Section 7: Specifications

Similar documents
Section 2: Underground

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

ANY SPECIFICATION DRAWINGS OR DATED PRIOR TO SEPTEMBER 2015 WILL NOT BE HONORED.

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

If a new residence s electrical service is not located within 200 feet of existing

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

Electric Service Standards

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

Basic Service. This Section provides information regarding a. Introduction

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

Please check with your local inspection authority for any additional requirements before installation.

Gas meter clearances and service installation requirements

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

(Condensed from National Electric Code)

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

RESIDENTIAL QUICK REFERENCE

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Underground Service Requirements and Instructions

Demarcation Points. Example 1

a) Line and load compartments must be separated by a stable barrier.

UNDERGROUND SERVICES SECONDARY

Huntsville Utilities Underground Residential Service Requirements

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

Specifications for Electrical Underground Residential Distribution Systems

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

OPERATING PROCEDURE NO. 310

PADMOUNT EQUIPMENT LOCATIONS / CLEARANCES

SECTION GROUNDING AND BONDING

TEMPORARY METER POLE INSTALLATION

Specifications for Residential Overhead Electric Service Installation

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE

Metering Installations for Mobile Homes or Mobile Home Parks:

OVERHEAD SERVICES - SECONDARY

ELECTRIC DEPARTMENT CONSTRUCTION STANDARDS

Specifications for Residential Underground Electric Service Installation

TEMPORARY FACILITIES

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

Request for Electric and Gas Service Form

City of Santa Monica Building and Safety Division

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Residential Electric Policy

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

CONTENTS. B. System Design and Performance Requirements

Central Lincoln PUD Commercial Service Guidelines & Standards

An altered service that is moved, upgraded (ex., 200 to 400 amp) or changed to meet today's standards for electric service.

PRIMARY LINE EXTENSION

ELECTRICAL UTILITY CONSTRUCTION REQUIREMENTS FOR PLATS & LAND DEVELOPMENT

CONSTRUCTION HANDBOOK Guidelines and Information for Members, Builders & Developers

VOLUME 15 Section 6: Gas Metering Guidelines

Electrical Service Guidelines

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

City of Redding Construction Standards Index

CONDUITS AND FITTINGS

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS

Merrimac Municipal Light Department. Commercial Developments Policy

EXPRESS PERMIT INFORMATION

SECTION GROUNDING AND BONDING

Revisions for the 2015 Edition of the "Specifications and Requirements for Electric Installations (Bluebook)"

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

CONSTRUCTION STANDARDS SECTION CS 15 STREET LIGHTING

Customer Owned and Constructed Transformer Alcove

A. Product Data shall be provided for each type of product indicated.

METERING INSTALLATION

Specifications for Residential Overhead Electric Service Installation

1. Contractor shall obtain a valid electrical permit from the Town of Perinton.

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT NON-NETWORK SYSTEMS SECTION

SECTION GROUNDING AND BONDING

SECTION ELECTRICAL UTILITY SERVICES

SECTION CHAIN-LINK FENCES AND GATES 02821/1

CHAPTER 11 CONDUITS AND FITTINGS

SERVICES CHAPTER 35. wire. For all other installations, the rating of the ungrounded conductors shall be not less than 60 amperes.

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

SALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System

PERMANENT PAVEMENT REPAIR NO SCALE

SECTION 200 CLEARANCES

DIVISION 1100 TRAFFIC

Electric Service Handbook

SECTION FACILITY LIGHTNING PROTECTION

Michigan State University Construction Standards ELECTRICAL UNDERGROUND DUCTS AND MANHOLES PAGE

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. TRENCHING SECONDARY (120/240 volts)...

SECTION PART 1 GENERAL

CITY OF BRANSON MUNICIPLE CODE Chapter 18 BUILDINGS AND BUILDING REGULATIONS ARTICLE V. RESIDENTIAL CODE

TYPICAL INSTALLATION INSTRUCTIONS

HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT

Building Permit Application

ZG Scope. 2 Applicable Documents. 3 General. 4 Stock Item Numbers. Padvault Single-Phase Residential, 2.1 PacifiCorp Material Specifications

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

Transcription:

Section 7: Specifications 29

31

Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required See Note # 2 TRAVELED WAY MINIMUM CLEARANCES TO PADMOUNT TRANSFORMER EQUIPMENT Non-Combustable Walls 8' Bollards, Meters, Sprinkler Valves, Standpipe or Hydrant 8' Combustable Walls, Doors, Windows, Vents, Other Openings, Fire escapes 10' Above Grade Fuel Tanks/Meters 10' Driveways, Parking Lots, and/or Traveled Ways 10' Natural Gas or Propane Connections/Meters 15' Sidewalks 8' Gasoline Dispensing Units 20' Property Lines (from sides of equipment) 8' Facilities used to dispense or store hazardous liquids or gases; (example, Property Lines (from doors of equipment) 10' service station gas pumps and tanks, propane bulk dispensing tanks and Shrubs 8' emergency generator fueling points.) 20' Pools 15' Electrical Padmount Equipment 8' NOTES 1.) To inspect, provide access, operate and ventilate the equipment, the above specified clear area distances to buildings or shrubs shall be maintained. All distances shall be measured from the nearest surface of the equipment. Property lines shall be considered an obstuction, since fences, shrubs, etc. may be installed at a future date by adjacent property owners. 2.) If no curb exists, or transformer is located closer than 10' to the traveled way, protective vehicle posts ( ) shall be installed. 3.) Top of transformer pad shall be installed above finished grade. 4.) Transformer shall not be located on steep grades where access is made difficult. 5.) Transformer IS NOT to be located with its doors facing the building. 32 SPECIFICATIONS CLEARANCES FOR PADMOUNT EQUIPMENT SP-2 ISSUE DATE: 11/2016

33

34

35

36

INSTALLATION REQUIREMENTS FOR OVERHEAD SERVICE SE 2 1 MATERIALS FURNISHED BY MEMBER AND INSTALLED BY NHEC 1 WEATHER HEAD LOCATED AT TOP OF POLE. 2 * SEE NOTE 3 BELOW 2 3 4 SERVICE ENTRANCE CONDUCTORS TO BE INSTALLED IN CONDUIT WITH ENDS EXTENDING 3'-0" OUTSIDE OF WEATHER HEAD FOR DRIP LOOP. CONDUIT CONDUIT MAY BE EITHER SCHEDULE 80 PVC OR GALVANIZED STEEL. PIPE STRAPS INSTALLED PER N.E.C. 3 MATERIALS FURNISHED AND INSTALLED BY NHEC POLE, METER SERVICE DROP CONDUCTORS, WIRE HOLDER & CONNECTORS MATERIALS FURNISHED BY MEMBER AND INSTALLED BY MEMBER 4 5 6 7 8 MOUNTING BOARD MINIMUM 3/4" PRESSURE TREATED MATERIAL OR METAL BRACKETS FOR MOUNTING METER SOCKET DIRECTLY TO THE POLE. METER SOCKET WITH HUB SOCKET MUST HAVE INTEGRATED MAIN CIRCUIT BREAKER(S). TO BE SECURELY ATTACHED TO MOUNTING BOARD BY MEMBER. GROUND WIRE NO. 6 COPPER (MIN. SIZE) BONDED TO GALVANIZED STEEL CONDUIT BY MEMBER AS REQ'D. GROUND ROD CONNECTORS 5 6 9 GROUND RODS (2) MIN. 8'-0" x 5/8" DIAMETER COPPER CLAD. 7 5'-0" FINISH GRADE 8 3'-0" 2'-0" 7 6'-0" min. 9 LOAD NOTES: 1.) 2.) PLEASE CALL NHEC AND MAKE ARRANGEMENTS TO HAVE THE METER LOCATION APPROVED BEFORE MAKING ANY CHANGES IN YOUR PRESENT ENTRANCE OR INSTALLING A NEW ENTRANCE. MOBILE HOME METER LOCATION SHALL BE READILY ACCESSIBLE, IN SIGHT, AND NOT MORE THAN 30 FEET FROM EXTERIOR WALL OF MOBILE HOME IT SERVES. IF DISTANCE EXCEEDS 30 FEET, A SECOND DISCONNECT SWITCH IS REQUIRED. 3.) CONDUIT AND WEATHER HEAD MUST EXTEND TO THE TOP OF THE POLE AS SHOWN TO PROVIDE CLEARANCE FOR TEL & CATV ATTACHMENTS. RISER MATERIAL ABOVE METER TO BE FURNISHED BY MEMBER AND INSTALLED BY NHEC 4.) FOUR WIRE CABLE MUST BE INSTALLED FROM METER SOCKET TO DISTRIBUTION PANEL. CONSTRUCTION STANDARDS OVERHEAD SERVICE INSTALLATION REMOTE METER ON POLE SINGLE RESIDENCE SE 2 ISSUE DATE: 11/2016 37

INSTALLATION REQUIREMENTS FOR OVERHEAD SERVICE SE 3 1 WEATHER HEAD LOCATED AT TOP OF POLE. 2 SERVICE ENTRANCE CONDUCTORS TO BE INSTALLED IN CONDUIT WITH ENDS EXTENDING 3'-0" OUTSIDE OF WEATHER HEAD FOR DRIP LOOP. 3 4 MATERIALS FURNISHED BY MEMBER AND INSTALLED BY NHEC CONDUIT CONDUIT MAY BE EITHER SCHEDULE 80 PVC OR GALVANIZED STEEL. PIPE STRAPS INSTALLED PER N.E.C. MATERIALS FURNISHED BY MEMBER AND INSTALLED BY MEMBER 1 2 12" min. * SEE NOTE 3 BELOW BOTTOM OF DRIP LOOP MATERIALS FURNISHED AND INSTALLED BY NHEC POLE, METER SERVICE DROP CONDUCTORS, WIRE HOLDER & CONNECTORS 5 6 7 8 MOUNTING BOARD MINIMUM 3/4" PRESSURE TREATED MATERIAL OR METAL BRACKETS FOR MOUNTING METER SOCKET DIRECTLY TO THE POLE. METER SOCKET WITH HUB SOCKET MUST HAVE INTEGRATED MAIN CIRCUIT BREAKER(S). TO BE SECURELY ATTACHED TO MOUNTING BOARD BY MEMBER. GROUND WIRE NO. 6 COPPER (MIN. SIZE) BONDED TO GALVANIZED STEEL CONDUIT BY MEMBER AS REQ'D. GROUND ROD CONNECTORS 5 6 3 9 GROUND RODS (2) MIN. 8'-0" x 5/8" DIAMETER COPPER CLAD. 4 5'-0" TYPICAL INSTALLATION. CHECK LOCAL & NEC CODES FOR REQUIREMENTS ON GFI AND WEATHERPROOF RECEPTACLES. FINISH GRADE 8 2'-0" 7 6'-0" min. 9 NOTES: 1.) 2.) PLEASE CALL NHEC AND MAKE ARRANGEMENTS TO HAVE THE METER LOCATION APPROVED BEFORE MAKING ANY CHANGES IN YOUR PRESENT ENTRANCE OR INSTALLING A NEW ENTRANCE. MOBILE HOME METER LOCATION SHALL BE READILY ACCESSIBLE, IN SIGHT, AND NOT MORE THAN 30 FEET FROM EXTERIOR WALL OF MOBILE HOME IT SERVES. IF DISTANCE EXCEEDS 30 FEET, A SECOND DISCONNECT SWITCH IS REQUIRED. 3.) CONDUIT AND WEATHER HEAD MUST EXTEND TO THE TOP OF THE POLE AS SHOWN TO PROVIDE CLEARANCE FOR TEL & CATV ATTACHMENTS. RISER MATERIAL ABOVE METER TO BE FURNISHED BY MEMBER AND INSTALLED BY NHEC. 38 CONSTRUCTION STANDARDS OVERHEAD SERVICE INSTALLATION REMOTE METER ON POLE TRAVEL TRAILERS, MOTOR HOMES, ETC. SE 3 ISSUE DATE: 11/2016

39

40

41

42

43

44

45

46

47

BACKFILL AROUND VAULT MUST BE FLAT AND LEVEL FOR A MINIMUM WIDTH OF 3 FT. ON ALL SIDES. above Finish Grade C L FULL SQUARE TILE PAD & COVER REQUIREMENTS FOR SINGLE PHASE TRANSFORMERS USE PAD U6-5A AND WHEN USED AS A PULLING VAULT USE USE COVER U7-5B. (NOT SHOWN IN TOP VIEW) 3' MIN. 2'-0" U5-4 FULL TANK 7" KNOCK-OUT FOR CONDUIT INSERTION (FOUR SIDES) 12" COMPACTED CRUSHED STONE 1'-0" 1'-0" min. 2'-0" INSTALL 4" DRAIN PIPE WITH APPROVED DRAIN COVER TO DRAIN WATER TO DAYLIGHT FROM VAULT. PROVIDE 3" OF CRUSHED STONE ON TOP OF COMPACTED CRUSHED STONE IN BOTTOM OF VAULT. 4'-0" LC INSTALLATION REQUIREMENTS 1.) IF THE VAULT IS CUT INTO AN EMBANKMENT, NHEC MAY REQUIRE A RETAINING WALL EITHER IN FRONT OR BEHIND THE VAULT TO PREVENT MATERIAL FROM SPILLING INTO OR AWAY FROM THE VAULT. 2.) TOP OF VAULT SHALL BE SIX INCHES ABOVE FINISHED GRADE. 4" (Typ.) DRAIN COVER TOP VIEW LC 4'-0" 3.) ALL VAULTS WILL BE CONSTRUCTED WITH A DRAINAGE SYSTEM OF APPROVED PIPE MATERIAL TO DRAIN WATER THAT MAY PENETRATE THE VAULT. THE PIPING SHALL ORIGINATE AT THE LOWEST POINT INSIDE THE VAULT AND BE ROUTED TO FREE AIR AT AN ELEVATION BELOW ITS ORIGINATION THAT PROMOTES DRAINAGE.. 4.) IF VAULT IS LOCATED NEAR THE TRAVELED WAY, NHEC MAY REQUIRE A PROTECTIVE STRUCTURE TO PREVENT DAMAGE. 5.) SEAL ALL KNOCKOUTS AFTER CONDUIT IS PLACED. CONDUIT (TYPICAL) 6.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000 P.S.I. AFTER 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTM C-39-72(LATEST EDITION). 7.) REFER TO MEMBER HANDBOOK SECTION 2 OR CONSTRUCTION STANDARDS TAB 12 FOR FURTHER CLARIFICATION AND DETAILED DESCRIPTIONS FOR UNDERGROUND INSTALLATIONS. CONSTRUCTION STANDARDS VAULT ASSEMBLY FOR SINGLE RESIDENCE/PULLING U5-4 ISSUE DATE: 05/16 48

4" WALL (Typ.) 1" CONCRETE KNOCKOUT (Typ.) U5-5 TOP VIEW PRIMARY DRAIN COVER 1/2" REINFORCING ROD MIN. (4) PIECES EACH CORNER EVENLY SPACED. PRIMARY 4'-0" 12" (Typ.) 3' MIN. PAD 8'-0" PAD AS REQUIRED (NOT SHOWN IN TOP VIEW) VAULT TOP SECTION COVER AS REQUIRED (NOT SHOWN IN TOP VIEW) BACKFILL AROUND VAULT MUST BE FLAT AND LEVEL FOR A MINIMUM WIDTH OF 3 FT. ON ALL SIDES. SIDE SECTION LIFTING SLOT (Typ.) 1 (Typ.) 4" WALL (Typ.) 18" (Typ.) REINFORCING MESH (#6) ALL SIDES VAULT BOTTOM SECTION 42" TO BOTTOM OF KNOCKOUT 2'-0" PROVIDE 12" OF CRUSHED STONE IN BOTTOM OF VAULT. 6-1/2" (Typ.) 2'-8" 12" (Typ.) CONCRETE KNOCKOUT (TWO EACH SIDE) 1'-0" 3" LIP COMPACTED CRUSHED STONE 1'-0" min. 3' MIN. INSTALLATION REQUIREMENTS 1.) IF THE VAULT IS CUT INTO AN EMBANKMENT, NHEC MAY REQUIRE A RETAINING WALL EITHER IN FRONT OR BEHIND THE VAULT TO PREVENT MATERIAL FROM SPILLING INTO OR AWAY FROM THE VAULT. 2.) TOP OF VAULT SHALL BE SIX INCHES ABOVE FINISHED GRADE. END SECTION SEAM IS TONGUE & GROOVE WITH BITUMINOUS SEALANT CONCRETE KNOCKOUT ABOVE FINISHED GRADE 3.) ALL VAULTS WILL BE CONSTRUCTED WITH A DRAINAGE SYSTEM OF APPROVED PIPE MATERIAL TO DRAIN WATER THAT MAY PENETRATE THE VAULT. THE PIPING SHALL ORIGINATE AT THE LOWEST POINT INSIDE THE VAULT AND BE ROUTED TO FREE AIR AT AN ELEVATION BELOW ITS ORIGINATION THAT PROMOTES DRAINAGE. 4.) IF VAULT IS LOCATED NEAR THE TRAVELED WAY, NHEC MAY REQUIRE A PROTECTIVE STRUCTURE TO PREVENT DAMAGE. 30" (Typ.) 5.) SEAL ALL KNOCKOUTS AFTER CONDUIT IS PLACED. 9" (Typ.) 6-1/2" (Typ.) 1'-0" 6.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000 P.S.I. AFTER 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTM C-39-72 (LATEST EDITION). 12" (Typ.) 3" LIP 7) REFER TO MEMBER HANDBOOK SECTION 2 OR CONSTRUCTION STANDARDS TAB 12 FOR FURTHER CLARIFICATION AND DETAILED DESCRIPTIONS FOR UNDERGROUND INSTALLATIONS. COMPACTED CRUSHED STONE INSTALL 4" DRAIN PIPE WITH APPROVED DRAIN COVER TO DRAIN WATER TO DAYLIGHT FROM VAULT. 1'-0" min. CONSTRUCTION STANDARDS VAULT ASSEMBLY FOR MULTIPLE RESIDENCE INSTALLATIONS SINGLE PHASE LOOP FEED TRANSFORMERS PAD & COVER REQUIREMENTS 1.) FOR SINGLE PHASE 15 OR 25 KV TRANSFORMER (15-167 kva), USE PAD U6-5A & COVER U7-5B. 2.) FOR SINGLE PHASE 15 OR 25 KV 200 AMP SECTIONALIZING CABINET USE PAD U6-5B & COVER U7-5B. 3.) FOR SPLICING OR PULLING VAULT USE COVER U7-5A & COVER U7-5B. U5-5 ISSUE DATE: 05/16 49

U5-7 6'-3" 9" 4" WALL (Typ.) TOP VIEW PRECAST WITH TRANSFORMER OPENING 5'-0" CABLE OPENING COMPACTED CRUSHED STONE 1" CONCRETE KNOCKOUT (Typ.) DRAIN COVER 6'- 1/2" REINFORCING ROD MIN. (4) PIECES EVENLY SPACED 18" 9" 12" (Typ.) 12'-0" VAULT COVER AS REQUIRED - NOT SHOWN IN TOP VIEW VAULT TOP SECTION SIDE VIEW LIFTING SLOT (Typ.) 4" WALL (Typ.) 12" 4'-0" (Typ.) 42" TO BOTTOM OF KNOCKOUT 4'-0" (Typ.) REINFORCING MESH (#6) ALL SIDES 12" 2- PROVIDE 12" OF CRUSHED STONE IN BOTTOM OF VAULT. CONCRETE KNOCKOUT (TWO EACH SIDE) 9" (Typ.) CONCRETE KNOCKOUT (TWO EACH SIDE) 2'-4" 4" FLOOR VAULT BOTTOM SECTION 12" (Typ.) 1'-0" COMPACTED CRUSHED STONE 1'-0" min. INSTALLATION REQUIREMENTS 1.) IF THE VAULT IS CUT INTO AN EMBANKMENT, NHEC MAY REQUIRE A RETAINING WALL EITHER IN FRONT OR BEHIND THE VAULT TO PREVENT MATERIAL FROM SPILLING INTO OR AWAY FROM THE VAULT. 2.) TOP OF UPPER SECTION OF VAULT SHALL BE SIX INCHES ABOVE FINISHED GRADE. END VIEW 15" SEAM IS TONGUE & GROOVE WITH BITUMINOUS SEALANT 4'-0" (Typ.) CONCRETE KNOCKOUT (ONE EACH END) 12" (Typ.) 9" (Typ.) 1'-0" ABOVE FINISHED GRADE 3.) ALL VAULTS WILL BE CONSTRUCTED WITH A DRAINAGE SYSTEM OF APPROVED PIPE MATERIAL TO DRAIN WATER THAT MAY PENETRATE THE VAULT. THE PIPING SHALL ORIGINATE AT THE LOWEST POINT INSIDE THE VAULT AND BE ROUTED TO FREE AIR AT AN ELEVATION BELOW ITS ORIGINATION THAT PROMOTES DRAINAGE. 4.) IF VAULT IS LOCATED NEAR THE TRAVELED WAY, NHEC MAY REQUIRE A PROTECTIVE STRUCTURE TO PREVENT DAMAGE. 5.) SEAL ALL KNOCKOUTS AFTER CONDUIT IS PLACED. 6.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000 P.S.I. AFTER 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTM C-39-72 (LATEST EDITION). 7.) REFER TO MEMBER HANDBOOK SECTION 2 OR CONSTRUCTION STANDARDS TAB 12 FOR FURTHER CLARIFICATION AND DETAILED DESCRIPTIONS FOR UNDERGROUND INSTALLATIONS. DRAIN PIPE COMPACTED CRUSHED STONE INSTALL 4" DRAIN PIPE TO DRAIN WATER TO DAYLIGHT FROM VAULT. 1'-0" min. CONSTRUCTION STANDARDS PRECAST VAULT ASSEMBLY FOR 3-PHASE TRANSFORMERS FURTHER REQUIREMENT INCLUDES: 1.) VAULT COVER U7-7E TO ENCLOSE VAULT. 2.) APPROXIMATE WEIGHTS: VAULT TOP SECTION 5600 LBS. VAULT BOTTOM SECTION 5300 LBS. VAULT COVER U7-7E 2600 LBS. U5-7 ISSUE DATE: 05/16 50

U5-7S 6'-8" 9" 9" 4" WALL (Typ.) CABLE OPENING CABLE OPENING 1" CONCRETE KNOCKOUT (Typ.) TOP VIEW 5'-0" PRECAST WITH TRANSFORMER OPENING 5'-0" COMPACTED CRUSHED STONE DRAIN COVER 6'- 1/2" REINFORCING ROD MIN. (4) PIECES EVENLY SPACED 1'- 2'-8" 1'- 9" 9" 12" (Typ.) 12'-0" VAULT COVER AS REQUIRED - NOT SHOWN IN TOP VIEW VAULT TOP SECTION SIDE VIEW 12" LIFTING SLOT (Typ.) 4" WALL (Typ.) 4'-0" (Typ.) 42" TO BOTTOM OF KNOCKOUT 4'-0" (Typ.) REINFORCING MESH (#6) ALL SIDES 12" 2- PROVIDE 12" OF CRUSHED STONE IN BOTTOM OF VAULT. CONCRETE KNOCKOUT (TWO EACH SIDE) 9" (Typ.) CONCRETE KNOCKOUT (TWO EACH SIDE) 2'-4" 12" (Typ.) VAULT BOTTOM SECTION 1'-0" 4" FLOOR COMPACTED CRUSHED STONE 1'-0" min. INSTALLATION REQUIREMENTS 1.) IF THE VAULT IS CUT INTO AN EMBANKMENT, NHEC MAY REQUIRE A RETAINING WALL EITHER IN FRONT OR BEHIND THE VAULT TO PREVENT MATERIAL FROM SPILLING INTO OR AWAY FROM THE VAULT. 2.) TOP OF UPPER SECTION OF VAULT SHALL BE SIX INCHES ABOVE FINISHED GRADE. END VIEW 15" SEAM IS TONGUE & GROOVE WITH BITUMINOUS SEALANT 4'-0" (Typ.) CONCRETE KNOCKOUT (ONE EACH END) 12" (Typ.) 9" (Typ.) 1'-0" ABOVE FINISHED GRADE 3.) ALL VAULTS WILL BE CONSTRUCTED WITH A DRAINAGE SYSTEM OF APPROVED PIPE MATERIAL TO DRAIN WATER THAT MAY PENETRATE THE VAULT. THE PIPING SHALL ORIGINATE AT THE LOWEST POINT INSIDE THE VAULT AND BE ROUTED TO FREE AIR AT AN ELEVATION BELOW ITS ORIGINATION THAT PROMOTES DRAINAGE. 4.) IF VAULT IS LOCATED NEAR THE TRAVELED WAY, NHEC MAY REQUIRE A PROTECTIVE STRUCTURE TO PREVENT DAMAGE. 5.) SEAL ALL KNOCKOUTS AFTER CONDUIT IS PLACED. 6.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000 P.S.I. AFTER 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTM C-39-72 (LATEST EDITION). 7.) REFER TO MEMBER HANDBOOK SECTION 2 OR CONSTRUCTION STANDARDS TAB 12 FOR FURTHER CLARIFICATION AND DETAILED DESCRIPTIONS FOR UNDERGROUND INSTALLATIONS. DRAIN PIPE COMPACTED CRUSHED STONE INSTALL 4" DRAIN PIPE TO DRAIN WATER TO DAYLIGHT FROM VAULT. 1'-0" min. CONSTRUCTION STANDARDS PRECAST VAULT ASSEMBLY FOR 3-PHASE 600 AMP SECTIONALIZER FURTHER REQUIREMENT INCLUDES: 1.) VAULT COVER U7-7E TO ENCLOSE VAULT. 2.) APPROXIMATE WEIGHTS: VAULT TOP SECTION 5600 LBS. VAULT BOTTOM SECTION 5300 LBS. VAULT COVER U7-7E 2600 LBS. U5-7S ISSUE DATE: 05/16 51

52

U7-5B C L REINFORCING MESH (#6) PROVIDE 2 CARRY SLOTS (SEE DETAIL) C L 5'-0" 4'-4" 45 CHAMFER 1/2" REINFORCING ROD 3" 3-1/2" SIDE END CARRY SLOT DETAIL NOTE: 1.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000 P.S.I. AFTER 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTM C 39-72 (LATEST EDITION) 2.) APPROXIMATE WEIGHT: 1515 LBS. CONSTRUCTION STANDARDS VAULT COVER FOR U5-5 & U5-4 U7-5B ISSUE DATE: 01/06 53

54

IU Primary Trench ONE OR MORE PRIMARY CIRCUITS WITH TELEPHONE AND/OR CABLE TV 1'-0" RED WARNING TAPE 2'-0" min. TELEPHONE CABLE TV 3'-0" min. PRIMARY PRIMARY SECONDARY CONDUIT (TYP.) NO. 6 AWG SOLID BARE COPPER GROUND CONDUCTOR. (MEMBER SUPPLIED) PRIMARY CIRCUIT WITH SPARE 1'-0" RED WARNING TAPE 3'-0" PRIMARY PRIMARY PRIMARY SPARE CONDUIT (TYP.) NO. 6 AWG SOLID BARE COPPER GROUND CONDUCTOR. (MEMBER SUPPLIED) NOTE: 1. TRENCH WIDTH AS REQUIRED TO MAINTAIN MINIMUM SPACING BETWEEN ALL CONDUITS AND TRENCH SIDEWALLS. 2. TRENCH TO BE INSPECTED BY A REPRESENTATIVE OF NHEC PRIOR TO BACKFILLING. 3. REFER TO MEMBER HANDBOOK SECTION 2 OR CONSTRUCTION STANDARDS TAB 12 FOR FURTHER CLARIFICATION AND DETAILED DESCRIPTIONS FOR UNDERGROUND INSTALLATIONS. WHEEL COMPACTED BACKFILL, NO ROCKS LARGER THAN DIAMETER SAND OR FINE BACKFILL, NO ROCKS LARGER THAN 1" DIAMETER UNDISTURBED EARTH CONSTRUCTION STANDARDS TRENCH FOR JOINT ELECTRIC AND COMMUNICATION FACILITIES AND SPARE IU Primary Trench ISSUE DATE: 05/16 55

56

57

U7-6B 2'-0" 6'-0" 4" 4" 4" REINFORCING MESH (#6) PROVIDE 2 CARRY SLOTS (SEE DETAIL) 2'- 3" 1/2" REINFORCING ROD 2-1/2" SIDE END CARRY SLOT DETAIL NOTE: 1.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000 P.S.I. AFTER 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTM C 39-72 (LATEST EDITION). CONSTRUCTION STANDARDS UNDERWATER CABLE COVER U7-6B ISSUE DATE: 01/06 58

59