ARANGKADA PHILIPPINES 2010: A BUSINESS PERSPECTIVE. Infrastructure: Water

Similar documents
WATER RESOURCES IN THE PHILIPPINES: Status, Challenges and Opportunities

Public-Private Partnerships for Urban Water: Experiences of Manila, Philippines Mushtaq Ahmed Memon, Hidefumi IMURA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Angat Water Transmission Improvement Project

Water Resources. Inland freshwater (rivers, lakes, and groundwater) Marine (bay, coastal, and oceanic waters) Rainwater

THE WALLACE REPORT NOT A DROP TO DRINK: RP S WATER CRISIS PETER WALLACE

Water Sector Regulation in the Philippines by

East Asia Urban Sanitation Review

Metro Manila s PPP experience in contributing to SDG 6. Mark Tom Mulingbayan 20 March 2017

Philippine PPP Program SDG-6 (Water & Sanitation) and SDG-11 (Sustainable Cities)

Metro Manila Flood Control Project (II)

Challenges to water resource management: ensuring adequate supply and better water quality for the present and future generations

CHAPTER XI IMPLEMENTATION PLAN FOR THE PROJECT

SHIFTING PARADAIGM OF JAPANESE ASSISTANCE IN DISASTER RISK MANAGEMENT IN THE PHILIPPINES

COUNTRY REPORT: PHILIPPINES

Keywords separate, combined, Manila Water Company, sewerage service, Metro Manila

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities

LOCAL WATER UTILITIES ADMINISTRATION

IWRM Conflict Management The Laguna de Bay Experience Dolora N. Nepomuceno

THE MANILA BAY EXPERIENCE

Institutional Challenges, Scientific Opportunities

Status of Improvement of Water and Sanitation Facilities in Metro Manila Maria Rebecca A. Campos, Ph.D. Southeast Asian Regional Center for Graduate S

Case Study UNDERGROUND SEWERAGE SYSTEM ALANDUR. Sewerage

PHILIPPINES COUNTRY STUDY

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1

Our Sustainability Journey

Dr. Ma. Cecilia G. Soriano 17 November 2015 Danang, Vietnam

Designation of Water Quality Management Areas in the Philippines

Expanding Access to Improved Sanitation for the Poor INSIGHTS FROM THE PHILIPPINES IN PARTNERSHIP WITH

National Sewerage and Septage Management Program. April 30, Draft For Discussion Only

Expanding Access to Improved Sanitation for the Poor

LAGUNA LAKE DEVELOPMENT AUTHORITY. Introduction to

PHILIPPINE FRESHWATER RESOURCES: STRATEGIES FOR SUSTAINABLE DEVELOPMENT

Session II: Case Studies in Green Technology PPP Projects. Water Irrigation in Rural Areas

Public-Private Partnerships in the Philippines

Member s Annual Report Date of preparation :3/28/08 Name of the editor : Atty. Elenito M. Bagalihog

MANILA BAY Integrated Water Quality Management Project

Water Supply for Metro Manila. Mark Tom Mulingbayan

Rural Water Supply Project (IV)

TABLE OF CONTENTS. Preface. Abbreviations and Acronyms. Executive Summary. Water Quality Hot Spots. Philippines Water Quality at a Glance v

National Water Demand Management Policy

Water Governance in the Philippines and Some Thoughts on Governance

ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECTS IN THE APEC REGION

Public Private Partnerships in Fiji

Summary of Preparatory Study for Development Study (M/P)

Impacts of Drought in the e Philippines

Geothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia

Public Private Partnership PPP & The Egyptian Experience

The Experience of Small-Scale Water Providers in Serving the Poor in Metro Manila

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

Japanese ODA Loan Ex-ante Evaluation

A Proposal for Updating the MWSS Master Plan. Metropolitan Waterworks & Sewerage System. A proposal for updating the MWSS 2005 Master Plan

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

Face Off: Utility Sub-concessions and Local Private Providers in Metro Manila

NCICD From planning to Implementation

Beyond One-Size-Fits-All:

Initiative for Disaster Reduction through ODA

Integrated Planning for Meeting Clean Water Act Requirements

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017

ASIAN DEVELOPMENT BANK

PREPARATORY SURVEY FOR METRO MANILA SEWERAGE AND SANITATION IMPROVEMENT

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA

National Sewerage and Septage Management Program. Full Report Final Draft November 11, 2010

SOUTHEAST FLORIDA S RESILIENT WATER RESOURCES INCLUDING A CASE STUDY FOR THE CITY OF POMPANO BEACH

MANILA WATER s s Contribution to the Blue Economy

OVERVIEW CAPACITY & CONDITION

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map

Case Study: City of Nagoya, Japan

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE SERVICES 1

BENCHMARKING PPP PROCUREMENT 2017 IN NEPAL

Ex-ante Evaluation - 1 -

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

Water Resources in Japan and the development of IWRM in Kiso River

Philippine Presentation

Copyright 2017, Ontario Energy Association

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

Investing in Sustainable cities. Water Management in urban areas: Yangon s case

Case Study: Low-Cost Housing as a Nexus Showcase in Santa Rosa City. Country: City: Key Sectors: Housing, Wastewater Management, Clustering

In her 2004 State of the Nation Address (SONA), President Gloria

The JICA funded the P10-billion Batangas Port

Ex-Ante Evaluation (for Japanese ODA Loan)

PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3455 Project Name. Mauritania Port of Nouakchott Development Project Region

Ex-ante Project Evaluation

USAID FROM THE AMERICAN PEOPLE

Restoring Urban Infrastructure and Services in Nigeria

Water Related Challenges in Asia - A Tale Of Three Cities -

Sustainable Cities Strategy (Draft): Financing Solutions for Cities in Asia to Achieve GREAT

The Role of the World Bank in the Philippines Water Sector

Drought Contingency Plan

National Water Policy for Palestine

WATER-RELATED HAZARDS AND DISASTER RISK IN CAGAYAN RIVER BASIN, PHILIPPINES

Second Public Consultation. Talayan STP. Wastewater Treatment Facility. 12 December 2011 Barangay Sto. Domingo, Quezon City

CONCESSIONS TREATMENT AGENCY ALBANIA

The Dublin Statement on Water and Sustainable Development

Japanese urbanization and domestic wastewater management

Sacramento County Board of Supervisors Sacramento County Water Agency. October 21, 2008

Bold Inclusive Reforms for Infrastructure for the Next Decade

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

Transcription:

Infrastructure: Water Sector Background and Potential The dependable supply and distribution of water for urban living as well as agriculture is critical to economic growth and the everyday life of Filipinos. Fortunately, the Philippines has not been threatened by severe drought. However, the country is challenged to store and deliver sufficient water to its fast-growing population and to dispose of wastewater without damage to the environment or public health. Urban water supply has been privatized in Metro Manila and few other cities. Prospective investors in the water supply sector have noted the lack of an economic regulator and the inadequate capacity and resources of the current resource regulator. This discourages foreign investors from entering the field. The absence of an independent regulator forced the Metropolitan Waterworks and Sewerage System (MWSS), Manila Water Company, and Maynilad Water Services to establish one by contract. While the arrangement is novel and apparently works, establishing an independent regulator via legislation will afford greater comfort and long-term stability. Currently, the water resource developer (MWSS) is also the regulator. The regulatory office is under the supervision and management of the MWSS Board of Trustees. There is a need for a separate and independent Water Regulatory Commission. More than a decade ago, the Senate Technical Committee on Energy introduced three bills to reform the power and water sectors in the Philippines: the Electric Power Industry Reform Act (EPIRA), the Water Reform Act, and the Electric Cooperative Reform Act. Of the three bills, only EPIRA has been passed. There is an immediate need to revisit the proposal for a Water Reform Act, an EPIRA for water. Currently there is no institutional and legal framework to guide private and public cooperation in developing water sources throughout the country. Most of the country is dependent on separate local water districts each with its own plans, regulations, and policies. A private investor has to deal with individual local water districts to develop water supply projects to serve local communities. The present legal framework has some 172 DECEMBER 2010

30 governmental agencies (e.g. DENR, DILG, DOH, DPWH) with varying scopes and limited jurisdictions, in the water sector and also must be rationalized. The fragmented nature of regulation and policies diffuses focus and confuses and dissuades new entrants. The water supply situation in Metro Manila and 8 other urban centers (Metro Cebu, Davao, Baguio, Angeles, Bacolod, Iloilo, Cagayan de Oro, and Zamboanga) has been described in various studies as critical. Immediate solutions to cope with the anticipated water deficit should be identified and implemented. In Metro Manila, the two concessionaires source water at a subsidized rate enabling them to distribute it to consumers at a very low price. How much are consumers willing to pay to have a reliable and sufficient water supply? Wholesale water rates must be sufficient to pay for the development of new water sources to meet existing and future demand, which means at least PhP 18 per cubic meter, probably more. Angat Dam currently supplies 97 percent of Metro Manila s water supply. In addition, the dam is used to supply irrigation water, together placing a serious strain on its capacity. Power is generated using the separate discharges for water supply to Metro Manila and to the 30,000-hectare Angat- Maasim Rivers Irrigation System and is not a factor in the consumption of water. In 2010 there is a shortage of 500 million liters per day (MLD) in Metro Manila, which is expected to increase to 2,000 MLD by 2015. The consensus is that (1) Angat is not capable of supplying the water supply needs of Metro Manila and (2) a new source for bulk water supply is essential. Another concern is the security of supply, as Metro Manila relies solely on a single source of bulk water vulnerable to damage from earthquakes. MWSS continues to develop plans to increase the water supply to Metro Manila, albeit slowly due to political interventions. Four major projects have been identified: (1) Wawa with a capacity of 50 MLD, (2) Laguna de Bay with a capacity of 300 MLD, (3) Sierra Madre with a capacity of 500 MLD, and (4) Laiban with an initial capacity of 1,900 MLD, plus the option of an additional 3,400 MLD via a future transbasin diversion from the Kanan River. The major obstacle for all four projects is financing, which depends on the creditworthiness of the buyer, MWSS, which in turn requires credit enhancement in the form of a GRP performance undertaking. The government of the Philippines has considered the Laiban proposal several times over the past 30 years and already spent substantial funds for physical data collection, engineering and environmental studies, and socio-economic surveys of the affected communities and indigenous peoples. A financially viable solution for proponents, equity sources, lenders, and government must be found. The government s aversion to take-or-pay arrangements, sovereign guarantees, and performance undertakings, while understandable, must be reconsidered in light of what realistically is essential to finance new water sources and also makes economic sense. The question is not so DECEMBER 2010 173

much if the country can afford such projects, but rather whether it can live without them. The longer their development is delayed, the more costly the solution is likely to be, not only in terms of price but also in terms of socio-economic impact. MWSS recently elected to consider public-private joint ventures under guidelines developed by NEDA, the Government Procurement Policy Board (GPPB), and the Office of the Government Corporate Counsel (OGCC). Recent administrations have not been willing to fund water supply projects. The private sector in this case San Miguel Bulk Water Company provided this proposal (or another) is implemented must finance the entire project, estimated to cost US$ 1.1 to 1.4 billion. The project as initially conceived 30 years ago has been studied thoroughly. When Laiban was initially proposed in the early 1980s, there were only about 1,200 families living in the reservoir area upstream of the proposed dam and its immediate vicinity. Today, there are 4,500 families living in this area. After San Miguel Bulk Water Corporation submitted its unsolicited proposal these families formed a cooperative that passed a resolution demanding each be paid PhP 3 million to relocate. The relocation cost alone is estimated to be at around PhP 400 million, which MWSS insists be borne by the private sector. In a JV scheme, unsolicited proposals are subject to a competitive challenge by other proponents. The ideal option is to bid out such major infrastructure projects, but to do so the government (MWSS) must collect extensive physical and environmental data and conduct technical studies that are costly and require several years to complete. The GRP lacks the resources and in-house expertise, moreover, to manage such a program. But without competitive bidding, how can the proposed cost be justified to consumers and taxpayers as reasonable and necessary? Under the JV approach, it is the implementing agency (MWSS) that decides. That agency should base its decision solely on the national interest, which in this case means a company that can most efficiently develop quality infrastructure that will result in an affordable, reliable supply of water for the long term. The success of this arrangement depends on good governance. MWSS also has allowed the two concessionaires to develop minor new water sources. Both Maynilad and Manila Water currently are developing 100 MLD from various sources, such as treating water obtained from Laguna de Bay. The Philippines has been myopic in its water policy over the last decade, focusing only on Metro Manila. MWSS only covers Metro Manila and portions of Bulacan, Cavite, and Rizal. What about the water supply to cities and communities not served by its two concessionaires? Even a major project like Laiban is not sufficient to service the requirements of other Luzon cities and towns. There is an urgent need for a national policy. To address the water supply needs of local government units, particularly cities and towns, a water supply company must deal with countless local officials and organizations. Working with so many small administrative units is inefficient compared to dealing with a central agency. The two Metro Manila concessionaires have prioritized their resources into upgrading the water distribution network. Their capital improvements have focused on improving the antiquated 174 DECEMBER 2010

piping system. There is a great need to invest in wastewater treatment to reduce the problem of discharging sanitary wastes into flowing streams and other bodies of water, such as fresh water lakes and Manila Bay, polluting the environment. Targets on sewage and sanitation are laid out in the concession agreement drafted by the IFC. Despite being the biggest consumer of water, the agriculture sector does not pay irrigation fees. Similar to other countries, almost 80% of the water supply is used in the agriculture sector, while the other 20% is spread among other sectors. Public sector irrigation systems (e.g. Angat- Maasim River Irrigation System, Upper Pampanga River Integrated Irrigation System, and Agno River Irrigation System) are poorly maintained and inadequate for the food requirements of a fastgrowing population. Heavy monsoon rains and severe typhoons have long caused flooding in Metro Manila and other low-lying areas of the archipelago. The rising ocean caused by climate change will increase the threat of flooding in coastal and river mouth areas where Filipinos have traditionally developed their towns and cities. Furthermore, urbanization has been accompanied by disruption of natural drainage systems through improper location of roads and buildings and poor disposal of solid waste. This has caused the lowering of the water-holding capacities of cities, resulting in more rainwater flooding low-lying areas accompanied by slower runoffs and increased flood damage. Headline Recommendations 1. 2. 3. Challenge: There is no substitute for long-term take-or-pay bulk water purchase agreements between creditworthy parties to support financing of new water supply projects. Solution: The GRP must enhance creditworthiness of water supply agencies such as the MWSS with performance undertakings. Alternatives: The MWSS concessionaires voluntarily enter into take-or-pay contracts for bulk water supply projects supported by their balance sheets or fund major new water supply projects directly. Challenge: Public policies, rules, and regulations for water are administered by numerous departments and agencies thereby undermining its development. Solutions: Rationalize water supply administration and policy via a Water Reform Act; strengthen the National Water Resources Board (NWRB). Establish a Department of Water and an independent water regulator. Develop a National Water Master Plan that identifies major water resources and treatment requirements; establish supportive policies, rules, and regulations. Challenge: New dams to provide additional water supplies for Metro Manila should be built. Solutions: Engage the private sector, preferably through transparent bidding. The policy disallowing take-or-pay and sovereign guarantees needs to be reviewed. Smaller and less expensive Sierra Madre or Wawa projects should be moved forward while the approach to the Laiban project is decided. DECEMBER 2010 175

4. Challenge: Irrigation and flood control desperately need reform and budgetary support. Solutions: Encourage the private sector to invest in irrigation using the BOT law or joint ventures with National Irrigation Administration (NIA). Reduce flooding by implementing measures to reduce the accumulation of silts and sediments and disposal of garbage in waterways. Prohibit development and construction of residences and commercial, industrial, or institutional structures within the flood plain. Recommendations (9): A. The NWRB s efforts towards adopting an integrated water resource management framework should be pursued and encouraged. Central to this is the establishment of an independent water regulator. A Department of Water (similar to the DOE) should be created to develop the country s water system. (Medium-term action NWRB and Congress) B. Legislate a Water Reform Act that will establish the institutional and legal framework to guide cooperation by on private and government entities in developing water sources throughout the country as well as a separate government agency for water regulation. The proposed industry regulator ideally should be empowered to set water tariffs; set and monitor compliance with service levels; set policies, rules, and standards; enforce competition policy; and approve proposed investment in the sector. The proposed legislation would include the institutional framework for sustainable water resource development, require the formation of a long-term management plan, establish river basin organizations. The budget should provide funding for a realistic capacity building program. (Medium-term action NWRB and Congress) C. The Water Reform Act should lead to a master plan and integrated water policy on how to develop each water source, the capacity each source creates taking into account future demand supported by technical feasibility studies, as well as policies to attract large investors and lenders. The Water Reform Act should clarify the limits of LGU authority regarding national projects. (Immediate action. OP, NEDA, NWRB, and Congress) D. Until such legislation is enacted and implemented, the executive branch should continue its current policy of strengthening the NWRB. The agency s capacity to address water pricing or tariff issues and to establish and safeguard service standards should be supported. The present direction and mandate of the Local Water Utilities Administration (LWUA) should also be revisited. (Immediate action NWRB and OP) E. Allow the market to determine the wholesale price of water. (Immediate action NWRB) F. For PPP water projects, the GRP should revisit its policy disallowing take-or-pay or sovereign guarantees, in the light of what makes sound economic sense. Various PPP models (BOT, JV, or concession) may be used. A publicly tendered or solicited project is usually preferable. Whichever model is chosen will depend on the government s policy to attract investments and ensure contractual stability. (Immediate action DOF and NEDA) 176 DECEMBER 2010

G. While the GRP remains unable to resolve issues relating to developing the Laiban project, it must begin working on plans for other alternatives such as the water supply projects of Sierra Madre and Wawa, which can be completed at reasonable cost. (Immediate action NWRB and NEDA) H. To better maintain and improve irrigation systems, encourage private sector investment through privatization of irrigation. (Medium-term action NWRB and NIA) I. Implement measures to reduce silt and garbage in waterways and prevent flooding, including better drainage, sewage, dikes, spillways, and planting trees. (Immediate action LGUs, NDCC, DPWH, and private sector) FGD Participants, Moderator and Secretariat Members November 17, 2009 Joint Foreign Chambers of the Philippines FOCUS GROUP DISCUSSION ON POWER AND WATER DECEMBER 2010 177