ENC. October 6, 0 THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA MATERIALS MANAGEMENT DEPARTMENT 0 OLD VENICE ROAD OSPREY, FLORIDA 49 TELEPHONE (94) 486-8 FAX (94) 486-88 MEMORANDUM TO: FROM: TITLE: Members of the School Board Lori White, Superintendent Mitsi Corcoran, Chief Financial Officer Pat Black, CPPB, Director of Materials Management APPROVAL TO AWARD BID #-08 FOR LIFT STATION INSTALLATION, MAINTENANCE, AND REPAIR AND DOMESTIC WATER TESTING SERVICES Bids to provide 'Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services' were received from six vendors on September, 0. The bid of Innovative Contractors was the best low bid meeting the advertised specifications based on a sealed scenario. This bid is for a period of one year with the option to renew for two additional one-year periods. The funds for these purchases are contained in the transfer from capital budget allocated to the Facilities Services Department. Failure to file a protest within the time prescribed in Section 0.57(), Florida Statutes, or failure to post the protest Not to exceed Requested by: bond or other security required by law Fiscal Impact: $00,000.00 Jody Dumas within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 0. Florida Statutes. Posting Date: 0-09-0 Recommended Motion: That the bid of Innovative Contractors, to provide 'Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services' in an amount not to exceed $00,000.00, be approved as presented.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 Cost to provide all labor, supervision, tests, fuel, equipment, and materials to maintain the lift stations. LOCATION OF LIFT STATIONS. ASHTON ELEMENTARY, 50 Ashton Rd, Sarasota, FL 4. BAY HAVEN SCHOOL, 90 W Tamiami Cir, Sarasota, FL 44. CRANBERRY ELEMENTARY, 775 Shalimar Terrace, North Port, FL 486 4. TRIAD, 440 Beneva Rd, Sarasota, FL 4 5. EDUCATION SERVICES/PURCHASING, 0 Old Venice Rd, Osprey, FL 49 6. EMMA E BOOKER ELEMENTARY, 50 Dr MLK Jr Way, Sarasota, FL 44 Monthly rate, inspected two () times per week, and the other lift station, yearly rate, one () time during the summer. 7. ENGLEWOOD ELEMENTARY, 50 N McCall Rd, Englewood, FL 4 Monthly rate, inspected two () times per week. 8. FRUITVILLE ELEMENTARY, 60 Honore Ave, Sarasota, FL 4 9. GARDEN ELEMENTARY, 700 Center Rd, Venice, FL 49 0. GLENALLEN ELEMENTARY, 7050 Glenallen Blvd, North Port, FL 487. LAKEVIEW ELEMENTARY, 799 Proctor Rd, Sarasota, FL 44. LAUREL/NOKOMIS, 900 E Laurel Rd, Nokomis, FL 475. MID-COUNTY ZONE LOCATION, 90 E Laurel Rd, Nokomis, FL 475 4. MCINTOSH MIDDLE SCHOOL, 70 S McIntosh Rd, Sarasota, FL 4 5. MCINTOSH MIDDLE SCHOOL (OLD INFINITY), 705 McIntosh Rd, Sarasota, FL 4 6. SARASOTA HIGH SCHOOL, 000 S School Ave, Sarasota, FL 47 # OF LIFT STATIONS Apollo Construction & Engineering Services, Inc. CEC Motor & Utility Services $7.4 $50.00 $99.8 $00.00 $99.8 $5.00 $99.8 $00.00 $7. $75.00 main $,58.76 $700.00 $7. $75.00 $,58.76 $700.00 $7.4 $50.00 $7.4 $50.00 $7. $75.00 $7. $75.00 6 $.4 $00.00 $99.8 $00.00 $99.8 $00.00 $7. $75.00 $99.8 $00.00 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 Cost to provide all labor, supervision, tests, fuel, equipment, and materials to maintain the lift stations. LOCATION OF LIFT STATIONS. ASHTON ELEMENTARY, 50 Ashton Rd, Sarasota, FL 4. BAY HAVEN SCHOOL, 90 W Tamiami Cir, Sarasota, FL 44. CRANBERRY ELEMENTARY, 775 Shalimar Terrace, North Port, FL 486 4. TRIAD, 440 Beneva Rd, Sarasota, FL 4 5. EDUCATION SERVICES/PURCHASING, 0 Old Venice Rd, Osprey, FL 49 6. EMMA E BOOKER ELEMENTARY, 50 Dr MLK Jr Way, Sarasota, FL 44 Monthly rate, inspected two () times per week, and the other lift station, yearly rate, one () time during the summer. 7. ENGLEWOOD ELEMENTARY, 50 N McCall Rd, Englewood, FL 4 Monthly rate, inspected two () times per week. 8. FRUITVILLE ELEMENTARY, 60 Honore Ave, Sarasota, FL 4 9. GARDEN ELEMENTARY, 700 Center Rd, Venice, FL 49 0. GLENALLEN ELEMENTARY, 7050 Glenallen Blvd, North Port, FL 487. LAKEVIEW ELEMENTARY, 799 Proctor Rd, Sarasota, FL 44. LAUREL/NOKOMIS, 900 E Laurel Rd, Nokomis, FL 475. MID-COUNTY ZONE LOCATION, 90 E Laurel Rd, Nokomis, FL 475 4. MCINTOSH MIDDLE SCHOOL, 70 S McIntosh Rd, Sarasota, FL 4 5. MCINTOSH MIDDLE SCHOOL (OLD INFINITY), 705 McIntosh Rd, Sarasota, FL 4 6. SARASOTA HIGH SCHOOL, 000 S School Ave, Sarasota, FL 47 # OF LIFT STATIONS main 6 Innovative Contractors Severn Trent Environmental Services, Inc. $40.00 $0.9 $5.00 $67.46 $5.00 $67.46 $5.00 $67.46 $0.00 $.7 $90.00 $99.8 $0.00 $.7 $90.00 $99.8 $50.00 $0.9 $50.00 $0.9 $0.00 $.7 $0.00 $.7 $0.00 $0.8 $40.00 $67.46 $5.00 $67.46 $5.00 $.7 $40.00 $67.46 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 Cost to provide all labor, supervision, tests, fuel, equipment, and materials to maintain the lift stations. LOCATION OF LIFT STATIONS. ASHTON ELEMENTARY, 50 Ashton Rd, Sarasota, FL 4. BAY HAVEN SCHOOL, 90 W Tamiami Cir, Sarasota, FL 44. CRANBERRY ELEMENTARY, 775 Shalimar Terrace, North Port, FL 486 4. TRIAD, 440 Beneva Rd, Sarasota, FL 4 5. EDUCATION SERVICES/PURCHASING, 0 Old Venice Rd, Osprey, FL 49 6. EMMA E BOOKER ELEMENTARY, 50 Dr MLK Jr Way, Sarasota, FL 44 Monthly rate, inspected two () times per week, and the other lift station, yearly rate, one () time during the summer. 7. ENGLEWOOD ELEMENTARY, 50 N McCall Rd, Englewood, FL 4 Monthly rate, inspected two () times per week. 8. FRUITVILLE ELEMENTARY, 60 Honore Ave, Sarasota, FL 4 9. GARDEN ELEMENTARY, 700 Center Rd, Venice, FL 49 0. GLENALLEN ELEMENTARY, 7050 Glenallen Blvd, North Port, FL 487. LAKEVIEW ELEMENTARY, 799 Proctor Rd, Sarasota, FL 44. LAUREL/NOKOMIS, 900 E Laurel Rd, Nokomis, FL 475. MID-COUNTY ZONE LOCATION, 90 E Laurel Rd, Nokomis, FL 475 4. MCINTOSH MIDDLE SCHOOL, 70 S McIntosh Rd, Sarasota, FL 4 5. MCINTOSH MIDDLE SCHOOL (OLD INFINITY), 705 McIntosh Rd, Sarasota, FL 4 6. SARASOTA HIGH SCHOOL, 000 S School Ave, Sarasota, FL 47 # OF LIFT STATIONS main 6 Southern Sanitary Systems US Water Services Corporation $600.00 $40.00 $00.00 $0.00 $,600.00 $0.00 $00.00 $0.00 $,600.00 $90.00 $600.00 $40.00 $600.00 $60.00 $00.00 $0.00 $00.00 $0.00 $,00.00 $0.00 $00.00 $0.00 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 LOCATION OF LIFT STATIONS - Continued 7. SARASOTA MIDDLE, 486 Ashton Rd, Sarasota, FL 4 8. SCTI SOUTH, 0 Indian Hills Blvd, Venice, FL 49 9. TAYLOR RANCH ELEMENTARY, 500 Taylor Ranch Tr, Venice, FL 49 0. TOLEDO BLADE ELEMENTARY, 0 Geranium Ave, North Port, FL 487. OLD TRIAD NORTH, 4409 Sawyer Rd, Sarasota, FL 4. VENICE ELEMENTARY, 0 Bahama St, Venice, FL 485. VENICE HIGH SCHOOL, Indian Ave, Venice, FL 485 () at baseball complex, () at football complex, monthly rate, inspected two () times per week. 4. VENICE MIDDLE SCHOOL, 900 Center Rd, Venice, FL 49 # OF LIFT STATIONS HOURLY RATE FOR EMERGENCY PUMPING SERVICES NOT COVERED DURING ROUTINE MAINTENANCE TO LIFT STATIONS. Labor rates to include all equipment, labor, supervision, fuel, pumping services, and disposal fees. Rate will only be paid for actual time on job. 5. 6. 7. 8. Standard working hours (Monday through Friday 7:00 A.M. - 5:00 P.M.); hourly rate, including overhead and profit. Non-standard working hours (Monday through Friday prior to 7:00 A.M. and after 5:00 P.M., and Saturday and Sunday); hourly rate, including overhead and profit. HOURLY RATE FOR EMERGENCY REPAIRS NOT COVERED DURING ROUTINE MAINTENANCE TO LIFT STATIONS, OR UPGRADES TO EXISTING LIFT STATIONS. Labor rates to include all equipment, labor, supervision, and fuel. Rate will only be paid for actual time on job. Standard working hours (Monday through Friday 7:00 A.M. - 5:00 P.M.); hourly rate, including overhead and profit. Non-standard working hours (Monday through Friday prior to 7:00 A.M. and after 5:00 P.M., and Saturday and Sunday); hourly rate, including overhead and profit. Apollo Construction & Engineering Services, Inc. CEC Motor & Utility Services $99.8 $00.00 $99.8 $00.00 $99.8 $00.00 9 $95.60 $75.00 $7. $75.00 $,400.08 $700.00 $99.8 $00.00 $00.00 $75.00 $00.00 $00.00 $69.0 $65.00 $97.84 $75.00 4 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 LOCATION OF LIFT STATIONS - Continued 7. SARASOTA MIDDLE, 486 Ashton Rd, Sarasota, FL 4 8. SCTI SOUTH, 0 Indian Hills Blvd, Venice, FL 49 9. TAYLOR RANCH ELEMENTARY, 500 Taylor Ranch Tr, Venice, FL 49 0. TOLEDO BLADE ELEMENTARY, 0 Geranium Ave, North Port, FL 487. OLD TRIAD NORTH, 4409 Sawyer Rd, Sarasota, FL 4. VENICE ELEMENTARY, 0 Bahama St, Venice, FL 485. VENICE HIGH SCHOOL, Indian Ave, Venice, FL 485 () at baseball complex, () at football complex, monthly rate, inspected two () times per week. 4. VENICE MIDDLE SCHOOL, 900 Center Rd, Venice, FL 49 # OF LIFT STATIONS HOURLY RATE FOR EMERGENCY PUMPING SERVICES NOT COVERED DURING ROUTINE MAINTENANCE TO LIFT STATIONS. Labor rates to include all equipment, labor, supervision, fuel, pumping services, and disposal fees. Rate will only be paid for actual time on job. 5. 6. 7. 8. Standard working hours (Monday through Friday 7:00 A.M. - 5:00 P.M.); hourly rate, including overhead and profit. Non-standard working hours (Monday through Friday prior to 7:00 A.M. and after 5:00 P.M., and Saturday and Sunday); hourly rate, including overhead and profit. HOURLY RATE FOR EMERGENCY REPAIRS NOT COVERED DURING ROUTINE MAINTENANCE TO LIFT STATIONS, OR UPGRADES TO EXISTING LIFT STATIONS. Labor rates to include all equipment, labor, supervision, and fuel. Rate will only be paid for actual time on job. Standard working hours (Monday through Friday 7:00 A.M. - 5:00 P.M.); hourly rate, including overhead and profit. Non-standard working hours (Monday through Friday prior to 7:00 A.M. and after 5:00 P.M., and Saturday and Sunday); hourly rate, including overhead and profit. 9 Innovative Contractors Severn Trent Environmental Services, Inc. $40.00 $67.46 $40.00 $67.46 $40.00 $67.46 $50.00 $0.56 $0.00 $.7 $00.00 $798.56 $40.00 $67.46 $60.00 $75.00 $60.00 $.50 $45.00 $75.00 $55.00 $.50 5 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 LOCATION OF LIFT STATIONS - Continued 7. SARASOTA MIDDLE, 486 Ashton Rd, Sarasota, FL 4 8. SCTI SOUTH, 0 Indian Hills Blvd, Venice, FL 49 9. TAYLOR RANCH ELEMENTARY, 500 Taylor Ranch Tr, Venice, FL 49 0. TOLEDO BLADE ELEMENTARY, 0 Geranium Ave, North Port, FL 487. OLD TRIAD NORTH, 4409 Sawyer Rd, Sarasota, FL 4. VENICE ELEMENTARY, 0 Bahama St, Venice, FL 485. VENICE HIGH SCHOOL, Indian Ave, Venice, FL 485 () at baseball complex, () at football complex, monthly rate, inspected two () times per week. 4. VENICE MIDDLE SCHOOL, 900 Center Rd, Venice, FL 49 # OF LIFT STATIONS HOURLY RATE FOR EMERGENCY PUMPING SERVICES NOT COVERED DURING ROUTINE MAINTENANCE TO LIFT STATIONS. Labor rates to include all equipment, labor, supervision, fuel, pumping services, and disposal fees. Rate will only be paid for actual time on job. 5. 6. 7. 8. Standard working hours (Monday through Friday 7:00 A.M. - 5:00 P.M.); hourly rate, including overhead and profit. Non-standard working hours (Monday through Friday prior to 7:00 A.M. and after 5:00 P.M., and Saturday and Sunday); hourly rate, including overhead and profit. HOURLY RATE FOR EMERGENCY REPAIRS NOT COVERED DURING ROUTINE MAINTENANCE TO LIFT STATIONS, OR UPGRADES TO EXISTING LIFT STATIONS. Labor rates to include all equipment, labor, supervision, and fuel. Rate will only be paid for actual time on job. Standard working hours (Monday through Friday 7:00 A.M. - 5:00 P.M.); hourly rate, including overhead and profit. Non-standard working hours (Monday through Friday prior to 7:00 A.M. and after 5:00 P.M., and Saturday and Sunday); hourly rate, including overhead and profit. 9 Southern Sanitary Systems US Water Services Corporation $,800.00 $50.00 $00.00 $0.00 $,00.00 $90.00 $45.00 $65.00 $45.00 $75.00 $55.00 $65.00 $75.00 $75.00 6 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 9. 0.. MATERIALS MARK-UP. Used for emergency repairs not covered during routine maintenance to the lift stations, and upgrades to existing lift stations. Materials to be billed at net cost. Include a percentage allowed for overhead and profit. A MAXIMUM OF 0% MARKUP of materials will be allowed. No mark-up of sales tax allowed. A copy of the itemized materials invoice from the supplier must be included with all billings to the SBSC. SUBCONTRACTED SERVICES. To be used only with prior written approval from the Facilities Services representative. Subcontracted services are to be billed at net cost. Include a percentage allowed for overhead and profit. MAXIMUM OF 5% MARK-UP of subcontracted services allowed. (No mark-up of sales tax allowed). A copy of the itemized subcontracted services invoice from the Subcontractor must be included with all billings to the SBSC for subcontracted services. RENTAL OF EQUIPMENT. Special rental equipment not used in the regular course of lift station installation, repair, and maintenance service and domestic water testing. To be used only with written approval from the Facilities Services representative. Rental is for active use of equipment. Payment for inactive use will not be allowed. Rental shall be billed at net cost. Include a percentage allowed for overhead and profit. A MAXIMUM OF 0% MARK-UP of cost of rental equipment will be allowed. No mark-up of sales tax allowed. A copy of the itemized rental invoice from the supplier must be included with all billings to the SBSC for rentals. Apollo Construction & Engineering Services, Inc. CEC Motor & Utility Services 0% 0% 0% 0% 0% 0%. HOURLY RATE FOR WATER TESTING SERVICES: $50.00 $75.00. HOURLY RATE FOR SPECIAL SERVICES: To be used only for lift station upgrades/specialty services project work with prior written approval from the Facilities Services representative. Does not apply to routine emergency services. Rate will only be paid for actual time on job. List services and hourly rate. Pipefitter $69.0 Electrician $77.00 Master Plumber $85.00 Technician $75.00 Electrician $85.00 Instrumentation Specialist $00.00 7 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 9. 0. MATERIALS MARK-UP. Used for emergency repairs not covered during routine maintenance to the lift stations, and upgrades to existing lift stations. Materials to be billed at net cost. Include a percentage allowed for overhead and profit. A MAXIMUM OF 0% MARKUP of materials will be allowed. No mark-up of sales tax allowed. A copy of the itemized materials invoice from the supplier must be included with all billings to the SBSC. SUBCONTRACTED SERVICES. To be used only with prior written approval from the Facilities Services representative. Subcontracted services are to be billed at net cost. Include a percentage allowed for overhead and profit. MAXIMUM OF 5% MARK-UP of subcontracted services allowed. (No mark-up of sales tax allowed). A copy of the itemized subcontracted services invoice from the Subcontractor must be included with all billings to the SBSC for subcontracted services. RENTAL OF EQUIPMENT. Special rental equipment not used in the regular course of lift station installation, repair, and maintenance service and domestic water testing. To be used only with written approval from the Facilities Services representative. Rental is for active use of equipment. Payment for inactive use will not be allowed.. Rental shall be billed at net cost. Include a percentage allowed for overhead and profit. A MAXIMUM OF 0% MARK-UP of cost of rental equipment will be allowed. No mark-up of sales tax allowed. A copy of the itemized rental invoice from the supplier must be included with all billings to the SBSC for rentals. Innovative Contractors Severn Trent Environmental Services, Inc. 0% 0% 0% 0% 0% 0%.. HOURLY RATE FOR WATER TESTING SERVICES: HOURLY RATE FOR SPECIAL SERVICES: To be used only for lift station upgrades/specialty services project work with prior written approval from the Facilities Services representative. Does not apply to routine emergency services. Rate will only be paid for actual time on job. List services and hourly rate. $47.00 $75.00 Crane Truck w/ Operator (4 ton) $00.00 Pump Truck (4,800 gal.) $50.00 Electrician $68.00 Reg Rate; After Hrs Rate Licensed Operator $75.00/hr; $.50/hr Maintenance Technician $75.00/hr; $.50/hr Electrician $75.00/hr; $.50/hr 8 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08 9. 0. MATERIALS MARK-UP. Used for emergency repairs not covered during routine maintenance to the lift stations, and upgrades to existing lift stations. Materials to be billed at net cost. Include a percentage allowed for overhead and profit. A MAXIMUM OF 0% MARKUP of materials will be allowed. No mark-up of sales tax allowed. A copy of the itemized materials invoice from the supplier must be included with all billings to the SBSC. SUBCONTRACTED SERVICES. To be used only with prior written approval from the Facilities Services representative. Subcontracted services are to be billed at net cost. Include a percentage allowed for overhead and profit. MAXIMUM OF 5% MARK-UP of subcontracted services allowed. (No mark-up of sales tax allowed). A copy of the itemized subcontracted services invoice from the Subcontractor must be included with all billings to the SBSC for subcontracted services. RENTAL OF EQUIPMENT. Special rental equipment not used in the regular course of lift station installation, repair, and maintenance service and domestic water testing. To be used only with written approval from the Facilities Services representative. Rental is for active use of equipment. Payment for inactive use will not be allowed.. Rental shall be billed at net cost. Include a percentage allowed for overhead and profit. A MAXIMUM OF 0% MARK-UP of cost of rental equipment will be allowed. No mark-up of sales tax allowed. A copy of the itemized rental invoice from the supplier must be included with all billings to the SBSC for rentals. Southern Sanitary Systems US Water Services Corporation 0% 0% 0% 0% 0% 0%.. HOURLY RATE FOR WATER TESTING SERVICES: HOURLY RATE FOR SPECIAL SERVICES: To be used only for lift station upgrades/specialty services project work with prior written approval from the Facilities Services representative. Does not apply to routine emergency services. Rate will only be paid for actual time on job. List services and hourly rate. $85.00 $78.00 Man plus Equipment $78.4 9 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08. HOURLY RATE FOR SPECIAL SERVICES - Continued Apollo Construction & Engineering Services, Inc. CEC Motor & Utility Services Contact Address Telephone Fax Federal ID Email Thomas G. Kamprath PO Box 5848 Shane Saputo 75 th Street East Sun City Center, FL 57 Palmetto, FL 4 8-645-496 94-845-09 8-645-5 94-845-049 59866 7508484 tkamprath @apollo-construction.com ssaputo @cecmotoru.com 0 Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08. HOURLY RATE FOR SPECIAL SERVICES - Continued Contact Address Telephone Fax Federal ID Email Innovative Contractors Plumber $68.00 Jason D. Tison PO Box 545 Severn Trent Environmental Services, Inc. Instrumentation Technician w/ Service Truck $5.00/hr; $75.00/hr Crane Truck w/ Operatior $75.00/hr; $.50/hr Backhoe/Utility Technician $00.00/hr; $5.00/hr Portable Trash Pump (4") $60.00/day; $80.00/wk Portable Generator (5-45 kw) $80.00/day; $540.00/wk By-Pass Pump (4" Silent Knight) $400.00/day; $,00.00/wk Vactor/Jet Unit (4 hr min)* Utility Tech $50.00/hr; $85.00/hr Televising Unit (4 hr min)* Utiltiy Tech $40.00/hr; $75.00/hr Smoke Testing (min 5,000) $.65/linear ft; na *Units per ft based cost quoted by job. Subs billed at cost+0% Dana A. Kaas 67 Park Row Osprey, FL 49 Houston, TX 77084 94-75-8668 8-578-400 94-75-8698 8-98-697 0075569 6685 info@innovativecontractors.com dkaas @severntrentservices.com Opened September, 0 - :00 p.m.
Tabulation for Lift Station Installation, Maintenance, and Repair and Domestic Water Testing Services-Bid #-08. HOURLY RATE FOR SPECIAL SERVICES - Continued Southern Sanitary Systems US Water Services Corporation Contact David Gage Victoria Penick Address Telephone Fax Federal ID Email 456 Ashton Road 499 Cross Bayou Boulevard Sarasota, FL 4 New Port Ritchey, FL 465 94-95-7867 77-848-89 94-9-9 77-848-770 6505977 000088 sosanitarysys @gmail.com Recorded by: Peggy Long Witnessed by: Joyce E. Haney jfussell @uswatercorp.com Opened September, 0 - :00 p.m.