ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar

Similar documents
ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

SECTION HYDRAULIC CEMENT UNDERLAYMENT

ARDEX GUIDE SPECIFICATION ARDEX K 521 Self-Leveling Concrete Topping with Aggregate Surface

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

FIVE STAR PRODUCTS, INC. (800)

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

Fiber Reinforced Tile and Stone Mortar

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

By CTS Cement Manufacturing Corp.

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

SECTION Pedestrian Traffic Coatings{PRIVATE } 1.1 SUMMARY (Specification writer shall add, delete or amend, as deemed necessary)

***********************************************************************************

ARDEX GUIDE SPECIFICATION

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

RENEW ELASTOMERIC ACRYLIC COATING (PAINT GRADE) MANUFACTURERS SPECIFICATION / SECTION

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

Construction. SikaTop 111 Plus. Application Instructions. Sika Corporation

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

SECTION CONCRETE AND MASONRY COATINGS

ARDEX X 32 MICROTEC Universal Rapid Setting and Drying Thin-to-Thick Bed Mortar

FIVE STAR PRODUCTS, INC. (800)

Waterproofing and Damp-proofing Cementitious Slurry

SECTION CAST-IN-PLACE CONCRETE

Ultratop. High-Performance, Self- Leveling Concrete Topping DESCRIPTION LIMITATIONS FEATURES AND BENEFITS INDUSTRY STANDARDS AND APPROVALS

CEMENTITIOUS CRYSTALLIZING WATERPROOFING PART 1 GENERAL

1.1 Related Work Specified in Other Sections (Delete if Not Applicable):

1. Rapid Set Cement. 2. Methods of preparation. 3. How to stage a job site. 4. Installation Mix, place, finish. 5. Coloring the TRU.

SUPER-KRETE SPECIFICATION S-1 EXISTING CONCRETE SURFACE PREPARATION SECTIONS ; /19; ;

Jewel Stone. Decorative Concrete Overlay System. Part 1 GENERAL MANUFACTURER S SPECIFICATION

SECTION BRICK MASONRY ASSEMBLIES

Florock Seamless Flooring Systems

PART 1 - GENERAL. Section Cast-in-Place Concrete 1.3 REFERENCES

CP-24CC Potassium Silicate Concrete

Advantages: Advantages include:

Florock Seamless Flooring Systems

CC-1004 Ultra High Temperature Epoxy Adhesive

ARDEX GUIDE SPECIFICATION ARDEX PC-T POLISHED CONCRETE TOPPING Part of the ULTRAFLOR ARDEX DIAMATIC Polished Concrete System

Part 1 - General. Spec Component Sikadur 32 Hi-Mod. DIVISION 3 -CONCRETE Section Cast-in-Place Concrete Bonding Agents for Concrete

Section COATING RESTORATION

prospec.com Concrete Repair & Restoration

DIVISION 9 FINISHES Section Floor Finishes

FIVE STAR PRODUCTS, INC.

Easy to apply Nonflammable Low odor Castable Make excellent materials of construction

CHARACTERISTICS / ADVANTAGES

ARDEX X 90 OUTDOOR TM

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES

Construction. Sikadur 31, Hi-Mod Gel. Application Instructions. Sika Corporation

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

Construction. Sika Armatec 110. Application Instructions. Sika Corporation

Construction. Sika Armatec 110. Application Instructions. Sika Corporation

Fundamentals of Concrete

SECTION EPOXY TERRAZZO

SECTION CONCRETE PAVING SLABS SET IN MORTAR

Pacific Polymers Elasto-Deck BT Guide Specification

CONCRETE REPAIR IN ACTION: USING THE MANUAL AS A GUIDE. Christen Longoria, P.E. San Antonio District Project Engineer

Florock Seamless Flooring Systems

SC-113 STRONGCOTE VEHICULAR GRADE TRAFFIC DECK MEMBRANE SYSTEM SECTION 07570

ALBERTA TRANSPORTATION TECHNICAL STANDARDS BRANCH B391 JULY 2017 SPECIFICATION FOR CONCRETE PATCHING MATERIALS

Kolorines Glass Mosaic Tiles Project Specification

SPECIFICATION GUIDELINE

ULTRA-HIGH STRENGTH SHEAR KEY GROUT

A. This Section includes resinous flooring systems with epoxy body coat(s).

POLYURETHANE FOAM SAMPLE DESIGN GUIDELINES URETHANE

SPECIFICATION GUIDELINE

SECTION A. American Society for Testing and Materials (ASTM):

NXT SUBSTRATE PREPARATION AND PRIMER GUIDE TDS 230N

Custom Polishing Systems

3-Part Epoxy Grouting System for Pile Capping

FIVE STAR PRODUCTS, INC. (800)

B. Related Sections: 1. Division 07 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces.

Editing notes to assist users are included within bordered boxes. Delete these notes prior to final printing.

Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

Acrylitex Interior Texture and Coating Submittal Documentation

SECTION GROUT. A. American Society for Testing and Materials (ASTM):

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

3-part thixotropic epoxy patching mortar

FAST SETTING and FAST CURING MORTAR NATCEM 35

Vulkem EWS with PUMA Technology (Heavy Duty) APPLICATION INSTRUCTIONS

Product Data Sheet Sikadur -31 CF Normal Product Description Uses ruction Const Characteristics / Advantages

Application Instructions for Keystone Kool Deck on Existing Concrete

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

Broadcast Parking Garage System

PRODUCT DATA SHEET Sikadur -42 HE

Union County Vocational - Technical Schools Scotch Plains, New Jersey

PRODUCT DATA SHEET Sika Level-315 F

Application Specification:

1. Repairing brick masonry, including replacing damaged units as indicated on drawings. 2. Repointing mortar joints.

MANUFACTURER'S SPECIFICATIONS Section ST. ASTIER LIME PLASTER (NHL) PLASTER ON CONCRETE

POLYMER CONCRETE 100 EPOXY POLYMER CONCRETE DILUTE ACIDS RESISTANCE

SECTION SANDSTONE RESTORATION

AVM System 500. Aussie Membrane 500

Transcription:

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar SECTION 03 92 50 PART 1 - GENERAL 1.1 SUMMARY A. This section includes Portland cement-based, microsilica-modified, fast setting structural repair mortar suitable for overlays, form & pour applications, and full depth repairs. 1. ARDEX TRM Transportation Repair Mortar 2. ARDEX P 71 PRIMER 3. ARDEX BONDING & ANTI-CORROSION AGENT B. Related Sections include the following: 1. Section 033000, Cast-In-Place Concrete 1.2 REFERENCES A. ASTM C 109, Standard Compressive Strength of Hydraulic Cement Mortars B. ASTM C 78, Standard Test Method for Flexural Strength of Concrete C. ASTM C 469, Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression D. ASTM D 4541, Pull-Off Strength of Coatings Using Portable Adhesion Testers E. ASTM C 496, Splitting Tensile Strength of Cylindrical Concrete Specimens F. ASTM C 157, Length Change of Hardened Hydraulic-Cement Mortar and Concrete G. ASTM C 309, Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete H. ICRI Technical Guideline No. 03732 Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays I. ICRI Technical Guideline No. 03730 Guide for Surface Preparation for the Repair of Deteriorated Concrete Resulting from Reinforcing Steel Corrosion SECTION 03 92 50-1 MODIFIED 8/2/2011

1.3 SUBMITTALS A. Product Data: Submit manufacturer's product data and installation instructions for each material and product used. Include manufacturer's Material Safety Data Sheets. B. Qualifications Data: For Installer 1.4 QUALITY ASSURANCE A. Manufacturer's Qualifications: The manufacturer shall be a company with at least five years experience and regularly engaged in the manufacture and marketing of products specified herein. B. Installer Qualifications: Installation of the ARDEX product must be completed by a factorytrained applicator using mixing equipment and tools approved by the manufacturer. Please contact ARDEX Engineered Cements (724) 203-5000 for a list of recommended installers. 1.5 DELIVERY, STORAGE AND HANDLING A. Deliver products in original packaging, labeled with product identification, manufacturer, batch number and shelf life. B. Store products in a dry area with temperature maintained between 50 and 85 F (10 and 29 C) and Protect from direct sunlight. C. Handle products in accordance with manufacturer's printed recommendations. 1.6 PROJECT CONDITIONS A. Do not install material below 50 F (10 C) surface and air temperatures. These temperatures must also be maintained during and for 48 hours after the installation of products included in this section. Install quickly if substrate is warm and follow warm weather instructions available from the ARDEX Technical Service Department. PART 2 PRODUCTS 2.1 REPAIR MORTAR A. Formable, pourable, pumpable, Portland cement-based, microsilica-modified, structural repair mortar for horizontal, vertical, and overhead applications for deteriorated interior and exterior concrete above, on, or below grade. 1. Acceptable Products: a. ARDEX TRM as manufactured by ARDEX Engineered Cements, 400 Ardex Park Drive, Aliquippa, PA 15001 USA 724-203-5000. SECTION 03 92 50-2 MODIFIED 8/2/2011

2. Performance and Physical Properties: Meet or exceed the following values for material cured at 73 F and 50 percent relative humidity: a. Working Time: 10 20 minutes. b. Compressive Strength: 3000 psi (20.7 MPa) at 3 hours, 4000 psi (27.6 MPa) at 1 day, 6,500 psi (44.8 MPa) at 7 days, 8,000 psi (55.2 MPa) at 28 days, ASTM C109. c. Direct Tensile Bond Strength: 240 psi (1.7 MPa) at 28 days, ASTM D4541. d. Flexural Strength: 850 psi (5.9 Mpa) at 7 days, 1100 psi (7.6 MPa) at 28 days, ASTM C78. e. Modulus of Elasticity in Compression: 3.8 x 10 6 psi (2.6 x 10 4 MPa) at 28 days, ASTM C469, modified. f. Splitting Tensile Strength:, 550 psi (3.8 MPa) at 7 days, 625 psi (4.3 MPa) at 28 days, ASTM C496, mortar. g. Shrinkage: Less than 0.065% at 28 days, ASTM C157, air cured. h. Color: Concrete gray. i. Combustibility: Non-combustible, both before and after use. j. Foot Traffic: 2 hours k. Vehicular Traffic: 6 hours PART 3 EXECUTION 3.1 PREPARATION A. General: Prepare substrate in accordance with manufacturer s instructions. Prior to proceeding with any repair, please refer to the International Concrete Repair Institute s ICRI 03730 Guide for Surface Preparation for the Repair of Deteriorated Concrete Resulting from Reinforcing Steel Corrosion; ICRI 03732 Guideline for Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays; and the American Concrete Institute s ACI 546R-04 Concrete Repair Guide for general guidelines for concrete repair. 1. All concrete and masonry substrates must be sound, solid, dry, and completely free of all oil, grease, dirt, curing compounds and any substance that might act as a bond breaker. Overwatered, frozen or otherwise weak concrete surfaces must also be cleaned down to sound, solid concrete by mechanical methods such as scarifying, scabbling or similar in accordance with ICRI 03732 before priming. Acid etching and the use of sweeping compounds and solvents are not acceptable. 3. The repair area must be saw cut in a basic rectangular shape at least 1/2 (12 mm) in depth. The cuts should be made at 90 angle, and should be slightly keyed. Chip out the concrete inside the cuts to a minimum depth of 1/2 (12 mm) until the area is squared or box shape. 4. Mechanically prepare surface to obtain an exposed aggregate surface with a minimum surface profile of approximately 1/16 (1.5 mm). 5. For cases with exposed reinforcing steel, mechanically clean the steel to remove all rust and any other contaminants in accordance with ICRI 03730. Prime the steel with SECTION 03 92 50-3 MODIFIED 8/2/2011

B. Joint Preparation ARDEX Bonding & Anti-Corrosion Agent prior to proceeding with repair. For further details, please refer to the ARDEX Technical brochure. 1. Moving Joints and Cracks honor all expansion and isolation joints up through the ARDEX TRM. A flexible sealing compound suitable for the application may be installed. ARDEX ARDISEAL RAPID PLUS may be installed for interior applications only. 2. Control Joints and dormant cracks greater than 1/16 fill all non-moving joints and cracks with ARDEX ARDIFIX Joint Filler. 3.2 INSTALLATION OF TRM Transportation Repair Mortar: A. Examine substrates and conditions under which materials will be installed. Do not proceed with installation until unsatisfactory conditions are corrected. B. Coordinate installation with adjacent work to ensure proper sequence of construction. Protect adjacent areas and landscaping from contact due to mixing and handling of materials. C. Mixing: Comply with manufacturer's printed instructions and the following. 1. Precondition components to temperature of 70 plus or minus 5 F (21 plus or minus 2.5 C) prior to mixing. 2. Pre-dampen the inside of a 5 gallon pail or inside of a clean mortar mixer, and remove any excess water. 3. Add 5-6 pints (2.37 L TO 2.84 L) of clean potable water per 50-pound (22.7 kg) bag. 4. Slowly add 1/3 of a 50 lb. (22.7 kg) bag. Once material is blended in, add the next third and so on until all material is added. 5. Mix using a ½ to ¾ (12 to 19 mm) low speed heavy-duty mixing drill with a heavy gauge square box (butterfly) mixing paddle. Forced action mortar mixers are also suitable. Mix to a uniform, lump-free consistency. Do not overwater. 6. For application depths greater than 4 inches, add up to 25 pounds (11.3 kg) clean, uniformly graded, saturated-surface-dry 3/8-inch (.95 mm) aggregate per bag, as directed by manufacturer. D. Application: Comply with manufacturer's printed instructions and the following. 1. Do not apply in freezing conditions or during precipitation. 2. Comply with manufacturer s guides for hot and cold weather application. SECTION 03 92 50-4 MODIFIED 8/2/2011

3. Primer: Dampen substrate to fill concrete pores with water. Remove ponding, glistening, or surface water (saturated surface dry). Alternatively, ARDEX P 71 Primer can be used in accordance with the ARDEX Technical brochure. Do not allow the concrete or ARDEX P 71 to dry before installing ARDEX TRM. If ARDEX Bonding & Anti- Corrosion Agent is specified as a primer, follow the application instructions in the ARDEX Technical Brochure. 4. ARDEX TRM can be applied to any prepared concrete surface using standard concrete practices. Allow material to take initial set before finishing. 5. When overlaying, Apply scrub coat of repair mortar into primed or saturated surface dry substrate to ensure intimate contact and establish bond. Apply ARDEX TRM while scrub coat is wet. 6. Steel trowel the mortar to the desired finish once it takes its initial set. 7. Vibrate closed form repairs to ensure intimate contact with the substrate, establish bond, and ensure proper consolidation. Avoid over-vibration. 8. ARDEX TRM can be installed to a minimum thickness of ½ up to 4 (6 mm to 5 cm) neat. For application depths greater than 4, including full depth repairs up to 8, extend ARDEX TRM with aggregate as recommended by manufacturer. E. Curing: 1. Keep surface damp for 48 hours with continuous light water-fogging or curing blanket. 2. If no coating or sealer is to be applied, a water-based curing compound meeting ASTM C309 may be used. Do not use solvent-based curing compounds. 3. Allow to cure a minimum 6 hours before applying any final coatings or sealers. 4. Acceptable for foot traffic in 2 hours and vehicular traffic in 6 hours. F. Cleaning: Remove excess material before material cures. If material has cured, remove using mechanical methods that will not damage substrate. END OF SECTION SECTION 03 92 50-5 MODIFIED 8/2/2011