City of Santa Monica Building and Safety Division

Similar documents
2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

DEPARTMENT OF PLANNING SERVICES BUILDING INSPECTION DIVISION 1555 N 17 TH AVENUE, GREELEY, CO (970)

Basic Requirements for Residential Electrical Installations

(Condensed from National Electric Code)

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

St. Clair County Electrical Code Regulations

RESIDENTIAL BUILDING REQUIREMENTS

Homeowner electrical wiring guide. Including the 2015 Canadian Electrical Code amendments

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 7/14/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

APPLICATION FOR FINISHED BASEMENT PERMIT

Permit Posting and Inspection Procedures

Replace 210.8(a)(7) with: Sinks. Where receptacles are installed within 6 feet of the outside edge of a sink. Page 1 of 5

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

ORDINANCE NO NOW, THEREFORE, BE IT ENACTED BY THE CITY COUNCIL OF THE CITY OF FAIRBANKS, ALASKA, as follows:

HOMEOWNER PERMITS AND ELECTRICAL WIRING GUIDE

RESIDENTIAL QUICK REFERENCE

CHAPTER LOCAL AMENDMENTS TO THE NATIONAL ELECTRICAL CODE 2011 EDITION

OVERHEAD SERVICES - SECONDARY

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

Click here to get back to 2011 NEC Code Updates Part 1

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

PROJECT INSTRUCTIONS For Electrical Installers

TEMPORARY METER POLE INSTALLATION

Contractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

CITY OF GRANDE PRAIRIE

Basement Finish. City of New Prague Building Inspections Department 118 Central Ave N New Prague, MN (952) Fax (952)

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

WIRING METHODS CHAPTER 38

HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT

Building Regulations; Construction 11

Specifications for Residential Overhead Electric Service Installation

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

Office use only 115 S. FRANKLIN AVE. Permit No. POLO, IL 61064

ELECTRICAL INSTALLATIONS

Table of Contents. Preface

Wyoming Division IAEI Annual Meeting/Seminar 2003 Code Panel Questions Answers in BOLD, using 2002 NEC

OVERHEAD SERVICE. Table of Contents - Section 400

Typical Finished Basement Details

RESIDENTIAL BASEMENT ALTERATIONS GUIDE

Section 7: Specifications

City of Guntersville Residential Building Permit

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

Basement Build-Out Guidelines

CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes:

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

Revised October 2017, the information contained in this bulletin supercedes the requirements of all previous bulletins.

Village of Gurnee Construction Documents Submittal Requirements

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Electrical Service Guidelines

Village of Glen Ellyn Basement Remodeling Project Guidelines

a) Line and load compartments must be separated by a stable barrier.

Pulaski County, Virginia

VIII. BUILDING DEPARTMENT SCHEDULE & CHECKLIST OF INSPECTIONS

Appendix C - International NEC Electric Code Amendments

Metering Installations for Mobile Homes or Mobile Home Parks:

COUNTY OF NEVADA BUILDING DEPARTMENT POLICIES

SERVICES CHAPTER 35. wire. For all other installations, the rating of the ungrounded conductors shall be not less than 60 amperes.

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

FRAMING INSPECTION GENERAL

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

$ Plan Review Fee when Permit Application is submitted BASEMENT REMODEL BUILDING PERMIT APPLICATION. Status Sticker OFFICIAL USE ONLY

ATTACHED/DETACHED GARAGE BUILDING PERMIT APPLICATION

Residential Basement Finish Guide

Electric Service Handbook

$ Plan Review Fee when Permit Application is submitted SHED BUILDING PERMIT APPLICATION. Application Date / /

Basic Service. This Section provides information regarding a. Introduction

RESIDENTIAL BUILDING PLAN REQUIREMENTS

DEVICES AND LUMINAIRES

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

Huntsville Utilities Underground Residential Service Requirements

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

Please check with your local inspection authority for any additional requirements before installation.

Specifications for Residential Overhead Electric Service Installation

Specifications for Residential Underground Electric Service Installation

Building Permit Application

Pacific Inspection Group Keaau-Pahaoa Rd Keaau, Hawaii Somewhere In Paradise Keaau, Hawaii 96749

1 & 2 Family Garage/Shed Permits City of Oshkosh Inspection Services Division

9) Home Inspection: As defined in Section 1-10 of the Act.

TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION

CONTENTS. B. System Design and Performance Requirements

City of Santa Monica Building and Safety Division

Temporary Wiring. Low-Voltage Electrical Safety Orders

DEVICES AND LUMINAIRES

Section 2: Underground

SECTION GROUNDING AND BONDING

Section Standards of Practice. a) The following are terms commonly used in the writing of home inspection reports.

CODE COMPLIANCE GUIDELINE GENERAL BUILDING

Transcription:

This is to be used as a general checklist; it is not inclusive of all code requirements and inspection criteria. General requirements Verify that address on permit matched Address, Description and Approvals: Verify that shown on plans. Verify that work performed matches that shown on permit Verify that valuation matches scope of work performed Inspection card to be on site with approved plans Temporary Power Pole Installation: Minimum 100 amp. Service as outlined in N.E.C. 2-20 amps GFCI protected receptacles, with additional 220-volt receptacle w/handle tie (30,40 or 50 amp breaker). All receptacles and breakers to be in proper working order and installed in accordance with manufactures specifications. Services enclosure and all subsequent equipment to be bonded and grounded in accordance with N.E.C 250-81 & 250-72 (a-e). In addition an 8 ground rod ia to be installed, with a #8 grounding electrode conductor attached with an approved/listed clamp, the grounding electrode conductor must be protected physical damage in an approved manner. Arch-fault circuit interrupters required for receptacle circuit feeding bedrooms Underground Conduit Installation: Underground Installation and Services requirements: 100amps.Minimum. Use only those materials listed for direct burial,(p.v.c., Direct burial cable or liquid tight or as specified by N.E.C.) other materials subject to listing and approval. For minimum burial depths see table 300-5 N.E.C.,(Remember this will be measured from the Revised 12/02/05 Page 1 of 6

top of circuit NOT bottom of trench) All joints and conduit bodies to comply with 300-5 & 710-4 (b) remain exposed for inspection, all conduit bodies use as pull boxes must remain open so inspector can verify wire size and conduit fill requirements have been met. As to further requirements approved/ listed joint cement or compound must be used. Where schedule 40PVC is used it must be protected from 18 below grade to 8 above per N.E.C. 300-5 (d) protection from physical damage. Note if using schedule 80 this requirement does not apply. Underground service feed are required on all new buildings or remodels exceeding 50% valuation Service Riser (mast)/main Service overhead: Mast is required to be minimum 1 ¼ ridged metal. (230-28) Supported with in 36 of the service enclosure. (346-12) Mast to extend above roof a minimum of 18 with in 4 of edge, (230-24a(except-3) no support couplings above roof line. (P.G.E.) Support mast over 24 above roof line in a approved manor. (P.G.E.) Service Conductors: Service entrance conductors shall be sized per tables 70-195 and 316 N.E.C. Neutral conductors shall be identified at either end with a white or neutral gray color.200-6b Minimum Clearance for S.E.C., shall be 8 for roofs > 4in12; 3 for <4in12. (230-24a/230-24a exception2) Minimum clearance to a window shall be not less than 3. 230-24a Clearances over walks, driveways, streets and parking lots per 230-24B N.E.C. Clearance over swimming pools shall be per 680-8 N.E.C. Meter/Main: 100 Amp minimums for all single family residences (#4 copper service conductor) dependant Revised 12/02/05 Page 2 of 6

on load served. 230-42b/Tbl. 310-16 and the ampacity tables. Minimum working clearance of 30 wide and 36 deep to be maintained at service enclosure. (110-16) Maximum height 6 6 for breakers. 380-8A (44 to 66 meter head per SCE) Number of primary disconnects not to exceed 6 at any service enclosure. (Six movements of the hand) 230-71 Receptacle locations: All walls over 2 in length and located so that no point along any wall is greater than 6 feet from any opening or obstruction or more than 12 between receptacles in bedrooms, living rooms and dens. In kitchens receptacles are required to be spaced not more than 2 feet from any opening or obstruction or more than 4 apart all counter spaces 12 or wider have at least one outlet. Note all outlets with-in 6 feet of water are required to be GFCI protected. All kitchen counter top receptacles to be GFCI protected. Peninsulas are required to have a minimum of one receptacle. Island counter tops are required to have a minimum of one receptacle. Exteriors are required to have at least one GFCI protected receptacle at the front and rear of all dwelling units. Bathrooms are required to have one GFCI protected receptacle located adjacent to each lavatory; additionally these receptacles are required to be on their own 20 amp. Breaker. Note see Sec. 210-52 N.E.C. for other specific requirements. Lights,(where required) switching, clearance and support: Lighting required in: o All Bathrooms o Kitchens o Hallways o Stairs o At every entrance to: garages, dwelling units and storage areas where (electrical service is available). o Attics, basements and equipment areas. (Hvac, A/C, F.A.U. and water heaters located other than in attics, basements and garages). Additionally a service receptacle is required within 25 of all equipment for servicing. Revised 12/02/05 Page 3 of 6

At least one switch controlled outlet in every habitable room, See N.E.C. 210-70 (a) for specific locations. Clearance to combustibles and adjacent boxes: Recessed lighting (non-i.c. rated) 3 insulation, and ½ to combustibles, per 410-66 (b) Recessed lighting with (IC.,I.P. rated) 0 clearance to Insulation and combustibles, or per manufactures specifications. Ceiling fans must be installed in an approved manor not be supported by standard electrical boxes. See 370-27 for more details. All fixtures assemblies to be installed in an approved manor/per manufactures installation instructions. Title 24 California Energies Code requires primary lighting in kitchens and bathrooms to be florescent or other approved type. (Energy efficient) these fixtures to be controlled by first switch. All boxes fixtures and hardware must be listed by recognized listing agency o 110 N.E.C. Service cable and conduit specifications: Specifics for Romex: Protect Romex from physical damage to 8 above floor, (where exposed). Maintain minimum 1¼ clearance from stud face, where bored framing members have been bore.1 ¼ to face provide nailing protection. 336-6(b) Bends in Romex must be a minimum of 5 diameters. 336-16 Protection of Romex is required with in 6 of attic accesses. 333-12 (a) Sheathing of Romex to penetrate box minimum ¼ but not more than 1 o 370-17 Romex must be stapled to stud with in 8 of single gang boxes and 12 of multi-gang boxes; support shall be at intervals not exceeding 54 for horizontal runs parallel to framing members. Revised 12/02/05 Page 4 of 6

Sub-panels and boxes: Working clearance and breaker heights at sub-panels are the same as service enclosures. 110-16a/380-8 Sub-panels shall not be located in close closets or bathrooms. 240-24 (d) (e) Grounding at sub-panels to be isolated from neutral buss. 250-23a/250-6b Installation of all electrical equipment and hardware to be per manufactures installation instructions. Boxes must remain accessible. 370-21 Wire fill of boxes to be per table 370-16b, minimum services loop in box to be 6. 370-14 All metal boxes must be grounded (aluminum flex approved for ground up to 100 residential use only/commercial is limited to 6 ) Boxes installed in non-combustible walls may set back ¼ maximum, flush in combustible wall surfaces. 370-20 Grounding/bonding Requirements: UFER grounding: UFER ground shall be either #4 bare copper continuous in length suspended from the bottom reinforcing bar inside the footing and within 2 of soil, it shall be a 20 continuous length at the suspended portion or #4 Rebar shall be a 20 continuous length at the suspended portion and extend above footing or stem wall. The grounding conductor shall be attached with an approved clamp and remain accessible. ( Sized per table 250-94) Ground rods of copper or copper clad aluminum shall be 8 in length and completely driven. 250-83 (c3) For other made electrodes see 250-83 Grounding electrode conductors sized #6 or smaller shall be protected from physical damage in an approved manor. 250-94a Revised 12/02/05 Page 5 of 6

Bonding: All electric service require cold water bond within 5 ft. of entering the building Gas and water piping shall be bonded All pool heaters; pumps and equipment shall be bonded. Spas, whirlpool baths and hydro-massage equipment shall be bonded; this equipment also requires GFCI protection. Revised 12/02/05 Page 6 of 6