IECC 2006 with Hawaii Amendments

Similar documents
IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC Commercial Significant Changes Summary Tier I

A Closer Look Inspection Service 2015 IECC Residential DFW area handout

2015 Michigan Residential Code Energy Worksheet for New Single-family Residential Building

REScheck Software Version Compliance Certificate

Boulder City NV Prepared by (Print Name) Signature Date

Instructions for the Residential Building Data Collection Checklist 2009 International Energy Conservation Code with 2011 Georgia Amendments

NC ECC Commercial Training June 2011

Compliance Certificate

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting

Compliance Certificate

Hardin County Planning and Development Commission

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other

Compliance Certificate

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016

Michigan Energy Code Training and Implementation Program

Italcementi Center for Research and Innovation

Prescriptive Checklist for the 2015 Washington State Energy Code

Single Family Residence Building Permits

Feature Zone IECC 2009 IECC

Rhode Island Commercial Codes FAQs

Interpretation Variables and Common Areas of Confusion. Of the 2009 IECC

North Carolina Energy Code Future of Commercial Requirements

The look and layout of the 2012 IECC changes. chapters 1-4 Commercial (CE) and. chapters 1-4 Residential (RE) 2011 Colorado Code Consulting, LLC 2

Plan Check & Field Inspection Guide

REScheck Software Version Compliance Certificate

2016 ASHRAE 90.1 Summary of Important Changes

RESIDENTIAL ENERGY EFFICIENCY

1998 and 2000 International Energy Conservation Code Version 3.0 April 2000

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD

IRC 2012 Key Changes

Energy modeling in IDA ICE according to ASHRAE , app. G

BUILDING ENERGY CODES UNIVERSITY

Energy Trigger (A Existing Building Upgrade Mechanism Model)

New Hampshire Residential Energy Code

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.

Energy Code Basics for Residential Buildings. Presented by Newport Ventures NEWPORT VENTURES

RESIDENTIAL ENERGY EFFICIENCY

WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia

The ASHRAE Energy Code: How it Will Affect Your Projects

REScheck Compliance Certificate Massachusetts Energy Code REScheck Software Version 3.6 Release 1 Data filename: O:\REScheck 38\38258.

C H A P T E R 3. Completing the Residential Analysis Worksheet STEP 1: WINDOWS AND OTHER GLASS AREAS

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

Training Certification Categories

Page 1. ASHRAE STANDARD Section. COMMENTS This is opinion and not comprehensive.

INSIDE RESCheck / COMCheck

Florida HERO Program Residential Eligible Product List All Products

A/E Design Deliverable Checklist

Building Codes and Ordinances ARC 227

2012 IECC Residential with State Adopted Changes

Energy Efficiency Programs

Government of Rajasthan Energy Department

City of High Point Airport Overlay District Noise Level Reduction Design Standards

2010 National Building Code Adoption and Associated Process Changes

What's New With Title 24

THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS

Village of Glen Ellyn Basement Remodeling Project Guidelines

ANSI/ASHRAE/IESNA Standard /2001/2004 Energy Standard for Buildings Except Low-Rise Residential Buildings

FLORIDA BUILDING CODE, Energy Conservation

HERO Program Residential Eligible Product List California Residential Eligible Products... 2

Montana Homebuilder Brief: Residential Energy Code 1

Existing Building Upgrades

BUILDING ENERGY ANALYSIS REPORT. PROJECT: Plan Linda, CA. Project Designer: Empire Engineering 1402 D Street Marysville, CA

2009 Washington State Energy Code/2012 International Energy Code Comparison

Michigan Energy Code Training and Implementation Program

A/E Design Deliverable Checklist

RESIDENTIAL ENERGY CHAPTER 4

Residential Plan Review for New One and Two Family Dwellings

Michigan Energy and Cost Savings

2015 IECC Commercial Updates

AVOIDING 2015 MINNESOTA ENERGY CODE VIOLATIONS

A. GENERAL INFORMATION

California HERO Program Residential Eligible Product List All Products

GENERAL PLAN REVIEW REQUIREMENTS

CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8)

Recommended Amendments to the 2012 International Residential Code (IRC)

2012 International Energy Conservation Code for Simple Commercial Buildings

Manitoba Energy Code for Buildings. Part 3 Building Envelope

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System)

Module number 6 provides an on-line, self-paced training seminar on energy efficiency and energy conservation for residential buildings.

Ontario s Building Code

Development of Design Guidance for K-12 Schools: From 30% to 50% Energy Savings

2013 Nonresidential Energy Standards Overview

ASHRAE 62.2: What s New in 2016

OR LEGAL DESCRIPTION PLAN: BLOCK: LOT: APPLICANT / CONTACT:_ INSPECTION RESULTS TO BE MAILED TO THIS ? YES NO

Green Building Guideline of Jordan

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

Oregon High Performance Home Requirements

Green Building Guideline of Jordan

2018 IECC Commercial Significant Changes. Ken Baker (thanks to Eric Makela and CADMUS)

Culver City Building Safety Division Mandatory Green Building Program

2011 NORTHERN NEVADA ENERGY CODE AMENDMENTS

WINDOW AND DOOR REPLACEMENT SAMPLE PLAN

Is Yours? Homes Across Missouri are Being Built to the Latest National Energy Efficiency Standards

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

ILLINOIS SPECIFIC AMENDMENTS TO THE IECC 2015 EDITION

EnergyPro Building Energy Analysis. Single-story School Building

Transcription:

IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST ENVELOPE REQUIREMENTS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists for designers. Use the as a checklist to identify relevant information during plan review. For each requirement check either or to indicate whether the project complies or the requirement is not applicable in this case. Project: Date: Component/System ENVELOPE REQUIREMENTS Certification Responsible design professional 104.1* Signed statement on plans certification on plans Construction documents Include: Insulation R-values Fenestration U-factors and solar heat gain coefficients (SHGCs) 104.2 Roof insulation above deck R-15 502.2 Typically foam board on the roof deck. If Insulation location on plans tapered, R-value in some areas can be lower Insulation R-value on plans than the requirement if designer shows that weighted-average U-factor complies. Roof metal building R-19 + R-10 (with R-5 thermal block) 502.2 Typically two layers of batt insulation. One draped over purlins with enough slack to allow the second layer to be installed on top and parallel to the purlins. Also with R-5 foam block between purlins and metal roof deck. Roof attic or other R-30 502.2 This category includes attics, cathedral ceilings, and insulation installed under the roof deck. Insulation on top of suspended ceiling is not allowed for compliance. Wall mass (CMU or concrete) Insulation R-value on plans Thermal block indicated on plans Insulation location on plans Insulation R-value on plans No insulation required 502.2 pg. 1 of 16 November 18, 2015

Wall metal building R-13 502.2 May be compressed as the metal skin is Insulation shown on plans attached to the girts. Insulation R-value on plans Wall metal frame R-13 502.2 Requires insulation in framing cavity Insulation location on plans Insulation R-value on plans Wall wood frame and other R-13 502.2 Requires insulation in framing cavity Insulation location on plans Insulation R-value on plans Door - swinging U-0.70 502.2 Most hollow or filled-core opaque metal or wood doors comply. Door non-swinging U-1.45 502.2 No insulation required for roll-up and sliding applications. Low-slope roof membrane No requirement No cool-roof requirement. Windows maximum area 40% of gross wall area 502.3 If the project cannot comply with the prescriptive limit on window area, then it must comply with ASHRAE Standard 90.1-2004. Windows solar heat gain coefficient (SHGC) 0.25 if projection factor < 0.25. 0.33 if projection factor 0.25-0.5. 0.40 if projection factor 0.5. 502.3 Requires tinted and/or coated glazing to comply. Many combinations are possible. Projection factor = horizontal projection of overhang vertical distance from overhang to bottom of window. 40% window area SHGC indicated on plans Overhang dimensions on plans, if applicable Windows U-factor 1.20 502.3 Single-pane glazing complies. Skylights minimum area No requirement Skylights maximum area 3% of gross roof area 502.3 If the project cannot comply with the prescriptive limit on skylight area, then it 3% skylight area must comply with ASHRAE Standard 90.1-2004. Skylights solar heat gain 0.40 glass 502.3 Requires tinted and/or coated glazing. Many coefficient (SHGC) 0.35 plastic combinations are possible. SHGC indicated on plans Skylights U-factor 1.60 glass 1.90 plastic 502.3 Single-pane skylights will comply ENVELOPE REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 2 of 16 November 18, 2015

Air leakage Fenestration air leakage Sealing of the building envelope Outdoor air intakes and exhaust openings. Loading-dock weatherseals Recessed lighting * section added or modified by Hawaii amendment 502.4 Max. fenestration leakage rates in s 502.4.1 and 502.4.2. Openings and penetrations are caulked or gasketed. Air intakes, exhaust openings, stairways, and shafts have dampers. Loading-dock doors have weatherseals. Recessed lighting is IC rated and sealed. ENVELOPE REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 3 of 16 November 18, 2015

IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST MECHANICAL SYSTEM REQUIREMENTS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists for designers. Use the as a checklist to identify relevant information during plan review. For each requirement check either or to indicate whether the project complies or the requirement is not applicable in this case. Project: Date: Component/System MECHANICAL SYSTEM REQUIREMENTS Certification Information on construction documents Mechanical system commissioning and completion Responsible design professional certification on plans Include: Equipment type, capacity and efficiency System controls Fan motor hp and controls Duct sealing Duct and pipe insulation and location Include construction document notes indicating commissioning requirements Provide evidence of commissioning and completion prior to final inspection. 104.1* Signed statement on plans 104.2 503.2.9* Applies to all new HVAC systems. Commissioning plan can be located in a separate document as long as notes on the plans include a reference to the plan. System adjusting and balancing to be completed according to generally accepted engineering standards. Some specific requirements are listed in the code amendment. Notes on plans indicate commissioning requirements pg. 4 of 16 November 18, 2015

HVAC equipment performance HVAC system controls Thermostatic controls Off-hour controls Shutoff dampers Tables 503.2.3(1) - 503.2.3(11) 503.2.3 Cooling efficiency rated by SEER, EER, or COP. varies by equipment type and cooling capacity. 503.2.4 Automatic off-hour thermostat control required. Ventilation Outdoor air ventilation per IMC 503.2.5 Natural or mechanical ventilation required for all spaces. Energy Recovery Ventilation Energy recovery with effectiveness 503.2.6 Complying systems are typically heatrecovery 50% required for systems with wheels that extract sensible supply air flow 5,000 cfm and heat and moisture from ventilation air minimum outdoor air 70%. Several and transfer it to exhaust air. exceptions listed in the code. Duct and plenum insulation R-5 in unconditioned space R-8 outdoors Cooling efficiency listed on plans Cooling capacity listed on plans Appropriate controls indicated on plans Outdoor air ventilation rates listed on plans Heat-recovery equipment and control sequence on plans 503.2.7 Duct insulation R-value on plans Duct and plenum sealing Sealed per IMC 503.2.7 Piping insulation Minimum thickness per table 503.2.8 503.2.8 For chilled water systems, minimum insulation thickness is 1 for pipes 1.5 diameter and 1.5 for larger pipes. VAV fan control Variable flow fans with motors 10 hp have variable-speed control Hydronic system controls Part-load controls for CHW systems 300kBtu/hr Pump isolation with multiple chillers or boilers Heat rejection equipment fan speed control Speed control for cooling tower fans 7.5 hp 503.4.2 In addition, if the system has directdigital control, then static pressure reset controls are required. 503.4.3 If 300kBtu/hr cooling capacity, then variable flow required with variablespeed pumps or staged pumps. Supply water temperature reset controls also required. Plants with multiple chillers shall automatically reduce flow when a chiller is shut down. 503.4.4 Cooling tower fans 7.5hp required to have multi-speed or variable-speed control with automatic temperature control. Pipe insulation thickness on plans Variable-speed fan control on plans Pump control on plans Cooling tower fan motor hp on plans Fan control on plans (if applicable) MECHANICAL SYSTEM REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 5 of 16 November 18, 2015

Multiple-zone systems Variable air flow 503.4.5 In variable air volume (VAV) systems, reheat is not permitted except when airflow is reduced to a minimum level specified in the code. Heat recovery for service water heating * section added or modified by Hawaii amendment Condenser heat recovery for systems operating 24 hr/day with watercooled cooling capacity 6,000 kbtu/hr and service water heating load 1,000 kbtu/hr 503.4.6 Most typically applies to hotels, highrise residential buildings, and hospitals. Typical systems are heat-recovery chillers and heat-pump water heaters. VAV box max. and min. airflow shown on plans Heat recovery equipment on plans MECHANICAL SYSTEM REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 6 of 16 November 18, 2015

IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST SERVICE WATER HEATING REQUIREMENTS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists for designers. Use the as a checklist to identify relevant information during plan review. For each requirement check either or to indicate whether the project complies or the requirement is not applicable in this case. Project: Date: Component/System SERVICE WATER HEATING REQUIREMENTS Certification Information on construction documents System commissioning Service water-heating equipment efficiency Temperature controls Heat traps Responsible design professional certification on plans 104.1* Signed statement on plans Include 104.2 Water heating equipment type, size and efficiency System controls Pipe insulation and location No requirement for water heating systems. Efficiency per Table 504.2 504.2 Table covers electric resistance, heat Equipment capacity and pump, storage gas, instantaneous gas, efficiency listed on plans and pool heaters. Allow setpoint of 110 F for dwelling 504.3 units and 90 F for other occupancies. Public lavatories limited to 110 F. For non-circulating systems provide 504.4 Intent is to prevent thermosiphoning in Heat trap(s) indicated on plans equipment with integral heat traps or non-circulating systems. (if applicable) provide heat traps on supply and Heat trap may be integral to the water discharge piping. heater. May be a 180 degree bend in inlet and outlet pipe. pg. 7 of 16 November 18, 2015

Pipe insulation Maximum supply pipe length/volume Circulation system controls Minimum insulation thickness: 1 for circulating systems ½ for non-circulating storage systems: first 8 ft from tank (or from tank to heat trap) on inlet and outlet. 504.5 Insulation location and thickness indicated on plans No requirement Automatic controls or manual controls to turn off pump when system is not in operation Pools Readily accessible on/off switch No continuous pilot light Time switch for heater and pumps Pool covers required, except with >60% site-recovered/solar heat * section added or modified by Hawaii amendment 504.6 Controls must be accessible. Circulation controls indicated on plans 504.7 Readily accessible pool heater on/off switch Time switch on heater and pump Pool cover or site-recovered heat SERVICE WATER HEATING REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 8 of 16 November 18, 2015

IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST LIGHTING AND ELECTRICAL REQUIREMENTS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists for designers. Use the as a checklist to identify relevant information during plan review. For each requirement check either or to indicate whether the project complies or the requirement is not applicable in this case. Project: Date: Component/System LIGHTING AND ELECTRICAL REQUIREMENTS Certification Information on construction documents Responsible design professional certification on plans Include Lighting fixture schedule with input power Lighting control narrative No requirement. 104.1* Signed statement on plans 104.2 This information is necessary for the reviewer to be able to verify lighting power compliance. Lighting system functional testing Dwelling unit lighting No requirement. 505.1 Hotel guest rooms are not considered dwelling units and must meet the lighting requirements. Controls - manual Each space must have at least one manual lighting control, except in security areas and in stairways and corridors that are egress paths 505.2.1 Controls may be either located within the space or may be remote if the switch identifies the space served and the status. Controls on plans pg. 9 of 16 November 18, 2015

Controls light reduction Controls automatic lighting shutoff Controls allow occupants to reduce the lighting load by at least 50% with reasonably uniform illumination. Exceptions: Areas with only one luminaire Areas with occupant sensor control Corridors, storerooms, restrooms, and public lobbies Sleeping units Spaces with lighting power <0.6W/sf Buildings >5,000 sf must have automatic scheduled controls or occupant sensors. Exceptions for Sleeping unit Patient care areas Areas where shutoff would endanger occupants. 505.2.2.1 Methods: Dimming or multi-level switching of all luminaires in a space. Dual switching of alternate luminaires Independently switching each luminaire 505.2.2.2 Also requires occupant override capability and holiday scheduling capability. Some exceptions listed in the code. Controls on plans Time switch controls or occupancy sensor controls on plans Controls - daylightresponsive Controls display & accent lighting Controls guest rooms No requirement No requirement Hotel and motel guest rooms shall have a master switch at the main entry door that controls all permanently-wired lightings and switched receptacles, except for those in the bathroom. 505.2.3 Manual controls are acceptable. Controls indicated on plans Exit signs 5 watts per face 505.4 Indicated in fixture schedule LIGHTING AND ELECTRICAL REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 10 of 16 November 18, 2015

Total connected interior lighting power Interior lighting power allowance Includes input power for all proposed luminaires. Some exceptions apply. Special cases: Screw-in luminaires. Rated luminaire power (not the lamp power) Low-voltage lighting. Power rating of the transformer (not the lamp power) Line-voltage track lighting. Input power for the proposed luminaire power (but not less than 30 W/linear foot) or the power of the circuit breaker or other current-limiting device. Total connected power shall be no greater than allowance based on building type and floor area. 505.5.1 Note that luminaire input power is not necessarily equal to the rated watts of the lamps. Input power for fluorescent and HID fixtures depends on the lamp/ballast combination. The input power for the specified fixtures must be listed in the fixture schedule on the plans. Pay special attention to the special cases such as screw-base fixtures as noted to the left. 505.5.2 Lighting-power-density allowances are listed in Table 505.5.2. Includes an additional allowance for retail display lighting. All fixtures located and identified on plans Fixture schedule includes input power for each fixture Exterior lighting controls Exterior lighting efficacy Automatic control required for all exterior lighting. Dusk-to-dawn lighting shall have either photocell control or an astronomical timeclock. Lighting not designated for duskto-dawn shall have astronomical time-clock control. Some exceptions apply. Luminaires >100W shall have efficacy 60 lumens/watt Though not required by code, ideally the designer includes a table on the plans showing the allowed lighting power calculation (listing space types and floor areas) along with a total of the connected lighting power. 505.2.4 Time switches required to have at least 10 hours battery backup. 505.6.1 Typically satisfied by fluorescent, highintensity-discharge, induction, and LED type lamps. Controls indicated on plans Fixture schedule includes efficacy or includes lumen output and power input for each fixture LIGHTING AND ELECTRICAL REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 11 of 16 November 18, 2015

Exterior building lighting power Electricity meters Electrical transformers Electrical motors Vertical and horizontal transportation systems Electrical sub-metering Maximum allowed power listed in Table 505.6.2 includes: Tradeable allowance Non-tradeable allowance Exceptions apply to some exterior lighting applications. Each dwelling unit has a separate electric meter. No requirement No requirement No requirement No requirement 505.6.2 Though not required by code, ideally the designer includes a table on the plans showing the allowed lighting power calculation for both tradeable and non-tradeable exterior lighting areas along with a total of the connected exterior lighting power. All fixtures located and identified on plans Fixture schedule includes input power for each fixture 505.7 Meters indicated on plans * section added or modified by Hawaii amendment LIGHTING AND ELECTRICAL REQUIREMENTS - 2006 IECC WITH HAWAII AMENDMENTS pg. 12 of 16 November 18, 2015

IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST ADDITIONS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists for designers. Use the as a checklist to identify relevant information during plan review. For each requirement check either or to indicate whether the project complies or the requirement is not applicable in this case. Project: Date: Component/System ADDITIONS General Windows maximum area Window U-factor and SHGC Skylights maximum area Skylight U-factor and SHGC Mechanical systems s for new construction apply to additions. Unaltered portions of the existing building are not required to comply. Total building window area including addition 40% of gross wall area Same as new construction. See envelope checklist Total building skylight area including addition 3% of gross roof area Same as new construction. See envelope checklist s for new systems and equipment serving additions are the same as for new construction. See the mechanical checklist. 101.4.3 There are two general compliance options: 1. The addition alone 2. The addition + existing building as one building 502.3 If the project cannot comply with the prescriptive limit on window area, then it must comply with 506 Total Building Performance or ASHRAE Standard 90.1-2004. 502.3 s do not apply when glass is replaced in an existing sash (101.4.3). 502.3 If the project cannot comply with the prescriptive limit on skylight area, then it must comply with 506 Total Building Performance or ASHRAE Standard 90.1-2004. 502.3 s do not apply when glass is replaced in an existing sash (101.4.3). 101.4.3 Unaltered portions are not required to comply. pg. 13 of 16 November 18, 2015

Service water heating Pools and spas Interior lighting Exterior lighting s for new equipment, controls and piping serving additions are the same as for new construction. See the service water heating checklist. s for new pools and inground spas are the same as for new construction. See the service water heating checklist. s for lighting systems in additions are the same as for new construction. See the lighting checklist. s for exterior lighting systems for additions are the same as for new construction. See the lighting checklist. 101.4.3 Unaltered portions are not required to comply. 101.4.3 101.4.3 101.4.3 ADDITIONS - 2006 IECC WITH HAWAII AMENDMENTS pg. 14 of 16 November 18, 2015

IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST ALTERATIONS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists for designers. Use the as a checklist to identify relevant information during plan review. For each requirement check either or to indicate whether the project complies or the requirement is not applicable in this case. Project: Date: Component/System ALTERATIONS General Change in occupancy Roof New-construction requirements apply to altered portions of the building. Unaltered portions are not required to comply. Full compliance is required for buildings undergoing a change in occupancy that would result in an increase in energy consumption. No requirement: Roof recover Ceiling/roof cavity not exposed New-construction requirements: New roof Alteration where ceiling/roof cavity is exposed (exception if cavity is filled with insulation) 101.4.3 101.4.4 101.4.3 Any new roof must meet the requirements for a new roof. Roof alterations that expose the ceiling or roof cavity where that cavity is part of the thermal envelope shall meet the R-value requirement for new roofs, except a lower R-value is allowed if the cavity is filled with insulation. pg. 15 of 16 November 18, 2015

Wall Windows maximum area Window U-factor and SHGC Skylights maximum area Skylight U-factor and SHGC Mechanical systems Service water heating systems Lighting systems No requirement: Wall cavity is not exposed New-construction requirements: Wall cavity is exposed (exception if cavity is filled with insulation) Total building window area after added windows 40% of gross wall area Same as new construction. See envelope checklist Total building skylight area after added skylights 3% of gross roof area Same as new construction. See envelope checklist New heating, cooling and duct systems are required to meet new construction requirements. New water heating systems are required to meet new construction requirements. New lighting systems that are part of an alteration are required to meet new construction requirements. 101.4.3 If a wall cavity is exposed during alteration, then it shall be insulated to meet the new-construction requirement. However, it is acceptable to install a lower R-value if the cavity is filled (i.e. not deep enough to meet the code requirement). 502.3 If the project cannot comply with the prescriptive limit on window area when new windows are added, then it must comply with 506 Total Building Performance or ASHRAE Standard 90.1-2004. 502.3 s do not apply when glass is replaced in an existing sash (101.4.3). 502.3 If the project cannot comply with the prescriptive limit on skylight area when new skylights are added, then it must comply with 506 Total Building Performance or ASHRAE Standard 90.1-2004. 502.3 s do not apply when glass is replaced in an existing sash (101.4.3). 101.4.3 For example, replacement air conditioners must meet the efficiency requirements, and new ducts must meet the insulation requirements. Unaltered portions of the system are not required to comply. 101.4.3 Unaltered portions of the system are not required to comply. 101.4.3 ALTERATIONS - 2006 IECC WITH HAWAII AMENDMENTS pg. 16 of 16 November 18, 2015