Raritan River Bridge Replacement. Public Information Session September 2016

Similar documents
Project Purpose. Federal Railroad Administration

Executive Summary. ES-1 Introduction. ES-2 Background

NOTICE OF RE-SCHEDULED BOARD MEETINGS

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

AUTOMATION OF MOVABLE BRIDGES Presented at AREMA September Office of Vice President/Chief Engineer

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

PUBLIC HEARING April 24, 2017

Distribution Restriction Statement Approved for public release; distribution is unlimited.

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

Project Planning and Development Process

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

HUDSON TUNNEL PROJECT

Executive Summary S.1 INTRODUCTION

SCOPE OF WORK FOR CONSULTANT INSPECTIONS Type III-S (Current Date) (State or County) Bridges Group XXXX State Job No. XXXXXXX

Marine Board Spring Meeting April 27, 2011 David M. Kennedy

Strain Gauge Balancing of the Lea Joyner

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

RECORD OF DECISION OF THE FEDERAL TRANSIT ADMINISTRATION

Indirect and Cumulative Effects

CHAPTER 7. San Dieguito River Flooding Adaptation

Specializing in top down bridge construction through environmentally sensitive areas.

KRISTOPHER J. KRZYSTON, CEI, CEM

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

Port of Long Beach Port Master Plan Overview December 22, 2008

Cooper, Robertson & Partners Architecture, Urban Design. Flood Mitigation in

Climate Change Resiliency Program

RESOLUTION NO

Metro Blue Line Improvements & Project Update

REHABILITATION PACKAGE 4-a

Port Jervis Line Service Strategy Report. Appendix C: Port Jervis Line Capacity Improvements Analysis

Green Line Extension EOT. Project Location. Project Purpose. Environmental Impact Report Public Scoping Session

Superstorm Sandy The Experience of The Port Authority of New York and New Jersey

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation

W. Tobey Ritz MTA Metro-North Railroad, Chief Engineer Capital Engineering New York/New York

Vulnerability Assessment

Several intersection improvements, bicycle-pedestrian improvements, and ITS/signage improvements are recommended for the short- and medium-term.

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Chatham County EMERGENCY OPERATIONS Plan INCIDENT ANNEX C BRIDGE DISRUPTION

Winnipeg River Bridge on PR313 at Lac du Bonnet. June 2014

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

5 Recommendations 5.1 LONG-TERM ALTERNATIVES CONSIDERED

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies

I-10 Mobile River Bridge. & Bayway Widening

ELEVATORS, LULAS AND PLATFORM LIFTS

presented at 2015 Mississippi Water Resources Conference April 7, 2015

West Seattle and Ballard Link Extensions. Stakeholder Advisory Group March 14, 2018

RESCHEDULED MEETING NOTICE

Lowestoft Flood Risk

NJ State Rail Plan. New Jersey Short Line Railroad Association Briefing September 12, 2012

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

Work Group Discussion Guidance

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Hinksey Flood Alleviation Scheme Sink or Swim

APPENDIX A. Project Scoping

A117.1 Chapter 3 Building Blocks

Delco Lead Train safe haven service and inspection facility

22.1 INTRODUCTION 22.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

Pulaski Skyway Rocker-Bent Investigation Contract at Span 47 and 97

Bonner Bridge: Ensuring Connectivity and Resilience on North Carolina's Coastal Barrier Islands

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)

East St. Tammany Storm Surge Protection Project Request

Bridge articulation No. 1.04

Session I: Introduction

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Mitigating wind and flood: The increased wind vulnerability of static elevation vs. amphibious retrofit

Bonner Bridge Replacement Update:

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE

From: John D. Hines, P.E. Re: Old Dominion University Campus Master Plan Sea Level Rise Narrative

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

Load Transfer Sequencing for Maintenance of Lift Span Bridges

INTRODUCTION. NOS Priorities Roadmap, p. 3

CEF Action n 2014-IT-TM-0543-W

Alder Drive / Blair Road Bridge Replacement Projects

Factor Potential Effects Mitigation Measures

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

Implement an annual King Tide site monitoring and inspection program to document local and regional routes and nodes at early risk from flooding

New Jersey Department of Environmental Protection

Attachment A FTA DCE Worksheet Section II, NEPA Class of Action

Major Capital Investments

Using a Programmatic Agreement as a Bridge to the Future: Streamlining Historic Review Clearance for Hundreds of Wooden Trestle Bridges Presenters:

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

1. Introduction Noise Analysis Results Figures. List of Tables

2. Does not require, involve or include any additions to, or repair or modification of, the existing foundation.

Chapter 4 Bridge Program Drawings

Downtown Estes Loop Project Frequently Asked Questions

From the ADA and ABA Accessibility Guidelines for Buildings and Facilities

Transcription:

Raritan River Bridge Replacement Public Information Session September 2016

Welcome AT THIS MEETING YOU CAN: Learn about the Raritan River Bridge Replacement Project Understand how the project will be evaluated in an Environmental Assessment prepared in accordance with the: - National Environmental Policy Act of 1969 (NEPA) - Section 106 of the National Historic Preservation Act - Section 4(f) of the U.S. DOT Act Ask questions and provide comments

Why is it Needed? The bridge is a critical link on the North Jersey Coast Line, NJ TRANSIT s third most heavily used rail line Raritan River Drawbridge was significantly damaged during Sandy in 2012 The bridge was closed for three weeks after the storm for repairs. Today it operates at reduced train speeds and is safe, but vulnerable to future storms Current maintenance activities will not address the long-term needs

Project Goals and Objectives Improve resilience of the Raritan River Bridge to severe storms Improve bridge s resistance to ocean surges Raise tracks and electrical and mechanical systems above Design Flood Elevation to the extent practical Design vulnerable components to better withstand saltwater and ocean surge Provide adequate structural capacity to comply with current code Minimize loss of service on the North Jersey Coast Line during and following storm events

Project Goals and Objectives Provide rail improvements that minimize service disruption and optimize operations Optimize design speeds for trains on the bridge, up to 60 mph Avoid substantial compromises to existing North Jersey Coast Line timetables Accommodate heavier freight trains of 286,000 pounds and potentially up to 315,000 pounds Minimize capital and operating and maintenance costs Implement within a reasonable timeframe Minimize impacts to NJ TRANSIT and Conrail operations during Construction

Project Goals and Objectives Maintain and improve marine navigation beneath the bridge Minimize delays to marine traffic due to bridge malfunctions Widen channel to minimize the risk of collisions with marine vessels Enable the safer and faster passage of boats beneath the structure Avoid impacts to marine traffic during construction

Project Goals and Objectives Minimize adverse impacts on the built and natural environment Avoid property acquisition to the maximum extent feasible Avoid, minimize, or mitigate adverse impacts on historic resources Avoid impacts on parklands, open space, natural features, and coastal waters Maintain access to nearby residences and businesses during construction Minimize construction impacts to the extent feasible

Alternatives Considered No Action Alternative Rehabilitation Alternative Replacement Bridge Alternatives Fixed span alignment Movable bridge alignment within existing bridge footprint or to the east or west of existing bridge. Movable bridge types include: Swing bridge (similar to the existing bridge) Vertical lift bridge Bascule bridge (single or double-leaf bascules)

Moveable Span Options Swing Bridge (similar to existing bridge) Vertical Lift Bridge Bascule Bridge (Double Leaf)

Bridge Rehabilitation Alternative is Not Feasible Inadequate clearance beneath the existing bridge to drive additional support piles North Jersey Coast Line service would need to be suspended for prolonged periods of time Extensive retrofitting of the main span piers would require narrowing the navigation channel Top of rail could not be raised to meet Design Flood Elevation Marine navigation beneath the bridge would not be improved

Project Site

Preferred Alternative Vertical Lift Bridge to the West Vertical lift in closed position Vertical lift in open position provides vertical clearance of 110 feet and full navigation channel clearance (300 feet)

Benefits of Preferred Alternative Western Alignment Can be designed to meet NJ TRANSIT s Design Flood Elevation criteria and operating requirements (e.g., 60 mph design speed) Avoids impacts to parklands and minimizes property acquisition requirements Minimizes impacts to railroad operations and marine traffic during construction

Vertical lift Span Benefits of Preferred Alternative Eliminates center pier and provides unimpeded navigation channel (300 feet wide) Operating machinery located well above flood levels Allows the replacement bridge to be built near existing bridge while maintaining navigation channel and railroad operations Avoids need to close half the channel during construction

What is NEPA? NEPA stands for the National Environmental Policy Act of 1969 Helps decision-makers and the public understand how a proposed project will affect the environment Requires the identification and analysis of potential environmental impacts associated with construction and operation of a proposed project An Environmental Assessment for the project is being prepared in accordance with NEPA

Section 106 of the National Historic Preservation Act FTA and NJ TRANSIT are also evaluating the project in accordance with Section 106 of the National Historic Preservation Act Section 106 requires consultation with interested parties and the public on the project s effects on historic properties, additional input is welcome The project will require the removal of railroad properties including: Raritan River Drawbridge, Essay Tower, a substation and signal bridge, and railroad catenary, which are contributing resources to several historic districts The proposed project will likely impact the remnants of two small boats that are buried within the sandy beach at the river s edge and require construction in areas of archaeological sensitivity for marine resources FTA and NJ TRANSIT are working with the New Jersey State Historic Preservation Office and other consulting parties to minimize impacts to historic resources and develop appropriate mitigation measures

Section 4(f) Evaluation Section 4(f) of the U.S. Department of Transportation Act of 1966 requires that a special effort should be made to preserve Park and recreation land or Historic resources This project is anticipated to effect some historic resources and no effect on park & recreation land. A Section 4(f) Evaluation will be circulated for public review in conjunction with the Environmental Assessment The evaluation must demonstrate that there are no feasible and prudent alternatives to using Section 4(f) resources and that all possible planning has been done to minimize harm to the resources FTA will make a Section 4(f) determination, which will be submitted to the U.S Department of the Interior for concurrence

How to Comment WE WELCOME YOUR FEEDBACK. TO COMMENT THIS EVENING: Hand write comments on forms provided at the front desk TO COMMENT OUTSIDE OF THIS PUBLIC MEETING: Visit the Project s website: www.njtransitreslienceprogram.com/contact-us Send written comments to: Mr. RJ Palladino, Senior Program Manager NJ TRANSIT Planning & Programs Department One Penn Plaza East, 8th Floor Newark, NJ 07105

Thank You! www.njtransitresilienceprogram.com NJ TRANSIT Resilience Program - Capital Planning & Programs Department One Penn Plaza East, 8th Floor, Newark, NJ 07105