Relationship between twin tunnels distance and surface subsidence in soft ground of Tabriz Metro - Iran

Similar documents
Modeling of TBM Tunnel Construction for the Greater Cairo Metro Line 3

ANALYSIS OF DIFFERENT LOADS AFFECTING THE URBAN RAILWAY TUNNEL SYSTEMS OF CAIRO METRO UNDERNEATH THE RIVER NILE

Determining radius of influence of the face in EPB shield tunneling by finite difference method.

Comparison of geotechnic softwares - Geo FEM, Plaxis, Z-Soil

IGC. 50 th. 50 th INDIAN GEOTECHNICAL CONFERENCE INFLUENCE OF TUNNELING ON AN EXISTING PILE FOUNDATION

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY

4D grouting pressure model of a bored tunnel in 3D Tunnel

Two-dimensional finite element analysis of influence of plasticity on the seismic soil micropiles structure interaction

Modelling shearing characteristics of reinforced concrete

A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES

Analysis of skin friction in prebored and precast piles

4D grouting pressure model PLAXIS

Numerical Analysis of Pipe Roof Reinforcement in Soft Ground Tunnelling

NUMERICAL ANALYSIS OF GEOSYNTHETIC REINFORCED SOIL ABOVE A TUNNEL

Static Response of Reinforced Soil Retaining Walls with Modular Block Facing

Evaluation on Bearing Capacity of Ring Foundations on two-layered Soil

Underground Construction Technology

Finite Element Study Using FE Code (PLAXIS) on the Geotechnical Behavior of Shell Footings

NUMERICAL STUDY OF OFFSHORE SKIRTED FOUNDATIONS SUBJECTED TO COMBINED LOADING

Comparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

Numerical Coupling of Stress and Seepage in the Design of Pressure Tunnel under to High Internal Water Pressure

BEHAVIOR OF PILES IN SAND SUBJECTED TO INCLINED LOADS

Investigating Effect of Tunnel Gate Shapes with Similar Cross Section on Inserted Forces on Its Coverage and Soil Surface Settlement

PILE SETTLEMENT ZONES ABOVE AND AROUND TUNNELLING OPERATIONS

Quantifying the creep behaviour of polyester resin and grout

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11

Analytical and Numerical Solutions of Tunnel Lining Under Seismic Loading and Investigation of Its Affecting Parameters

Parametric Study on Geogrid-Reinforced Track Substructure

Journal of Asian Scientific Research EVALUATION OF RECTANGULAR CONCRETE-FILLED STEEL-HOLLOW SECTION BEAM-COLUMNS

Numerical Analysis of Lining Hinge in Tunnels

Numerical Analysis of Piles in Layered Soils: A Parametric Study By C. Ravi Kumar Reddy & T. D. Gunneswara Rao K L University, India

APPROXIMATE ANALYSIS OF PILED RAFT. Rameez Gahlot1, Roshni J John2

Numerical Analysis of a Novel Piling Framed Retaining Wall System

Dimensioning and design of the segmental lining

Footing Bearing Capacity on Elastic-Plastic Soil

Behaviour of rigid retaining wall with relief shelves with cohesive backfill

Journal of Engineering Science and Technology Review 7 (2) (2014) Research Article

Modelling the response of single passive piles subjected to lateral soil movement using PLAXIS

Corrosion Protection of Rock Bolts by Epoxy coating and its Effect on Reducing Bond Capacity

VOL. 11, NO. 16, AUGUST 2016 ISSN ARPN Journal of Engineering and Applied Sciences

Seismic design of tunnels

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS

Settlement assessment of running tunnels a generic approach

A 2D DEM mono-pile model under combined loading condition

Pile-group response due to tunnelling

Earthquake Design of Flexible Soil Retaining Structures

Assessment of Tunnel Stability with Geotechnical Monitoring

North American Society for Trenchless Technology 2008 No-Dig Conference & Exhibition. Dallas, Texas April 27 May 2, 2008

Surface Subsidence Analysis Due to Longwall Underground Coal Mining Method in PT. Gerbang Daya Mandiri, Tenggarong, East Kalimantan

Comparison of strength of artificially frozen soil in two test modes

M.C. Christianson Itasca Consulting Group, Inc., Minneapolis, Minnesota, USA

STUDY ON TUNNELING FOR UNDERGROUND METRO RAIL SYSTEM IN DHAKA CITY

REVIEW ON SHEAR SLIP OF SHEAR KEYS IN BRIDGES

Modelling of ground deformation control induced by slurry shield tunnelling

Nonlinear Finite Element Analysis of Composite Cantilever Beam with External Prestressing

AVOIDING EXCESSIVE DISPLACEMENTS: A NEW DESIGN APPROACH FOR RETAINING WALLS

Northport Berth 3 design and construction monitoring

FEATURES & BENEFITS OF ARMTEC TUNNEL LINER PLATE

The take into account of soil-structure interaction phenomena to study mining subsidence consequences on buildings.

THIN-WALLED components have an increasingly

Using EPS Buffers for Diaphragm Walls

Buckling Analysis of Cold Formed Silo Column

Reduced Ductility due to Local Variation in Material Properties for 3D-printed Components

3-D FINITE ELEMENT ANALYSIS OF PILE-TO-PILE CAP CONNECTIONS SUBJECTED TO SEISMIC ACTION

Collapse analysis of the Daikai station in Kobe Metropolitan

CHAPTER 5 FINITE ELEMENT MODELLING

Seismic Design of a Slope Stabilization Work Using Piles and Tendons

Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles

Seismic characteristic of underground stations

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

Influence of Orientation of Piles on Seismic Response of Pile Groups

Numerical Analysis of the Influence of Geometry of Ceramic Units (Blocks) on Structural Walls

Compressive strength of double-bottom under alternate hold loading condition

Prof. Eng. Daniele PEILA

Study on earth pressure acting upon shield tunnel lining in clayey and sandy grounds based on field monitoring

Investigation into a New Approach for Roadway Roof Support Design That Includes Convergence Data

Influence of Vertical Acceleration on Seismic Response of Endbearing

Tension and compression testing of fibre reinforced polymer (FRP) bars

Design Illustrations on the Use of Soil Nails to Upgrade Loose Fill Slopes

Chapter 2: Strain. Chapter 3: Torsion. Chapter 4: Shear and Moment Diagram

Effect of Seismic Reinforcement of Sheet Pile Quay Wall Using Ground Anchor

IGC. 50 th INDIAN GEOTECHNICAL CONFERENCE PERFORMANCE ENHANCEMENT OF ISOLATED FOOTING WITH MICRO-PILES

Influence of unloading soil modulus on horizontal deformation of diaphragm wall

[Kouravand Bardpareh* et al., 5(6): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

Fagà, Bianco, Bolognini, and Nascimbene 3rd fib International Congress

Investigation of the behavior of stiffened steel plate shear walls with Finite element method

Example of a modelling review Roof truss

Insights into the mechanics of multi-seam subsidence from Ashton underground mine

A Study of Angle of Draw in Mining Subsidence Using Numerical Modeling Techniques

Downloaded from Downloaded from /1

STRUCTURAL BEHAVIOUR OF HOLLOW STEEL SECTIONS UNDER COMBINED AXIAL COMPRESSION AND BENDING

Seepage-Stress Coupled Analysis on Shield Tunnel Face Stability in Layered Soil

Compressive strength of double-bottom under alternate hold loading condition

Single Piles and Pile Groups

THREE-DIMENSIONAL NUMERICAL ANALYSIS ON EXCAVATION AND SUPPORT OF DEEP PIT NEAR THE SUBWAY TUNNEL BY COMPUTER SIMULATION TECHNIQUE

CMCE Computational Methods in Civil Engineering

Interpretation of Danish Chalk Parameters Applicable to Foundation Design

Numerical Modeling of Slab-On-Grade Foundations

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil

Transcription:

University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2012 Relationship between twin tunnels distance and surface subsidence in soft ground of Tabriz Metro - Iran Saied M. F. Hossaini Universtiy of Tehran Mehri Shaban University of Tehran Alireza Talebinejad University of Tehran Publication Details S.M.F. Hossaini, M. Shaban and A. Talebinejad, Relationship between twin tunnels distance and surface subsidence in soft ground of Tabriz Metro - Iran, 12th Coal Operators' Conference, University of Wollongong & the Australasian Institute of Mining and Metallurgy, 2012, 163-168. Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library: research-pubs@uow.edu.au

RELATIONSHIP BETWEEN TWIN TUNNELS DISTANCE AND SURFACE SUBSIDENCE IN SOFT GROUND OF TABRIZ METRO - IRAN Saied Mohammad Farouq Hossaini 1, Mehri Shaban 2 Talebinejad 3 and Alireza ABSTRACT: This paper presents a series of three-dimensional finite distinct element analyses carried out for line 1 of Tabriz metro tunnels. Interaction between these circular parallel twin tunnels excavated by an Earth Pressure Balance machine in a soft ground has been studied. The Influence of the distance between twin tunnels on the surface subsidence, bending moment and axial forces in the segmental lining of the first tunnel have been particularly, investigated. Advancing of the second tunnel affects the surface subsidence, bending moment and internal forces in the lining of the first tunnel. These effects relate directly to the width of the pillar separating the twin tunnels. It was found that the location of the maximum subsidence is offset from the centreline of the first tunnel. The offset increases with decrease in the distance between the tunnels. Also, moment and axial forces of the first tunnel decrease by increasing the space between the tunnels. The interaction between the tunnels has been quantified and classified in accordance with various tunnel distances. INTRODUCTION The use of underground spaces for transport infrastructures is required in development of large cities. In some cities, the geotechnical and underground conditions require the construction of new tunnels close to existing ones. In other cases, the solution of twin tunnels presents major advantages, such as reduction of both tunnels diameter and soil movement resulting from the tunnel construction (Chen, et al., 2009). Ground movements are an inevitable consequence of excavating and constructing tunnels. Tunnel excavation causes relaxation of in situ stress, which is only partially restricted by the insertion of the tunnel support. In fact it is not possible to create a void instantaneously and provide an infinitely stiff lining to fill it exactly. Hence, a certain amount of the deformation of the ground will take place at the tunnel depth; this will trigger a chain of movements, resulting in settlements at the ground surface, which are more significant at shallow tunnel depth (Moller and Vermeer, 2008). Numerical modelling and in situ observations were used to analyse the interaction between twin tunnels. Results show that in some configurations, the interaction could largely affect the soil settlement and that the design of twin tunnels requires numerical analysis associated to monitoring during the design phase (Hage Chehade and Shahrour, 2008). The construction of the first tunnel may notably affect the soil conditions: reduced confinement, stress release and reduction of the strength parameters of the soils. Consequently, the second tunnel will be excavated through a different material and the induced settlements related to the second tunnel will be generally greater (Guglielmetti, et al., 2007). This paper presents 3D numerical analysis conducted to investigate the influence of twin tunnel spacing on the surface settlement and internal forces resulting from the tunnel excavation. Analysis was carried out for three different tunnel distances namely 0.5D, 1D and 1.5D where D is the tunnel's diameter. TABRIZ METRO LINE 1 Tabriz is a large city in the north west of Iran with a population of about two million. Tabriz metro is designed in three lines. Line 1 starts at south east of the city and after passing the city centre ends at the south west. In this line two parallel circular tunnels are excavated by two EPB machines. The length of tunnels is 8 km and their diameter is 6.88 m. Figure 1 shows three lines of Tabriz metro. 1 Associate Professor, School of Mining Engineering, University of Tehran, Tehran, Iran, mfarogh@ut.ac.ir 2 MSc graduate, School of Mining Engineering, University of Tehran, mehri.shaban@gmail.com 3 MSc graduate, School of Mining Engineering, University of Tehran, a_talebinejad@yahoo.com 16 17 February 2012 163

Figure 1 - Three lines of Tabriz metro Geotechnical condition is divided into four different sections in the tunnel alignment. Analysis was carried out for sections 1 and 2 of line 1 because of the critical conditions of these parts regarding geotechnical specification, water table depth and existence of old buildings. There is one sedimentary layer in section 1 and four different layers in section 2 including two silt layers with different properties, a sand layer and a man filled layer. The properties of different layers are summarized in Table 1. Table 1 - Properties of different layers of Tabriz metro line 1 Parameter Section1 Section 2 Fine sedimentary layer Manfilled silt sand silt Friction angle (degree) 35 5 15 33 34 Cohesion (MPa) 0 0 0.015 0 0.025 Bulk modulus (MPa) 33.34 15.62 22.3 33.34 33.34 Shear modulus (MPa) 11.12 5.6 7.4 15.4 11.2 Thickness (m) - 5 8 15 20 Tunnel depth (m) 10 14 Water depth (m) 20 6 The depth of tunnels from the ground surface is 10 m and 14 m in sections 1 and 2, respectively. In section 1 ground water table is 8 m above the tunnels crown but it is below the tunnel invert in section 2 (Jahad-e Tahghighate Sahand, 2005). THREE DIMENSIONAL MODELS Figure 2 shows the model used for analysis of horizontally aligned tunnels with 6.88 m diameter and 7 m pillar width. The boundary of the model is extended to a distance where there is no effect of tunnel construction on the lateral border of the model. This distance is 5.5D equal to 38 m from each tunnel's centre. The length, width and height of the model are 56 m, 90 m and 40 m, respectively. Layers of section 2 and their properties are also shown in Figure 2. The model contains 57 280 elements and 60 147 nodes. The mesh size increases gradually when the distance from the tunnel increases. The mesh size in the 164 16 17 February 2012

direction of the tunnel axis is equal to the segment length which is 1.4 m. Concerning the boundary conditions, the displacements are constrained in three directions at the bottom, while zero horizontal displacement is imposed at lateral boundaries. Figure 2 - The mesh used for modelling The ratio of the horizontal to vertical stress (k) is 0.43 and 0.74, respectively for sections 1 and 2. Initial vertical stress is calculated as the weight of the layers. The stress induced by surface structures and traffic is applied as planner load on the top boundary of the model. This stress is assumed to be 24 000 N/m 2. The soil behaviour is described by an elastic perfectly plastic Mohr-Coulomb criterion. Modelling of the twin tunnels construction is carried out in the following steps: Construction of the first tunnel 1.4 m, applying face pressure and installation of shield elements. This cycle is repeated till 9.8 m of the tunnel is excavated (7 cycles). There would be no lining installed up to this length. Continuing step one followed by installing lining elements and then injection of grout behind the shield. Repetition of step two till 35 m of tunnel 1 is excavated Starting the construction of the second tunnel in the same way performed for the first one. The shield is modelled as a rigid cylinder by means of shell elements with external diameter of 6.86 m and length of 9.8 m. Segmental lining is modelled with shell elements with thickness of 0.3 m and internal diameter of 6 m. The behaviour of the shield and segmental lining is assumed to be linear-elastic. Properties of the shield and lining are shown in Table 2. Results Table 2 - Properties of shield and segmental lining Type of support system Elastic modulus (Gpa) Poisson s ratio Shield 200 0.25 Segmental lining 25.2 0.2 Analysis was conducted for three various pillar width of 3.5 m (0.5D), 7 m (D) and 10.5 m (1.5D). Figure 3 shows the surface settlement for different tunnel distances in section 1. The pattern and magnitude of the settlement depend on the distance between tunnels. Maximum settlement is about 2.65 cm, 2 cm and 1.9 cm for the pillar width of 3.5 m, 7 m and 10.5 m, respectively. By increasing pillar width from 3.5 m to 7 m, maximum settlement decreases about 25% but it decreases about 5% when pillar width 16 17 February 2012 165

increases from 7 m to 10.5 m. The maximum soil settlement is observed for tunnels with the narrowest pillar width (i.e. 3.5 m) where maximum settlement occurs in the centre part of the pillar. When distance between the tunnels increases the settlement in this part decreases because of decreasing the interaction between tunnels. Figure 3 - Surface settlement for different pillar width between tunnels in section 1 Interaction between tunnels leads to increase in soil movement in the pillar between them. As Figure 4 shows in pillar width of less than 10.5 m maximum settlement offsets from the centre line of the first tunnel. The magnitude of offset increases when distance between tunnels decreases. In pillar width of 3.5 m maximum settlement occurs at 5.19 m far from the first tunnel axis. Figure 4 - Offset of maximum settlement from the center line of the first tunnel in section 1 Figure 5 shows the settlement curves in section 2. In this section, for pillar width of 3.5 m, maximum settlement doesn t occur in the central part of the pillar but is near to the first tunnel (i.e. 4.44 m from centre of the first tunnel). For the pillar width of 7 m maximum settlement is in the pillar zone with 0.75 m offset from pillar centre, but for 10.5 m pillar width maximum settlement is 3 m from the centre part of pillar (2.25m from the first tunnel wall).the shape of curve for this case shows that the interaction between tunnels decreases. Maximum settlement is 3.9, 3.5 and 2.75 cm for 3.5, 7 and 10.5 m pillar width, respectively. Therefore, increasing pillar width from 3.5 m to 7 m leads to decrease of 11% and increasing pillar width from 7 m to 10.5 m leads to another decrease of 27% in the ground settlement. The maximum settlements estimated for pillar width of 3.5 m and 7 m are not allowable in urban area. Therefore, the pillar width of 10.5 m is suitable as it decreases the settlement to an allowable amount in section 2. Excavation of the second tunnel changes the bending moment and axial forces in the segmental lining of the first tunnel. Tables 3 and 4 show the quantities of these parameters for various tunnels distances. As shown in these Tables, for lowest distance, the bending moment increases 17% and 11.5% and axial force increases about 6.5% and 9.5% in sections 1 and 2, respectively. Bending moment and axial forces in the lining of the first tunnel decrease when the distance between tunnels increases. In both 166 16 17 February 2012

sections the effect of advancing of the second tunnel on the lining of the first tunnel is negligible for 10.5 m pillar width. Figure 5 - Surface settlement for different pillar width between tunnels in section 2 Table 3 - Bending moment on the lining of the first tunnel after excavating the second one Pillar width (m) Moment in segments (KN-m) Section 1 Section 2 Moment in segments compare to (KN-m) single tunnel (%) compare to single tunnel (%) 3.5 0.884208 17 2.13057 11.5 7 0.831688 10 1.99667 6.5 10.5 0.781443 3.5 1.94025 1.5 Pillar width (m) Table 4 - Axial forces in the first tunnel lining after excavating the second one Magnitude of forces (KN) Section 1 Section 2 Magnitude of forces compare to single (KN) tunnel (%) compare to single tunnel (%) 3.5 664.94 6.5 1222.2 9.5 7 644.45 3 1152.6 3.5 10.5 625.84 0.06 1127.4 1.1 CONCLUSIONS The following conclusions can be drawn from this numerical study: Settlement decreases with increasing the distance between the tunnels for both sections. In section 1, the magnitude of settlement is 2.65, 2 and 1.9 cm for pillar width of 3.5, 7 and 10.5 m, respectively. In section 2, settlement changes from 3.9 to 2.65 cm when pillar width change from 3.5m to 10.5 m; Offset of maximum settlement from the centre line of the first tunnel decreases by increasing the tunnels' distance. It is 5.19m and 4.44 m for section 1 and section 2, when the pillar width is 3.5m. The offset reaches zero for pillar width of 10.5 m; The moment in the segmental lining of the first tunnel decreases by increasing the distance between the tunnels. In section 1, it increases 17% for pillar width of 3.5 m while it increases 3.5% for pillar width of 10.5 m. These amounts are 11.5 and 3.5% for section 2; The axial force decrease by increasing of tunnels distance. It changes 6.5% and 9.5% for section 1 and section 2 when the pillar width is 3.5 m. These changes are 0.06% and 1.1% for pillar width of 10.5 m. 16 17 February 2012 167

In section 1, interaction between tunnels is negligible for pillar width of 7 m (D) and further. In section 2, interaction between two tunnels is negligible for pillar width of 10.5 m (1.5D) and further. REFERENCES Chen, S L, Lee, S C and Gui, M W, 2009. Effects of rock pillar width on the excavation behavior of parallel tunnels. Tunneling and Underground Space Technology, 24, pp 148-154. Guglielmetti, V, Piergiorgio, G, Mahtab, A and Xu Sh, 2007. Mechanized tunneling in urban areas, Talor and Francis Group, London, UK. Hage, Chehade, F and Shahrour, I, 2008. Numerical analysis of the interaction between twin tunnels: Influence of the relative position and construction procedure. Tunneling and Underground Space Technology, 23, pp 210-214. Jahad-e, Tahghighate Sahand, 2005. Report of geotechnical studies of Tabriz metro line 1. Moller, S C and Vermeer, P A, 2008. On numerical simulation of tunnel installation. Tunneling and Underground Space Technology, 23, pp 461-475. 168 16 17 February 2012