed) c. Location and dimensions of all existing and proposed structures/infrastructure d. Topography (2-ft. contour intervals) e. Streams/drainageways/wetlands with buffers/setbacks f. Floodplains g. Steep slopes (>25%) Page 3 of 5

h. Soil type(s) with HSG, permeability, depth to bedrock and depth to seasonal high groundwater table identified i. Any on-site easements j. Proposed limits of disturbance 2. All ESD practices shall be designed and located to prevent basement seepage, flooding, soil erosion, increases in nonpoint pollution and minimize pollutants in stormwater runoff from both new and redevelopment. 3. All rooftop downspouts shall discharge to and drain continuously through at least 75 feet of vegetation (e.g. vegetated channel, swale, or filter strip) in a non-erosive manner to the property line. 4. To the extent practical, all other site impervious areas shall drain and discharge continuously through vegetation in a non-erosive manner. The length shall be equal to that of contributing impervious area. 5. All access roads and/or driveways constructed for this project shall use open sections in lieu of curb and gutter. 6. The following ESD practices may be used in lieu of providing the required rooftop and other impervious area vegetation lengths: dry wells, rain gardens, bioretention and swales. 7. Design constraints specific to each ESD practice as specified in the Manual must be addressed. 8. The total impervious area draining to any ESD practice shall conform to the specifications listed in the Manual. 9. The drainage area to each rooftop downspout shall be 500 square feet or less. Drainage areas to individual downspouts greater than 500 square feet shall be treated using drywells, rain gardens, or other similar practices specified by ASCD. 10. ASCD reserves the right to deny approval under this Standard Plan based on any limitations or conditions noted herein and require that a design be prepared by a professional engineer in accordance with the Allegany County Stormwater Ordinance and the Manual. Construction 1. The ASCD Inspector shall be contacted at least 48 hours prior to the start of construction at 301-777-1747, extension 109. 2. All stormwater practices and/or runoff controls shall be installed and maintained according to this Standard Plan and the criteria contained in Chapter 5 of the Manual. Subsequent alteration or modification of these practices requires approval from ASCD. 3. Access to the site will be made available at all reasonable times during construction and with reasonable notification after construction for inspection by ASCD. 4. The applicant/homeowners shall promptly repair and/or restore all stormwater practices found in noncompliance by ASCD. 5. ASCD reserves the right to deny approval under this Standard Plan and require that a design be prepared by a professional engineer in accordance with the Allegany County Stormwater Ordinance and the Manual. 6. Nothing in this Standard Plan relieves the applicant from complying with any and all federal, State, and local laws and regulations. 7. In the event that the applicant fails to provide adequate sediment control according to the provisions of this plan, ASCD reserves the right to require corrective action. Page 4 of 5

8. Coverage under this Standard Plan shall remain valid for two (2) years from the date of approval. Post-Construction Prior to issuance of a Certificate of Occupancy, the following obligations must be fulfilled: 1. The ASCD Inspector shall be contacted to perform a final construction inspection to ensure that final grading, establishment of permanent stabilization and implementation of ESD planning techniques and practices are completed according to this plan. 2. A sketch at an appropriate scale clearly depicting the location of all disconnected impervious areas and ESD practices and associated easements shall be attached to the Operation & Maintenance Agreement. O&M Agreement shall be fully executed and recorded among the Land Records of Allegany County. Page 5 of 5