Wabash Valley Power 2017 Integrated Resource Plan

Similar documents
INTEGRATED RESOURCE PLAN

Indiana Electricity Projections: The 2017 Forecast

Non-Technical Summary

Zero Net Carbon Portfolio Analysis

DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans

2017 IRP Update. Proposed Long Term Resource Strategy Proposed Conservation

CHAPTER 1 EXECUTIVE SUMMARY

Environmental Compliance (Slides 7-15) Angila Retherford, Vice President Environmental Affairs and Corporate Sustainability

Tucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE

Potential Impacts of a Renewable and Energy Efficiency Portfolio Standard in Kentucky

Table of Contents. 6.2 Socio-Economic Impacts of the Preferred Plan Five-Year Action Plan

Renewable Resources. David Jacobs Manager, Resource Planning and Procurement

Village of Morrisville Water & Light Department Integrated Resource Plan

Zero Net Carbon Portfolio Analysis

Prism 2.0: The Value of Innovation

INTEGRATED RESOURCE PLANNING REPORT TO THE INDIANA UTILITY REGULATORY COMMISSION. Submitted Pursuant to Commission Rule 170 IAC 4-7

Before the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc.

Capacity Performance Training. June 24, 2015

Public Utility Regulatory Policy Act Standards

Electricity Markets. Rapid Conference May 17, Mike Rencheck Rencheck Consulting LLC

Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619

2017 Integrated Resource Plan. February 2017

General Session. Four Decades of Pursuing a Diversified Energy Portfolio at MIKE KOTARA. Senior Vice President

APSC Docket No U Entergy Arkansas, Inc Integrated Resource Plan

ERCOT in 2018: Challenges & Opportunities

Table of Contents Page i

Generation Technology Assessment & Production Cost Analysis

Ten Year Site Plan:

Indianapolis Power & Light Company. Demand-Side Management Potential Forecast. For

MTEP18 Futures. Planning Advisory Committee June 14, 2017

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Understanding Renewable Energy Credits

Capacity Performance Training. March 16, 2015

FortisBC Resource Planning Community Stakeholder Workshop

2016 Integrated Resource Plan Executive Summary

Game-Based Simulation of Gas-Fired Generation Mix With High Renewable Energy Shares

Client Name/Presentation Title

Beyond LCOE: The Value of CSP with Thermal Energy Storage

ENERGY INDEPENDENCE AND SECURITY ACT OF 2007 New PURPA Standards (16-19) Management Policy Statement of Decatur County REMC

Benchmarking of Demand Response Potentials Final Report:

New England Electricity Outlook

EXECUTIVE SUMMARY. In accordance with New Mexico Administrative Code, Integrated Resource Plan for Electric Utilities.

IRP 101. Intro to Integrated Resource Planning. Scott Benson Manager, Resource & Transmission Planning. March 23, 2017

Ameren Missouri. Renewable Energy Standard Compliance Plan Prepared in Compliance with 4 CSR

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The

PGE s 2013 Integrated Resource Plan

MASACHUSETS ENERGY STORAGE INITIATIVE. NASEO Fuels and Grid Integration Committee September 12, 2016 Joanne Morin, MA DOER

Chapter 5 - Generation & Supply Alternatives

ENTERGY NEW ORLEANS 2015 IRP RENEWABLES TECHNICAL CONFERENCE

Entergy New Orleans, Inc.

DEMAND-SIDE MANAGEMENT MARKET POTENTIAL STUDY. Final Report. Volume 5: Distributed Generation Analysis. Prepared for: Ameren Missouri

We applaud you for adding solar generation and encourage you to add much more ASAP.

2015 PSE IRP EXECUTIVE SUMMARY

Geothermal Heat Pump Technology. What s new in the business of capturing the. Energy We Already OWN

The Husker Power Plan: A New Energy Plan for Nebraska

2014/15 Annual review of Meridian Energy Limited

California s Renewable Portfolio Standard

RESOURCE PLAN DECISIONS

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8

New Jersey s Clean Energy Program

Energy Efficiency & Integrated Resource Planning. Ellen Zuckerman & Jeff Schlegel Southwest Energy Efficiency Project (SWEEP)

Independent Power Production Policy

PNM Integrated Resource Plan SEPTEMBER 2013

Methods for Forecasting Energy Supply and Demand

Impact of Regional Greenhouse Gas Initiative and Renewable Portfolio Standards on Power System Planning

Colorado PUC E-Filings System

Marin Clean Energy Applicant Analysis for the County of Napa

Comparison of Renewable Portfolio Standards (RPS) Programs in PJM States

Geothermal Alliance of Illinois

EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results

Chapter 7 - Decision Tree analysis

NRG Business. Mauricio Gutierrez COO and President NRG Business

Time-Varying Value of Energy Efficiency

Submitted to: Pennsylvania Public Utility Commission

Marin Clean Energy. California s First Community Choice Aggregation Program. March 21, 2014

The Projected Impacts of the Clean Air Interstate Rule on Electricity Prices in Indiana

Demand Side Management Programs. Chris Edge July 20, 2007

DSR follow on final presentation

Entergy Louisiana, LLC

CCA Terms Glossary. Valley Clean Energy Alliance. i CCA Terms Glossary

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017

Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead

Integrated Resource Plan

INTEGRATED RESOURCE PLAN

Florida Energy Efficiency and Conservation Act

REQUEST FOR INNOVATIVE ELECTRICAL CONSERVATION PROGRAMS. Gainesville City Commission Energy Conservation Workshop April 19, 2004

New England States Committee on Electricity

USEA Briefing Washington DC. Neil Kern, July 21, 2016

Greenhouse Gas Emissions. Climate Change: Taking Action for the Future

RENEWABLE ENERGY DEVELOPMENT STATE TAX POLICIES AND INCENTIVES IMPACTING

THE FUTURE ENERGY JOBS ACT A Win for Illinois Clean Energy Economy

2017 TEN-YEAR SITE PLANS

PEAK DEMAND REDUCTION STRATEGY

Renewable Portfolio Standards In the United States of America

Renewable Portfolio Standards

Executive Summary PSE Integrated Resource Plan. Contents. Chapter 1: Executive Summary

Monitoring Report SD-7: Environmental Stewardship

The German Electricity System

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

Transcription:

Wabash Valley Power 2017 Integrated Resource Plan Executive Summary January 2018 Wabash Valley Power 722 North High School Road Indianapolis Indiana 46214 www.wvpa.com

What is an Integrated Resource Plan (IRP)? Wabash Valley Power Association s (Wabash Valley or the Company) 2017 IRP is a planning document that evaluates the next 20 years to assess our Members requirements for electricity and our ability to meet that need in a reliable and competetive manner. Why do we prepare an IRP? Every electric utility in the State of Indiana that is publicly, municipally or cooperatively owned must prepare an IRP every two years, soon to be three years, to comply with the Indiana Utility Regulatory Commission s (IURC) Rule 7, technically 170 IAC 4-7. What does Wabash Valley s IRP contain? We divide Wabash Valley s 2017 IRP into the following five sections plus a technical appendix: 1. Overview We discuss our system profile, including the Members we serve and our service area, and describe our process for developing the IRP. 2. Resource Assessment We provide general characteristics of our load, such as our historical summer and winter peaks. We also provide a description of Wabash Valley s existing generation resources (supply-side) and end-customer resources (demand response, energy efficiency and distributed generation). 3. Load Forecast and Forecasting Methodology We summarize our methodology for forecasting our Members electricity requirements and we provide both a base case forecast and range forecasts for the next 20 years. 4. Selection of Resource Options We review and analyze potential future resource options to meet our forecasted peak and energy requirements and determine our base resource plan. 5. Scenario Analysis We develop scenarios to examine the impact of various uncertainties and develop alternate expansion plans to meet those requirements. We also outline our short-term action plan for the next three years. The following Executive Summary shares a brief overview of Wabash Valley s 2017 IRP and is intended to communicate the key concepts to our Members, other interested parties and the public. Page 1

Executive Summary Wabash Valley is a generation and transmission (G&T) cooperative based in Indianapolis, Indiana, that provides wholesale electricity to twenty-three Members: nineteen in the northern half of Indiana, three in Illinois and one in Missouri. In turn, these distribution cooperatives supply electricity to more than 313,000 retail members. Just over 75 percent of our retail customer base resides in Indiana, with approximately 16 percent in Illinois, and 9 percent in Missouri. This map illustrates Wabash Valley s composite service area. The areas identified on this system are not exclusively served by the Members. Numerous municipal electric utilities, as well as investor-owned utilities, permeate this service area. Page 2

Wabash Valley s goal is to develop and maintain a diverse portfolio of power supply resources with contract terms, fuel supplies, counterparties, and ownership options that promote reliable, low-cost service to our Members. Wabash Valley s 2017 resources are depicted in the following charts: 2017 Resources 1 Wabash Valley employs end-customer resources as part of our power supply portfolio. Wabash Valley offers the following energy efficiency (EE) and demand response (DR) programs to help customers use energy more wisely and efficiently. Programs EE Residential Air Source Heat Pump Rebate Geothermal Heat Pump Rebate Touchstone Energy Home Program LED Discount Program LED Security Lights DR Water Heater Program Air Conditioner Program Pool Pump Program Field Irrigation Program Entire Home Interrupt Program Ditch Pump Program Grain Dryer Program EE Commercial & Industrial (C&I) Lighting Retrofit Incentives HVAC Retrofit Incentives Schools Retrofit Program Agricultural Retrofit Program C&I Custom Retrofit Program Business New Construction Program Page 3

Baseload CC Gas Intermediate CC Gas Peaking CT Baseload Coal 2017 Wabash Valley IRP Executive Summary Wabash Valley s 2017 IRP is based on the Company s 2017 Power Requirements Study that combines the forecasts of the twenty-three individual Members. Pass-Through Loads are certain large power customers who are included in the Company s total planning load because Wabash Valley has the ultimate responsibility to meet the large power customers energy requirements and make purchases at market to meet the minimum reliability requirements. However, the Pass-Through Loads customers have the ability to customize their power supply portfolio based on their respective risk tolerances. Wabash Valley s base case load forecast indicates the following: Key Data 2018 2036 Average Growth % Energy Growth (GWh) (excl. Pass-Through Loads) 7,277 8,531 0.9% Energy Growth (GWh) (incl. Pass-Through Loads) 8,192 9,450 0.8% Demand Growth Coincident Peak Demand (MW) (excl. Pass-Through Loads) Demand Growth Coincident Peak Demand (MW) (incl. Pass-Through Loads) 1,472 1,719 0.9% 1,597 1,844 0.8% Wabash Valley consistently examines potential new peaking, intermediate and baseload generating resources (both independently and jointly, both existing and new) in anticipation of capacity needs in 2018 and beyond. Wabash Valley employs several decision making factors in selecting new power supply resources. While price is clearly important, and is depicted below, Wabash Valley also considers the technical viability of a proposed project, operational flexibility, resource deliverability and location, impact on diversification of Wabash Valley s power portfolio, overall price risk exposure, equity requirements and contract term. Additionally, Wabash Valley assesses each alternative s environmental impact. Factor 70% $1,089/kW $7.05/kW-mo $41/MWh Factor 35% $1,089/kW $7.05/kW-mo $57/MWh Factor 7% $734/kW $4.76/kW-mo $153/MWh Factor 85% $4,165/kW $26.97/kW-mo $73/MWh Page 4

Demand Response (DR) Residential EE Small/Large Commercial EE Baseload Landfill Gas Intermediate Wind Intermediate Solar Battery Storage 2017 Wabash Valley IRP Executive Summary Factor 90% $1,608/kW $10.41/kW-mo $49/MWh Factor 42% $1,951/kW $12.63/kW-mo $53/MWh Factor 15% $2,670/kW $17.29/kW-mo $177/MWh Factor 90% $2,964/kW $19.19/kW-mo Avg. Total Cost $68/MWh Factor 1% $344/kW $2.23/kW-mo $979/MWh Factor 60% $1,371/kW $8.88/kW-mo $20/MWh Factor 60% $441/kW $2.86/kW-mo $7/MWh Wabash Valley has developed and maintains a detailed resource plan to serve forecasted Member load requirements. Since Wabash Valley s composite load requirements show an average load factor of approximately 55% to 65%, the Company plans to attain a power supply resource ratio of approximately 60% baseload/intermediate capacity to 40% peaking capacity with a move toward a greater percentage of natural gas units (e.g. combined cycle and peakers). The base expansion plan indicates capacity needs starting in 2018, and Wabash Valley anticipates meeting these needs in a diversified manner. From 2018 to 2020, Wabash Valley expects to meet our incremental capacity needs primarily by purchasing capacity through the regional transmission organization (RTO) capacity auctions or bilateral transactions. In the near term, market capacity prices appear favorable, as supported by indicative bilateral quotes, and our optimization model selected capacity market purchases as the preferred option. Although market capacity prices remain favorable beyond 2020, the risk of relying on that option increases. Therefore, we limit the amount of capacity market purchases our optimization model may select resulting in more competition among all supply-side and demand-side resource options. Incremental capacity market purchases and cumulative planned additions, stated in Page 5

installed capacity (ICAP) values, over the 20-year plan horizon for the base expansion plan are depicted in the following graphs. Page 6

In addition to making incremental capacity market purchases, Wabash Valley will commence purchasing output from three wind projects from 2018 to 2020. Additions include 25 MW of wind power in 2018, 75 MW in 2019 and another 100 MW in 2020. Although our optimization model did not choose EE and DR programs in the early years of our 20-year plan horizon, at the request of our Members Wabash Valley will continue to run and enhance our EE program offerings and may choose to continue to build DR resources in the near term. Past 2020, Wabash Valley s base resource plan capacity needs are largely met by building 600 MW of baseload combined cycle resources and 350 MW of peaking combustion turbine resources along with 50 MW of EE. The expiration of existing purchase power agreements drives the need for these resources. Wabash Valley will continually evaluate available projects that show potential to provide cost effective renewable 2 energy and seek alliances, partnerships and opportunities for joint operations with other electric utilities. At the end of our 20-year plan horizon in 2036, Wabash Valley s current base expansion plan forecasts that our energy and capacity needs will be served as depicted in the following charts. 2036 Resources 1 Wabash Valley s power supply team analyzes all opportunities to improve the Company s power supply portfolio while being cognizant of any regulation that may affect these sources. These opportunities may include the purchase/sale of generating assets, purchase/sale of cost-based power agreements and purchase/sale of fixed priced forward contracts. We analyze these opportunities to evaluate risk, reliability, and cost impact to our Members. While Wabash Valley has developed and maintains a detailed resource plan to serve forecasted Member load requirements, we may adjust that plan if we are able to take advantage of economic opportunities that arise. Page 7

1 Forecasted Capacity (MW) stated in unforced capacity (UCAP) values. 2 Wabash Valley supports renewable energy by owning landfill gas generation and purchasing the output from wind farms and biogas generators. Wabash Valley sells, separately, the environmental attributes associated with this generation to its members and third parties, and therefore does not claim this generation as renewable within our own supply portfolio. Page 8