ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

Similar documents
Greenfield Pond B Rehabilitation

EVALUATION OF ENVIRONMENTAL MONITORING DATA GATHERED DURING ASHTABULA RIVER DREDGING, ASHTABULA RIVER, OHIO

Conditions of Section 401 Certification for Nationwide Permits and General Conditions. General Condition 12 (Soil Erosion and Sediment Controls)

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project

CHAPTER 7. San Dieguito River Flooding Adaptation

Hudson River PCBs Superfund Site

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

Kim DeLaney, Ph.D. Strategic Development Coordinator. Overview & Project Approach 1/30/2014. Waterways Forum 3 - Regulation (1/29/2014) 1

TEMPORARY SEDIMENT TRAP CODE

Grand Calumet. River Revitalized

City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

PERMITTING AND CONSTRUCTING THE INTRACOASTAL WATERWAY DEEPENING PROJECT IN BROWARD COUNTY, FLORIDA

6 Preliminary Assessment of Construction Method and Constructability Issues

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY

JOINT PUBLIC NOTICE May 14, 2018

Constructed Wetland Use in Nonpoint Source Control

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment

STATE OF WASHINGTON FINAL DECISIONS AND SECTION 401 WATER QUALITY CERTIFICATION CONDITIONS FOR THE CORPS OF ENGINEERS 2017 NATIONWIDE PERMIT PROGRAM

THE BENEFITS OF MECHANICAL DEWATERING: CASE STUDY OF MACHADO LAKE ECOSYSTEM REHABILTATION PROJECT IN LOS ANGELES, CALIFORNIA

G.B. Sonny Hall, PhD. Veronika Thiebach

WATER TREATMENT PLANT PRELOADING AND SEDIMENT CONSOLIDATION AREA 2010 CONSTRUCTION WORK PLAN

Prepared by the East Central Florida Regional Planning Council and the Treasure Coast Regional Planning Council for the Florida Department of

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

The City of Cocoa (City) is located in east

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico

Environmental Resource Permitting for Artificial Reefs

In support of an alternative water supply

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Dredge and Fill Standards on the Highland Lakes

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Presentation Overview

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Dredging and Dredged Material Disposal Overview

Natural and Engineered Wetlands for Stormwater Management

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Regional Watershed Planning. Calumet Summit 2010: A Call to Connect Calumet Conference Center April 27, 2010

Cat Island Chain Restoration, Green Bay

CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY

Current Trends in Marina Planning and Design

REUSE OF DREDGED SEDIMENTS

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

Palm Beach County Board of County Commissioners Workshop October 29, Yongshan Wan, Ph.D. P.E. Section Leader Coastal Ecosystems Section

8. A. AQUATIC HABITATS

DRAFT Environmental Impact Report

PRENTISS CREEK (SUB-E) KENSINGTON PLACE CONCEPT PLAN VILLAGE OF DOWNERS GROVE, ILLINOIS AUGUST, 2011

ALMY POND TMDL MANAGEMENT PLAN

Environmental Information Worksheet

Friant Dam and Millerton Reservoir

LOWER BOIS D ARC CREEK RESERVOIR PROGRAM. NTMWD & Freese and Nichols August 29, 2017 LBCR Program Contractor Involvement Workshop

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

RESTORATION OF THE NORTHERN TIP OF MON LOUIS ISLAND Mobile Bay National Estuary Program. Fowl River WMP Steering Committee May 19, 2015

South Florida Water Management District

KRISTOPHER J. KRZYSTON, CEI, CEM

RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

Appendix D Section 404 Certification

3.0 CUMULATIVE PROJECTS SCENARIO

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District

SITE DESIGN ENGINEER'S STATEMENT:

5. Name of waterbody(ies) (if applicable & if known) in which work will occur? Harney Flats Canal

Municipal Stadium Wetland

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

Lake Pepin TMDL Water Quality Objectives

Survey of Bottom Substrate Composition and Fish Habitat Value at Nett Lake

Watercourses and Wetlands and Agricultural Activities

TARGETED DREDGING OF NEAR-SHORE DEBRIS AND SEDIMENT, UPPER TRENTON CHANNEL, DETROIT RIVER: A CASE STUDY

Best Management Practice (BMP) Guidance Manual

Hydrology and Flooding

WODCON XXI, June 2016, Miami, Florida Some Proven Benefits of Polymer Use in the Treatment of Sediments in Recent Dredging Projects

WELCOME! Mill Creek Daylighting Technical Feasibility Study. Thank you! Open House December Please sign in and get a comment form.

J O I N T P U B L I C N O T I C E

Water and Watersheds. Data Maps Action

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

Department of Army Permitting Process: Dredging

Design Features of Constructed Wetlands for Nonpoint Source Treatment. September 1995

Economics of Implementing Two-stage Channels

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Stage 5 Geography Full Day. Student Name: Case Study: Water Management at Penrith Lakes

These potential changes and their implications are outlined in Annex 1.

Monitoring Stormwater Best Management Practices: Why Is It Important and What To Monitor

Annual Update. Large-Scale Oyster Restoration in Support of the Chesapeake Bay Agreement Oyster Goal. Stephanie Reynolds Westby, NOAA

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement

Mobile Treatment Units

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE. February 18, 2014

Transcription:

ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Eau Gallie River & Elbow Creek Restoration Dredging Melbourne, Florida Planning, Permitting, and Final Engineering Design June 11, 2015

Introductions St. Johns River Water Management District Ralph Brown, P.E. (Project Manager) Woody Boynton, P.E. (Director, Division of Administrative and Operational Services) William Tredik, P.E. (Indian River Lagoon Protection Initiative Leader) Taylor Engineering, Inc. Jonathan Armbruster, P.E. (Project Manager) David Stites, Ph.D. (Environmental Services) Amec Foster Wheeler, Inc. Mike Kelley, P.E. (Survey and Geotechnical Investigations) 2

Presentation Outline 1) Project Problem, Objectives, and Solution 2) Project Location a) Dredging footprint b) Dredged material management footprint 3) Construction Methods a) Hydraulic dredging and pipeline b) Temporary dredged material management area (DMMA) c) Dewatering d) Permanent sediment storage 3

Presentation Outline 4. Project Progress a) Data Collection b) Design c) Permitting 5. Project Schedule a) Design and Permitting b) Construction 6. Questions and Answers 4

Project Problem Muck deposits in the Eau Gallie River and Elbow Creek damage: o Water quality and natural resources o Recreational activities o Property values o Navigability 5

Project Objectives Improve ecosystem characteristics o Water quality and habitat o Wildlife diversity Improve recreational opportunities o Fishable/swimmable waters Ballard Park Boat Ramp 6

Project Solution Restoration Dredging o Remove accumulated muck sediments o Dewater and dispose of dredged material o Avoid water quality, wetland, and species impacts 7

Project Dredging Limits Dredge from the confluence of the IRL with the Eau Gallie River to the Eau Gallie River Control Dam Project limits also include Elbow Creek from: o o o Confluence of Elbow Creek & Eau Gallie River Laurie Street Bridge Magnolia Avenue Bridge Upstream Eau Gallie Control Dam Downstream Eau Gallie Control Dam 8

Project Introduction (Overview) a) Overview b) Background Eau Gallie River Restoration Project begins at the mouth 9

Eau Gallie Control Dam a) Overview b) Background Eau Gallie River Restoration Project ends at the control dam 10

11

Complete Project Footprint Sediment Management Here Dredging Here DMMA: Sediment Dewatering Dredging Pipelines Sediment Storage Melbourne Airport

Project Equipment on the Water Hydraulic Dredge 12 18 inch hydraulic dredge Observer boats DMMA return water pipeline Booster pumps Turbidity curtains Dredge crew work boats Dredged pipelines Signs 13

DMMA Facility and Equipment Booster pumps Dredged material slurry pipeline DMMA return water pipeline Earthwork equipment Worker vehicles Job trailer Typical DMMA View Typical Paired Pipeline Layout 14

Dewatering Techniques Gravity settling (primary method) Optional methods (If necessary) o Coagulants/flocculants o Geotextile tubes o Hydrocyclones o Filter presses o Scalping pump boxes o Hydraulic scalpers and classifiers Geotextile Tubes Hydrocyclone 15

Final Sediment Disposal Material will be trucked from the DMMA site to Sarno Road Landfill Trucking route avoids public roads Approx. 625,000 cubic yards Truck Route DMMA Disposal 20 cubic yard dump truck 16

Survey & Geotechnical Data Collection Bathymetric and boundary surveys Shoreline condition survey Geotechnical investigation (water and land) Sediment chemistry o Metals, nutrients, flocculent, and coagulant testing Muck Location Muck Probe Muck Thickness 17

Natural Resources Surveys and Assessments Shoreline vegetation Submerged resources Wetlands delineations Upland habitat characterization Listed species assessments 18

Engineering Design Dredging Template 19

Engineering Design - Pipeline Corridor Paired pipeline o Slurry inflow and water outflow Directional drill under major roadways o Apollo Road o Wickham Road Road cuts under smaller roads 20

Engineering Design - DMMA Earthen containment facility Stormwater management Outflow weir Internal roads Vegetated buffers and fencing Discharge Weir 21

Environmental Protections Daylight (12 hours) dredge operation Contractor safety controls in project specifications Noise protection o No night time equipment operation o Noise-shielded booster pump operation In-water signs and markers for pipeline and dredging equipment Turbidity management o Turbidity not to exceed 29 NTU above background (FDEP) Manatee Protection Plan requirements Shoreline and DMMA vegetated buffers Fencing around DMMA 22

Permitting Required permits o FDEP and USACE o Project qualifies for restoration permits o City of Melbourne Coordination o Brevard County o City of Melbourne Airport Authority o City of Melbourne o Florida East Coast Railroad o Other private entities o EGRET 23

Project Schedule Permit Authorizations Federal, State, City of Melbourne Permits For DMMA construction mid-september 2015 For dredging early 2016 Construction DMMA construction Fall 2015 Dredging begins Winter Spring 2016 Project completion December 2018 24

Questions? 25