INSTALLATION INSTRUCTIONS FOR BALCO, INC. TRENCH GRATES MR-X-P

Similar documents
B-500 / B-600 SERIES

AcroWall-ES System. Class PB Exterior Insulation and Finish System providing a primary moisture barrier. Typical Details

1-2-3MORTAR Modified Portland cement based mortar, to be used to adhere any prefabricated construction elements

SECTION ROOF PEDESTAL PAVER SYSTEM

INSTALLATION INSTRUCTIONS RC-SERIES SNAP-LOCK RETROFIT FOR FIBERGLASS CONTAINMENT SUMPS

ROLL-IN SHOWER PAN. For additional information, call the Aqua Bath Customer Service Department At

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SERIES G1A, G1B & G1C SLIDE GATES

ZURN INDUSTRIES, INC., FLO-THRU DIV.,

INSTALLATION PROCEDURES

PREFABRICATED STEEL TRUSS SPECIFICATIONS

Product Guide Specification

RHE3 Dock Leveler Installation Manual

Installation Instructions

DOWSIL Silicone Transition System: Application Guide Build a Better Barrier

C.I.Agent Barrier Boom Containment System

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SHOWER & TUB/SHOWER INSTALLATION

3M Fire Barrier Moldable Putty Pads MPP+ Product Data Sheet

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SERIES G1G, G1H & G1I SLIDE GATES

SPECIFICATIONS: Architectural Aluminum Railings

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

Gold Bond brand /NGC. High Strength LITETM. Family of Products

SECTION WOOD GYMNASIUM FLOORING

ACOUSTICAL WALL TREATMENT SECTION 09840

Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along

ROOF PAVER SYSTEM National Distribution SPEC - SECTION 07760

BIN LINER INSTALLATION MANUAL IMPORTANT!

SINGLE SWING DOOR PAIRED SWING DOOR

ORDER DESK TOLL FREE (800) SIGMA SWITCHES PLUS

Linear Drainage ZF806 ZF812

Installation Instructions

Global Water Instrumentation, Inc.

STEVES & SONS PRODUCT WARRANTY

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

Installation Instructions

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

Series 5500 Bellows Pump Connectors Catalog 474E

SECTION 07530CP EPDM MEMBRANE ROOFING

at home installation guide Manufactured by:

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS

Maximum Sizes 20 Minute Single : 4 x 9 20 Minute Pair: 8 x 9. Mat formed 32 pound particleboard conforming to ANSI:A208.1 Grade #1-LD

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

CURTAINWALL DEFLECTION SOLUTIONS

END TRUCKS WHEEL SIZES: 9", 12", 15" & 18"

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

Paver and Ground lights - Anchor Plate

3 1/4 Welded frame Gives a wood window appearance, no painting

Zurn Z886. 6" Perma-Trench. Installation Instructions

Proudly Made in the U.S.A.

Dura Rack Family Of Products. 237,000 sq. ft. manufacturing facility

Preassembled steel stairs with concrete-filled treads.

IPE WOOD DECK TILES National Distribution SPEC - SECTION 07760

Zurn Z874. Trench Drain System. Installation Instructions

INSTALLATION PROCEDURE

Vehicle Restraint Installation Manual

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block

Easy Drain. Modulo. TAF Side outlet INSTALLATION MANUAL FOR WOODEN OR CONCRETE SUBFLOORS

Model #369SM-RDP. 8/23/2016 Page 1 of 10

TILE TILE

Corium Brick Rainscreen System Specifications

TAYLOR FORGE STAINLESS

Narrow Modular Pavers (NMP) for Sand-Set Installations

Treads, Tread Repair Covers and Nosings

SERIES H2R ACCESS COVER With Retro-Grate

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

MODELS: SM & SMSS

Façade Architectural Wall Panel System - Guide Specification 3/11/2017 SECTION FRAMED DECORATIVE PANEL SYSTEMS PART 1 - GENERAL 1.

Waterstops play a critical role in the integrity of concrete

1.02 RELATED WORK: Refer to the following sections for related work:

Installation Procedure

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

Section Wood Grille Ceiling Panels

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

DECK CONSTRUCTION REQUIREMENTS

Avery Dennison SF 100 Polyester Series Permanent - StaFlat or Kraft Revision: 5 Dated: 01/09/18

WESTERN UNDERGROUND COMMITTEE GUIDE 3.4 (3.4/00/0565)

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

Model # 158-P4. 12/12/2013 Page 1 of 11

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

Performance Plus Carpet Selection GUIDE

ALGRIP Slip-Resistant Metal Trench and Expansion Joint Covers Custom fabricated, slip-resistant cover solutions for civil construction projects

Model # 238HS-P8. 4/27/2011 Page 1 of 11

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Model # 238-U6. 5/24/2013 Page 1 of 11

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

BIO-AQUIFER STORM SYSTEM

A. Meet at Project site <insert number> days before starting installation.

INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP

Retaining Wall System

STORM UTILITY WATER DRAINS

Installation Guide Document No Transaction Windows Copyright 2017 Terra Universal Inc. All rights reserved. Revised October 2017

Berliss Companies 644 Route 10 P.O. Box 45 Livingston, NJ Phone: (973) Fax: (973)

Model # 338S-RDP. 7/31/2012 Page 1 of 13

WOOD ATHLETIC FLOORING

Transcription:

2626 South Sheridan PO Box 17249 Wichita, Kansas 67217 Phone: (316) 945-9328 Fax: (316) 945-0789 INSTALLATION INSTRUCTIONS FOR BALCO, INC. TRENCH GRATES MR-X-P 2012, Balco, Inc. 04/05/12 Document Control No. TGI1300

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPE MR-X-P TRENCH GRATE SYSTEMS Document Control No. TGI1300 The following installation instructions are very important. Read them carefully, and be sure you understand them completely before you begin any work. STORAGE & HANDLING The trench grate frame may require some assembly. Store this product in the horizontal position in a clean, dry location. This is a finished product. Store this product in a protected area. Do not stack anything on these Trench Grates. Figure 1 2

Document Control No. TGI1300 TRENCH GRATE PARTS LIST 1. Assembled Grate TOOLS REQUIRED This is a list of tools and materials recommended for use in the installation of these joint systems. Tools and materials in this list are not provided by Balco, Inc. A. Trench Forms (by others) B. Spacers (by others) INSTALLATION These installation instructions are for use in the installation of Balco, Inc. MR-X-P Series Trench Grates. The MR-X-P Series is designed for installation in conjunction with a trench drain (by others) or concrete liner (by others). These installation instructions are appropriate for use in the installation of straight and radius configurations. The system is illustrated in Figure 1. The system shall be installed as follows: STEP 1. Review Balco, Inc. approved shop drawings for types and locations. STEP 2. Pour the concrete support pad, if required (see Figure 2). Ensure that the pad is the proper width, thickness, elevation, and length. Ensure that the top surface of the pad is level. If the trench has been formed already, proceed directly to Step 4. STEP 3. Using trench forms and spacers, form the trench on the support pad (see Figure 3). Ensure that the trench is the proper length, depth, and width for the specified trench grate system and that the trench grate will be level and flush with the finished floor when it is installed. Figure 2 NOTE: IF A TRENCH DRAIN OR CONCRETE LINER ARE SPECIFIED, THE DRAIN OR LINER CAN BE USED TO FORM THE TRENCH. IF THE DRAIN OR LINER IS USED TO FORM THE TRENCH, FOLLOW THE DRAIN OR LINER MANUFACTURER'S INSTRUCTIONS TO COMPLETE THE TRENCH. STEP 4. Pour the concrete to form the trench. If a trench drain or concrete liner is used, form the trench Figure 3 3

Document Control No. TGI1300 in accordance with the drain or liner manufacturer's installation instructions (see Figure 4). Ensure that the trench is the proper width, depth, elevation, length, and configuration. STEP 5. After the concrete has cured, remove any concrete forms, liner supports, etc. in accordance with acceptable standard industry practice. STEP 6. If pavers or similar flooring materials are to be used for the finished floor, install them at this time. Install the finished floor materials in accordance with the manufacturer's instructions and good industry practice. Ensure that the installed trench grate will be level with the finished floor. Figure 4 NOTE: PAVERS PLACED INTO A SAND BED MAY SETTLE, OR THEY MAY EXPAND IN HOT WEATHER. THESE PROCESSES CAN CAUSE THE PAVERS TO APPLY PRESSURE TO THE TRENCH GRATE SYSTEM, RESULTING IN IMPROPER ALIGNMENT OF THE GRATE, SECTIONS, DEFORMATION OF THE SYSTEM AND/OR DAMAGE TO THE TRENCH GRATE. MEASURES MUST BE TAKEN TO ENSURE THAT THE EXPANSION OR THE SETTLING OF THE PAVERS DOES NOT DEFORM THE TRENCH OR DAMAGE THE GRATE. PROVIDE ADDITIONAL RESTRAINT FOR THE PAVERS TO PREVENT THEM FROM DEFORMING THE TRENCH GRATE SYSTEM OR OTHERWISE DAMAGING IT. Figure 5 STEP 7. Place a section of the trench grate in position in the trench (see Figure 5). Ensure that the trench grate is properly centered in the trench and that the trench grate edges overlap the liner or the edge of the trench a minimum of 3/8". STEP 8. Place each subsequent section of the trench grate in position, splicing the sections of grate together as required. Figure 6 4

Document Control No. TGI1300 STEP 9. Splice bars are welded to sections of the grate. Slide the mating sections of grate together so that the splice bars attached to one section of the grate align the grate section with the mating section of the grate and so that the mating sections of grate are abutted together as closely as possible (see Figure 6 and Figure 7). Ensure that the sections of grate are properly aligned with one another. Figure 7 5

WARRANTY POLICY Balco, Inc. warrants to its purchasers that all products sold by it will be free from manufacturing and material defects. Any defective product will be replaced or repaired free of any charge, provided a claim is brought to our attention, in writing, within the established warranty period following the date of shipment by us and provided our examination shows the product has failed under the terms of this warranty. The established warranty period for exterior joint cover systems (Duraflex TM) is five (5) years provided the systems are installed by a Balco Certified Installer. The established warranty period for grids and mats is two (2) years. The established warranty period for all other Balco, Inc. products is one (1) year. Balco, Inc. will not be responsible for installation costs involved in such repair or replacement. Balco, Inc. shall have no obligation under this warranty if owner subjects materials to improper conditions (refer to Balco's installation instructions) This is in lieu of all other warranties, expressed or implied, and is the sole warranty extended by Balco, Inc. Our liability under this warranty is limited to repair or replacement and does not include any responsibility for consequential or other damage of any nature. It is further agreed and understood that the price stated for the seller's products is consideration for the limitation of seller's liability hereunder. REGISTERED TRADEMARKS: BALCO, INC. PATENT NUMBERS: "VINYLINES" "SAF-T-GLO" 5,357,727; 5,782,044; 5,829,216; "METAFLEX" "SAF-TEN BEVEL" 5,832,678; 6,014,848; 6,115,980; "SENTRY" "DURAFLEX" 6,581,347; 6,942,419; 6,955,017; "ILLUMI-TREAD" 6,962,026; 7,104,717; 7,856,781 SAF-T-GLO patent pending