ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

Similar documents
BoSS Room-Mate. 3T - Through the Trap Method

Safety First Mobile Towers - 3T Method INTRODUCTION

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

Mobile Towers - 3T Method

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

Safety First Mobile Towers - 3T Method INTRODUCTION

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

Safety First Mobile Towers - 3T Method INTRODUCTION. Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE

Inspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE

SIDE CANTILEVER TOWER SCAFFOLD. 3T - Through the Trapdoor Method USER GUIDE

STAIRMAX 700 MK2 USER GUIDE. Aluminium Tower 700 Climbing Rung. 3T - Through The Trapdoor Method

BoSS Climalite Camera and lighting tower

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

8 Rung Industrial Tower

1450/850. Instruction Manual. Mobile Access Tower

INSTRUCTION MANUAL MOBILE ACCESS TOWER

Assembly Instructions

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE

A SAFER WAY TO REACH NEW HEIGHTS. Instruction Manual. Mobile Access Tower. 3T - Through the trap method

Span 300 Instruction Manual

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

Span 400 Instruction Manual

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Span 400 Series Instruction Manual

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Snappy Ladder 300 Instruction Manual

ONE MAN TOWER. Instruction/safety manual

Industrial Aluminium Towers

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

Industrial Aluminium Towers

3T - Through The Trapdoor Method

LEWIS Miniscaff Folding Tower Assembly Guide

Industrial Aluminium Towers

Industrial Aluminium Towers

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service

Single Width Tower Assembly Guide

3T - Through The Trapdoor Method

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

Low Level Access Platform

ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR

Tower ASSEMBLY GUIDE

AGR TOWER. Standard Features include. Tower Assembly Training Available

GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004

A-0312 ASSEMBLY GUIDE

TOWER EXTENSION PACK 3 Model No. SSCL3. TOWER EXTENSION PACK 4 Model No. SSCL4 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND. Model No. SSCL1.

Thanks for viewing this information PDF. There's more products, details, speci cation etc. on our website - CLICK THE LINKS ABOVE

Assembly Instructions

GENERAL SAFETY RULES. INSTRUCTION MANUAL (Platform Heights 1.1m, 2.1m, 3.1m & 4.1m)

Mini-Max Access Tower System Data-Sheets

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

1 Man Mobile Aluminium Tower System


Instruction Manual Span Scaffolds

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Mobile Tower Scaffold. 1. INTRODUCTION 2. REGULATIONS 3. PRIOR TO ERECTION 4. MOVING A TOWER 5. INSPECTION 6. HAZARDS

ASSEMBLY GUIDE FOR USE WITH EURO TOWERS LADDER FRAME 3T TOWER SYSTEMS ONLY

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Adjusta Minit Anti-Surf

Customer Support Manual. This booklet contains information on how to erect, dismantle and use Waco Kwikform Aluminum Scaffolding.

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

User Manual. JUMBO FOLDING SCAFFOLD w/stairs & railing

PROFESSIONAL ROLLING TOWER SYSTEMS

USER S MANUAL HAKI STAIR TOWER

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

Safety on Heights: Our Policy

Rolling scaffold single/double width Safe-Quick Guardrail RS TOWER 51/52/54

USER S MANUAL. HAKI Loading Tower

Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT

Aluminum Scaffold Safety Rules

TAKING YOU TO NEW HEIGHTS IN SAFETY...

USER S MANUAL HAKI COMPACT STAIR TOWER

USER S MANUAL HAKI PUBLIC ACCESS STAIR

Scaffold Instruction Manual

USER S MANUAL HAKI PUBLIC ACCESS STAIR

ALUMINUM SCAFFOLDING


SAFETY SYSTEM. G-Deck Consideration. Manual Handling

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

SAFE WORK PROCEDURE LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: Leon Prevost Brent Vandenbosch

Assembly and Use manual Rolling tower 5100 and 5200 Stair tower 5300 Folding tower 5400 and 5500 EN C

Mobile Safety. EN Assembly and Use manual Rolling tower 4100 and 4200 Folding tower 4400-K C-0711.

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one

ACCess equipment Towers LADDers TresTLes & BoArDs PLATforms Low LeVeL ACCess 32-33

Transcription:

ROOM-MATE 3T - Through the Trapdoor USER GUIDE

Safety First Introduction Please read this user guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available to download from our website at bossaccesstowers.com. BoSS mobile aluminium towers are light-weight scaffold towers used throughout the building and construction industry for both indoor and outdoor access solutions where a stable and secure platform is required. Ideal for maintenance and installation work or short-term access, the highly versatile towers provide a strong working platform for a variety of heights. This user guide provides you with step by step instructions to ensure your system is erected easily and safely, using the 3T (Through The Trapdoor) method. The law requires that personnel erecting, dismantling or altering towers must be competent. Any person erecting a BoSS mobile tower must have a copy of this user guide. For further information on the use of mobile access and working towers consult the PASMA operators code of practice. If you need further information, design advice, additional user guides or any other help with this product, please contact the manufacturer on +44 (0)1621 745900 or email uk.customercare@wernerco.com. Compliances Following examination by the SP Technical Research Institute of Sweden, the Boss Room-Mate mobile access tower has been issued with a Type Examination Certificate No. 249403 in accordance with the requirements of Ordinance AFS 1990:12 Stallningar, type examination rules SPCR 064 for temporary structures and SS-EN 1004:2005 including appurtenant standards. User Guide EN 1298-IM-EN 1 BoSS Room-Mate User Guide

Safety First Preparation and inspection Inspect the equipment before use to ensure that it is not damaged and that it functions properly. Damaged or incorrect components should not be used. Safe use Check that all components are on site, undamaged and that they are functioning correctly - (refer to Checklist and Quantity Schedules). Damaged or incorrect components should not be used. Check if the ground on which the mobile access tower is to be erected and moved is capable of supporting the tower. The safe working load is 275kgs (606lbs) per platform level, uniformly distributed up to a maximum of 750kgs per tower. Towers must always be climbed from the inside during assembly and use. It is recommended that towers should be tied to a solid structure when left unattended. Adjustable legs should only be used for levelling. Lifting of equipment Tower components should be lifted using a reliable lifting material (e.g. strong rope) employing a reliable knot (e.g. clove hitch) to ensure safe fastening. Always lift within the footprint of the tower. Assembled mobile towers should not be lifted with a crane or other lifting device. bossaccesstowers.com 2

Safety First Stabilisers / ballast Stabilisers or outriggers and ballast weights should always be fitted when specified. The Quantity Schedules show the recommended stabilisation. In circumstances where there is restricted ground clearance for stabilisers/outriggers, contact your supplier for advice. Ballast must be of solid materials (i.e. not water or loose sand) and should not be positioned to overload individual legs. Ballast should be secured against accidental removal where practicable, and be supported on the lowest rung of the bottom frame. Movement The tower should only be moved by manual effort, and only from the base. When moving the tower, beware of live electrical apparatus, particularly overhead, plus wires or moving parts of machinery. No person or materials should be on the tower during movement. Caution should be exercised when wheeling a tower over rough, uneven or sloping ground, taking care to unlock and lock castors. If stabilisers are fitted, they should only be lifted a maximum of 25mm above the ground to clear ground obstructions. The overall height of the tower when being moved, should not exceed 2.5 times the minimum base dimensions, or 4 metres overall height. Before use, check the tower is still correct and complete. After every movement of the tower use a spirit level to check that it is vertical and level and set the adjustable legs as required. Do not move the tower in wind speeds over 7.7 metres per second (17mph). 3 BoSS Room-Mate User Guide

Safety First During use Beware of high winds in exposed, gusty or medium breeze conditions. We recommend that in wind speeds over 7.7 metres per second (17 mph), cease working on the tower and do not attempt to move it. If the wind becomes a strong breeze, expected to reach 11.3 metres per second (25 mph), tie the tower to a rigid structure. If the wind is likely to reach gale force, over 18 metres per second (40 mph), the tower should be dismantled. Wind description Beaufort scale Beaufort no. Speed in m.p.h Speed in m/sec Medium Breeze Strong Breeze Raises dust and loose paper, twigs snap off Large branches in motion, telegraph wires whistle 4 8-12 4-6 6 25-31 11-14 Gale Force Walking is difficult 8 39-46 17-21 Beware of open-ended buildings, which can cause a funnelling effect. Do not abuse equipment. Damaged or incorrect components should not be used. Raising and lowering components, tools, and/or materials by rope should be conducted within the lower base. Ensure that the safe working load of the supporting decks and the tower structure is not exceeded. The assembled tower is a working platform and should not be used as a means of access or egress to other structures. Beware of horizontal forces (e.g. power tools) which could generate instability. Maximum horizontal force 20kg. Mobile towers are not designed to be suspended - please refer to your supplier for advice. Do not use boxes or stepladders or other objects on the platform to gain extra height. bossaccesstowers.com 4

Safety First Ties Ties should be used when the tower goes beyond its safe height, beyond the limits of the stabilisers/outriggers, or if there is a danger of instability. They should be rigid, two way ties fastened to both uprights of the frame with load bearing right angled or swivel couplers. Only couplers suitable for the 50.8mm diameter tube of the tower should be used. Ideally, ties should be secured to both faces of a solid structure by means of anchorages. The tie frequency may vary depending on the application, but they should, at a minimum, be every 4 metres height. For further information on tying-in a tower please contact your supplier. Maintenance - storage - transport All components and their parts should be regularly inspected to identify damage, particularly to joints. Lost or broken parts should be replaced, and any tubing with indentation greater than 5mm should not be used and put to one side for manufacture repair. Adjustable leg threads should be cleaned and lightly lubricated to keep them free running. Brace claws, frame interlock clips, trapdoor latches and platform wind-locks should be regularly checked to ensure they lock correctly. Refer to the BoSS Inspection Manual for detailed inspection and maintenance advice. Components should be stored with due care to prevent damage. Ensure components are not damaged by excessive strapping forces when transported. 5 BoSS Room-Mate User Guide

Components 4 Rung Guardrail Frame Trapdoor Platform Toe Board Set 7 Rung Lift Frame Locking Pin Base Unit Diagonal Brace Castor and Castor Adaptor or Adjustable Leg Horizontal Brace Stabiliser bossaccesstowers.com 6

Boss Room-Mate Quantity schedule Code Description No. of rungs to platform Weight (kgs) (WH) 2.80m (PH) 0.80m 3.80m 1.80m 4.55m 2.55m 5.55m 3.55m 6.30m 4.30m 8.05m 6.05m 3 7 10 14 17 24 Height 1 Height 2 Height 3 Height 4 Height 5 Height 6 33351300 125mm Castor 2.50 4 4 4 4 4 4 32441300 Castor Adaptor* 0.21 4 4 4 4 4 4 *When used on uneven ground and adjustment is required, 4 adjustable legs must be used which replace the castor adaptors. 60151400 Base Unit 21.43 1 1 1 1 1 1 60251400 7 Rung Lift Frame 9.80 2 2 4 6 60351400 4 Rung Guardrail Frame 5.60 2 2 30451100 1.8m Trapdoor Deck 14.35 1 1 2 2 3 4 31251300 1.8m Horizontal Brace (Red) 1.88 3 5 7 9 9 13 31351300 2.1m Diagonal Brace (Blue) 2.06 1 2 4 4 6 30451400 Toe Board Set 10.00 1 1 1 1 1 1 31751300 SP7 Fixed Stabiliser 5.80 4* 4 4 31851300 SP10 Adjustable Stabiliser 9.87 4 4 * SP7 Stabiliser only required when Room-Mate is used externally. 7 BoSS Room-Mate User Guide

Assembly When erecting a BoSS Room-Mate: To comply with the Work at Height Regulations, guardrails are positioned in advance of climbing onto a platform to reduce the risk of falling. All platforms feature double guardrails on both faces of the tower. All guardrails should be 2 and 4 rungs (0.5m and 1.0m) above platforms. Position handrails 4 rungs above platform level. Position intermediate handrails 2 rungs above platform level. Never stand on an unguarded platform positioned above the second rung of a tower. If your risk assessment shows it necessary, you may also need to guardrail platforms at this level. To dismantle a BoSS Room-Mate: Remove toe boards, and pass down the tower. Unclip farthest end of braces and immediately go to protected trapdoor position on ladder to complete removal. Remove upper platforms from protected levels below. Pass removed components out of the tower to a colleague. bossaccesstowers.com 8

Assembly Procedure Mobile Towers - 3T Method Height 1 - platform 0.8m Lay the folded base unit on its side. When using castor adaptors 1 for flat and level ground only, fit four castor adaptors into the bottom of the base unit and then insert four castors into the castor adaptors. The bottom of the base unit may be identified by the bottom end casting - see diagram: When using adjustable legs for uneven or sloping ground, push four castors into four adjustable legs and then insert the adjustable legs into the bottom of the base unit. The bottom of the base unit may be identified by the bottom end casting - see diagram: 9 BoSS Room-Mate User Guide

Assembly Procedure Stand the base unit up and push the central hinged frame 2 outwards until flat. Unfold the two end frames. Insert the locking pin into the top centre hinge joint. Lock the castor brakes. Check the ground is flat and all four castor wheels are in contact with the ground. Use a spirit level to check the base unit level. If the ground is uneven or sloping you must fit adjustable legs. IMPORTANT. Only use the adjustable legs to level the tower and not to gain extra height. bossaccesstowers.com 10

Assembly Procedure 3 Fit a horizontal brace (red) as a guardrail on the top (7th) rung, on the hinged frame side of base unit. IMPORTANT. Always ensure braces are fully locked in position. 4 Position a platform on the 3rd rungs of the base unit. Do not position above the 3rd rung. Engage the wind-locks, underneath the rungs, at both ends of the platform. 11 BoSS Room-Mate User Guide

Assembly Procedure Climb onto the platform in the sequence shown. From the seated position, fit horizontal braces as guardrails on the 5th and 7th rungs on the open side of the base unit. Do not stand on the platform until the guardrails are in place. 5 IMPORTANT Always ensure braces are fully locked in position. If your risk assessment shows it is necessary, fit a set of toe boards to the platform. Check there are no gaps through which any materials could fall and that the trap door opens correctly. The tower is now complete. 6 IMPORTANT. Never climb up the outside of the base unit. Never overreach get down and reposition the base unit. bossaccesstowers.com 12

Height 2 Platform 1.8m 1 2 Assemble the base unit as shown in steps 1 and 2 on pages 9-10. Fit a horizontal (red) brace between the verticals just above the 1st rung, on the open side of the tower. IMPORTANT. Always ensure braces are fully locked in position. Position a temporary platform on the 2nd rungs of the tower. 3 Engage the wind-locks underneath the rungs at both ends of the platform. Fit a four rung guardrail frame to each end of the base unit. Ensure that the 4 rung frame interlock clips are engaged. 13 BoSS Room-Mate User Guide

Height 2 Platform 1.8m 4 Reposition the temporary platform to the 7th rung of the tower. Ensure the wind-locks are engaged, at both ends of the tower. Fit a diagonal brace (blue) on the open side of the tower, between the 7th and 11th rungs. If the tower is being used externally, fit 4 stabilisers to the tower. Note: Stabilisers omitted on drawing for clarity. Refer to the stabilisers section on page 25 for guidance on positioning stabilisers. Climb the tower on the inside using the rungs of the end frames. From a protected position within the trapdoor, fit four horizontal braces as guardrails, two and four rungs above the platform (the 9 th and 11 th rungs of the tower), on both sides of the tower. IMPORTANT. Always ensure braces are fully locked in position. NEVER stand on the platform until the guardrail braces are in place. bossaccesstowers.com 14

Height 3,5 & 6 Platform 2.55m, 4.3m & 6.05m 1 Assemble the base unit as shown in steps 1 and 2 of Height 1 (0.8m) build method. See pages 9-10. Position a temporary platform on the 2nd rungs of the tower. 2 Engage the wind-locks, underneath the rungs, at both ends of the platform. 15 BoSS Room-Mate User Guide

Height 3,5 & 6 Platform 2.55m, 4.3m & 6.05m 3 Fit a 7 rung lift frame to each end of the base unit. Ensure the four frame interlock clips are engaged. Fit a diagonal brace between the 3 rd and 7 th rungs on the open side of the tower. Fit another diagonal brace in the opposite direction to the lower diagonal, between the 7 th and 11 th rungs of the tower, as shown. bossaccesstowers.com 16

Height 3,5 & 6 Platform 2.55m, 4.3m & 6.05m 4 Fit a platform to the 10 th rungs of the tower. 5 Fit four stabilisers to the tower. Refer to Stabilisers Section on page 25 for guidance on positioning stabilisers. 17 BoSS Room-Mate User Guide

Height 3,5 & 6 Platform 2.55m, 4.3m & 6.05m Climb the tower on the inside using the rungs of the end frame. 6 From the protected trapdoor position, fit four horizontal braces as guardrails, two and four rungs above the platform (the 12 th and 14 th rungs of the tower) on both sides of the tower. IMPORTANT. Always ensure braces are fully locked in position. NEVER stand on the platform until the guardrail braces are in place. bossaccesstowers.com 18

Height 3,5 & 6 Platform 2.55m, 4.3m & 6.05m If building to 4.3m & 6.05m Platform height: Continue to fit additional pairs of 7 rung lift frames, diagonal braces, horizontal guardrails and trapdoor decks. DO NOT CLIMB ON TO THE PLATFORM UNTIL GUARDRAILS ARE IN PLACE. Fit a set of toe boards to the platform (see page 18). Check there are no gaps through which any material could fall and that the trapdoor opens correctly. 7 The tower is now complete. 6.05m Tower 6.05m Platform Height 4.3m Platform Height 4.3m Tower 19 BoSS Room-Mate User Guide

Height 4 Platform 3.55m For Height 4, the tower must be erected and platform levels repositioned as shown. 1 2 3 Assemble the base unit as shown in steps 1 and 2 of Height 1 (0.8m) build method. See pages 9-10. Fit a platform to the 10 th rungs of the tower. Engage the windlocks, underneath the rungs, at both ends of the platform. Fit a diagonal brace (blue) on the open side of the tower between the 1 st and 5 th rungs. bossaccesstowers.com 20

Height 4 Platform 3.55m Climb the tower on the inside using the rungs of the end frames. 4 From the protected trapdoor position, fit 4 horizontal braces as guardrails, two and four rungs above the platform (the 12 th and 14 th rungs of the tower) on both sides of the tower. 21 BoSS Room-Mate User Guide

Height 4 Platform 3.55m 5 Fit a 4 rung guardrail frame to each end of the tower. Ensure the frame interlock clips are engaged. bossaccesstowers.com 22

Height 4 Platform 3.55m The platforms must now be repositioned as follows: Whilst 6 standing on the upper deck, unlatch the four guardrail brace hooks furthest from the trapdoor but leave the braces in position. From the protected position of the trapdoor deck, unlatch the remaining four brace hooks and remove the four guardrail braces and then descend immediately to the lower platform. NEVER stand on a platform without guardrails. Remove the platform from the 10 th rungs of the tower. Fit a diagonal brace between 7 th and 11 th rungs of the tower in the opposite direction to the lower diagonal. Reposition the deck from the 2 nd rung to the 6 th rung of the tower and fully guardrail, as shown. 23 BoSS Room-Mate User Guide

Height 4 Platform 3.55m Fit a diagonal between the 9 th and 13 th rungs of the tower. Fit a 7 deck on the 14 th rungs of the tower. From the protected position of the trapdoor deck, fit a pair of guardrails two and four rungs above the platform (16 th & 18 th rungs of the tower). Fit a diagonal between the 14 th and 18 th rungs of the tower, as shown. Fit toe boards (see instructions page 18). The tower is now complete. bossaccesstowers.com 24

Stabilisers and Outriggers Stabilisers Stabilisers are used when the tower is to be moved occasionally, frequent movement will require outriggers. SP10 and SP15 telescopic stabilisers must always be fully extended. Position the lower clamp so that the lower arm is as close to the horizontal as possible. Adjust the position of the top clamp to ensure the stabiliser foot is in firm contact with the ground. Ensure clamps are secure. When moving, check for obstructions and lock feet a maximum 25mm off the ground, unlock castors, and move. After moving, check all castors are in ground contact and lock stabiliser feet. Outriggers For information on mobile outriggers please consult your supplier. 25 BoSS Room-Mate User Guide

Notes bossaccesstowers.com 26

For further information about this product or any other products and services, please contact: The Causeway, Maldon, Essex, CM9 4LJ, United Kingdom +44 (0)1621 745900 +44 (0)1621 859845 uk.customercare@wernerco.com bossaccesstowers.com Members of: PN03302600 2017 WernerCo Rev. 10/17