Stakeholder Consultation on Draft IEP/IRP 2016

Similar documents
Energy Energy Energy Energy Energy Energy Energy

Response to NERSA REFIT Review Consultation Paper. 6 th May 2011

REFIT comments AND Recommendations to Nersa

Regulatory Framework PPAs and IPPs

Residential Heat Pump Rebate Programme

Guide and overview to the Independent Power Producer (IPP) Process in South Africa and Eskom. June 2010

The South African Renewable Energy Independent Power Producers Procurement Programme (REIPPPP) Lessons Learned

Sustainable energy solutions for South African local government. A practical guide

Economic impacts of South Africa s energy mix

Implementation of Cogeneration Directive (2004/8/EC) in Poland

UPDATED FOR THE THIRD BID SUBMISSION DATE. First Issued: 3 August 2011 Reissued for Third Bid Submission Date: May 2013 TENDER NO: DOE/003/13/14

Electricity Slide Index Slide 2: Generating Electricity Slide 3: SA Power Grid

Steps in Building a Wind Farm

Renewable Energy Scenarios

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA

Independent Power Producers (IPPs)

Southern California Edison Approach to Renewable Integration June 7, 2011

Quantifying the capital requirement: 19% RE by 2030

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group

Future wind deployment scenarios for South Africa

Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators. Kenyan Country Report

Energy from Renewable Sources Act

Least Cost Electricity Mix for South Africa Optimisation of the South African power sector until 2050

Obscure Electricity Planning is Detrimental to South Africa

CUC s Response to Alternative Energy

Renewable energy: Investing in Africa

Energy Summit: Defining the Energy Future of Local Government. 7 th to 9 th March 2018

Electricity Scenarios for South Africa Presentation to the Portfolio Committee on Energy

Portland General Electric 2016 Integrated Resource Plan. OPUC Public Meeting December 20, 2016

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh.

Some Doubts about Oxford s Argument on Stranding Thermal Coal in Japan

Brief Overview of Renewable Energy Regulation in Tanzania

Least-cost electricity mix for South Africa until 2040 Scenarios to guide the South African power system pathway

Revenue Application FY2018/19

Status of CSP and its future in the South African energy mix

PPIAF Assistance in Montenegro

PRESENTATION ON THE INDEPENDENT POWER PRODUCER PROCUREMENT PROGRAMME PORFOLIO COMMITTEE ON ENERGY PARLIAMENT; CAPE TOWN.

Green Energy and Green Economy Act. Changes to Ontario s Electricity Sector

Zero Net Carbon Portfolio Analysis

Progress in Renewable Energy Policies for Green Growth in South Africa

Environmental Compliance (Slides 7-15) Angila Retherford, Vice President Environmental Affairs and Corporate Sustainability

National Power Summit Hyderabad. 9 th February 2018

Derisking Renewable Energy Investment

Renewable energy in Belarus

ERLN Meeting. Renewable Energy and Energy Efficiency. Wolfgang Böhmer. Eskom: Grid Access Unit

PPP IN INFRASTRUCTURE RESOURCE CENTER

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd

BALANCING CODE NO. 1 (BC1)

Business Practice Manual for The Transmission Planning Process

SECTOR ASSESSMENT (SUMMARY): ENERGY

A Holistic Approach to Energy Management Presented by Ari Kobb Manufacturing in America March 14-15, 2018

2014 Integral Analytics, Inc.

Incentives and Barriers for Decentralised Power Generation in Finland and in Thailand

CTF PRIVATE SECTOR PROPOSAL SUSTAINABLE ENERGY GENERATION COMPONENT A JOINT SUBMISSION FROM IFC & AfDB

Netherlands Energy efficiency report

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

Alberta Capacity Market

A Multi Stakeholder Perspective

SPP at a Glance. Located in Little Rock. Approximately 600 employees

South Africa. Claire Tucker and Kagiso Khanye. Bowman Gilfillan

ELECTRICITY GENERATION: INDEPENDENT TECHNICAL AUDITS CONDUCTED ON TWELVE SOUTH AFRICAN POWER STATIONS

Over-View of Electricity Regulation in Tanzania

Ian Curry Managing Director BR Energy South Africa

DECISION ON A TEMPORARY REGIME FOR THE PROVISION OF ANCILLARY SERVICES AND BALANCING OF THE POWER SYSTEM OF BOSNIA AND HERZEGOVINA

CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

District Heating and Integration of Wind Power in Denmark

Load Serving Entity Definition Refinement Draft Final Proposal

South Africa: Transitioning to a low-carbon economy

SUBSIDIARY LEGISLATION

Council of the European Union Brussels, 13 December 2017 (OR. en)

Reduced Network Modeling of WECC as a Market Design Prototype

STRATEGIC CONTEXT FOR ENERGY PLANNING CHAPTER 2

Expand Win-Win Cooperation; Promote Sino-African Mutual Development

PJM Proposal for Incremental Auction Redesign

TPP-GIP Integration Proposal November 30, 2011

THE NEW LAW FOR RENEWABLE ENERGY SOURCES IN GREECE AND MEASURES FOR THE DEVELOPMENT OF PHOTOVOLTAIC APPLICATIONS IN THE COUNTRY

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

Clean Energy for all Europeans

Benefits from Generation and Storage on the Distribution System

INQUIRY INTO THE NATIONAL ELECTRICITY SUPPLY SHORTAGE AND LOAD SHEDDING

Procurement Guidelines

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Integrated Resource Plan

System Management Action Flagging Methodology Statement

New England States Committee on Electricity

Medium Term Scenarios for Electricity Supply/Demand Balance

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA

1. Executive Summary Ameren Missouri

Cost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC

UGANDA COUNTRY REPORT; ENERGY POLICY

ISLAMIC REPUBLIC OF PAKISTAN

High Flexible Distributed Power Plant to support Intermittent Renewable Power Generation. Mike Welch Siemens Industrial Turbomachinery Ltd.

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism

New possibilities for reducing the cost of pumped storage backup for intermittent wind and solar power

The Home Depot - Financing a Renewable & Alternative Energy Commitment

Electricity Grid of the Future. Program Director: Dr. Sonja Glavaski

South Africa s Grid Emission Factor

EVIDENCE OF THE ENERGY EFFICIENCY AND CONSERVATION AUTHORITY

Summary of 2016 MISO State of the Market Report

Transcription:

PAMSA Comment & recommendations Stakeholder Consultation on Draft IEP/IRP 2016 7 December 2016 Jane Molony & Sue Rohrs

+ A CASE FOR CO-GENERATION

Introduction n PAMSA represent over 90% of the pulp and paper manufacturers in the country. n Value of Pulp and Paper production in 2015 stood at 28 billion rand, contribution to balance of trade at 5 billion rand and employment in the sector from planting trees through to recycling at around 150 000 people. n Thembani Bukula when opening the session said we all want the same thing, stable affordable environmentally friendly power. n Cogeneration offers exactly this.

Case for Co-generation n Energy efficiency gains through improvements in fuel conversion efficiency and use of waste resources and fuels. [An Eskom boiler and generator is typically 32% thermally efficient - valuable energy out divided by total energy in - and typical co-gen thermal efficiency is 75%. The same ratios apply to water consumed, ash dumped and CO 2 emitted]. n Reduction in utility infrastructure investment due to decentralisation of energy production, as well as Transmission and Distribution equipment. [Co-gen already has Grid Connection. Some adjustments are needed, but they ride on back of existing Tx and Dx infrastructure] n Has come to aid of state during power shortages. YET not a single mention of it in draft IRP serious unintended consequences.

Case for Co-generation n Reduced transmission and distribution losses [because the power is generated by same industry consuming it.] n Fuel saving by improved thermal efficiency compared to Eskom coal generation [as above 32% vs 75%] n Reductions in greenhouse gas emissions (CO 2 ) n Opportunities for creating employment in industrial sector [more investment = more industrial activity = more jobs; also prevents potential loss of employment] n Grid Support 24/7 distributed generator

+ DRAFT IEP

Draft IEP n Draft 2016 IEP Problem Statement (as set out in DoE presentation): n There is currently inadequate supply in both the electricity and liquid fuel industries due to a lack of timely investments in new capacity. - Electricity generation is constrained due to insufficient capacity and inadequate availability of existing infrastructure.

Draft IEP n Draft 2012 IEP: The then 800MW which was allocated to Co- Gen in 2012 Ministerial Determination was included in IRP 2010 Committed Build Plan. n This has not been done in draft IEP 2016, and it is suggested that it should be. Thus, the 1800MW allocated to Co-Gen in 2012 and 2015 by Minister of Energy should be referred to in draft IEP. n Current draft IEP Report states that: n Electricity generation system remains constrained in the short term (i.e. within the next five years) with the only new technologies that can be rapidly deployed to address the constraint being those with short lead times, such as biomass and solar. n This is incorrect, as there is enough co-gen power available to address these constraints immediately.

+ DRAFT IRP

Draft IRP n Co-Gen Ministerial Determination allocating 1800MW to Co-Gen is not referred to amongst the others in paragraph 2. (although amended Determination was gazetted as recently as August 2015, and there have been 2 bid windows for Co-Gen RFB) n Paragraph 3 no Co-Gen or forestry/mill residue has been taken into account in reports referred to informing draft IRP. n Ministerial determinations are allowed to lapse, except for Renewables up to Bid Window 4.5, and 900MW of coal the Co-Gen Determination of 1800MW therefore lapses.

Draft IRP n No MTRMP provided for in draft IRP, and therefore no provision for short-term supply constraints (as envisaged in draft IEP) n If there is no provision for Co-Gen in draft IRP, without an amended MTRMP, then there is no mechanism for the Minister to determine an allocation to Co-Gen going forward.

Draft IRP n If there is no allocation to Co-Gen, then there is no market for sales by Co-Generators, as Co-Generators (who have existing capacity, surplus to own needs), have traditionally only been able to sell into the following programmes: n MTPPP programme (which is no longer operational) n STPPP programme (Eskom has advised STPPP generators (approximately 800MW of Co-Gen power) that this programme will no longer be continued) n Eskom s WEPS purchases (Eskom has expressed doubt that this programme will continue) n Co-Gen RFB (which will no longer be applicable, according to draft IRP)

Draft IRP n Amendment to New Generation Regulations n New Gen Regs were amended to provide for sales of existing capacity under Co-Gen RFB n It would now appear that these amendments serve no purpose.

Draft IRP n Electricity Regulation Act n ERA provides that generators must apply for licences. n In licence applications they must show compliance to IRP, or give reasons for deviation for consent of the Minister. n In absence of an allocation to Co-Gen under draft IRP, and/ or an MTRMP-like provision in IRP, co-generators will not be able to show compliance to IRP. n There will therefore not be a guaranteed licence to generate, or a licence amendment, even for their substantial existing generation. n This also applies to other generation sources and technologies not catered for in the draft IRP which are able to satisfy the short term capacity constraints identified in the Problem Statement referred to in the draft IEP presentation.

+ DISCREPANCIES

Discrepancies in DoE Docs relating to Draft IRP Some discrepancies are as follows: n IRP Update Presentation Assumptions n Information in slide Non-Eskom Plant is missing in draft IRP. n Installed capacity of Sappi is set out as 144MW, and Mondi as 120MW. Installed capacity of various Sasol plants is also mentioned. n None of this information is used in IRP 2016 Draft. n Cumulative Capacity from Procured Determinations is shown as 11MW for Co-Gen, but is not referred to in draft IRP.

Discrepancies continued n Draft IRP n Scenarios not listed: - Transmission and distribution infrastructure is to be dealt with in the IRP, which should assess these in detail, taking into consideration the grid planning currently conducted by Eskom (source: 2016 Draft IEP Report) - New technology (storage) - Adequacy of regulatory framework for Gas - Adequacy of Gas infrastructure - Co-Generation (if suggestions to re-instate previous Co- Gen Ministerial Determinations and Co-Gen RFB are not accepted)

Discrepancies continued n Annexures: n EPRI Report (technology costs) [no reference to Co- Gen] n Demand Forecast n Technology Learning Rates* n Discount Rate Presentation* n Additional Assumptions Report* *Last 3 annexures not available on DoE website, and are critical for meaningful assessment of draft IRP.

+ RECOMMENDATIONS

Recommendations n 1800MW allocated to Co-Gen in 2012 and 2015 by the Minister of Energy should be referred to in draft IEP. n Following provision in draft IEP: n The electricity generation system remains constrained in the short term (i.e. within the next five years) with the only new technologies that can be rapidly deployed to address the constraint being those with short lead times, such as biomass and solar. n Should be amended by deletion of the words: - with the only new technologies that can be rapidly deployed to address the constraint being those with short lead times, such as biomass and solar, and the substitution thereof of the words but this may be addressed by utilising immediately available Co-Generation capacity

Recommendations n If assessment regarding implications of Co-Generation s nonappearance in draft IRP is correct, then supply of Co-Generation should be specified as being exempt from any Ministerial Determinations and from the requirement, as interpreted by NERSA and the DoE, that new generation capacity may only be procured by a Ministerial Determination. n Re-assess draft IRP based on, amongst other things, price likely to be charged for natural gas procurement (if not already agreed), grid infrastructure constraints and gas regulation, policy and infrastructure constraints. n Treat 1800MW of Co-Gen previously determined by the Minister as Committed Build, and therefore part of the new IRP.

Recommendations n Amend draft IRP to cater for procurement of this 1800MW. n Provide that the Ministerial Determination for 1800MW of Co-Gen still applies. n Continue to procure energy from both greenfields and brownfields plants as enabled in the Co-Gen RFB and in the Amended New Gen Regs. n Make provision for willing buyer/willing seller sales and wheeling (i.e. private transactions between IPPs and non-state buyers) as NERSA will determine if the tariffs are acceptable (cost-effective supply).

Recommendations n Stipulate that these sales are deemed to be compliant to IRP. n Stipulate that these sales do not require a Ministerial Determination ito s34 of the ERA. n Stipulate an exemption from compliance with the IRP regarding technologies not included in the IRP, up to a specified capacity. n Make provision for sales of electricity to other countries. n Insert an MTRMP-like document as an annexure to draft IRP (for short term supply constraints).

+ Thank you