Green Station CCR Surface Impoundment

Similar documents
Inflow Design Flood Control System Plan

Run-on and Run-off Control System Plan

Inflow Design Flood Control System Plan

APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan

Environmental Design Group

Run-on and Run-off Control System Plan

Initial Inflow Design Flood Control System Plan

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F:

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR:

UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS

Proposed Retail Development

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

MOODY FLATS QUARRY STORMWATER, EROSION CONTROL, AND DRAINAGE PLAN SHASTA COUNTY, CALIFORNIA. Prepared by:

Initial Inflow Design Flood Control System Plan Holding Pond

526 & 528 Boston Post Road Redevelopment Sudbury, MA

DRAINAGE DESIGN REPORT

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

Attachment 6 Hydrologic and Hydraulic Analysis

D. B. Wilson Station CCR Landfill

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

CCR Certification: Initial Inflow Design Flood Control System Plan for the

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

Inflow Design Flood Control System Plan

Background. October 7, American Electric Power 1 Riverside Plaza, 22nd Floor Columbus, Ohio 43215

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

STORMWATER MANAGEMENT REPORT

RETENTION BASIN EXAMPLE

Mixed-Use Development Site Plan. for. 131 Eliot Street Milton, Massachusetts

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

Warner Robins Stormwater Local Design Manual

STORMWATER MANAGEMENT PLAN

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

Stormwater Local Design Manual For Houston County, Georgia

Application for a Dam Permit Ash Basin No. 1

MODEL Stormwater Local Design Manual. City of Centerville

Run-on and Run-off Control System Plan

III. INVENTORY OF EXISTING FACILITIES

SIZING WATER SERVICE LINES AND METERS

Coal Combustion Residuals Inflow Design Flood Control System Plan

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

Stormwater Analysis Report

APPENDIX III Hydrologic and Hydraulic Evaluations

Submittal Requirements. Post Construction Verification Document Plan Requirements

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

Introduction to Storm Sewer Design

Extended Detention Basin Design

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR (c)(1)(i)-(xii)

Engineering Report. 1 Garfield Circle

ENVIRONMENTAL ENGINEERING LAND SURVEYING

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

SC-01 Surface Outlet and Baffle Sediment Basin

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

North Omaha Ash Landfill Run-on and Run-off Control System Plan

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Drainage Analysis. Appendix E

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

NC2 Ash Disposal Area Run-on and Run-off Control System Plan

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

Water Resources Management Plan

D.E. KARN GENERATING FACILITY BOTTOM ASH POND HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT. Assessment Report. Pursuant to 40 CFR 257.

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226

Design Example Residential Subdivision

Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia

Chapter 10. Conduit Outlet Structures Introduction General Layout Information

Final Drainage Report

Jacobi, Toombs, and Lanz, Inc.

Coal Combustion Residuals Unit Structural Stability Assessment

J.H. CAMPBELL GENERATING FACILITY BOTTOM ASH POND 3 HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT. Assessment Report. Pursuant to 40 CFR 257.

STORMWATER MANAGEMENT


CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report

STORM DRAINAGE DESIGN MANUAL

INSPECTION REPORT. Third Annual RCRA CCR Unit Inspection Report January 2018 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT

2018 Annual Dam and Dike Inspection Report

McElroy s Run Impoundment Structural Stability Assessment Report

DRAINAGE PLAN AND REPORT OLD DENVER ROAD

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

Transcription:

Green Station CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control System Plan October, Prepared By: Project ID: B

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control System Plan CCR Surface Impoundment Information Name: Operator: Green Station CCR Surface Impoundment Sebree Generating Station Address: Highway Robards, Kentucky CCR Unit Identification Number: Kentucky State Dam Inventory System ID No. Qualified Professional Engineer Name: David A. Lamb Company: Associated Engineers, Inc. Kentucky P.E. Number: Regulatory Applicability As part of the. Hydrologic and hydraulic capacity requirements for CCR surface impoundments, an owner or operator of an existing or new CCR surface impoundment or any lateral expansion of a CCR surface impoundment must design, construct, operate, and maintain an inflow design flood control system as specified below. The owner or operator of the CCR unit must prepare the initial inflow design flood control system plan no later than October,. The hazard potential classification definitions (from: VI. Development of the Final Rule - Technical Requirements) that must be considered follow: High hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation will probably cause loss of human life Significant hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation results in no probable loss of human life, but can cause economic loss, environmental damage, disruption of lifeline facilities, or impact other concerns. Low hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation results in no probable loss of life and low economic and/or environmental losses. Losses are principally limited to the surface impoundment s owner s property.

) The inflow design flood control system must adequately manage flow into the CCR unit during and following the peak discharge of the inflow design flood specified in item ) of this section. ) The inflow design flood control system must adequately manage flow from the CCR unit to collect and control the peak discharge resulting from the inflow design flood specified item ) of this section. ) The inflow design flood is: (i) For a high hazard potential CCR surface impoundment the inflow design flood is the probable maximum flood; (ii) For a significant hazard potential CCR surface impoundment the inflow design flood is the,-year flood; (iii) For a low hazard potential CCR surface impoundment the inflow design flood is the -year flood; (iv) For an incised CCR surface impoundment the inflow design flood is the -year flood. Discharge from the CCR unit must be handled in accordance with the surface water requirements under.- (Part - Criteria for Classification of Solid Waste Disposal Facilities and Practices Subpart A - Classification of Solid Waste Disposal Facilities and Practices Section.- - Surface water). Inflow design flood control system Plan: ) Content of the plan. The owner or operator must prepare an initial inflow design flood control system plan that must document how the inflow design flood control system has been designed and constructed to meet the requirements of this section. Each plan must be supported by appropriate engineering calculations. ) Amendment of the plan. The owner or operator of the CCR unit may amend the written inflow design flood control system plan at any time provided the revised plan is placed in the facility s operating record. The owner or operator must amend the written inflow design flood control system plan whenever there is a change in conditions that would substantially affect the written plan in effect. Description of Impoundment An aerial photo of the CCR unit is provided as Attachment A and an excerpt from U.S. Geological Survey (USGS). minute Robards and Delaware topographic quadrangle maps showing the location of the CCR unit is provided as Attachment B.

The CCR unit has been in place for plus years and is used for the placement of coal combustion residual material; currently slurried bottom ash. The immediate watershed that drains to the CCR unit, and in which the CCR unit is considered to be located, is unnamed and. acres in size. The unnamed watershed discharges from the CCR impoundment outflow structure and is routed to the Green River. The CCR unit is a combined incised/earthen embankment structure. Embankments form the west, south and east sides of the impoundment and the north side is incised. The Green River is located approximately feet east of the structure. Due to surface relief, only the toe area of the south dike is potentially subject to flooding. The predominant features were small stream valleys draining eastward to the Green River. Most of the central portion of the south dike was constructed on a subdued ridge. The toe of the outboard slope intersected a lower drainage area. Underlying preconstruction soils consisted of Loring- Grenada, Loring-Zanesville-Wellston (Henderson County) and Loring-Wellston-Zanesville (Webster County) soil associations which are generally characterized as well drained to moderately well drained soils on nearly level to sloping uplands. The west dike is generally less than five feet in height and the south dike reaches a maximum height of. feet. The east dike reaches a maximum height of approximately eight feet and is buttressed with a secondary parallel embankment that serves as a -foot wide roadway. The Burns and Roe, Inc. Engineering and Consultants June, site grading plans show the original construction layout and ground contours for the impoundment site. Bottom ash has been placed above the normal pool along the inboard side, essentially creating reclaimed land Depth of impounded water and CCR is feet and feet (at respective locations of maximum impounded water and CCR depths). Elevation of impounded water and CCR is feet and feet, respectively, above mean sea level. These approximate depths and respective elevations are based on the most recent (December ) flight derived topographic contours and bathymetric survey data. The remaining storage capacity is approximately, cubic yards (if CCR can be placed to the elevation of the current water surface). This volume was calculated based on the maximum allowable storage volume and the current volume of CCR stored in the facility based on the most recent bathymetric survey. The approximate volume of impounded water and CCR is, cubic yards (approximate water volume is, cubic yards and approximate CCR volume is, cubic yards). This volume was calculated based on the maximum storage capacity, the current amount of CCR stored in the facility based on the most recent bathymetric survey, and the best available as-built data for the structure construction prior to placement of CCR. The impoundment discharge consists of two corrugated steel pipes, each inches in diameter. The pipe intakes are through a concrete common headwall collection structure with a variable height steel debris deflector on each pipe intake.

Inflow Design Flood Control System Plan The initial inflow design flood control system plan documents that the inflow design flood control system has been designed and constructed to meet the storm generated discharge requirements for a Significant hazard potential CCR surface impoundment which means a diked surface impoundment where failure or mis-operation results in no probable loss of human life, but can cause economic loss, environmental damage, disruption of lifeline facilities, or impact other concerns. The inflow design flood for a Significant hazard potential CCR surface impoundment is the,-year flood. Analysis via HydroCAD Stormwater Modeling software of the of the Green CCR impoundment site drainage demonstrates that the design flood control system adequately manages inflow and discharge out of the CCR unit during and following the specified,- year/-hour storm event. HydroCAD Stormwater Modeling by HydroCAD Software Solutions, LLC is a widely recognized comprehensive hydrology and hydraulics software for use by Civil Engineers, useful for runoff and sediment control design calculations. The HydroCAD modeling results for the Green CCR impoundment are attached to this report. The operating facility has verified that discharge from the Green CCR impoundment is handled in accordance with the surface water requirements under.- (Part - Criteria for Classification of Solid Waste Disposal Facilities and Practices Subpart A - Classification of Solid Waste Disposal Facilities and Practices Section.- - Surface water). Sources of Information Geotechnical and other information provided by Associated Engineers, Inc. Engineering design drawings and other information provided by Big Rivers Electric Corporation United States Geological Survey U.S. Geological Survey (USGS). minute Robards and Delaware topographic quadrangle maps

Attachment A. Aerial Photo of the Green CCR Surface Impoundment

Attachment B. Topographic Map showing the Green CCR Surface Impoundment

S P S S SWES SWS Solid Waste Emergency Storage S P Waste Water Pond GBAP SWS GBAP SWS S GBAP SWS WWP SWS P S S L Green Bottom Ash Pond GBAP SWS WWP SWS S Pumped Flows WWP SWS S GBAP SWS S GBAP SWS S GBAP SWS Subcat Reach Pond Link Routing Diagram for Green Impoundment NO REACHES, Printed // HydroCAD.- s/n HydroCAD Software Solutions LLC

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Area (acres) CN Description (subcatchment-numbers). (S). (S, S, S, S, S). (S). (S). (S). (S). (S). TOTAL AREA Area Listing (all nodes)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Time span=.-. hrs, dt=. hrs, points Runoff by SCS TR- method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment S: SWES SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: WWP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: WWP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: WWP SWS Subcatchment S: GBAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Tc=. min CN= Runoff=. cfs. af Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=,' Tc=. min CN= Runoff=. cfs. af Subcatchment S: GBAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: GBAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: GBAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: GBAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: GBAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: GBAP SWS Pond P: Green Bottom Ash Pond Pond P: Waste Water Pond Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Tc=. min CN= Runoff=. cfs. af Peak Elev=.' Storage=. af Inflow=. cfs. af Outflow=. cfs. af Peak Elev=.' Storage=. af Inflow=. cfs. af Outflow=. cfs. af Pond P: Solid Waste Emergency Storage Link L: Pumped Flows Peak Elev=.' Storage=. af Inflow=. cfs. af Outflow=. cfs. af Manual Hydrograph Inflow=. cfs. af Primary=. cfs. af Total Runoff Area =. ac Runoff Volume =. af Average Runoff Depth =.".% Pervious =. ac.% Impervious =. ac

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: SWES SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Sheet Flow, Grass: Short n=. P=.". Total, Increased to minimum Tc =. min Subcatchment S: SWES SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: WWP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Unpaved Kv=. fps Subcatchment S: WWP SWS Hydrograph Flow (cfs). cfs Time (hours) Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: WWP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Grassed Waterway Kv=. fps Subcatchment S: WWP SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: WWP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs).. Lake or Reservoir, Mean Depth=.'. Total, Increased to minimum Tc =. min Subcatchment S: WWP SWS Hydrograph Flow (cfs). cfs Time (hours) Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Tc=. min CN= Runoff

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: GBAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Unpaved Kv=. fps... Shallow Concentrated Flow, Unpaved Kv=. fps., Total Subcatchment S: GBAP SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=,' Tc=. min CN= Runoff Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: GBAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Unpaved Kv=. fps. Total, Increased to minimum Tc =. min Subcatchment S: GBAP SWS Hydrograph Flow (cfs). cfs Time (hours) Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: GBAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Unpaved Kv=. fps. Total, Increased to minimum Tc =. min Subcatchment S: GBAP SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: GBAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Unpaved Kv=. fps Subcatchment S: GBAP SWS Hydrograph Flow (cfs). cfs Time (hours) Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: GBAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Grassed Waterway Kv=. fps Subcatchment S: GBAP SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: GBAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Unpaved Kv=. fps. Total, Increased to minimum Tc =. min Subcatchment S: GBAP SWS Hydrograph Flow (cfs). cfs Time (hours) Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: GBAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs).. Lake or Reservoir, Mean Depth=.'. Total, Increased to minimum Tc =. min Subcatchment S: GBAP SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Tc=. min CN= Runoff Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Pond P: Green Bottom Ash Pond [] Warning: Exceeded Pond P by.' @. hrs Inflow Area =. ac,.% Impervious, Inflow Depth >." Inflow =. cfs @. hrs, Volume=. af Outflow =. cfs @. hrs, Volume=. af, Atten= %, Lag=. min Primary =. cfs @. hrs, Volume=. af Routing by Stor-Ind method, Time Span=.-. hrs, dt=. hrs Peak Elev=.' @. hrs Surf.Area=. ac Storage=. af Plug-Flow detention time=. min calculated for. af (% of inflow) Center-of-Mass det. time=. min (,. -. ) Volume Invert Avail.Storage Storage Description #.'. af Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)................ Device Routing Invert Outlet Devices # Primary.'." Round Culvert L=.' CMP, mitered to conform to fill, Ke=. Inlet / Outlet Invert=.' /.' S=. '/' Cc=. n=., Flow Area=. sf # Device.'." Round Culvert L=.' CMP, square edge headwall, Ke=. Inlet / Outlet Invert=.' /.' S=. '/' Cc=. n=., Flow Area=. sf # Primary.'." Round Culvert L=.' CMP, mitered to conform to fill, Ke=. Inlet / Outlet Invert=.' /.' S=. '/' Cc=. n=., Flow Area=. sf # Device.'." Round Culvert L=.' CMP, square edge headwall, Ke=. Inlet / Outlet Invert=.' /.' S=. '/' Cc=. n=., Flow Area=. sf Primary OutFlow Max=. cfs @. hrs HW=.' (Free Discharge) =Culvert (Passes. cfs of. cfs potential flow) =Culvert (Barrel Controls. cfs @. fps) =Culvert (Passes. cfs of. cfs potential flow) =Culvert (Barrel Controls. cfs @. fps)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Pond P: Green Bottom Ash Pond Hydrograph. cfs Inflow Area=. ac Peak Elev=.' Storage=. af Inflow Primary Flow (cfs). cfs Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Pond P: Waste Water Pond Inflow Area =. ac,.% Impervious, Inflow Depth >." Inflow =. cfs @. hrs, Volume=. af Outflow =. cfs @. hrs, Volume=. af, Atten= %, Lag=. min Primary =. cfs @. hrs, Volume=. af Routing by Stor-Ind method, Time Span=.-. hrs, dt=. hrs Peak Elev=.' @. hrs Surf.Area=. ac Storage=. af Plug-Flow detention time=. min calculated for. af (% of inflow) Center-of-Mass det. time=. min (,. -. ) Volume Invert Avail.Storage Storage Description #.'. af Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)................ Device Routing Invert Outlet Devices # Primary.'." Round Culvert L=.' CMP, projecting, no headwall, Ke=. Inlet / Outlet Invert=.' /.' S=. '/' Cc=. n=., Flow Area=. sf # Primary.'." Round Culvert L=.' CMP, projecting, no headwall, Ke=. Inlet / Outlet Invert=.' /.' S=. '/' Cc=. n=., Flow Area=. sf Primary OutFlow Max=. cfs @. hrs HW=.' (Free Discharge) =Culvert (Barrel Controls. cfs @. fps) =Culvert (Inlet Controls. cfs @. fps)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Pond P: Waste Water Pond Hydrograph. cfs Inflow Area=. ac Peak Elev=.' Storage=. af Inflow Primary Flow (cfs). cfs Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Pond P: Solid Waste Emergency Storage Inflow Area =. ac,.% Impervious, Inflow Depth =." Inflow =. cfs @. hrs, Volume=. af Outflow =. cfs @. hrs, Volume=. af, Atten= %, Lag=. min Primary =. cfs @. hrs, Volume=. af Routing by Stor-Ind method, Time Span=.-. hrs, dt=. hrs Peak Elev=.' @. hrs Surf.Area=. ac Storage=. af Plug-Flow detention time=. min calculated for. af (% of inflow) Center-of-Mass det. time=. min (. -. ) Volume Invert Avail.Storage Storage Description #.'. af Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)............ Device Routing Invert Outlet Devices # Primary.' Custom Weir/Orifice, Cv=. (C=.) Head (feet).. Width (feet).. Primary OutFlow Max=. cfs @. hrs HW=.' (Free Discharge) =Custom Weir/Orifice (Weir Controls. cfs @. fps)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Pond P: Solid Waste Emergency Storage Hydrograph. cfs Inflow Area=. ac Peak Elev=.' Storage=. af Inflow Primary Flow (cfs). cfs Time (hours)

Green Impoundment NO REACHES HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Link L: Pumped Flows Inflow =. cfs @. hrs, Volume=. af Primary =. cfs @. hrs, Volume=. af, Atten= %, Lag=. min Primary outflow = Inflow, Time Span=.-. hrs, dt=. hrs Point manual hydrograph, To=. hrs, dt=. hrs, cfs =..................................... Link L: Pumped Flows Hydrograph. cfs. cfs Manual Hydrograph Inflow Primary Flow (cfs) Time (hours)

Reid/HMPL Station CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control System Plan October, Prepared By: Project ID: B

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control System Plan CCR Surface Impoundment Information Name: Operator: Reid/HMPL Station CCR Surface Impoundment Sebree Generating Station Address: Highway Robards, Kentucky CCR Unit Identification Number: Kentucky State Dam Inventory System ID No. Qualified Professional Engineer Name: David A. Lamb Company: Associated Engineers, Inc. Kentucky P.E. Number: Regulatory Applicability As part of the. Hydrologic and hydraulic capacity requirements for CCR surface impoundments, an owner or operator of an existing or new CCR surface impoundment or any lateral expansion of a CCR surface impoundment must design, construct, operate, and maintain an inflow design flood control system as specified below. The owner or operator of the CCR unit must prepare the initial inflow design flood control system plan no later than October,. The hazard potential classification definitions (from: VI. Development of the Final Rule - Technical Requirements) that must be considered follow: High hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation will probably cause loss of human life Significant hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation results in no probable loss of human life, but can cause economic loss, environmental damage, disruption of lifeline facilities, or impact other concerns. Low hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation results in no probable loss of life and low economic and/or environmental losses. Losses are principally limited to the surface impoundment s owner s property.

) The inflow design flood control system must adequately manage flow into the CCR unit during and following the peak discharge of the inflow design flood specified in item ) of this section. ) The inflow design flood control system must adequately manage flow from the CCR unit to collect and control the peak discharge resulting from the inflow design flood specified item ) of this section. ) The inflow design flood is: (i) For a high hazard potential CCR surface impoundment the inflow design flood is the probable maximum flood; (ii) For a significant hazard potential CCR surface impoundment the inflow design flood is the,-year flood; (iii) For a low hazard potential CCR surface impoundment the inflow design flood is the -year flood; (iv) For an incised CCR surface impoundment the inflow design flood is the -year flood. Discharge from the CCR unit must be handled in accordance with the surface water requirements under.- (Part - Criteria for Classification of Solid Waste Disposal Facilities and Practices Subpart A - Classification of Solid Waste Disposal Facilities and Practices Section.- - Surface water). Inflow design flood control system Plan: ) Content of the plan. The owner or operator must prepare an initial inflow design flood control system plan that must document how the inflow design flood control system has been designed and constructed to meet the requirements of this section. Each plan must be supported by appropriate engineering calculations. ) Amendment of the plan. The owner or operator of the CCR unit may amend the written inflow design flood control system plan at any time provided the revised plan is placed in the facility s operating record. The owner or operator must amend the written inflow design flood control system plan whenever there is a change in conditions that would substantially affect the written plan in effect. Description of Impoundment An aerial photo of the CCR unit is provided as Attachment A and an excerpt from U.S. Geological Survey (USGS). minute Robards and Delaware topographic quadrangle maps showing the location of the CCR unit is provided as Attachment B.

The CCR unit has been in place for plus years and is used for the placement of coal combustion residual material; currently slurried bottom ash. The immediate watershed that drains to the CCR unit, and in which the CCR unit is considered to be located, is unnamed and. acres in size. The unnamed watershed discharges from the CCR impoundment outflow structure and is routed to the Green River. The CCR unit is a combined incised/earthen embankment structure. Embankments form the west, south and east sides of the impoundment and the north side is incised. The original terrain on which the pond was constructed generally sloped toward the west. Although the Green River is located less than. miles from the site, the structure does not extend significantly into the floodplain. Underlying preconstruction soils consisted of Loring- Grenada, Loring-Zanesville-Wellston (Henderson County) and Loring-Wellston-Zanesville (Webster County) soil associations which are generally characterized as well drained to moderately well drained soils on nearly level to sloping uplands. The embankment reaches its greatest relief of approximately feet on the west side. The Burns & McDonnell Engineering Co. October, design drawings show the inboard slope and central core portion of the dike to be constructed of compacted soil fill and the outboard slope to be consisted of sand fill. A sand blanket drain was designed for the outboard third of the base of the dike for the majority of the length and the plans show a crushed limestone drainage layer with a minimum thickness of inches topped with a minimum six inches thick sand layer which extends across the entire width of the dike cross section in the southwest corner. The plans also show a cut-off trench in the original ground below dike crest and extending for the entire length of the dike. Depth of impounded water and CCR is feet and feet (at respective locations of maximum impounded water and CCR depths). Elevation of impounded water and CCR is feet and feet, respectively, above mean sea level. These approximate depths and respective elevations are based on the most recent (December ) flight derived topographic contours and bathymetric survey data. The remaining storage capacity is approximately, cubic yards (if CCR can be placed to the elevation of the current water surface). This volume was calculated based on the maximum allowable storage volume and the current volume of CCR stored in the facility based on the most recent bathymetric survey. The approximate volume of impounded water and CCR is, cubic yards (approximate water volume is, cubic yards and approximate CCR volume is, cubic yards). This volume was calculated based on the maximum storage capacity, the current amount of CCR stored in the facility based on the most recent bathymetric survey, and the best available as-built data for the structure construction prior to placement of CCR. The impoundment discharge consists of a rectangular concrete drop structure with a variable height steel debris skimmer. The pool elevation can be controlled by adding or removing stop logs. The discharge structure connects to a -inch diameter smooth walled metal pipe underground conveyance.

Inflow Design Flood Control System Plan The initial inflow design flood control system plan documents that the inflow design flood control system has been designed and constructed to meet the storm generated discharge requirements for a Significant hazard potential CCR surface impoundment which means a diked surface impoundment where failure or mis-operation results in no probable loss of human life, but can cause economic loss, environmental damage, disruption of lifeline facilities, or impact other concerns. The inflow design flood for a Significant hazard potential CCR surface impoundment is the,-year flood. Analysis via HydroCAD Stormwater Modeling software of the of the Reid/HMPL CCR impoundment site drainage demonstrates that the design flood control system adequately manages inflow and discharge out of the CCR unit during and following the specified,- year/-hour storm event. HydroCAD Stormwater Modeling by HydroCAD Software Solutions, LLC is a widely recognized comprehensive hydrology and hydraulics software for use by Civil Engineers, useful for runoff and sediment control design calculations. The HydroCAD modeling results for the Reid/HMPL CCR impoundment are attached to this report. The operating facility has verified that discharge from the Reid/HMPL CCR impoundment is handled in accordance with the surface water requirements under.- (Part - Criteria for Classification of Solid Waste Disposal Facilities and Practices Subpart A - Classification of Solid Waste Disposal Facilities and Practices Section.- - Surface water). Sources of Information Geotechnical and other information provided by Associated Engineers, Inc. Engineering design drawings and other information provided by Big Rivers Electric Corporation United States Geological Survey U.S. Geological Survey (USGS). minute Robards and Delaware topographic quadrangle maps

Attachment A. Aerial Photo of the Reid/HMPL CCR Surface Impoundment

Attachment B. Topographic Map showing the Reid/HMPL CCR Surface Impoundment

S RHAP SWS S P RHAP SWS Reid/HMPL Ash Pond S L RHAP SWS Pumped Flows Subcat Reach Pond Link Routing Diagram for Reid HMPL Impoundment, Printed // HydroCAD.- s/n HydroCAD Software Solutions LLC

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Area (acres) CN Description (subcatchment-numbers). (S). (S). (S). TOTAL AREA Area Listing (all nodes)

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Time span=.-. hrs, dt=. hrs, points Runoff by SCS TR- method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment S: RHAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: RHAP SWS Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff=. cfs. af Subcatchment S: RHAP SWS Pond P: Reid/HMPL Ash Pond Link L: Pumped Flows Runoff Area=. ac.% Impervious Runoff Depth=." Flow Length=' Tc=. min CN= Runoff=. cfs. af Peak Elev=.' Storage=. af Inflow=. cfs. af Outflow=. cfs. af Manual Hydrograph Inflow=. cfs. af Primary=. cfs. af Total Runoff Area =. ac Runoff Volume =. af Average Runoff Depth =.".% Pervious =. ac.% Impervious =. ac

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: RHAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Sheet Flow, Grass: Short n=. P=."... Shallow Concentrated Flow, Unpaved Kv=. fps. Total Subcatchment S: RHAP SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff Time (hours)

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: RHAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)... Shallow Concentrated Flow, Unpaved Kv=. fps. Total, Increased to minimum Tc =. min Subcatchment S: RHAP SWS Hydrograph Flow (cfs). cfs Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Slope=. '/' Tc=. min CN= Runoff Time (hours)

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Subcatchment S: RHAP SWS Runoff =. cfs @. hrs, Volume=. af, Depth=." Runoff by SCS TR- method, UH=SCS, Weighted-CN, Time Span=.-. hrs, dt=. hrs Area (ac) CN Description *...% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs).. Lake or Reservoir, Mean Depth=.'. Total, Increased to minimum Tc =. min Subcatchment S: RHAP SWS Hydrograph Flow (cfs). cfs Time (hours) Type II -hr Rainfall=." Runoff Area=. ac Runoff Volume=. af Runoff Depth=." Flow Length=' Tc=. min CN= Runoff

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Pond P: Reid/HMPL Ash Pond Inflow Area =. ac,.% Impervious, Inflow Depth >." Inflow =. cfs @. hrs, Volume=. af Outflow =. cfs @. hrs, Volume=. af, Atten= %, Lag=. min Primary =. cfs @. hrs, Volume=. af Routing by Stor-Ind method, Time Span=.-. hrs, dt=. hrs Starting Elev=.' Surf.Area=. ac Storage=. af Peak Elev=.' @. hrs Surf.Area=. ac Storage=. af (. af above start) Plug-Flow detention time=. min calculated for. af (% of inflow) Center-of-Mass det. time=. min (,. -. ) Volume Invert Avail.Storage Storage Description #.'. af Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)................ Device Routing Invert Outlet Devices # Primary.'." Round Culvert L=,.' CMP, end-section conforming to fill, Ke=. Inlet / Outlet Invert=.' /.' S=. '/' Cc=. n=. Steel, smooth, Flow Area=. sf # Device.'.' long x.' breadth Broad-Crested Rectangular Weir Head (feet)........... Coef. (English)........... Primary OutFlow Max=. cfs @. hrs HW=.' (Free Discharge) =Culvert (Barrel Controls. cfs @. fps) =Broad-Crested Rectangular Weir (Passes. cfs of. cfs potential flow)

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Pond P: Reid/HMPL Ash Pond Hydrograph Flow (cfs). cfs. cfs Time (hours) Inflow Area=. ac Peak Elev=.' Storage=. af Inflow Primary

Reid HMPL Impoundment HydroCAD.- s/n HydroCAD Software Solutions LLC Printed // Page Summary for Link L: Pumped Flows Inflow =. cfs @. hrs, Volume=. af Primary =. cfs @. hrs, Volume=. af, Atten= %, Lag=. min Primary outflow = Inflow, Time Span=.-. hrs, dt=. hrs Point manual hydrograph, To=. hrs, dt=. hrs, cfs =..................................... Link L: Pumped Flows Hydrograph. cfs. cfs Manual Hydrograph Inflow Primary Flow (cfs) Time (hours)