Analysis of Microtunnelling Using Process Simulation Module

Similar documents
Modeling Microtunnelling Construction Operations with WebCYCLONE

Summary, Conclusion and Outlook

Contents. List of tables. List of figures. Declaration. Kurzfassung. Acknowledgements

DEVELOPMENT OF INTELLIGENT DECISION SUPPORT MEANS FOR EFFECTIVE MICROTUNNELING CONSTRUCTION PLANNING

SIMULATION OF BORED PILE CONSTRUCTION

IPC Company & DPI Presentation. February 2017

Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON

TUNNEL_SIM: DECISION SUPPORT TOOL FOR PLANNING TUNNEL CONSTRUCTION USING COMPUTER SIMULATION. Mohamed Marzok Moatassem Abdallah Moheeb El-Said

Martha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines


Pipe Jacking. Progress is built on ideas.

QUANTIFYING THE EFFECTS OF LUBRICATION ON JACKING FORCES

Ching Guan Kee ABSTRACT

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS

2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995

CC1602 Microtunneling

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Diaphragm wall Construction

Trenchless Technology The Missing Recipe for Sustainable Infrastructure s Construction and Maintenance in the Arab Countries

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.

OPTIMIZING EARTHMOVING OPERATIONS USING OBJECT-ORIENTED SIMULATION. Mohamed Marzouk Osama Moselhi

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Validation and verification of specification models

OPTIMIZING JOINT OPERATION OF TWO TOWER CRANES THROUGH LOOK-AHEAD PLANNING AND PROCESS SIMULATION

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

SPECIAL CONDITIONS FOR MICROTUNNELING (MT) October, 2006

E-Power Pipe : A new trenchless method for underground cable installation

NO DIG BERLIN 2015 Symposium and Exhibition March. Paper 5-3. Increasing requirements move boundaries in Pipe Jacking

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati

Experts in tunneling with Tunnel Boring Machines

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

1.0 Micro Tunnelling An overview

Project Time Management

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

Estimation of Concrete Paving Construction Productivity Using Discrete Event Simulation

Performance review of a pipe jacking project in Hong Kong

Multiple Large Diameter Microtunnels with Limited Ground Cover

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

BRIDGE_ SIM: FRAMEWORK FOR PLANNING AND OPTIMIZING BRIDGE DECK CONSTRUCTION USING COMPUTER SIMULATION. Mohamed Marzouk Hisham Zein Moheeb Elsaid

Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project

SPECIAL PURPOSE SIMULATION TEMPLATE FOR UTILITY TUNNEL CONSTRUCTION

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY

MICROTUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

Review: Simple schedule risk modelling with Safran Risk

Grouting for Freezing

Loshan pipe manufacturing Co. LOSHAN PROFILE

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless

PIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

Presented By: Brenden Tippets, Project Executive

Use of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS.

SIMULATION MODEL OF PREFABRICATED HOUSE FROM MANUFACTURING TO ON-SITE INSTALLATION

INTEGRATION OF CONSTRUCTION AND TRAFFIC ENGINEERING IN SIMULATING PIPE-JACKING OPERATIONS IN URBAN AREAS. Chi-Sun Poon

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

Estimating the Size of Temporary Facilities in Construction Site Layout Planning Using Simulation

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

5/16/2018. New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters. Dr. Marc Peters, Herrenknecht AG. Highlights.

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Weighing the Risks of Installing a Lake Tap with Microtunneling

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project

Microtunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected.

WARNING DO NOT BID ON THIS PROJECT

BC s Magazine for Trenchless Construction

Brief Discussion on Application of Guided Boring Non-excavation Technology in Repair of Sewage Pipes Mei-Di SHAN1,a,*, Feng ZHOU2,b

Three-dimensional computer simulation of soil nailing support in deep foundation pit

SIMULATION OF CONSTRUCTION OPERATION WITH DIRECT INPUTS OF PHYSICAL FACTORS Simulation with first-order factors

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

A number of abbreviations and technical terms have been used in this guideline:

Simulation of construction processes considering spatial constraints of crane operations

Optimizing Construction Planning and Scheduling through Combined Virtual Prototyping Technology and Building Information Models

Concrete Pipe Jacking

BRADSHAW CONSTRUCTION CORPORATION

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING

Mastering Microsoft Project 2010

GEOTECHNICAL BASELINE REPORTS APPLYING THE GUIDELINES TO MICROTUNNELING

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

Effective Resources Management in Construction Industries for Success

Offshore meets Onshore: Trenchless solutions for pipeline landfalls.

A TUTORIAL ON ERGONOMIC AND PROCESS MODELING USING QUEST AND IGRIP. Deidra L. Donald

TBM rescue projects using shafts and ground freezing

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

2014 Summer Winter Integrated Field Technologies (SWIFT) Conference, Vancouver, BC

underground coal mine delay data analysis system

Problems Realized with Contractor-Proposed Pilot Tube Auger Boring

Program Evaluation and Review Technique (PERT)

Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking

Available online at ScienceDirect. Procedia Engineering 189 (2017 ) 11 17

Combining Activity-Based Costing with the Simulation of a Cellular Manufacturing System

Tools and techniques for modelling production systems

8Re: Northern Access 2016 Project. Ischua Creek Crossing (MP 62.4) Analysis of Feasibility and Risks of Direct Pipe Installation

Vibroflot Modular Product Range

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts

NZQA Expiring unit standard version 3 Page 1 of 6

Soil Improvement by Compaction Grouting

Transcription:

an ISRM specialized conference Analysis of Microtunnelling Using Process Simulation Module T. T. Dang a * a University of Mining and Geology, Hanoi, Vietnam * thanh.dangtrung@rub.de (corresponding author s E-mail) Abstract The use of process simulation module can be benefit for planning and operating a microtunnelling project. Thereby, problems at different construction phases can be anticipated and analyzed. Moreover, it has potential to optimize usage of resources, to develop better project plans, to minimize costs or project duration, to improve overall construction project management and to avoid costly mistakes. This research presents an approach for analyzing construction operations with Microtunnel Boring Machines (MTBM) utilizing process simulation module. It helps to analyze the processes and to identify the influence of disturbances on the productivity of MTBM operations. In view of these objectives, the MiSAS (Microtunnelling: Statistics, Analysis and Simulation) module is introduced and applied. The MiSAS simulation module allows to evaluate the impact of the disturbances and predict the resulting tunnel advance rate. Within the paper an actual microtunnelling projects at the city of Recklinghausen, Germany, is used for the case study. Keywords: Microtunnelling operations; Process simulation module; Microtunnelling: Statistics, Analysis and Simulation (MiSAS) module; Microtunnel Boring Machines (MTBM). 1. Introduction Microtunnelling operations involve a complex interaction of processes and the productivity is affected by disturbances, such as weather, limited space, staff absenteeism, regulatory requirements, design changes and reworks. Hence, there is a need for a better understanding the disturbances influencing productivity. The efficiency of MTBM will be increased by that knowledge. The use of simulation module is a widely used tool for the design, analysis and optimization of technical processes. In general, the simulation model can help to analyze causes for delay, bottlenecks and reduction of productivity during construction operations. Since the early 1990s until 2000, a number of simulation systems and simulation applications were used. Liu and Ioannou (1992) developed a simulation module, called COOPS. The COOPS module are defined via a graphical user interface where the simulator can capture resources, define different resources and can link with the calendars that can be used to pre-empt activities during work breaks. Odeh et al. (1992) and Tommelein et al. (1994) developed an module, named CIPROS. The CIPROS enables the user to relate construction plans and specifications to a construction plan. McCahill and Bernold (1993) developed a general purpose module called STEPS with a library consisting of standard models for common construction processes. Martinez (1996) introduced STROBOSCOPE. STROBOSCOPE is used in the analysis of construction operations. It is designed for modeling complex construction operations in detail and for the development of special purpose simulation tools. Within this paper, the use of MiSAS module is presented to analyze production under consideration of typical disturbances of MTBM systems. The MTBM with hydraulic spoil removal is the most widely used with many recent innovations and for this reason in the focus of this research. 2. Theories The paper is describe in brief the methodology in order to develop the MiSAS module. The MiSAS is established based on System Modeling Language (SysML) model. The SysML model describing the microtunnelling process is developed in the first step. The simulation model consists of three types of diagram: block definition diagram (bdd), state machine diagram (stm) and sequence diagram (sd), which are supported in the SysML. The simulation model is used to analyze and understand the entire process involved in microtunnelling construction and identify the model variables for which information needs to be collected. Subsequently, the simulation software AnyLogic is applied to create the MiSAS (Microtunnelling: Statistics, Analysis and Simulation)

an ISRM specialized conference simulation module based on the SysML formalization. The implementation of the proposed methodologies, utilizes discrete event simulation (DES) and system dynamic (SD) modelling. The simulation module allows to evaluate the impact of the different ground conditions, disturbances and predict the resulting tunnel advance rate. The detail of the procedure in order to develop the MiSAS module, the papers of Dang (2013; 2014a; 2014b) are recommended for further reading. 3. Introduction MiSAS module This section will introduce the MiSAS module in detail. All the components of the developed module MiSAS and the entire of Graphical User Interfaces (GUI) have been designed and implemented utilizing AnyLogic simulation software. The author proposed in this study the development of a graphical interactive environment for the simulation of tunnels construction with MTBM. Here, the user will input the information through the GUI. There have been twenty-one Active Object Classes (AOC) used to design and code in order to develop the module MiSAS. Thirteen of the AOC are designed in order to represent the behavior of the devices in microtunnelling (e.g. the behavior of MTBM, separation plant, crane, etc.). Three of them are designed to analyze the output results (e.g. rate of progress, prediction of the total time of a project with and without disturbances, 3D animation simulation, etc.). Six of the AOC have been coded and GUI developed to input the data and information. The role of six GUI is to input, define the various resources, activity durations, disturbances, site layout. Fig. 1a and b depict twenty one AOCs and an example of the interface of an input resource specification of the MiSAS module. (a) (b) Fig. 1. a. Twenty-one AOC of MiSAS and b. An example of the GUI for resource specification 3.1. The GUI - Input Resource specification The GUI of input resource specification is depicted in Fig. 1b. The screen allows the user to: 1) Define the quantity of laborers working in the construction project; 2) Input of the activity durations (e.g. the time to connect and disconnect cables, the time for mixing lubricant and so on); 3) In addition, the definition of the project is also used (e.g. length of the project, attributes of type of pipe, and so forth). 4) Run simulation analysis and link to other interfaces such as: 3D animation, statistics analysis of the data during running MiSAS module. 3.2. The GUI - Input disturbances The GUI of input disturbances form as depicted in Fig. 2. It describes and imputes the most common types of disturbances that normally occur on the job site. The screen allows the user to: 1) Define the type of disturbances that may occur. The type of disturbances used in this research are: slurry problems, navigation errors, mechanical and operation problems. Define the duration time to repair the disturbances. Define the occurrence per cycle. As the disturbances are stochastic. Therefore, the GUI of input disturbances may help the user to input their forecast about the percentage of disturbances that may be expected per cycle. The value of the occurrence per cycle depends on the experiences of the user.

an ISRM specialized conference 3.3. The GUI - Static analysis and statistics The static analysis and statistics extracts data from all of the system s component. Fig. 3 depicts the main menus for the static analysis and statistics. Different types of reports are obtained, there are: 1) rate of progress; 2) prediction of the productivity of microtunnelling with and without disturbances; 3) estimation of the productivity with different soil components; 4) evaluation of some information, which are helpful for microtunnelling (e.g. prediction of the total volume of lubricant support for project, estimation of the volume of spoils that need to be excavated, etc.). Fig. 2. The GUI for defining disturbances Fig. 3. The GUI - Static analysis and statistics

an ISRM specialized conference 3.4. The GUI - Dynamic analysis and statistics The dynamic analysis and statistics supports animation to present the overall system dynamics, the interaction between laborers and resources, the delay associated to the individual resources. Fig. 4 illustrates a screenshot of a layout of a tunnel construction with MTBM after 10 cycles of simulation. It also depicts animated screens of the overall activity of MTBM, resources, laborers. Fig. 4. The GUI - Dynamic analysis and statistics 4. Case study The application of the MiSAS module has been executed on the three different microtunnelling projects in Germany. This paper presents the data, which has been collected in a project located in Recklinghausen City, Germany, named BV Recklinghausen V.5.1. Details of the microtunnelling project, including the general information, ground conditions, activities duration and disturbances will be discussed. 4.1. Project description The tunnel went along the road Im Reitwinkel as shown in Fig. 5. A 79.44 meters long drive completely through fine sand and silt. The depth to the axis was approximately 7.4 meters, grade 1.4 and the pipe size was 1.8 meters internal diameter, 2.2 meters external diameter, 3.5 meters Koelner Strasse Im Reitwinkel Fine sand and silt Im Reitwinkel Tunnel Length of tunnel = 79,44 m Marl and clay (a) Site plan and position of bore holes (b) Simplified long section Fig. 5. Details of BV Recklinghausen V.5.1.

an ISRM specialized conference length. Excavation was carried out by the microtunnelling machine VSM 1800 with an outside diameter of 2.20 meters using hydraulic spoil removal. The position of the construction site was easily accessible. The whole tunnel of project Recklinghausen V.5.1 will encounter the types of soil conditions which are fine sand and silt. That is a good soil condition in order to execute jacking processes. The average time for jacking processes based on the data collected from the job site ranged from 85.00 minutes to 99.00 minutes. 4.2. Duration data collection The input data duration used for running the simulation model must be collected. In order to collect duration information, the eleven important durations affecting the productivity of the microtunnelling construction are collected. There are: 1) attaching pipe; 2) lifting pipe and go to shaft; 3) lowering pipe; 4) laying pipe; 5) replacing jack collar; 6) connecting cables and hoses; 7) jacking processes; 8) retracting jack collar; 9) disconnecting cables and hoses; 10) time for cleaning spoil container; 11) time for mixing bentonite. The activities duration is archived within two weeks by using a stop watch at the job site as shown in Table 1. Table 1. Duration information of job site: BV Recklinghausen V.5.1 Activity number Activity Minimum Mode Maximum value (min) value (min) value (min) 1 Attaching pipe section 0.30 0.50 0.70 2 Lifting pipe go to shaft 0.50 0.80 1.00 3 Lower pipe 0.90 1.20 1.50 4 Laying pipe 1.00 1.70 2.00 5 Replace jack collar 10.00 12.50 15.00 6 Cables connect 12.00 15.00 16.30 7 Jacking forward 53.00 95.00 165.00 8 Retract jack collar 11.00 13.30 15.00 9 Disconnect cables 23.00 25.00 27.50 10 Time for clean spoil container 15.00 23.00 27.00 11 Time for mixing bentonite 13.00 15.00 16.00 Note: Lowest value: The minimum value; Highest value: The maximum value; Mode value: The most likely value. 4.3. Simulation results The application of the module to the project are described in this section. The simulation module is performed to evaluate and analyze the impact of the disturbances on the productivity of MTBM. The simulation experiment consider the disturbances occur during jacking processes. The mean time between failure (MTBF) are generated by the triangular distribution. The assumptions input values made for the applications in this paper shown in Table 2. Table 2. Configuration of disturbance simulation Type of disturbances Mean cycles Time to repair (min) between failure (%) Min Max Mode Blocking, Burst of Slurry Lines 15 65 85 70 Blocking of Separation Plant 35 60 75 70 Laser Problems 10 15 20 17 MTBM Problems 5 220 250 235 Pump Problems 15 50 60 55 Jacking Station Problems 3 40 50 45 Table 3. Overall simulated microtunnelling process productivity in project BV Recklinghausen V.5.1 with disturbances Total sim. Time unit (min) Cycle number Productivity for one pipe (3.5m) Productivity per time unit 4621.5 22 210.07 0.00476035919 Fig. 6 shows the change of productivity of the tunnel in the sub-project BV Recklinghausen V.5.1 considering disturbances. Table 3 displays the productivities obtained from the simulation. The comparison with the case without disturbances was carried out. After 22 cycles, the average simulated duration with disturbances is 210,07 min for one pipe of 3.5m length (compared with 159.925 min for

Time in minutes an ISRM specialized conference one pipe without disturbances), that means that it is ca. 27.1% higher than the average productivity obtained without disturbances. The total time to finish the project with disturbances is 4621.50 min. The total time is 1103.15 min (ca. 18.4 hours) higher if compared with the total time to finish the project without disturbances which is 3518.35 min. 300 250 200 150 100 50 0 2 4 6 8 10 12 14 16 18 20 22 Simulation Cycles (Number of Pipes) Fig. 6. Simulation cycle durations considering disturbances in project BV Recklinghausen V.5.1 Working time: 45.3% Waiting time: 31.6% Delay time: 23.1% Fig. 7. Utilization of MTBM (as% of total time) considering disturbances in project BV Recklinghausen V.5.1 The simulation results in Fig. 7 also represent the working time, waiting time and delay time of the MTBM. The results show that the working time of the MTBM is 45.3%, as shown in Fig. 7, black area. The waiting time for jacking processes is 31.6%, represented in Fig. 7, yellow area, and the delay time (because of the occurring disturbances) is 23.1%, represented as red area in Fig. 7. 5. Conclusions In the research, an appropriate and adaptable simulation module for microtunnelling construction operations based on a formal model description of MTBM with hydraulic spoil removal was introduced. The simulation module focuses on the evaluation of the effect of different disturbances on the productivity of the microtunnelling process. In specific applications, the MiSAS module helps the manager or engineer to analyze the possibility of multiple approaches to execute the tunnel construction with MTBM. Using MiSAS, it is also shown that the best allocation of resources can be determined based on productivity. Overall, the MiSAS simulation module accomplishes the initial objectives as defined. It provides a set of flexible and powerful analytic techniques that can be customized by any user according to the specific applications that are desired. References Liu, L. Y. and P. G. Ioannou., 1992, Graphical object-oriented discrete event simulation system. In Proceedings of the 24th Conference on Winter Simulation, Association for Computing Machinery, New York, USA, pp. 1285 1291. ISBN: 0-7803-0798-4. Odeh, A. M., I. D. Tommelein, and R. I. Carr., 1992, Knowledge based simulation construction plans. In Proceedings of the 8th Conference on Computing in Civil Engineering, Volume 7, ASCE, New York, USA, pp. 1042 1049. Tommelein, I. D., R. I. Carr, and A. M. Odeh., 1994, Assemply of simulation networks using design, plans, and methods. Journal of Construction Engineering and Management, 120(4), 796 815. McCahill, D. F. and L. E. Bernold., 1993, Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management 119(3), 590 606. Martinez, J. C., 1996, STROBOSCOPE - State and resource based simulation of construction process. PhD. Thesis, The University of Michigan.

an ISRM specialized conference Dang, T. T., 2013, Analysis of microtunnelling construction operations using process simulation. Ph.D. thesis, Bochum Ruhr Univ., Germany. Dang, T. T., 2014, Advancement simulation of microtunnel boring machines. Proc. Of 3 rd International Conference on Advances in Mining and Tunnelling., 253-259. Dang, T. T., Le, L. H and Le, T. K., 2014, Multi-method simulation of the construction process in microtunnel boring machines. Proc. Of 3 rd International Conference on Advances in Mining and Tunnelling., 265-271.