Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

Similar documents
Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

ATTACHMENT D SCOPE OF SERVICES

FEMA PA Match Training

EJCDC Contract Documents for America s Infrastructure Buy online at

STATE OF NEW JERSEY DEPARTMENT OF COMMUNITY AFFAIRS. NUMBER: EFFECTIVE: March 2013 REVISED: July 2015 REVISED: June 2016

CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005

BOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018.

Construction Family of Documents

BID AND PURCHASING LAWS/BEST PRACTICES

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

Job Order Contracting (JOC) ITB JE Overview August 2016

Construction Manager as Constructor (CMc) Manual

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

DEPARTMENT OF THE TREASURY

STATE OF NEW JERSEY DEPARTMENT OF THE TREASURY

BID THRESHOLD AND QUOTES

AVIATION AUTHORITY POLICY

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

INVITATION FOR BID. HVAC Equipment Replacement for Black Box Theatre at Nordlof Center. Issued June 14, Name of Bidding Firm:

Owner s Representative SCOPE OF SERVICES

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

The New Procurement Review for School Nutrition Programs

Pre-Bid Conference Agenda

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents

Request for Proposals

CHAPTER 5.0: RECORD-KEEPING AND REPORTING REQUIREMENTS

INVITATION FOR BID. HVAC Equipment Replacement for Nordlof Center Lower Level West. Issued November 8, Name of Bidding Firm:

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Selection of Contractor Step 5. June 2013

REQUEST FOR PROPOSALS

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Proposal For: 2018 American Bar Association Temporary Services

The HOME Program and Multifamily Rehabilitation

PROCUREMENT GUIDELINES For Grantees Receiving Federal Transit Funds via MDOT Revised March 2017

DEN Process: Project Closeout. David Mashburn, Director of Facility Services DENVER INTERNATIONAL AIRPORT February 8, 2017

Document B252TM 2007

Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR

Commissioners Mital, Simpson, Helgeson, Manning, and Brown Mel Damewood, Engineering Manager; Mike McCann, Generation Manager

New Jersey State Prevailing Wage Act

Michigan Works! West Central Request for Proposal Region 4 Offender Success Employment Readiness Service Provider

Understanding Public Bid Law La. R.S. 38:

San Diego Housing Commission POLICY

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

Stacey Camillo, Contract Administration. As-Needed Construction Contracting

COMPANY DATE PROJECT

Chapter 6 Labor Standards Recipient Checklist

CERTIFICATION REGARDING LOBBYING. (This Certification is required pursuant to 31 U.S.C. 1352)

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

LOWER BRULE SIOUX TRIBE TRIBAL EMPLOYMENT RIGHTS OFFICE COMPLIANCE PLAN STATE DEPARTMENT OF TRANSPORTATION PROJECTS COMPANY DATE PROJECT

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

CDBG Federal Labor Standards. Discussion Questions

14-RFP-002-LJ (REISSUE) Comprehensive Performance Audit Services of SBD Incentive Agreements Technical Questions and Answers.

CCA Contract Forms Type Members Non-Members

Request for Proposal: Controlled System Separation Feasibility Study

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

PREQUALIFICATION QUESTIONNAIRE

LFN Update on Implementing Energy Savings Improvement Programs. June 16, 2011

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

INVITATION TO BID (ITB) PARKING OFFICE AT WILLIAM P. HOBBY PROJECT NO. 738


Project Labor Agreements. September 18, 2012

REQUEST FOR QUALIFICATIONS

ARTICLE 4 SPECIFICATIONS AND SCOPES OF WORK

TEAMING, SUBCONTRACTING, AND JOINT VENTURES

Subcontractor Pre-Qualification Form

Main Building Auditorium

PROPOSAL WRITING WORKSHOP June 8, 2016

Centennial Steam Piping Replacement Project PROJECT REQUIREMENTS & SPECIFICATIONS SCOPE OF WORK DRAWINGS

REQUEST FOR PROPOSALS

LOWER MANHATTAN DEVELOPMENT CORPORATION

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

Davis-Bacon Labor Standards Protecting Construction Workers Rights. February 2, 2016 (revised 9/13/2017)

Vista Ridge Integration Project Progressive Design-Build Services

SUBRECIPIENT MONITORING GUIDE

WEATHERIZATION ASSISTANCE PROGRAM PROCUREMENT. A. Introduction

Finance & Technology Administrator (815) ext 223

Kenya Integrated Water, Sanitation and Hygiene (KIWASH) Project. Invitation for Bid (IFB) DISP-KIWASH

Completing the Electronic Annual Certifications & Representations Survey: Supplier Guidance

WORKFORCE DEVELOPMENT BOARD OF CENTRAL OHIO

OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4.

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Lease-Leaseback Project Delivery Method

Seattle Public Schools The Office of Internal Audit

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

Negotiating. Construction. Contracts STANDARD OPERATING PROCEDURES NJSDA NEW JERSEY SCHOOLS DEVELOPMENT AUTHORITY TRENTON, NEW JERSEY

ConsensusDocs. Catalog. Updated Docs Inside

University of Kansas Procurement Services

Facilities Construction Services Minor Capital Project Field Guide

PURCHASING MANUAL & POLICIES

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17

Transcription:

Subrecipient Administrative Training (SAT) Meeting NJEDA Office, Trenton, NJ December 18, 2014 Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

NJEDA Construction Contacts Stephen Martorana Real Estate Design & Construction Manager 609-858-6656 SMartorana@njeda.com Diana Butcavage Sr. Construction Officer RE/Office of Recovery 609-858-6089 DButcavage@njeda.com NJEDA Website www.njeda.com/sandyconstruction

NJEDA Compliance Contacts Steve Quattro Program Manager Internal Process Management 609-858-6913 SQuattro@njeda.com Lorena Young EEO/Contract Administrator Labor Compliance Officer Section 3 Coordinator Office of Recovery 609-858-6947 lyoung@njeda.com NJEDA Website www.njeda.com/affirmativeaction

Agenda Procurement Contract Management Construction Period Close-Out Compliance: Labor Standards/Affirmative Action/EEO/ Section 3

Procurement

Procurement- NJ State Law Designed to achieve maximum open and free competition When hiring a contractor or procuring professional services, Subrecipients must follow: NJ State regulations and requirements regarding procurement Municipality may follow own written procurement procedures if stricter than NJ State Laws.

Procurement- Overview Subrecipients of CDBG funds are responsible for ensuring that goods and services are procured competitively and in accordance with State of NJ procurement rules and regulations. Procurement policies should describe how the subrecipient will procure supplies, materials, services and equipment. The policy should assure that all purchases are handled fairly and in a manner that encourages full and open competition.

Procurement- Overview Subrecipients should follow the procedures established in the NJEDA CDBG-DR Administrative Manual and document how all procurements were handled. Every agency should keep procurement records that allow an auditor or other interested party to track the specific nature of the goods or services bought with public funds, and the entire process used to purchase those goods and services. The purpose of this documentation is to show that the public body obtained high quality goods and services at the lowest possible price through an open, competitive process.

Procurement- Compliance Procurements must comply with: Conflict of Interest Policy Bonding requirements (Construction procurement ONLY) Equal Opportunity Labor laws Small, Minority, Woman, Veteran Owned Business Enterprise Section 3

Methods of Procurement Procurement methods based on product/service procured Procurement by Competitive Proposal Procurement by Non-competitive Proposals Procurement by Sealed Bids

Competitive Proposals (Professional Services) Goods and services for fixed-price Obtain an adequate number of qualified sources Used for qualification-based procurement such as architectural/engineering professional services Used when conditions are not appropriate for use of sealed bids

Professional Services- Option 1 For use when Subrecipient currently has professional under contract provided: Contract executed within last 24 months; Professional is licensed; The scope of services for original procurement must include services that are specifically named or encompassing of those proposed to be paid with CDBG-DR funds; Price was an evaluative factor in procurement; and

Option 1 (continued) The Municipality must submit the following documentation for review: Original procurement notice with date and method of publication shown A copy of the Request for Proposals or Qualifications with identification of procurement approach Award or selection documentation Current contract Statement from purchasing official stating their determination of how this current contract meets State procurement law

Professional Services- Option 2 For use when Subrecipient does not has professional under contract: For all contracts use competitive proposals as set forth in N.J.S.A. 52:34-9 et seq. & N.J.A.C. 17:19-1.1, 3.1 et seq.: Publicized RFP s to identify all evaluation factors and their relative importance. Solicitation from adequate number of qualified sources (typically 3) RFP to contain a detailed list of tasks in the proposed scope of work Must have a method for conducting technical evaluation Must conduct negotiations with responsive and responsible offerors, based on evaluation of proposals Award made to the most advantageous source of the goods and services

Option 2 (continued) The Municipality must submit the following documentation for the file: Procurement notice with date and method of publication shown A copy of the Request for Proposals or Qualifications with identification of procurement approach Award or selection documentation Copies of all bids received and bib tabulation sheet; Resolution(s) to enter into contract and/or any resolutions pertaining to the procurement process; A copy of the current contract; and Statement from purchasing official stating their determination of how this current contract meets State procurement law.

Non-competitive Proposals Limited use used only when: Infeasible to use other methods of procurement Item is available only from a single source Emergency situation not permitting competitive solicitation Subrecipient should consult NJEDA CDBG staff before utilizing this method Must do a cost analysis verifying proposed cost data

Procurement by Sealed Bids (Construction) Requires publicly soliciting sealed bids Publication period Provide a clear definition of scope of work Public opening, with recorded minutes Bids and bid tabulation provided to NJEDA Fixed-price contract is awarded to the lowest responsible and responsive bidder

Excluded Parties Other Considerations May not use debarred, suspended or ineligible contractors or professionals Check http:// www.sam.gov/portal/public/sam and http://www.nj.gov/treasury/debarred prior to signing any contract with contractors or subcontractors Required by State to use SWMVBE (Small, Woman, Minority, Veteran Owned Business Enterprises) businesses whenever possible (25% goal) Conflict of Interest Required to have written code of standards to prevent conflicts of interest in procurement

Construction Bid Package Documents 1. Advertisement for Bids 2. Information for Bidders 3. Bonding and Insurance Requirements 4. Bid Bond 5. Information on Payment and Performance Bonds with copies of Bond Forms 6. Bidder Qualifications 7. Sample Contract 8. Information regarding use of SWMVBE s 9. NJEDA SWMVBE Form 1- Utilization Worksheet

Documents to be Submitted by Subrecipient prior to Bid Opening 1. Detailed Cost Estimate a) Subrecipient to obtain/perform an inhouse cost estimate prior to bid submission to be used for comparative verification of bids. Approved bid to be with +/-10% of estimate. 2. Current Conflict of Interest Policy

Documenting Procurement Compliance The Subrecipient must document and submit the following to EDA for the project file: Bid Advertisement with date and method of publication shown; A copy of the bid package, including specifications and drawings provided; Copies of all bids received and bib tabulation sheet; Resolution(s) to enter into contract and/or any resolutions pertaining to the construction procurement process; A copy of the contract(s) entered into; and A statement from the purchasing official stating their determination of how the contract meets State Procurement Law.

Questions?

Contract Management

Contract Management- NJ State Law When contracting with a construction contractor and/or professional for services, Subrecipients must follow: NJ State regulations and requirements regarding contracting Municipality may follow own written contracting procedures if stricter than NJ State Procurement Laws.

Common Rules Regarding Contracting All services, professional, or construction, paid in whole or in part with CDBG-DR funds, require the execution of a formal contract. All contracts should contain a clear, concise, and detailed description of the: scope of work total cost duration or life of the contract compliance requirements reporting responsibilities

Common Rules (continued) All contracts requesting payment for activities not clearly defined in the scope of services may be denied CDBG- DR funding. It is the responsibility of the Subrecipient to manage all contracts executed for CDBG-DR funded projects. All construction contracts using CDBG-DR funds for payment must pass a cost reasonableness test. Based upon pre-bid cost estimate

Common Rules (continued) Before the Subrecipient can sign a contract with a proposed contractor or professional service provider, the Subrecipient must ensure that the parties are not on the Federal and State listing of excluded parties for a Federally funded project (Debarred). All professional service contracts and construction contracts paid for with CDBG-DR funds must use firms/businesses that are licensed to operate in the State of New Jersey. No grant funds will be released to pay businesses that do not hold this license. Provide copies of BRC s and CRC s (Contractors only).

Professional Services Forms of Contract Standard A/E contract template Lump sum or Max Not-to-Exceed Must include all required CDBG-DR Compliance Provisions for Professional Services as defined in the NJEDA CDBG-DR Administrative Manual. Fees must be reasonable and justifiable Construction Contracts Generic construction contract Firm-fixed price Must include all exhibits included in Appendix 5 of the NJEDA CDBG-DR Administrative Manual. Bonding requirements- Payment and Performance

Bonding Requirements Bid Bond & Consent of Surety (with Bid) 10% of total bid price, but not in excess of $20,000 Consent of Surety for 100% of bid price Performance Bond (with Contract) 100% of approved bid Payment Bond (with Contract) 100% of contract price Maintenance Bond (optional) 100% of project costs One (1) or two (2) year(s)

Documents Required to be Included as part of the Construction Contract 1. State of New Jersey Standard Terms and Conditions 2. CDBG Compliance Provisions for Construction Contracts 3. CDBG General Conditions 4. VCA- Voluntary Compliance Agreement

Documents the Contractor must Provide with Executed Contract 1. Anti-Lobbying Certification 2. Payment Bond 3. Performance Bond 4. Certificate of Owner s Attorney 5. Certificates of Insurance 6. Contractor Schedule of Values (AIA G703) 7. Anticipated Draw Schedule 8. Drug-Free Workplace Certification (HUD-50070) 9. NJ Business Registration Certificate (BRC) 10.NJ Public Works Contractor Registration Cert. (CRC)

Questions?

Construction Period

Construction Period Activities Pre-Construction meeting Construction Schedule (updated upon 10% variance) Site Inspections and Progress Meetings Monthly Requisitions Record Drawings (updated on site) Change Orders (approval required) SWMVBE Monthly Contract and Subcontract Activity Report

Invoicing One per Month (per Project)- Combine Professional Services and Construction Payment Applications into ONE (1) Municipal submission. Must include SWMVBE Monthly Contract and Subcontract Activity Report - (include applicable contractor certificates with 1 st application only) NJEDA will pay the Subrecipient by an ACH electronic transfer using the ACH Form or by check

Invoicing- Professional Services Must match approved contract amount Approved/Signed by Municipal Designee prior to submission Must be eligible costs Final contract amount will not be paid until all required documents are received by NJEDA

Invoicing- Construction Payment Requisitions Required items must be in file (previously submitted) Verification of Prime Contractor and Subcontractor Eligibility Debarment check completed for all contractors and subcontractors Business Registration (BRC) & Contractor Registration (CRC) Checklist/Tracking sheet items in file

Construction Payment Requisition - Approved Forms AIA G702- Application and Certificate for Payment Signed/sealed by Project Architect/Engineer Approved/Signed by Municipality prior to submission 10% Retainage held AIA G703- Schedule of Values (Continuation Sheet for G702) Line items matching approved amounts Alternate equivalent forms must be approved by NJEDA prior to 1 st submission and use.

Construction Payment Requisition Required Monthly Submitted Back-up SWMVBE Monthly Contract and Subcontract Activity Report include with each monthly construction payment requisition include applicable contractor certificates with 1 st application only Partial Release of Liens Periodic NJEDA site inspections with photo documentation Photo documentation by owner rep. showing invoiced items progress/completeness for months when NJEDA inspector not on site

Construction Payment Requisitions- Labor Compliance Submitted to Labor Compliance Officer- Lorena Young Certified Payrolls (weekly, originals) Affirmative Action Manning Report (electronic submission) Monthly Section 3 Report

Disbursement NJEDA will pay the Subrecipient by an ACH electronic transfer using the ACH Form submitted monthly. All payments made on a pro-rated basis with other funding sources. Payment confirmation (from Subrecipient to professional or contractor) must be received prior to next payment processing

Questions?

Close-Out

Close-Out (Prior to Final Payment) Subrecipient must provide, complete and/or review from GC and Subcontractors: Architect/Engineer Records, if applicable Final Record Set copy to be submitted to EDA Certificate of Substantial Completion (AIA G704), with Punch-list Certificate of Approval/Certificate of Occupancy Final NJEDA Construction Completion Inspection O & M Manuals/Warrantees/Guaranties (Copy of Transmittals) Consent of Surety (AIA G707) Contractor Release of Liens (AIA G706A) Prevailing Wage/ Affirmative Action/ EEO/ Section 3/ SWMVBE Completion Certificate

Documents & Checklists Available for Your Use www.njeda.com/sandyconstruction NJEDA CDBG-DR Administrative Manual Procurement/Construction Procedures Checklist for Public Agencies and Non-Profits Bid packet, Contract, and Construction Documents Tracking Sheet Labor Standards/Section 3/EEO/ Affirmative Action/ SWMVBE Bid Package and Pre-Construction Document Tracking Sheet

Questions?

Thank you