APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

Similar documents
NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

Northwest State Route 138 Corridor Improvement Project

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

NOTICE OF PREPARATION

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

CEQA Initial Study Checklist ENVIRONMENTAL CHECKLIST FORM. Potential Industries Solid Waste Facility Permit for a Recycling Transfer Station

County of El Dorado Notice of Preparation Tilden Park Project

Draft Environmental Impact Report for The Farm at Alamo Creek Specific Plan Project

Table of Contents. City of Redlands - Redlands Crossing Center

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

NOTICE OF PREPARATION

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

2035 General Plan Update, Belmont Village Specific Plan, and Climate Action Plan

Environmental Setting, Impacts, and Mitigation Measures

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

City of Palo Alto (ID # 7047) City Council Staff Report

CITY OF LOS ANGELES SAN PEDRO COMMUNITY PLAN

SMUD Franklin Electric Transmission Project. Initial Study and Mitigated Negative Declaration Addendum July 2017

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

3.0 COMMENTS AND RESPONSES

Los Coyotes Country Club Development Plan

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

Draft Environmental Impact Report Serramonte Views Condominiums and Hotel Project

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

SAFETY AND NOISE 9. Safety and Noise

CEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report

Sutter County Community Services

3 PROJECT DESCRIPTION

NIGHTTIME ILLUMINATION

3 REVISIONS TO THE DRAFT EIR

A. Introduction. A.1 Overview of the Proposed Project

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

Purpose of the EIR. Chapter 1 Introduction

DRAFT FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT. Conference Center, Hotel, and Graduate School of Management Building University of California, Davis

NOTICE OF PREPARATION AND SCOPING MEETING

Chapter 21. Noise BACKGROUND

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

Indirect and Cumulative Effects

Mitigation Monitoring Program

4.3 AGRICULTURE AND FOREST RESOURCES

The following sections from the CEQA Guidelines define the role and purpose of an EIR:

APPENDIX C COMMENTS AND RESPONSE TO COMMENTS RECEIVED ON DRAFT NEGATIVE DECLARATION

County of El Dorado. El Dorado Hills Apartments Project Draft Environmental Impact Report. SCH No Prepared For: Prepared by:

South of Woodward Avenue Project

Findings of Fact and Statement of Overriding Considerations

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant:

TRAFFIC STUDY GUIDELINES

NOTICE OF PREPARATION OF A DRAFT FOCUSED ENVIRONMENTAL IMPACT REPORT

El Dorado Water & Power Authority. El Dorado Water Reliability Project

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

3.0 CUMULATIVE PROJECTS SCENARIO

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

NOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project

Environmental Information Worksheet

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

UC Davis Medical Center Education Building Project Phase 2 Telemedicine Resource Center and Rural PRIME Facility January CEQA Findings

III. Corrections and Additions

SECTION F UPDATED PERMIT REQUIREMENTS

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process

Introduction Page I-1 INTRODUCTION

APPENDIX A. Project Scoping

Final Quiet Zone Work Plan

Request Modification of Conditions (Modification of conditions of existing Conditional Use Permit approved on March 22, 2011 to expand a borrow pit)

Solar Ready Homes/Solar Oriented Developments Residential Stakeholder Meeting

County of San Diego DEPARTMENT OF PARKS AND RECREATION. Administrative Office: (858) Fax: (858) Reservations: (858)

- FACT SHEET - THE GUIDING PRINCIPLES

4 ALTERNATIVES. LAFCo also received input as a part of the Notice of Preparation (NOP) and scoping process regarding potential alternatives.

3.0 ERRATA TO THE DRAFT EIR

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process.

1.0 INTRODUCTION 1.1 EIR REQUIREMENT

DRAFT ENVIRONMENTAL IMPACT REPORT SOLEDAD VILLAGE SCH NO Lead Agency:

ENVIRONMENTAL INFORMATION FORM

7.0 GROWTH-INDUCING AND CUMULATIVE IMPACTS

California Environmental Quality Act Findings LAX Terminals 2 and 3 Modernization Project 1. Project Description Summary

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

You Can t Build Without CEQA!

ES Executive Summary. Introduction. Overview of the Project Area

B. ALL RESIDENTIAL ALTERNATIVE

HASTINGS COLLEGE OF THE LAW. Certification of the Final Environmental Impact Report and Approval of the Long Range Campus Plan

VIEWPOINT SCHOOL MODERNIZATION PROJECT

4.14 HAZARDOUS MATERIALS

Chapter 4 Environmental Setting, Impacts, and Mitigation 4.6 NOISE Environmental Setting. Approach to Analysis

5. TAC EMISSIONS 5.1 INTRODUCTION HEALTH EFFECTS

INITIAL STUDY/NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT ORANGE COUNTY WATER DISTRICT PRADO BASIN SEDIMENT MANAGEMENT DEMONSTRATION PROJECT

San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

ADVANCED MATERIALS RESEARCH LABORATORY

Addendum to the Final Recirculated Environmental Impact Report for the Taft Recycling and Sanitary Landfill Permit Revision Project

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

1.0 INTRODUCTION 1.1 THE ENVIRONMENTAL REVIEW PROCESS Purpose and Authority

Addendum No.9 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement/ Environmental Impact Report

Transcription:

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS B203 Sacramento, CA 95817-1899 Contact: Rob Ferrera at (916) 732-6676 Subject: Sacramento Headquarters Campus Master Plan Environmental Impact Report Review Period: September 19, 2017 to October 18, 2017 Purpose of Notice: In accordance with the California Environmental Quality Act (CEQA), the Sacramento Municipal Utility District (SMUD) is distributing a notice of preparation (NOP) to solicit comments on the scope of an environmental impact report (EIR) that is being prepared for the Headquarters Campus Master Plan (HQCMP) project. SMUD is the lead agency responsible for the project and as such, is also responsible for complying with the provisions of CEQA. The HQCMP would provide strategic and long-term planning of the SMUD Headquarters Campus and support streamlined development and ongoing maintenance of the campus. SMUD will prepare an EIR, as required by Public Resources Code Section 21080.09, to evaluate the environmental effects of growth and development under the HQCMP. The EIR will evaluate the HQCMP at a programmatic level, but will also evaluate elements at a project-level of detail where appropriate. A program EIR is intended to generally evaluate an overall project, such as a plan, and to streamline environmental review of subsequent activities (i.e., individual projects) that are consistent with the overall project (e.g., HQCMP). This NOP has been prepared pursuant to Sections 15082 and 15083 of the CEQA Guidelines. This NOP starts a public scoping period that will assist in the preparation of the Draft EIR. The public scoping period is for 30 days and will run from September 19, 2017 to October 18, 2017. The purpose of the NOP is to provide sufficient information about the proposed project and its environmental impacts to allow agencies and the interested parties the opportunity to provide a meaningful response related to the scope and content of the EIR, including possible environmental impacts, mitigation measures, and alternatives. Project Location: The SMUD Headquarters Campus (project site) is located in Sacramento, California and is entirely owned and operated by SMUD (Exhibits 1 and 2). The project site is bounded by 59th Street to the west, 65th Street to the east, Folsom Boulevard to the north, and S Street to the south (Exhibit 3). SMUD property located to the west of 59 th Street, previously the SMUD Corporate yard, is not a component of the HQCMP and will not be analyzed as part of this project. The Sacramento Regional Transit (RT) light rail tracks bisect the site and form a portion of the site s northern border. The total HQCMP area is approximately 34 acres, with Page 1

Exhibit 1 Regional Location Page 2

Exhibit 2 Project Vicinity Page 3

Exhibit 3 Existing Campus Layout - Aerial Page 4

approximately 9.5 acres north of the Sacramento RT track alignment and 24.5 acres south of the alignment. Currently, 5 permanent structures, and additional temporary support structures occupy the Headquarters Campus, providing approximately 437,000 square feet (sf) of space for utility and office functions. While property west of 59 th Street and East City Substation are also owned and operated by SMUD, they are not part of the HQCMP or considered part of the project site. Description of Proposed Project: The project would involve the implementation of the HQCMP, which would guide the development and transition of SMUD s 34-acre headquarters campus into a more active, sustainable, and flexible land use created through density, street experience, and variety that interfaces with the community and maintains consistency with local and regional planning efforts. The HQCMP would be implemented over a 20-year horizon, and each phase of the project will be described further in the EIR. The HQCMP would also allow SMUD to identify physical improvements to support the strategic vision. These may include new facilities to be located at the project site or how existing uses would be relocated within the campus. As shown in Exhibit 4, the following elements are included as part of the project: A campus focused on the south side of the light rail tracks (except for the Central Plant and potential auxiliary building); A customer/innovation center building at the corner of 59th and S Streets; A training center and office building with corporate training rooms, offices, and mail/print services; A utility building providing warehousing storage and related administrative offices; Expansion of the SMUD Corporate Center (SCC), previously the Customer Service Center (CSC), to provide additional space for potential research and development, information technology, expanded business support services, renewable energy demonstration area, and expanded/improved outdoor seating and employee gathering space uses; and, Flex space along Folsom Boulevard for potential future spacing needs. Under the current conceptual land plan, the majority of onsite structures (other than the flagship Headquarters and CSC buildings) would be replaced within the western and southern areas of campus. Up to 550,000 sf of utility and office space would be provided, which represents a net 113,000 sf increase above existing conditions at the Headquarters Campus. The existing Headquarters Building and Central Plant would be retained. The southeastern corner of campus, which is considered underused, could be modified to include an expansion of the existing CSC building for additional business support services, a renewable energy demonstration area, or expanded/improved outdoor seating and gathering spaces for employees. The majority of the northern portion of the Headquarters Campus (i.e., north of the RT track alignment) would be retained as flexible space to address potential future spacing needs, although an auxiliary building would be relocated to this portion of the campus. The proposed HQCMP would not involve the realignment of existing public streets adjacent to the project site, although additional access points, including improved access along Folsom Boulevard, may be included as part of the HQCMP. Page 5

Exhibit 4 Conceptual Land Plan Page 6

Potential Approvals and Permits Required: Elements of the project could be subject to permitting and/or approval authority of other agencies. As the lead agency pursuant to CEQA, SMUD is responsible for considering the adequacy of the IS and determining whether to approve the project. Permits potentially required from other agencies could include: State Local State Water Resources Control Board/Central Valley Regional Water Quality Control Board: Construction Storm Water Discharge Permits. California Department of Transportation: Permits for movement of oversized or excessive loads on State Highways. Sacramento Metropolitan Air Quality Management District (SMAQMD): Authority to Construct/Permit to Operate pursuant to SMAQMD Regulation 2 (Rule 201 et seq.). City of Sacramento: Tree removal permit to comply with the City of Sacramento Tree Ordinance Building permits to comply with Sacramento City Code requirements Encroachment permit Improvement Plans Grading Permit Rezone Lot Merger Tentative Subdivision Map Conditional Use Permit Site Plan and Design Review Potential Environmental Effects: The EIR will describe the significant direct and indirect environmental impacts of the project. The EIR also will evaluate the cumulative impacts of the project, defined as impacts that could be exacerbated when considered in conjunction with other related past, present, and reasonably foreseeable future projects. SMUD anticipates that the project could result in potentially significant environmental impacts in the following resource areas, which will be further evaluated in the EIR: Aesthetics: Temporary and long-term changes in scenic views or visual character of the project site, as viewed by motorists on State Route 50, 59 th Street, 65 th Street, and Folsom Boulevard. Air Quality: Temporary increases in air pollutant emissions associated with construction; and long-term increases in pollutant emissions associated with project operation and maintenance (including employee commute to and from the Headquarters Campus). Cultural Resources: Temporary or permanent disturbances of known and unknown historic, archaeological, or tribal cultural resources. Page 7

Greenhouse Gas Emissions: Temporary increases in greenhouse gas emissions associated with mobile-source exhaust from construction worker commute trips, truck haul trips, and equipment (e.g., excavators, graders); and long-term increases in greenhouse gas emissions associated with project operation (including employee commute to and from campus and stationary equipment, such as internal-combustionengine-powered generators). Hazards and Hazardous Materials: Potential risks associated with accident or upset conditions during construction because of previous commercial operations within the Headquarters Campus. Noise: Temporary increases in noise (including off-site, vehicle traffic noise) and vibration levels during construction; and long-term increases in noise from project operation and maintenance. Transportation and Traffic: Temporary and long-term increases in traffic and traffic hazards on local roadways during construction and project operation and maintenance. Utilities and Service Systems: Increased demand for water and wastewater service within the Headquarters campus and the potential need to increase capacity of existing infrastructure. These potential impacts will be assessed and discussed in detail in the EIR, and feasible and practicable mitigation measures will be recommended to reduce any identified significant or potentially significant impacts. SMUD anticipates that the project would not result in significant environmental impacts in the following resource areas, which will not be further evaluated in the EIR: agriculture and forest resources, biological resources, geology and soils, hydrology and water quality, land use and planning, mineral resources, population and housing, public services, and recreation. An Initial Study will be included as an appendix in the EIR with brief explanations as to why significant impacts to each resource are not anticipated, as required by CEQA. Comment Period: Written comments on the NOP can be sent anytime during the NOP review period which begins September 19, 2017 to October 18, 2017 at 5:00 pm. Please send your written or electronic responses, with appropriate contact information, to the following address: Rob Ferrera Sacramento Municipal Utility District Environmental Management P.O. Box 15830 MS B203 Sacramento, CA 95852-1830 rob.ferrera@smud.org Page 8

Digital copies of the NOP are available on the internet at: https://www.smud.org/en/aboutsmud/company-information/document-library/ceqa-reports.htm. Hardcopies of the NOP are available for public review at the following locations: Sacramento Municipal Utility District Customer Service Center 6301 S Street Sacramento, CA 95817 Sacramento Municipal Utility District East Campus Operations Center 4401 Bradshaw Road Sacramento, CA 95827 Scoping Session: Written comments on the NOP may also be provided at the open house scoping session to be held September 27, 2017 from 6:30 to 7:30 p.m. at SMUD s Customer Service Center located at 6301 S Street, Sacramento CA 95817. At the scoping session, project information can be discussed with SMUD staff and written NOP comments will also be accepted. If you have questions regarding the IS and NOP or the scoping session, please contact Rob Ferrera at the email address shown above. Page 9