A Unified, Intelligent & Evolvable Solution to Enable NERC CIP Compliance and Substation Knowledge

Similar documents
Circuit Breaker Asset Management Using Intelligent Electronic Device (IED)- Based Health Monitoring

SUBNET IoT to the PI System: A Bridge to Support Business Use Cases

Business Practice. Contents

Grid Solutions. ASSET PERFORMANCE MANAGEMENT for Electrical Substations

Asset Risk Assessment Through Advanced Analytics. Cop yri g h t 2014 OSIso f t, LLC.

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

Information Document Protection System Information ID# R

Analyzing Event Impacts using PI Event Frames and Versify

Managing intelligent electronic devices

Advisory Council Meeting March 4, 2010 Utility Representative Steve Willard Vendor Representative Carl Mansfield - Sharp Labs of America, Inc.

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E.

Effective Management of Distribution Grid Model Data

DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT

ELECTRICITY SUPPLY - POWER SYSTEM MAINTENANCE Carry out routine inspection and servicing on high voltage minimum oil circuit breakers

Facility Interconnection Requirements

Lenovo Services for the Data Center

SENTRON Powermanager. SENTRON Powermanager. Identifying hidden potential for energy optimization and savings. Answers for industry.

OEE is Key in Packaging Automation

Improving Protection System Reliability With Automatic NERC PRC-005 Testing and Reporting

Analytics Are Just the Tip of the Iceberg How the PI System Revolutionizes Asset Management

South Carolina Electric & Gas Company Transmission Function Employees Job Titles and Descriptions. Electric Transmission

Enhancing the core Vijeo Citect V7.20. Enhancing the core. Improved SCADA in a collaborative operations management environment

PLUS TEMPERATURE CONTROL SYSTEMS FOR THE CHEMICAL, PHARMACEUTICAL AND PLASTICS INDUSTRIES

The effectiveness of oil analysis for failure prediction of power transformers

Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator

High Speed Data Collection with FactoryTalk Historian ME

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type)

Industry Solution. Real-time Historian for Synchrophasor Data Management

Distribution GIS & Grid Model Data Management

Standard TPL Transmission System Planning Performance Requirements

Grid IQ Microgrid Control System

Advanced Enterprise Work and Asset Management for Performance-Driven Utilities

Using the Intelligrid Methodology to Support Development of a Smart Grid Roadmap

Asset Management of Electrical System

PJM Technical Guidelines for. Installation of Synchrophasor Measurements at. Generation Facilities

DYNAC. Advanced Traffic Management.

C2-304 INTEGRATED INFORMATION SYSTEM FOR THE SIEPAC REGIONAL ELECTRICITY MARKET

Asset Optimization and Condition-Based Maintenance (CBM) Improving Reliability and Quality

Carry out routine inspection and servicing on high voltage bulk oil circuit breakers

Analytics for Smart Grids. - DONG Energy Case Study on Optimization of Business Processes and Integration of IT Platforms

Implementing ITIL Best Practices

Wonderware System Platform 2017 Real-time Operations Control Platform for Supervisory, HMI, SCADA and IIoT

ABB Ability Ellipse APM

A*STAR Funded IEDS Project - Microgrid Energy Management System. by H B GOOI

Agenda. ClearQuest 8.0 What s New. Positioning Integrations Collaboration Administration New Features Deprecations Q&A

Session Number: 5 Proactive Remote Service Support

The Power of Integration

Innovation & Grid Modernization at ComEd. Laura García García Grid Strategy & Analytics Commonwealth Edison

SAP Manufacturing Execution (SAP ME) Integrated and Real Time Production Execution. Eric Thieren Solution Sales Focused Business Solutions EMEA

ENERGY STUDIO PRO THE NEXT-GEN ASSET MANAGEMENT PLATFORM ALL YOUR DATA IN ONE PLACE

Food & Beverage Portfolio

Contents QUALIFICATIONS PACK - OCCUPATIONAL STANDARDS FOR ELECTRONICS INDUSTRY. What are Occupational Standards(OS)? Introduction

Welch Allyn Connex. Electronic Vitals Documentation (EVD) System

Job Descriptions. Title & Job Functions: Transmission Function Employees

Standard PRC-002-NPCC-01 Disturbance Monitoring

Substation Outage and Clearance Coordination Procedures

CEMAT based on process control system SIMATIC PCS 7. cemat

Enabling Asset Integrity Management for the Oil & Gas Industry

Predictive Analytics for Pumps, Valves and Seals Experience In Motion

MPM 100 Monitor Product Description Guide

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB:

Fleet Optimization with IBM Maximo for Transportation

HV Equipment Conditions Monitoring Summary and Evaluation of Various Data Sources

Siemens Power Technologies International. Bridging the Gap Enterprise Model Management for Operation and Planning

ExISTING SubSTATION INfORmATIONON

Solutions for food and beverage Uncompromised hygiene, reliability and productivity

Transmission Function Employees - Job Titles and Descriptions 18 C.F.R 358.7(f)(1)

IBM Tivoli Endpoint Manager for Lifecycle Management

Let s share a vision Schneider Electric - Industry Levente Balasa 14/10/2010 2

Enabling Real-time Operational Intelligence

Years of experience, customized for you.

Application Station Software Suite

Obsoleting PowerLink Advantage Migrating to PowerLink HMI

Distribution Information Exchange Code

IDS Pipeline Automation Reliable and cost-effective Solutions

Primaned Belgium. Oracle Primavera P6 Enterprise Project Portfolio Management Data Sheet. Revision Date 04/08/2017

Using Dynamic Real-Time Substation Information to Reinvent Asset Management

Introduction to Jetstream

Energy Industry Challenges

FLEET MANAGEMENT SOLUTIONS

Electricity Supply to Africa and Developing Economies Challenges and Opportunities. Technology solutions and innovations for developing economies

SHOULD YOUR BARCODE LABELING SOLUTION BE FULLY INTEGRATED WITH YOUR BUSINESS SYSTEM?

Medium Voltage Service Maintenance and refurbishment

Cost of downtime Loss of production Manufacturing scrappage. Why motors fail The most common causes of motor failure are:

Manage Risk and Improve Profits

Highest efficiency across the line. Optimized Packaging Line. siemens.com/packaging

Predictive Maintenance and Quality Sanna Randelius Predictive Management/Market Research Leader Industry Solutions Team

Han MK, Business Development (Power Generation), 23rd March 2010 ABB Power and Automation Days ABB in Power Generation

Innotech is a registered Trademark of Mass Electronics Pty Ltd Copyright 2013 Mass Electronics Pty Ltd

Automation Portfolio for the Water Industry

MANUFACTURING EXECUTION SYSTEM

Choosing a Location-based Application for your Business

Best practices for asset data management : ISO 5500X in practice

Integrated Volt/VAR Control

DA concept for higherquality. supplies. 24 ABB Review 4/1996

ActiveFactory 9.0 for InFusion Real-Time Analysis and Reporting Software for Production and Performance Management

Delivering the Knowledge to Drive Your Business Forward. Insight. The Power of Information. The Power of Blue

Guide to Modernize Your Enterprise Data Warehouse How to Migrate to a Hadoop-based Big Data Lake

Transcription:

A Unified, Intelligent & Evolvable Solution to Enable NERC CIP Compliance and Substation Knowledge Travis Jaffray SUBNET Solutions, Inc Modern Challenges, Modern Opportunities Existing Infrastructure Internal Changes External Forces Productivity & Effectiveness Future Flexibility Asset Maximization

The Challenge of Existing Infrastructure IED + IED + IED + Intelligent Substation NETWORKS = Security Concerns BUSINESS SYTEMS Live Substation Information The Challenge of Internal Changes People & policies Information access Cultural integration Systems integration

The Challenge of External Forces New legislation Deregulation Competition Lobbyists Unforeseen events The Challenge of Productivity & Effectiveness Productivity, work satisfaction & organizational effectiveness. Focus on value-added tasks.

The Challenge of Future Flexibility Decisions regarding the unknown Fewer experts The Challenge of Asset Maximization Islanded information Uninformed decisions Current asset investments Productivity

The Ideal Solution Maximizes the useful lifespan of existing assets. Unifies, simplifies, and speeds up the administration and management of data, infrastructure, and users. Retains the ability to exploit future opportunities without sacrificing current goals. Improves the use of internal resources and streamlines decision-making processes. Let s examine a utility that addressed its network asset management challenges with this ideal solution.

Network Asset Management NAM why bother? You need to: increase line loads improve safety enhance reliability reduce repair cost While: equipment ages budgets are slashed experience is short new legislation is introduced It s enough to drive anyone mad.

First Base: On-line Monitoring & Diagnostics FAILURE RATE % With monitoring Without monitoring Acceptable failure rate 10 20 30 40 50 YEARS Replacement deferral Why On-line Monitoring & Diagnostics?

Objective of On-line Monitoring What is monitored? Transformers Battery banks Breakers

Transformer Monitoring Top oil temp Reserve tank level Dissolved gas OLTC temp Ambient temp Bushing leakage current Power supply Load current & voltage Cooling fans & pumps OLTC tap position Bottom oil temp Humidity Oil-filled Circuit Breaker Monitoring Bushings Arc duration Recharging motor time Open and close operating times Motor limit switch defects Motor operating time Leakage Breaker latch release times Auxiliary supply voltage Operating coil continuity Heater integrity

Battery Monitoring Float system voltage Charging system voltage Discharging system voltage Interconnect resistance Total bus current Cell temperature Cell voltage Cell impedance Ambient temperature Average impedance per string Floating string current Charging string current Discharging string current Feature Project: Asset Management @ SWTC www.southwesttransmission.coop Headquarters: Benson, Arizona Transmission Cooperative 613 miles of transmission line 30 plus substations and telecommunication facilities

SWTC Goals Shift from time-based to condition-based maintenance for: Transformers Breakers Relaying Transformers: Add dissolved gas monitoring Add electronic temperature monitoring Integrate LTC and temperature functions Breakers: Condition monitoring integrated into breaker control relay Planned network to all substations: T1 to each location Flow all maintenance data to a central server SWTC Requirements Needed better database resolution and longer term storage: 15 second snapshots instead of one minute 30 year history instead of two weeks Fast database queries: Ease of use Multiple data requests Make informed decisions quickly using accurate data System features desired: Algorithms which would indicate maintenance issues Feed SAP work order system Email maintenance personnel Trending of data SUBNET Solutions EnterpriseSERVER.NET compatibility DNP 3.0 protocol (TCP/IP, Serial, Master/Slave) connectivity Automatic point creation to minimize duplication of work

SWTC System SEL 351, 321, 311, 387, 267 Intelligent Substation Operator Interface Enterprise Historian SUBSTATION ENGINEERS FUTURE DNP/IP/T1 MAINTENANCE TECHNICIANS ASSET MANAGERS Intelligent Substation Information Server Business Intelligence IT SPECIALISTS SCADA SCADA/EMS PERSONNEL QUALITROL 509ETM Unified. Intelligent. Evolvable. BECKWITH M2100A, B & C Successes to Date Issues resolved based on historian data Kartchner Substation Tap Changer Hackberry Substation Battery Charger

NERC CIP this is only the start of the journey Change management Compliance management Compliance administration NERC CIP a look ahead Due to complexity, traceability will only be possible by standard templates, repositories, workflows and user interfaces. SWTC s NERC CIP solution is already future-proof.

SWTC CBM FUTURE PLANS A & B Contacts Trip & Close Times DC Voltages Phase Currents X & Y Coils Coil Currents Summary Benefits Maximizes the useful lifespan of existing assets. Unifies, simplifies, and speeds up the administration and management of data, infrastructure, and users. Retains the ability to exploit future opportunities without sacrificing current goals. Improves the use of internal resources and streamlines decision-making processes.

Summary Benefits Facilitates NERC CIP compliance via the central management of connections between remote IEDs and authorized users. Hundreds of thousands of IEDs managed by this solution. Evolvable platform not just best-in-class NERC CIP solution. No need to maintain clients and third party applications on user machines. Summary Benefits Built-in report generator Provides access to authorized applications only. Access rights based n multiple, userdefinable groups. Configurable logging of connection traffic. Accomplishes all of this without having to replace or duplicate, any existing SCADA or IT infrastructure.

Questions?