Checklist for the Auditor

Similar documents
Checklist for the Auditor

Checklist for the Auditor

Self-Evaluation/Audit Checklist for Food Supplement Manufacturers

SGF INTERNATIONAL E.V. IMPLEMENTING PROVISIONS VOLUNTARY CONTROL SYSTEM (VCS) STATUS: 2007 SURE-GLOBAL-FAIR FOR THE

HACCP audit checklist

SOUTH BALTIC PROJECT CHECKLIST. Protocol no: Inspection

QM Food Safety Quality Management System

Food Safety Quality Management System

SUPPLIER QUALITY SYSTEM SURVEY

Dr. Ramakrishnan Nara Perry Johnson Registrars (PJR, USA)

GFSI BENCHMARKING REQUIREMENTS GFSI Guidance Document Version 7.1 PART III - D PRE-PROCESSING HANDLING OF PLANT PRODUCTS

General food hygiene requirements and HACCP

Food Safety Quality Management System

FLEXFAB SUPPLIER ASSESSMENT QUESTIONNAIRE COMPANY DATA

Hazard Analysis and Critical Control Point The Almond Board of California. Overview. Definitions

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

Changes in the EXCiPACT 2017 Edition Requirements from the 2012 Edition

N/A not used at site level. Refer External Document Register current list of reference available. Food (forms and registration) Regulations 2015

THE BASIC PRINCIPLES OF HACCP

The IFSQN FSSC Implementation Package

INCOMING INSPECTION AND PRESERVATION. Co-X/AFD/SOP02

SUPPLIER QUALITY SYSTEM SURVEY

PART III - EIII PROCESSING OF ANIMAL AND PLANT PERISHABLE PRODUCTS (MIXED PRODUCTS)

PART III - EII PROCESSING OF PLANT PERISHABLE PRODUCTS. GFSI BENCHMARKING REQUIREMENTS GFSI Guidance Document Version 7.1

The World Bank. Aide Memoire for use during GMP inspections

Registered Starting Material Auditing Guide

The best just got better!

FSMA. An Industry Perspective Patty Harvey MCAFDO February 24, 2016

SQF Code Food Safety Management System Implementation Workbook

Implementation & Documentation Requirements for ISO 22716:2007 Certification

Trotz sorgfältiger inhaltlicher Prüfung übernehmen wir keine Haftung für die Richtigkeit und Aktualität für Unterlagen von Dritten.

GFSI BENCHMARKING REQUIREMENTS GFSI Guidance Document Version 7.1 PART III - EIII PROCESSING OF ANIMAL AND PLANT PERISHABLE PRODUCTS (MIXED PRODUCTS)

PART III - L PRODUCTION OF (BIO) CHEMICALS

PART III - EIV PROCESSING OF AMBIENT STABLE PRODUCTS

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

PRP 1 Prerequisite Programmes

Hygiene and Safety legislation in the EU + Fruit juice Chain

(More than 130 document files) GMP+ B3 Editable Document kit

Questionnaire Layout:

PART III - L PRODUCTION OF (BIO) CHEMICALS

SQF Food Safety Code for Manufacture of Food Packaging

Self Assessment Checklist

European Code of Practice For Feed Additive and Premixture Operators

PART III - EI PROCESSING OF ANIMAL PERISHABLE PRODUCTS

Master Air Parts, Inc Skyway Drive, Suite 303 Santa Maria, CA (805) Phone (805) Fax

GFSI BENCHMARKING REQUIREMENTS GFSI GUIDANCE DOCUMENT VERSION 7.2 PART III - EI PROCESSING OF ANIMAL PERISHABLE PRODUCTS

Our comprehensive SQF Storage and Distribution Food Safety Management System package contains everything you will need to achieve SQF Certification.

GMP On Site Series. GMP Essentials

UNI EN ISO 22000:2005 STANDARD CHECK-LIST

AIB International GMP Inspection Results Report

Vendor Qualification Survey

GMP & Quality Assurance. Mayur Sushir Dept of Microbiology MJC

PART III - EI PROCESSING OF ANIMAL PERISHABLE PRODUCTS

GFSI BENCHMARKING REQUIREMENTS GFSI Guidance Document Version 7.2 PART III - EI PROCESSING OF ANIMAL PERISHABLE PRODUCTS

GFSI BENCHMARKING REQUIREMENTS GFSI Guidance Document Version 7.1 PART III - EI PROCESSING OF ANIMAL PERISHABLE PRODUCTS

Guidance Document. Meeting Requirements as a Registered Food Importer. A guidance document issued by the Ministry for Primary Industries

BRC Storage and Distribution Quality and Safety Management System

Supersedes Division Name Revision No. 0 Export Division Page No. 1 of 9

BRC Food Safety and Quality Management System

Good practices in quality control in pharmaceutical industry - Overview of regulatory guidelines

DRAFT: FSSC FSMA Comparison

GFSI BENCHMARKING REQUIREMENTS GFSI GUIDANCE DOCUMENT VERSION 7.2 PART III - M PRODUCTION OF FOOD PACKAGING

Safeguarding public health. Deficiency Database Figures April June 2009

A Step by Step Guide for Preparing a Preventive Control Plan

OPW Engineered Systems

JFS-A/B/C Standards <Manufacturing> [Interpretations]

SQF Storage & Distribution Food Safety Management System

PART III - EIII PROCESSING OF ANIMAL AND PLANT PERISHABLE PRODUCTS (MIXED PRODUCTS)

Quality and Safety System for Specialty Feed Ingredients PROCESS DOCUMENT FORMULATION PROCESS VERSION

Appendix II FSEP Prerequisite Program Checklist

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

COMPLIANCE DATES. Preventive Controls. CGMP Compliance Date. Business Size. Business other than Small and Very Small employees

Subpart B Organization and Personnel, 21 CFR Responsibilities of the quality control unit.

FSMA Food Safety Seminar Japan External Trade Organization

HACCP Plan Grower Farm

PrimusLabs.com Facility Audit Paperwork Checklist

18.H Questionnaire for preparing GMP-inspections

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

c. HACCP SYSTEM INTERNAL AUDIT

AIB International GMP Inspection Results Report

SAMPLE. COMPANY NAME MANAGEMENT COMMITMENT Doc. #: P-001 Issued: Version #: 01 SQF Element #: & Prepared By: Page 2 of 7

(More than 135 document files) GMP+ B1 Editable Document kit

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

SUPPLIER FOOD SAFETY ASSURANCE

SQF Food Safety Code for Manufacturing

COMPARING THE STANDARDS

Supplier Excellence General Requirements

SUPPLIER SURVEY FORM Instructions

Announcement of the Ministry of Agriculture of People's Republic of. China. No. 2570

To the General Manager and the contact person of the Quality Management

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES

Quality and Safety System for Specialty Feed Ingredients PROCESS DOCUMENT CHEMICAL PROCESS VERSION

QM 001 Food Safety Quality Management System

Self Assessment Checklist

Industry Standard. Meat Retail Ready Packing Operations

SITE MASTER FILE For MHRA

PART III - M PRODUCTION OF FOOD PACKAGING

Supplier and External Manufacturer Requirements Manual

INTERNAL AUDITS, AUDIT REPORT

PART III - BI FARMING OF PLANTS. GFSI BENCHMARKING REQUIREMENTS GFSI Guidance Document Version 7.2

Transcription:

Page: 1 / 17 Checklist for the Auditor Content done page Overview / Audit Elements 2-3 General Information 4-6 ACS (Audit Checklist STANDARD) P 3 7-12 Summary Corrective Actions 13-14 Possible Comments by the Company 1 CoC Code of Conduct Checklist 16-17 Final Approval (access for SGF only) SGF Code ACS Further enclosures For the correctness of information Name of the SGF/IRMA Auditor Name of the SGF/IRMA Representative Signature SGF/IRMA Auditor Stamp + Signature SGF/IRMA Representative General information have to be filled in once into red-framed fields information is automatically filled in on every following page

Page: 2 / 17 Company: Country Code: SGF Factory ID: Date of audit: 1 Company Information 1.3 Certification 1.6 Social / Ethical standards 1.1 Product Range 1.4 1.2 Number of Employees 1. Part 1 / 3 Part 2 / 3 2 Information about the Quality Management 3.13 Equipment & Maintenance 4.10 2.1 Quality Management System 3.14 Calibration, Control of measurement and Monitoring Devices 2.2 Quality Manual 3.1 Waste / Waste Disposal.1 2.3 Quality management Representative 3.16 Sanitary Facilities.2 2.4 Documentation of Quality, Hygiene, relevant 3.17 Personnel Hygiene 6 Processes & Work Flows 3.18 Pest Control 6.1 2. HACCP 4 Cleaning Schedule, Time & Temperature, 7 2.6 Training Programs Contamination Risk, Product Analysis 7.1 2.7 Audits 4.1 Cleaning Schedules 2.8 Purchasing 4.2 Process / Temperature / Time Control 3 Good Manufacturing Practices 4.3 Control of Product Contamination 3.1 Premises, Grounds, Location 4.4 Control of Product Contamination: Fruit Acceptance 3.2 Layout / Product Flow 4. 3.3 Production Facilities: Building Production Area 4.6 3.4 Production Facilities: Walls 4.7 3. Production Facilities: Floors 4.8 3.6 Production Facilities: Ceilings 4.9 3.7 3.8 3.9 3.10 Production Facilities: Drainage Production Facilities: Windows Production Facilities: Doors Production Facilities: Lighting 3.11 3.12 Production Facilities: Ventilation Production Facilities: Water Supply Overview SGF/IRMA Audit Checklist Standard on basis of the SGF-GMP Self Assessment Questionnaire (for increased food safety, in particular in the fruit juice industry) General information for Parts 1, 2 and 3 Technical Information Company brochure + website Control of Product Contamination:Fruit Washing Control of Product Contamination: Fruit Sorting Control of Product Contamination: Fruit Extraction Control of Product Contamination: Pipelines/Hoses Control of Product Contamination: Contamination Maintenance Part 3 / 3 Product Analysis Product Packing, Storage & Transportation Product Packing Storage & Transportation General Traceability, Allergen Risk General Traceability Control of Nonconforming Products Product Recall

Page: 3 / 17 Audit Elements This checklist complements the regular SGF/IRMA plant inspections which include: Hygiene and GMP Sampling and Analytical examination of samples taken - Based on authenticity criteria of the Code of Practice for Fruit Juices and Nectars - Safety parameters like heavy metals, pesticide residues and mycotoxins Traceability checks Labelling control of semi finished goods based on the Code of Labelling (CoL) Control of Social and Economic Sustainability based on the Code of Conduct (CoC)

Page: 4 / 17 General Information 1.1 1.1.1 Fruit Product Range Fruit / Product range Major fruit Minor fruit 1.2 Number of employees 1.2.1 Number of Employees:

Page: / 17 General Information 1.3 Certification 1.3.1 Certificates available: Certificate Certificate number expiration date

Page: 6 / 17 General Information 1.4 Technical Information YES NO 1.4.1 DOC o 1.4.2 Flow chart existing - made available to customers. Please provide copy. If yes, is it made available to customers Remarks 1.4.3 1.4.4 Extraction systems Evaporation systems 1.4. Tank capacities (total volume) Capacity: 1.4.6 1.4.7 1.4.8 1.4.9 Ambient temperature tanks Sterile tanks Cooling tanks Deep frozen storage if yes capacity <40% or > 40% of total tank capacity if yes capacity <40% or > 40% of total tank capacity if yes capacity <40% or > 40% of total tank capacity if yes capacity <40% or > 40% of total tank capacity 1. Company brochure + website YES NO 1..1 Existing - please provide details 1.6 Social/ethical standards YES NO 1.6.1 Is there a social accountability statement and policy (apart from SGF- CoC) in place? Remarks Remarks

Page: 7 / 17 Company: Country Code: SGF Factory ID: Date of audit: Questionnaire Result Maximum achievable points Points % Remarks of the auditor Points 4 Points 2 Points 1 Point 0 Points na Remarks: The requirements are completely fulfilled The requirements are mostly fulfilled only small non-critical deviations from standard The requirements are mostly not fulfilled there are deviations from standard The requirements are fulfilled only in very small instances there are significant failures and major deviations from standard The requirements are not fulfilled at all in case question cannot be valued Not allowed to give 3 points! 2 Information about the Quality Management 20 0 0,00% Remarks 2.. HACCP 20 0 0,00% 2..2! Has the HACCP hazard analysis taken into consideration microbiological, chemical & physical hazards? 2..3! Have critical limits been set for all the Critical Control Points (CCPs) 2..4! Are the CCPs registered continuously?

Page: 8 / 17 Company: Country Code: SGF Factory ID: Date of audit: Questionnaire Result Maximum achievable points Points % Remarks of the auditor 2..! Are there established and suitable measures available to handle a CCP that is out of control? 3. Good Manufacturing Practices 20 0 0,00% 3.13 Equipment & Maintenance 0 0,00% 3.13.1! Cleanliness of existing equipment 3.14 3.14.1! Calibration, Control of measurement and Monitoring Devices Does the plant identify the measurements critical to food safety and the measuring and monitoring devices required to assure product safety? 10 0 0,00% 3.14.2! Are all the measuring and manufacturing devices that have a significant role in product safety and quality calibrated (records, calibration certificates/stamps)? 3.18 Pest Control 0 0,00% 3.18.1! Is there a pest control system implemented?

Page: 9 / 17 Company: Country Code: SGF Factory ID: Date of audit: Questionnaire Result Maximum achievable points Points % Remarks of the auditor 4 Cleaning Schedule, Time & Temperature, 30 0 0,00% Contamination Risk, Product Analysis 4.1 Cleaning Schedules 0 0,00% 4.1.4! Do you have cleaning schedules, procedures and records for the EQUIPMENT? 4.2 Process / Temperature/ Time Control 0 0,00% 4.2.1! Do you have established time and temperature programmes that have been shown to produce a microbiologically stable product? With regards to: e.g. ph of product/brix/levels and types of microorganisms in your final products. Please check relevant documentation. 4.10 Product Analysis 20 0 0,00% 4.10.1 Are the analyses relevant for food safety performed in a laboratory? 4.10.2 How are the testing procedures validated with the external lab? Please check a recent comparative report. 4.10.3 Is the final product release system working effectively?

Page: 10 / 17 Company: Country Code: SGF Factory ID: Date of audit: Questionnaire Result Maximum achievable points Points % Remarks of the auditor 4.10.4 Does the factory have a system for the management of product complaints? Product Packing, Storage & Transportation 40 0 0,00%.1 Product Packing 1 0 0,00%.1.1 Is the filling area of non-aseptic goods segregated from other processing areas?.1.2 Does the filling area contain all the necessary facilities to ensure the hygiene standards, appropriate to a filling area, can be provided?.1.3 How are packaging materials inspected, tested and stored to ensure they remain undamaged, clean and uncontaminated?.1.4 DOC o After filling are all containers individually labelled in accordance with appropriate industry and legal requirements? Please provide copy of typical label. YES NO

Page: 11 / 17 Company: Country Code: SGF Factory ID: Date of audit: Questionnaire Result Maximum achievable points Points % Remarks of the auditor.2 Storage & Transportation 2 0 0,00%.2.1 Is it ensured that only "foodstuffs only" vehicles are used for bulk transportation?.2.2 Is it ensured that the loading temperature is in accordance with the product specification?.2.3 Are temperatures of product deliveries maintained & monitored during transportation correctly?.2.4 Are all checks carried out on delivery vehicles prior to loading?.2. Are copies of cleaning certificates accepted?

Page: 12 / 17 Company: Country Code: SGF Factory ID: Date of audit: Questionnaire Result Maximum achievable points Points % Remarks of the auditor 6 General Traceability, Allergen Risk 1 0 0,00% 6.1 General Traceability 1 0 0,00% 6.1.1 Is there a system to check and verify traceability from the sources of raw materials and packaging through the production process to the shipment of the finished product? 6.1.2 Is the traceability ensured when rework of the product is performed? 6.1.3 Is the traceability ensured when part of the product is produced at another location? 6.1.4 How long are the traceability records maintained? 7 Control of Nonconforming Products 0 0,00% 7.1 Product Recall 0 0,00% 7.1.1 Does the plant have a procedure for product recall?

Page: 13 / 17 Summary of Corrective Actions (different remarks can be combined, if suitable) Question No. The following corrective actions have to be carried out Deadline for Follow up Date of Follow up Remark

Page: 14 / 17 Summary of Corrective Actions (different remarks can be combined, if suitable) Question No. The following corrective actions have to be carried out Deadline for Follow up Date of Follow up Remark

Page: 1 / 17 Possible Comments by the Company Name / Signature of SGF contact person in the company Name / Signature of SGF/IRMA auditor

Page: 16 / 17 CoC / Code of Conduct Checklist Chapter Principle Control points Status/Remarks I. Social and Economic Sustainability - Child labour Child labour shall not be permitted. A Child is I.1.1. Is there any child labour or under aged defined as a person aged less than 14 years person observed during the audit in the even if the local minimum is lower. (ILO plant? YES/NO Convention 138 and its accompanying If yes, please comment: Recommmendation 146 on child labour as well as ILO Convention 182 and ist accompanying Convention 190 on the worst form of child labour. YES NO Chapter Principle Control points Status/Remarks II. Environmental Sustainability - Waste water treatment Suppliers shall identify any negative environmental impacts of their activities, such as water pollution. The use of water as well as release of wastewater shall be properly managed in order to preserve surrounding water sources. II.1.1. Is there any waste water treatment in the plant? YES / NO If yes, please comment: YES NO II.1.2. What was improved/ renewed in the last years?

Page: 17 / 17 Chapter Principle Control points Status/Remarks III. Fruit Risk Assessment Programme for Pesticides (FRAPP) This question refers to the documentation III.1.1. Did your company deliver FRAPP about applied pesticides sent to SGF since the documentation to SGF? If not, explain why. last audit. The documentation can concern the If not, explain why: last harvest season or the current one. For example, during the audit 2017, processing IRMA members should prove that they have provided FRAPP documentation for the season 2016 or for 2017. As companies sometimes send some documentation which is not adapted to the FRAPP objectives (e.g. pesticide recommendations, pesticides allowed in the region/country or analyse results), the company should show the last FRAPP Confirmation to the auditor. This document shows that SGF has already approved the documentation sent. If the company did not deliver FRAPP documentation since the last audit, they should shortly explain why, in order that SGF can try to help the company in the future. YES NO