DECK DAMAGE AND PENETRATIONS

Similar documents
SECTION STEEL DECKING

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

DIVISION: METALS SECTION: STEEL DECKING REPORT HOLDER: EPIC METALS CORPORATION 11 TALBOT AVENUE RANKIN, PENNSYLVANIA 15104

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

DESIGNING WITH STEEL FORM DECK

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

Industry Standard Terms & Definitions Of The Steel Deck Institute

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

Design Manual and Catalog of Steel Deck Products STEEL DECK INSTITUTE MEMBER

A. Product Data: For each type of deck, accessory, and product indicated.

Structural vs Nonstructural Members. Roger LaBoube, Ph.D., P.E. Wei-Wen Yu Center for Cold-Formed Steel Structures

North Mountain IMS Medical Office Building

LPI 56 Technical Guide

The New SDI Diaphragm Design Manual

FORMDECK. constructions. constructions

Design of Reinforced Concrete Slabs

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

DESIGN CALCULATIONS INSTA-FOOTING LOAD BEARING CAPACITIES ON CONCRETE SLAB. January 14, 2017 Rev -

Analysis and Design of One-way Slab System (Part-I)

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

Lysaght Bondek. Structural steel decking system Design and Construction Manual

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, UNIFORM EVALUATION SERVICES

Pro-Con Structural Study for Alternative Floor Systems October 27, 2004

Cavity ShAftwall System

REPORT HOLDER: ispan SYSTEMS LP 70 BRENTWOOD DRIVE PRINCETON, ONTARIO N0J 1V0 CANADA EVALUATION SUBJECT:

Originally Issued: 03/10/2017 Revised: 03/30/2019 Valid Through: 03/31/ Design

THE FORENSIC MEDICAL CENTER

14240 W. 151 st Street, Homer Glen, IL Phone Fax Deck Building Guide

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE COMPOSITE LONG SPAN FLOOR DECK.

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Concrete Framing systems. Design choices. Basic flavors

DIVISION: METALS SECTION: METAL FASTENINGS SECTION: STEEL DECKING REPORT HOLDER: HILTI, INC.

COFS Mission. AISI Standards Hierarchy. North American Standards for Cold-Formed Steel Framing. Member versus System Design. Specification 10/21/2016

SECTION PLATE CONNECTED WOOD TRUSSES

Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

FACT SHEET #2 DECK INFORMATION

FIGURE R502.2 FLOOR CONSTRUCTION

PR-L274 Nordic Structures Revised April 16, 2017

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Administrative Changes

Building with Insul-Deck Floor & Roof System

BUILDING BULLETIN One and Two Family Dwellings Decks and Residential Access Ramps

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

10 EXTREME BASEMENT PANELS

STRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION. Presented by: Susan L. Lasecki P.E., S.E.

VTU EDUSAT PROGRAMME Lecture Notes on Design of Stair cases

Lightweight Steel Framing. Composite DeltaStud Load Tables

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

AISC Steel & Timber Research for High-Rise Residential Buildings

Lateral Design of Mid- Rise Wood Structures

The following are details of the code requirements of the 2015 International Residential Code for single-story decks.

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

Franklin Square Hospital Center Patient Tower

Typical Deck Details. Albemarle County, Virginia. Based on the 2012 Virginia Residential Code

SECTION NON-STRUCTURAL METAL FRAMING

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

A division of Canam Group

WALL CONSTRUCTION CHAPTER 6

AMERICAN NATIONAL STANDARD ANSI/NAAMM STANDARD. Maximum Bearing Bar Depth / 2 (63.5 mm)

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

LVL Product Guide 2.0E LVL 1.5E LVL

Copyright. magazine. CFS Load Bearing Construction

The difference is Guidance for the preparation of Deck Manufacturing Schedules

BEARING METAL STUD FRAMING

Talk to us, THE SMART DECKING PEOPLE Visit or Global Roofing Solutions Bond-Dek Composite Deck

Specifying metal studs for interior and exterior walls can be simple.

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance

Technical Data for. Headers. and Beams

THE SITUATION WITH STEEL DECKS

PFC-5804* Reissued February 1, Filing Category: DESIGN Wood

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California *Revised April 2003

DIVISION: CONCRETE SECTION: SPECIALTY PLACED CONCRETE REPORT HOLDER: EMMEDUE S.P.A.

SJI Code of Standard Practice

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

HAMBRO COMPOSITE FLOOR SYSTEM

Lecture-06 Analysis and Design of Slab Systems

PLYWOOD FLOATING FLOOR

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING AND SIDING PANELS REPORT HOLDER: KINGSPAN INSULATED PANELS, INC.

Composite Steel Deck - Slabs

Residential Deck Guide

Shaftwall and Area Separation Wall Systems.

Daytona Beach Pier Building Renovation Jun 2010

Tech Tips SidePlate Connections FAQ 09/30/2017

STAY-FORM TRANSFORMING MATERIALS. into products that make a better world

City of of Dauphin WOOD DECKS. Zoning and construction requirements for non-sheltered wood decks for residential dwellings.

SECTION GYPSUM BOARD ASSEMBLIES

SDI MANUAL OF CONSTRUCTION WITH STEEL DECK SDI MANUAL OF CONSTRUCTION WITH STEEL DECK 2SECOND EDITION

Lecture Retaining Wall Week 12

CHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS 301 SCOPE

CSU GUIDELINES. April 27, 2018 FOR POST-TENSIONED CONCRETE STRUCTURES.

Transcription:

DECK DAMAGE AND PENETRATIONS Prepared By Richard B. Heagler, P.E. SDI CONSULTANT Copyright 1987 (Rev. 2000) All rights reserved P.O. Box 25 Fox River Grove, IL 60021 Phone: (847) 458-4647 Fax: (847) 458-4648

Deck Damage and Penetrations Damage to and purposeful penetrations have much in common - the location and severity are seldom known beforehand. Usually the designer knows the general area where a vent stack may cut the roof, or approximately where a telephone conduit may pierce the slab; and he may not know how big the hole will be. This lack of information makes it hard to advise how a hole should be reinforced - if at all - or how damaged should be repaired. Guide specifications reflect this lack of specific knowledge; the Steel Deck Institute states, Openings not shown on the erection diagrams, such as those required for stack, conduits, plumbing, vents, etc., shall be cut (and reinforced, if necessary) by the trades requiring the openings. The designer should certainly be consulted for reinforcing requirements, but frequently, unless details are shown on the plans, no reinforcing is provided and the designer is not consulted. Deck damage presents similar problems. Broad statements can be made such as, All damaged must be repiaced ; then the designer must make the decision as to what constitutes damaged, and he must also consider how replacement may delay the job. How much damage can be tolerated depends on architectural and structural considerations. If the underside of the is to be exposed to public view then very little visible damage may be allowed. In most cases, the will be hidden by a ceiling, or by ducts and utilities so the usual question Is about structural performance. Roof Deck Roof Deck is designed to carry live and dead load without acting in conjunction with other materials. Horizontal as well as vertical loads may be considered. For most 1 1/2 (38 mm) deep roof s the loss of one rib, either by denting or penetration, can be tolerated and no reinforcement will be required. The Canadian Standard for Steel Roof Deck (CSSBI 10M-96) allows an unreinforced opening of 6 (152 mm) as long as not more than 2 webs are removed. A simple and conservative estimate of the capacity would be to take out one rib (about 20% at the worst) and apply this to the uniform loads shown in the tables; in most cases the load capacity is greater than required anyway. A six inch diameter hole will probably not bother the diaphragm strength; a dent can be larger than 6 (152 mm) and still carry the necessary horizontal load. Covering the dent or an 8 (203 mm) maximum hole with a 0.045 (1.14 mm) plate and carrying the plate to adjacent ribs could eliminate worries about insulation board spanning the dent and about a soft spot in the roof. For holes or dents greater than a rib (8 to 13 ) (203 mm to 330 mm) it would be advisable to use a 0.057 (1.45 mm) minimum plate. The following are exceptions to this advice: 1.) the hole may be located in such a place that the can safely cantilever from each adjacent support; 2.) a group of holes may be so close together that a frame Is required. A special case of roof penetration is the sump pan. Generally, when properly attached (see page 7) the sump pan will carry the load of the it replaces. It also acts as a small header to transfer loads into adjacent uncut sheets. Approximate per foot (of width) section properties of standard (0.075 ) (1.91 mm) sump pan are: I = 0.36 in. 4 (150 x 10 3 mm 4 ); Sp = 0.20 in. 3 (3,277 mm 3 ). Sump pan analysis methods are shown in Appendix A, as well as a reinforcing technique. Burn holes in side laps, caused by welded side lap attachments, are spaced far enough apart not to cause problems. However most manufacturers advise not welding the side laps of 0.028 (0.71 mm) (or thinner) because of the difficulty of obtaining a good weld. Typically, a side lap weld will cause a hole, the perimeter of the weld does the work. Burn holes near intermediate supports are unlikely to cause much loss of strength. (These holes are usually caused by the welder searching for the unseen structural member.) Distributed small dents, such as caused by foot traffic, will not cause a structural problem; but, if the denting covers a large percentage of the job, the insulation board may be better attached with mechanical fasteners rather than by adhesives. Holes caused by mechanical fasteners or screws are not problems. If the is not galvanized it is good practice to paint burned or abraded areas. 1

Roof Deck Plate Welds or fasteners at 8 (203 mm) c/c maximum Suggested schedule: Up to 6 (152 mm) - no reinforcing or 0.045 (1.14 mm) minimum plate thickness 6 to 8 (152 mm to 203 mm) diameter - 0.045 (1.14 mm) minimum plate thickness 8 to 13 (203 mm to 330 mm) diameter - 0.057 (1.45 mm) minimum plate thickness Over 13 (330 mm) - frame opening* (design by project engineer) *check cantilever ability of. Plate 2

Composite Floor Deck Floor serves a dual purpose - after it has done its work as a form it becomes the positive bending reinforcing for the slab. The first function, as a form, is usually more critical than the second function of carrying the live load because contractors do not like shoring the. Any damage or penetration must then be first examined as to how it affects the capacity to carry the concrete. Just as roof, the floor can be examined as a cantilever; the SDl does not publish a cantilever table for floor because of the great number of profile variations available. A method for calculating allowable cantilever is shown in Appendix B. Note that if the is used as a cantilever, adequate top reinforcing steel must be installed. Many contractors prefer to block out concrete where a penetration will occur; and, after the concrete cures sufficiently, burn the away. The need for additional bars or mesh would be determined by the engineer. The contractor should also inspect for adequate attachment at supports and side laps. Although collapsing failures are rare, most of them can be traced to inadequate fastening at the beams. Side laps that open during the pour are more common and are obviously caused by poor sheet to sheet connections. Concrete provides an alkaline environment that discourages corrosion; also, most applications of composite are in dry interior areas and most is galvanized. Painting burned, cut, and abraded areas is not usually required. But, if the is not galvanized or the anticipated atmosphere is corrosive, then touching up damaged exposed areas is recommended. Before concrete is poured the contractor shall inspect the to find any areas that may be damaged (crushed) and may require shoring for the pour. FAILURE TO REPAIR OR SHORE DAMAGED DECK BEFORE THE POUR OF THE CONCRETE MAY RESULT IN INJURY. Crushed areas or areas that buckle during the pour (usually caused by damage or by overspanning the ) do not adversely affect the live load capacity. Tests at West Virginia University, by Dr. Larry Luttrell, showed no loss in live load capacity when the was purposely buckled. 3

Floor Deck 1 0 (305 mm) maximum opening C4 x 5.4 extend & weld to 3 ribs beyond opening. (each side) 2 0 ( 610 mm) maximum opening Concrete stop required at all openings. DETAIL FOR OPENINGS TO 2 ft. 0 in. (610 mm) PERPENDICULAR TO DECK L 13 (330 mm) maximum opening 0.071 (1.80 mm) sheet welded to each cell all around or fasteners varies (see plan) 6 (152 mm) minimum each side of opening No reinforcement required where L is 6 (152 mm) or less, in direction perpendicular to. DETAIL FOR OPENINGS TO 13 in. (330 mm) PERPENDICULAR TO DECK 4

Appendix A Sump Pans Example 1: 22 gauge WR design L.L. = 40 psf (1.92 kpa) T.L. = 50 psf (2.39 kpa) Sump located at center of span 1 1/2 38 mm 6 0 (1,829 mm) 6 0 (1,829 mm) 22 1/2 (572 mm) 27 (686 mm) 22 1/2 (572 mm) IMPERIAL SI Total linear load on sump = 50 27 = 113 lb./ft. 12 113 lb./ft. Total linear load on sump = 2.39 x.686 = 1.64 kn/m 1.64 kn/m 56.5 lb./ft. 56.5 lb./ft. 0.82 kn/m 0.82 kn/m or construction concentrated load = 200 lb./ft. 200 lb./ft. or construction concentrated load = 2.92 kn/m 2.92 kn/m 100 lb./ft. 100 lb./ft. 1.46 kn/m 1.46 kn/m 50 psf 2.39 kpa 1-10 1/2 100 lb./ft. 572 mm 1.46 kn/m 22.5 2 50 12 12 M = 2 + 100 (22.5) = 3,305 in. lb. 2.39 M = 0.572 2 2 + 1.46 (0.572) = 1.226 kn mm Typical s n = 0.184 in. 3 /ft. of width fb = 3,305 = 18,000 psi < 20,000 O.K. 0.184 < 26,000 O.K. (temp. man load) Typical s n = 9,886 mm 3 /m of width fb = 1,226,000 N mm = 124 MPa < 138 O.K. 9,886 < 179 O.K. (temp. man load) 5

Appendix A Example 1: Cantilever span of 1 10 1/2 (572 mm) is less than the maximum recommended span for roof cantilever shown in the Steel Deck Institute Design Manual for WR20. O.K. No reinforcing required. Example 2: (same dimensions as Example 1.) 1-10 1/2 (572 mm) Sump end laps at this support Cantilever OK 6 0 (1,829 mm) This end of makes unstable work place Sump Install reinforcing channels as shown on sketch at page 7 before cutting opening. 6

Appendix A Roof Deck Cut-out for sump pan Reinforcing channel (0.034" min.) (0.86 mm) Reinforcing channel (0.034" min (0.86 mm) Reinforcing channel (0.034" min.) (0.86 mm) Reinforcing channel (0.034" min.) (0.86 mm) Put 1 1/2 (38 mm) deep reinforcing channels or zees in each rib at each side of opening (flush with top of ). Channels (zees) span between joists. Attach flanges of sump pan to channels or Z reinforcing. Cut-out for Sump Pan 3 (76 mm) min. Fasteners or welds at 8 (203 mm) c/c max. Cut-out for Sump Pan 3 (76 mm) min. Fasteners or welds at 8 (203 mm) c/c max. Sump Pan Reinforcing Z Sump Pan Reinforcing C Sump pan attachment to channel or Z reinforcing 7

Appendix B Maximum Floor Deck Cantilevers Bearing Width See note 3 Reinforcing steel for negative bending Pour Stop Cell. Closure Slab Depth Adjacent Span Cantilever Span 1.) Allowable bending stress of 20 ksi (138 MPa) with loading of concrete + + 20 psf (1 kpa) or concrete + + 150 lb. (667 N) concentrated load, whichever is worse. 2.) Allowable deflection of free edge (based on fixed end cantilever) of 1/120 of cantilever span under loading of concrete +. 3.) Bearing width of 3 1/2 (89 mm) assumed for web crippling check, which is; concrete + + 20 psf (1 kpa) over cantilever and adjacent span. 8