Metropolitan St. Louis Sewer District. Rate Proposal Overview

Similar documents
Exhibit MSD 1 METROPOLITAN ST. LOUIS SEWER DISTRICT RATE CHANGE PROPOSAL FEBRUARY 26, 2015

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM

City Council Public Input Session Water / Sewer Rate Study. March 19, 2014

Business Plan: Wastewater Removal and Stormwater Management

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

Handout 5: Stormwater Cost of Service

SURFACE WATER UTILITY FEE

FY 2018 Proposed Capital Improvement Program

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG).

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Applications of GIS for Stormwater Management in the City of Dallas. By Takele Dinka (PhD) GIS Analyst, City of Dallas

OVERVIEW CAPACITY & CONDITION

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

Engineering Department

FY2018 CIRP Detailed Summary

Storm Water and Sanitary Sewer

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

An Overview of Public Enterprises (with a focus on Water and Wastewater)

City of Anacortes Utility Rates & Information January 2016

Buffalo Sewer Authority. David P. Comerford General Manager

Wastewater System Master Plan and SSO Initiative

ANNUAL SSO REPORT FOR 2014

Infrastructure Asset Management in Action at Onondaga County Department of Water Environment Protection (WEP)

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A )

REVENUE REQUIREMENTS AND COST OF SERVICE RATES

CITY OF TORONTO WATER AND WASTEWATER UTILITY RATES

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

City of Naples. Utilities Department Operation and Maintenance Budgets Fiscal Year Water & Sewer Solid Waste Equipment Services

Sewerage and Water Board of New Orleans Strategic Plan

Management of Aging Wastewater Infrastructure -- Challenges and Strategies --

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

WAUKEE CENTRAL URBAN RENEWAL PLAN WAUKEE CENTRAL URBAN RENEWAL AREA WAUKEE, IOWA

Inflow & Infiltration Reduction: A System-Wide Sewer Rehabilitation Program

What is a stormwater utility fee?

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977

How to Read Your Water Bill and related topics. Tom Heikkinen, General Manager

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review

Kings Run Project Public Meeting. July 31, 2014

Development in the City of Toronto

Manatee County Utilities. Water/Wastewater Rates Public Hearing February 7, 2017

The South Hartford Conveyance and Storage Tunnel

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

History System Wide Coordination

Blueprint Columbus. Clean Streams. Strong Neighborhoods.

FORMATION AND OPERATION OF THE MARINE STORMWATER UTILITY Category: Comprehensive Environmental Management

Staff Report. Agenda Item Title: 14-02: Northwest Santa Rosa Reorganization No Sequoia Park Associates, LP

Comparison of Annual Costs Associated With Home Ownership in La Crosse County

Funding Stormwater Services

Streamlining I/I Repairs in Berlin Charter Township

Village of Glenview, Illinois. Stormwater Utility Fee Study. Executive Summary

BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

Infiltration and Inflow. Michael Sassaman Phone

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay

This policy will generally explain the following in regards to the City sewerage collection systems:

April, dale, Illinois. Prepared By: Fehr-Graham Associates, and Ehlers

ckly STAFF REPORT Trish Rhay, Assistant Director of Public Works Caitlin Sims, Senior Management Analyst

Benefit Assessment Report. Santa Barbara County Flood Control & Water Conservation District

ALBANY WATER BOARD SCHEDULE OF RATE STRUCTURE FEBRUARY 1, 2009

City of Concord. Sewer System Management Plan

CONSULTING ENGINEER S ANNUAL REPORT

Executive Summary of the Plan of Reorganization

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

KANSAS CITY S OVERFLOW CONTROL PROGRAM ANNUAL REPORT Reporting Period: January 1 to December 31, 2015

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Hamilton Water Division

SECTION 5.0 CENTRAL CONTRA COSTA SANITARY DISTRICT WASTEWATER SERVICE

WATER AND WASTEWATER RATES. July 24, 2017 Public Works Commission Meeting

Resolution Resolution to Adopt Rates and Fees for Village of Paw Paw Wastewater (Sanitary Sewer) System Beginning January 1, 2014

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques

Memorandum Neighborhood Development Services Office of the City Engineer City Hall Annex, 610 East Market St., Charlottesville

Audit of Stormwater Management Utility

Bacteria Reduction in Stormwater- the MS4 Approach

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

Chapter 8 Addressing I/I Issues and High Flows

New York City s Watershed Protection Program. David S. Warne Assistant Commissioner New York City Department of Environmental Protection

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

Spanish Wells Plantation Sewer Extension Project. July 2012

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

System Evaluation and Capacity Assurance Plan

BALTIMORE COUNTY MARYLAND FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM MANUAL

Oakland County Water Resources Commissioner Common to All, SAW Grant No Wastewater and Stormwater Systems Asset Management Program

Newport Bay Watershed Executive Committee

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint

Regional Stormwater Program 2013 Stormwater Management Plan

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

SECTION 5.0 CROCKETT COMMUNITY SERVICES DISTRICT WASTEWATER SERVICE

STORMWATER MANAGEMENT PROGRAM & ILLICIT DISCHARGE DETECTION AND ELIMINATION

City of Salem Stormwater Utility Answers to Frequently Asked Questions

Transcription:

Metropolitan St. Louis Sewer District Rate Proposal Overview

MSD Rate Commission First sewers built in the 850s in response to the 849 cholera outbreak Prior to 954, the area was covered by 79 separate sewer systems MSD is a public/government agency, created in 954 MSD annexed the area of St. Louis County west of I-270 at voters request and began to provide wastewater service in 977 MSD began to provide stormwater service to this area in 989 Established in 2000 to provide public input into how MSD sets its rates 5 organizations representing a broad cross-section of the community MSD serves Reviews all proposed rate changes under charter-defined parameters, and renders a recommendation to the Board of Trustees The 205 Rate Commission will consider a proposal for MSD rates for fiscal years 207-2020 (July, 206-June 30, 2020) 2

Two Utilities Wastewater Service Collecting and treating the "used" water from sinks, toilets and floor drains Travels through miles of pipes to one of seven treatment plants Treated to high standards before being returned to our region s waterways. Wastewater service is currently funded by rates based upon water usage and account type Stormwater Service Collecting the rain and other water drainage that is not naturally absorbed in the soil on your property Addressing regulatory requirements regarding impacts of stormwater runoff on receiving stream water quality Stormwater service is currently funded by a flat fee and small property taxes, based upon geographic location 3

Rate Change Proposal Four year rate plan, FY7-FY20 Wastewater rate change Wastewater: current Wastewater: proposed Stormwater revenue change Stormwater: current Stormwater: proposed 4

Current Rates, Progress under FY3-6 rate cycle CURRENT WASTEWATER RATES 5

WASTEWATER: current 203-206 Rate Proposal Status Capital Improvement & Replacement Program: Schedule and cost of needed repairs and improvements Maintain the system and ensure compliance with all State and Federal Regulatory requirements $97,05,000 identified in FY3-6 Rate Proposal On time and under budget: Plan to appropriate $889,632,000 (95%) of amount identified in FY3-6 Rate Proposal 80% of projects appropriated within 2 months of planned date through FY5 Appendix 7.7. 6

WASTEWATER: current 203-206 Rate Proposal Status Operations & Maintenance $76 M included in Rate Proposal $700 M appropriated [projected] Wastewater Operations Accomplishments Brought CCTV program in-house 6,737 manholes inspected 6,65 manholes rehabilitated,90 miles of sewer line inspected 66% ( 2 / 3 ) reduction in basement backups since cleaning program began Appendix 7.7. 7

Proposed Rate Changes PROPOSED WASTEWATER RATES 8

WASTEWATER: proposed Wastewater Rate Change Drivers MSD Project Clear: Regulatory Requirements Get the Rain Out Repair & Maintain Build System Improvements Financial Stability and Responsibility Maintain AA Bond Rating 9

WASTEWATER: proposed Wastewater Rate Proposal Key Financial Components $.5B Capital Program Wastewater Capital Improvement & Replacement Program $736M Operations & Maintenance Cost 2 $477M Total Debt Service Cost 3 Table 4-7 2 Table 4-6 3 Table 4-9 0

WASTEWATER: proposed Proposed Wastewater Capital Improvement & Replacement Program Fiscal Year Program Level 2 207 $332,5,688 208 $347,297,47 209 $373,664,090 2020 $439,398,796 Total 4 Year Program $,492,872,045 Planning, engineering, and construction of wastewater projects. 2 Table 4-7

WASTEWATER: proposed Additional Use of Debt Fund next four years through a combination of cash and bonds Total Cash Financing: $45M Total Bond Financing: $.B Assumes $900 M additional bond authorization Total debt authorized $2.620 2 Billion 00% of debt is used to fund the Capital Improvement & Replacement Program Table 4-8 2 Total Bonds FY2004-2020 2

WASTEWATER: proposed Proposed FY7-20 Wastewater Projects 598 Wastewater Planning, Design, & Construction Projects 226 Wastewater Construction Projects 39 Sanitary Sewer Overflows (SSOs) removed 24 Miles of Storage & Conveyance Tunnels designed One CSO will be removed during this rate cycle, in addition to the design and planning for future removals. The Green Infrastructure (Rainscaping) program is also designed to alleviate CSOs to the Mississippi. 3

WASTEWATER: proposed Proposed FY7-20 Wastewater Projects Appendix 7.2.2 4

WASTEWATER: proposed Stable Wastewater Operating Costs Total FY5 [projected] $69 M N/A % Change FY6 [projected] $78 M 5.4 % FY7 $76 M -.2 % FY8 $80 M 2. % FY9 $86 M 3.5 % FY20 $93 M 3.6 % Table 4-6 5

WASTEWATER: proposed Proposed Wastewater Operations & Maintenance,600 60,000 Manholes Inspected 6,000 Manhole Rehabilitations 2% per year, once per 50 year schedule Meets Consent Decree requirements for inspection, cleaning, and rehabilitation Miles of sewer inspected with CCTV 3,84 Miles of sewer cleaned 360 Miles of sewer rehabilitation 6

WASTEWATER: proposed Proposed Wastewater Rate Increase Average Residential Monthly Bill [with bond financing] Fiscal Year Monthly Bill $ Change % Change FY6 2 $ 40.72 $ 4.73 3. % FY7 $ 44.72 $ 4.00 9.8 % FY8 $ 49.56 $ 4.84 0.8 % FY9 $ 54.9 $ 5.35 0.8 % FY20 $ 60.86 $ 5.95 0.8 % based on 7 Ccfs per month 2 already approved in 202 as part of FY3-6 Rate Commission Process Table ES-4 7

WASTEWATER: proposed Wastewater Funding Options Voters Approve Bonds Option A Funded by Cash & Debt $900 M additional bonds $.5 Billion 4-Year Wastewater Capital Projects Avg. Single Family Wastewater Sewer Bill $$$ % Chg. FY6 $40.72 3.% FY7 $44.72 9.8% FY8 $49.56 0.8% FY9 $54.9 0.8% FY20 $60.86 0.8% Voters Reject Bonds Option B Funded by Cash Zero use of additional bonds $.5 Billion 4-Year Wastewater Capital Projects Avg. Single Family Wastewater Sewer Bill 2 $$$ % Chg. FY6 $40.72 3.% FY7 $44.72 9.8% FY8 $73.80 65.0% FY9 $83.46 3.% FY20 $96.0 5.0% Table ES-4 7 Ccfs/month 2 Table 4-25 7 Ccfs/month 8

Stormwater service, funding, and geographic disparities CURRENT STORMWATER SERVICE 9

STORMWATER: current Current Stormwater Service & Funding Overview MSD assumed stormwater management generally inside of I-270 in 954, and took over the stormwater management for the remainder of our service area in St. Louis County in 989 Stormwater service has differed dramatically among parts of the service area due to differences in funding for stormwater system maintenance and system improvement Stormwater is currently funded through a combined fee and tax system Three zones of stormwater funding overlap in MSD s service area 20

STORMWATER: current Stormwater Fee and Administrative Tax 204 Stormwater Fee total: $,338,000 ($0.24/$0.8) $2.88 or $2.6 per year for all residential customers 204 Total Tax Levy: $5,047,624 ($0.097/$00) Service Level: 2

STORMWATER: current Stormwater Tax 204 Total Tax Levy: $0,2,630 ($0.0682/$00) Service Level: PLUS: 22

STORMWATER: current Taxing Sub-districts Total 204 Tax Levy: $8,840,94 (Up to $0.0/$00 ) Service Level: PLUS 23

STORMWATER: current Current Stormwater Services & Funding $0.24 fee + $0.097 + $0.0682 + up to $0.0 $0.24 fee + $0.097 + $0.0682 $0.24 fee + $0.097 24 for customers also receiving wastewater sewer service

STORMWATER: current Average Cost per Customer $0.24 fee + $0.097 + $0.0682 + up to $0.0 $0.24 fee + $0.097 + $0.0682 $0.24 fee + $0.097 for customers also receiving wastewater sewer service 2 for a single-family home appraised value of $42,00, at 9% Residential assessment rate 25

STORMWATER: current Stormwater Regulatory Compliance Activities MSD ensures compliance with all local, state, and federal stormwater regulations, including: Plan Review and Permitting Complaint Investigation and Data Collection Emergency Response in critical health and safety situations 26

STORMWATER: current Creeks and BMPs/Basins 54 Miles of Creeks in Red Area 2638 BMPs/Basins in Red Area Currently funded in Red Area 27

STORMWATER: current Public Storm System 362.99 Miles of Storm Sewers in the Red Area in Red Area Currently not funded 28

Proposed Revenue Changes STORMWATER SERVICE 29

STORMWATER: proposed Stormwater Revenue Proposal Key Financial Components 4-year Operations & Maintenance cost of $90.8M 6-year $97.6M Capital program 2 Table 5-2, FY7-20 2 Table 5-5, FY5-20 30

STORMWATER: proposed Stormwater Revenue Change Drivers Necessary maintenance of public storm sewer system Initiate limited funding for necessary 6-year District-wide stormwater capital improvements 3

STORMWATER: proposed Proposed Stormwater Operating Costs Total % Change FY6 [projected] $6.0 M 6.3% FY7 $20.7 M 30.0% FY8 $23.7 M 4.5% FY9 $22.8 M -3.9% FY20 $23.5 M 3.% Table 5-2 32

STORMWATER: proposed Green Area: Proposed FY7-20 Stormwater Projects Projects: 64 Cost: $24,968,200 Yellow Area: Projects: 47 Cost: $7,450,000 Red Area: Projects: 59 Cost: $7,485,000 Appendix 7.5.2 33

STORMWATER: proposed Proposed Stormwater Revenue Structure Type of Charge Current Proposed OMCI Sub-district Taxes (Green area per $00 Assessed Value) Stormwater O&M Tax (Yellow area per $00 Assessed Value) District-wide Regulatory Tax (Red area per $00 Assessed Value) District-wide Stormwater Tax (proposed) (Red area per $00 Assessed Value) Fixed Monthly Charge Single-Family Residential ($/unit) Fixed Monthly Charge Multi-Family Residential ($/unit) Total Tax $0.097-0.879 $0.05-0.0 $0 $0.0682 $0 $0.097 $0.097 N/A $0.00 $.24 $0 $.8 $0 Total Fees $.8-.24 $0 $0.97 Table 5-34

STORMWATER: proposed Proposed Revenue Change Green Area Tax Rate Current $.097 + $.0682 + $.0 (up to) Proposed $.0 Avg. Annual Cost $6.67/year -$9.75/year Total $.97 $4.92/year Change in total tax: -0.5% per $00 of assessed valuation, based upon average appraisal in green area of $84,500 Table ES-6 35

STORMWATER: proposed Proposed Revenue Change Yellow Area Tax Rate Current $.097 + $.0682 Avg. Annual Cost $2.50/year Proposed $.0 +$3.60/year Total $.97 $6.0/year Change in total tax: 0.3% per $00 of assessed valuation, based upon average appraisal in yellow area of $70,800 Table ES-6 36

STORMWATER: proposed Proposed Revenue Change- Red Area Tax Rate Avg. Annual Cost Current $0.097 $0.52/ye ar Proposed $0.0 +$50.08/ year Total $.97 $60.60/ye ar Change in total tax:.2% per $00 of assessed valuation, based upon average appraisal in red area of $266,700 Table ES-6 37

Annualized impact of Wastewater and Stormwater revenue changes TOTAL CUSTOMER COST WASTEWATER + STORMWATER 38

WASTEWATER + STORMWATER: proposed Total Proposed Annual Customer Cost Single-Family Residential Proposed Average Annual Cost Total Annual Cost Percent Change Average Annual Cost without Bonds 2 Total Annual Cost FY6 $522.54 N/A $522.54 N/A Percent Change FY7 $577.92 +0.6% $577.92 +0.6% FY8 $636.00 +0.0% $926.88 +60.4% FY9 $700.20 +0.0% $,042.80 +2.5% FY20 $77.60 +9.2% $,93.40 +4.4% Table ES-4, Table ES-6 2 Table 4-25, Table ES-6 39

WASTEWATER + STORMWATER: proposed Total Proposed Annual Customer Cost Low-Income Residential Proposed Average Annual Cost Total Annual Cost Percent Change Average Annual Cost without Bonds 2 Total Annual Cost FY6 $26.83 N/A $26.83 N/A Percent Change FY7 $283.77 +8.4% $283.77 +8.4% FY8 $32.8 +0.2% $458.25 +6.5% FY9 $344.97 +0.3% $56.2 +2.6% FY20 $380.6 +0.3% $59.57 +4.6% Table ES-4, Table ES-6 2 Table 4-25, Table ES-6 40

WASTEWATER + STORMWATER Anticipated Revenue Change Process Proposal submitted to MSD Rate Commission February 26, 205 Final wastewater rate increase of April 202 rate plan implemented July, 205 Rate Commission Recommendation due to Board by August 205 MSD Board Approves Revenue Plan October-December 205 Tentative Bond Authorization and Stormwater Elections Calendar 206 MSD Board Adopts Revenue plan after elections 4

WASTEWATER + STORMWATER Rate Commission Formal Comments To submit formal comments to the Rate Commission for consideration in their process, please address to: Email: jfenton@stlmsd.com Mail: 2350 Market Street, St. Louis MO 6303 Attn: Annette Slack, Secretary to Rate Commission Intervener Application Available at www.stlmsd.com/ratecommission Deadline: March 20 42