Safety First Mobile Towers - 3T Method INTRODUCTION

Similar documents
BoSS Room-Mate. 3T - Through the Trap Method

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

Mobile Towers - 3T Method

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

Safety First Mobile Towers - 3T Method INTRODUCTION

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method INTRODUCTION. Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

Inspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified

BoSS Climalite Camera and lighting tower

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE

SIDE CANTILEVER TOWER SCAFFOLD. 3T - Through the Trapdoor Method USER GUIDE

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

STAIRMAX 700 MK2 USER GUIDE. Aluminium Tower 700 Climbing Rung. 3T - Through The Trapdoor Method

1450/850. Instruction Manual. Mobile Access Tower

8 Rung Industrial Tower

Assembly Instructions

INSTRUCTION MANUAL MOBILE ACCESS TOWER

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE

Span 300 Instruction Manual

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

A SAFER WAY TO REACH NEW HEIGHTS. Instruction Manual. Mobile Access Tower. 3T - Through the trap method

Span 400 Instruction Manual

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Span 400 Series Instruction Manual

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Industrial Aluminium Towers

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

Industrial Aluminium Towers

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

3T - Through The Trapdoor Method

ONE MAN TOWER. Instruction/safety manual

Industrial Aluminium Towers

Industrial Aluminium Towers

Snappy Ladder 300 Instruction Manual

LEWIS Miniscaff Folding Tower Assembly Guide

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service

3T - Through The Trapdoor Method

Single Width Tower Assembly Guide

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004

Low Level Access Platform

AGR TOWER. Standard Features include. Tower Assembly Training Available

TOWER EXTENSION PACK 3 Model No. SSCL3. TOWER EXTENSION PACK 4 Model No. SSCL4 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND. Model No. SSCL1.

Mini-Max Access Tower System Data-Sheets

ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR

Tower ASSEMBLY GUIDE

A-0312 ASSEMBLY GUIDE

Thanks for viewing this information PDF. There's more products, details, speci cation etc. on our website - CLICK THE LINKS ABOVE

GENERAL SAFETY RULES. INSTRUCTION MANUAL (Platform Heights 1.1m, 2.1m, 3.1m & 4.1m)

1 Man Mobile Aluminium Tower System

Assembly Instructions


Instruction Manual Span Scaffolds

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

ASSEMBLY GUIDE FOR USE WITH EURO TOWERS LADDER FRAME 3T TOWER SYSTEMS ONLY

Mobile Tower Scaffold. 1. INTRODUCTION 2. REGULATIONS 3. PRIOR TO ERECTION 4. MOVING A TOWER 5. INSPECTION 6. HAZARDS

Adjusta Minit Anti-Surf

Customer Support Manual. This booklet contains information on how to erect, dismantle and use Waco Kwikform Aluminum Scaffolding.

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

PROFESSIONAL ROLLING TOWER SYSTEMS


TAKING YOU TO NEW HEIGHTS IN SAFETY...

User Manual. JUMBO FOLDING SCAFFOLD w/stairs & railing

Safety on Heights: Our Policy

Rolling scaffold single/double width Safe-Quick Guardrail RS TOWER 51/52/54

Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT

Scaffold Instruction Manual

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

Aluminum Scaffold Safety Rules

USER S MANUAL. HAKI Loading Tower

CUSTERS FOLDY MOBILE SCAFFOLDING

SAFE WORK PROCEDURE LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: Leon Prevost Brent Vandenbosch

USER S MANUAL HAKI STAIR TOWER

USER S MANUAL HAKI COMPACT STAIR TOWER

ALUMINUM SCAFFOLDING

USER S MANUAL HAKI PUBLIC ACCESS STAIR

USER S MANUAL HAKI PUBLIC ACCESS STAIR

SAFETY SYSTEM. G-Deck Consideration. Manual Handling

Reliant Holdings Ltd Safety Management System

Assembly and Use manual Rolling tower 5100 and 5200 Stair tower 5300 Folding tower 5400 and 5500 EN C

Mobile Safety. EN Assembly and Use manual Rolling tower 4100 and 4200 Folding tower 4400-K C-0711.

Transcription:

BoSS Room-Mate 3T - Through the Trap Method Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available to download from our website at BoSS mobile aluminium towers are light-weight scaffold towers used throughout the building and construction industry for both indoor and outdoor access solutions where a stable and secure platform is required. Ideal for maintenance and installation work or short-term access, the highly versatile towers provide a strong working platform for a variety of heights. This User Guide provides you with step by step instructions to ensure your system is erected easily and safely, using the 3T (Through The Trapdoor) method. The law requires that personnel erecting, dismantling or altering towers must be competent. Any person erecting a Youngman BoSS mobile tower must have a copy of this guide. For further information on the use of mobile access and working towers consult the PASMA operators code of practice. If you need further information, design advice, additional guides or any other help with this product, please contact Youngman on +44 (0)1621 745900 or email sales@ COMPLIANCES The BoSS Room-Mate aluminium system has been tested and certified to EN 1004: 2004 Class 3 Instruction Manual EN1298-IM-EN Safety First SAFE USE Check that all components are on site, undamaged and that they are functioning correctly (refer to Checklist and Quantity Schedules). Damaged or incorrect components shall not be used. Check if the ground on which the mobile access tower is to be erected and moved is capable of supporting the tower. The safe working load is 275 kgs (606lbs), per platform level, uniformly distributed up to a maximum of 750kgs, per tower. Towers must always be climbed from the inside during assembly and use. It is recommended that towers should be tied to a solid structure when left unattended. Adjustable legs should only be used for levelling. LIFTING OF EQUIPMENT Tower components should be lifted using a reliable lifting material (e.g. strong rope), employing a reliable knot (e.g. clove hitch), to ensure safe fastening and always lift within the footprint of the tower. Assembled mobile towers should not be lifted with a crane or other lifting device.safety First Safety First USER GUIDE Edition 2: 2010 PREPARATION AND INSPECTION Inspect the equipment before use to ensure that it is not damaged and that it functions properly. Damaged or incorrect components shall not be used. 1 2

Safety First STABILISERS / BALLAST Stabilisers or outriggers and ballast weights shall always be fitted when specified. The Quantity Schedules show the recommended stabilisation. In circumstances where there is restricted ground clearance for stabilisers/outriggers, contact your supplier for advice. Ballast must be of solid materials (i.e. not water or loose sand) and should not be positioned to overload individual legs. Ballast should be secured against accidental removal where practicable, and be supported on the lowest rung of the bottom frame. Safety First DURING USE Beware of high winds in exposed, gusty or medium breeze conditions. We recommend that in wind speeds over 7.7 metres per second (17 mph), cease working on the tower and do not attempt to move it. If the wind becomes a strong breeze, expected to reach 11.3 metres per second (25 mph), tie the tower to a rigid structure. If the wind is likely to reach gale force, over 18 metres per second (40 mph), the tower should be dismantled. Wind Description Beaufort Scale Beaufort No. Speed in m.p.h Speed in m/sec Safety First TIES Ties should be used when the tower goes beyond its safe height, beyond the limits of the stabilisers/outriggers, or if there is a danger of instability. They should be rigid, two way ties fastened to both uprights of the frame with loadbearing right angled or swivel couplers. Only couplers suitable for the 50.8mm diameter tube of the tower should be used. Ideally, ties should be secured to both faces of a solid structure by means of anchorages. The tie frequency may vary depending on the application, but they should, at a minimum, be every 4 metres height. MOVEMENT The tower should only be moved by manual effort, and only from the base. When moving the tower, beware of live electrical apparatus, particularly overhead, plus wires or moving parts of machinery. No person or materials should be on the tower during movement. Caution should be exercised when wheeling a tower over rough, uneven or sloping ground, taking care to unlock and lock castors. If stabilisers are fitted, they should only be lifted a maximum of 25mm above the ground to clear ground obstructions. The overall height of the tower when being moved, should not exceed 2.5 times the minimum base dimensions, or 4 metres overall height. Before use, check the tower is still correct and complete. After every movement of the tower use a spirit level to check that it is vertical and level and set the adjustable legs as required. Do not move the tower in wind speeds over 7.7 metres per second (17mph). Medium Breeze Strong Breeze Raises dust and loose paper, twigs snap off Large branches in motion, telegraph wires whistle 4 8-12 4-6 6 25-31 11-14 Gale Force Walking is difficult 8 39-46 17-21 Beware of open ended buildings, which can cause funnelling effect. Do not abuse equipment. Damaged or incorrect components shall not be used. Raising and lowering components, tools, and/or materials by rope should be conducted within the lower base. Ensure that the safe working load of the supporting decks and the tower structure is not exceeded. The assembled tower is a working platform and should not be used as a means of access or egress to other structures. Beware of horizontal forces (e.g. power tools) which could generate instability. Maximum horizontal force 20 kg. Mobile towers are not designed to be suspended - please refer to your supplier for advice. Do not use boxes or stepladders or other objects on the platform to gain extra height. 3 4 For further information on tying-in a tower please contact your supplier or Youngman. MAINTENANCE - STORAGE - TRANSPORT All components and their parts should be regularly inspected to identify damage, particularly to joints. Lost or broken parts should be replaced, and any tubing with indentation greater than 5mm should not be used and put to one side for manufacture repair. Adjustable leg threads should be cleaned and lightly lubricated to keep them free running. Brace claws, frame interlock clips, trapdoor latches and platform windlocks should be regularly checked to ensure they lock correctly. Refer to the BoSS Inspection Manual for detailed inspection and maintenance advice Components should be stored with due care to prevent damage. Ensure components are not damaged by excessive strapping forces when transported. 5

Components BOSS ROOM-MATE Quantity Schedule Assembly 4 Rung Guardrail Frame Code Description Weight (kgs) No. of rungs to platform (WH) 2.80m (PH) 0.80m 3.80m 1.80m 4.55m 2.55m 5.55m 3.55m 6.30m 4.30m 8.20m 6.05m 3 7 10 14 17 24 Height 1 Height 2 Height 3 Height 4 Height 5 Height 6 333513 125mm Castor 2.50 4 4 4 4 4 4 324413 Castor Adaptor* 0.21 4 4 4 4 4 4 *When used on uneven ground and adjustment is required, 4 adjustable legs must be used which replace the castor adaptors. 301514 Base Unit 21.43 1 1 1 1 1 1 302514 7 Rung Lift Frame 9.80 2 2 4 6 When erecting a BoSS Room-Mate: To comply with the Work at Height Regulations, guardrails are positioned in advance of climbing onto a platform to reduce the risk of fall. All platforms feature double guardrails on both faces of the tower. Trapdoor Platform ToeBoard Set 303514 4 Rung Guardrail Frame 5.60 2 2 304514 1.8m Trapdoor Deck 14.35 1 1 2 2 3 4 312513 1.8m Horizontal Brace (red) 1.88 3 5 7 9 9 13 313513 2.1m Diagonal Brace (blue) 2.06 1 2 4 4 6 304514 Toeboard Set 10.00 1 1 1 1 1 1 317513 SP7 Fixed Stabiliser 5.80 4* 4 4 All guardrails should be 2 and 4 rungs (0.5m and 1.0m) above platforms. Position handrails 4 rungs above platform level. 7 - Rung Lift Frame Locking Pin Diagonal Brace 318513 SP10 Adjustable Stabiliser 9.87 4 4 * SP7 Stabiliser only required when ROOM-MATE is used externally. Position intermediate handrails 2 rungs above platform level. Never stand on an unguarded platform positioned above the second rung of a tower. if your risk assessment shows it necessary you may also need to guardrail platforms at this level. To Dismantle a BoSS Room-Mate: Base Unit Remove toeboards, and pass down the tower. Unclip farthest end of braces and immediately do to protected trapdoor position on ladder to complete removal. Remove upper platforms from protected levels below. Castor and Castor Adaptor or Adjustable Leg Horizontal Brace Stabiliser Pass removed components out of the tower to a colleague. 6 7 8

Assembly Procedure Mobile Towers - 3T Method HEIGHT 1 - PLATFORM 0.8M Lay the folded base unit on its side. When using castor 1 adaptors for flat and level ground only, fit 4 castor adaptors into the bottom of the base unit and then insert 4 castors into the castor adaptors. The bottom of the base unit may be identified by the bottom end casting see diagram Assembly Procedure Stand the base unit up and push the central hinged 2 frame outwards until flat. Unfold the two end frames. Insert the locking pin into the top centre hinge joint. Lock the castor Brakes. 3 Fit a horizontal brace (red) as a guardrail on the top (7th) rung, on the hinged frame side of base unit. IMPORTANT. Always ensure braces are fully locked in position. When using adjustable legs for uneven or sloping ground, push 4 castors into 4 adjustable legs and then insert the adjustable legs into the bottom of the base unit. The bottom of the base unit may be identified by the bottom end casting see diagram. 4 Position a platform on the 3rd rungs of the Base unit. Do not position above the 3rd rung. Engage the windlocks, underneath the rungs, at both ends of the platform. Check the ground is flat and all four castor wheels are in contact with the ground. Use a spirit level to check the base unit level. If the ground is uneven or sloping you must fit adjsustable legs. IMPORTANT. Only use the adjustable legs to level the tower and not to gain extra height. 9 10 11

5 Climb onto the platform in the sequence shown From the seated position, fit horizontal braces as guardrails on the 5th and 7th rungs on the open side of the base unit. Do not stand on the platform until the guardrails are in place. IMPORTANT Always ensure braces are fully locked in postion. Height 2 - Platform 1.8m 1 Assemble the base unit as shown in steps 1 and 2 on page 9-10 2 Fit a horizontal (red) brace between the verticals, just above the 1st rung, on the open side of the tower. IMPORTANT. Always ensure braces are fully locked in position. 3 Position a temporary platform on the 2nd rungs of the tower. Engage the wind locks, underneath the rungs, at both ends of the platform. Fit a four rung guardrail frame to each end of the base unit. Ensure the 4 rung frame interlock clips are engaged. 4 Reposition the temporary platform to the 7th rung of the tower. Ensure the windlocks are engaged, at both ends of the tower. Fit a diagonal brace (blue) on the openside of the tower, between the 7th and 11th rungs. If the tower is being used externally fit 4 stabilisers to the tower. Note: Stabilisers omitted on drawing for clarity. Refer to the stabilisers section on page 25 for guidance on positioning stabilisers. Climb the tower on the inside using the rungs of the end frames. From a protected position within the trapdoor, fit 4 horizontal braces as guardrails, 2 and 4 rungs above the platform (the 9th and 11th rungs of the tower), on both sides of the tower. IMPORTANT. Always ensure braces are fully locked in position. NEVER stand on the platform until the guardrail braces are in place. 6 If your risk assessment shows it is necessary, fit a set of toeboards to the platform. Check there are no gaps through which any materials could fall and that the trapdoor opens correctly.the tower is now complete. IMPORTANT. Never climb up the outside of the Base Unit. Never over reach get down and reposition the Base Unit. 12 13 14

HEIGHT 3,5 & 6 - Platform 2.55m, 4.3m & 6.05m 1 Assemble the base unit as shown in steps 1 and 2 of Height 1 (0.8m) build method. See page 9-10 2 Position a temporary platform on the 2nd rungs of the tower. Engage the wind locks, underneath the rungs, at both ends of the platform. 3 Fit a 7 rung lift frame to each end of the base unit. Ensure the 4 frame interlock clips are engaged. Fit a diagonal brace between the 3rd and 7th rungs on the open side of the tower. Fit another diagonal brace in the opposite direction to the lower diagonal, between the 7th and 11th rungs of the tower, as shown. 4 Fit a platform to the 10th rungs of the tower 5 Fit 4 stabilisers to the tower. Refer to Stabilisers Section on page 25 for guidance on positioning stabilisers. 15 16 17

HEIGHT 4 - Platform 3.55m 6 Climb the tower on the inside using the rungs of the end frame. From the protected trapdoor position, fit 4 horizontal braces as guardrails, 2 and 4 rungs above the platform (the 12th and 14th rungs of the tower) on both sides of the tower. IF BUILDING TO 4.3m & 6.05m PLATFORM HEIGHT: For Height 4 the tower must be erected and platform levels repositioned as shown. Continue to fit additional pairs of 7 rung lift frames, diagonal braces, horizontal guardrails and trapdoor decks. 1 Assemble the base unit as shown in steps 1 and 2 of Height 1 (0.8m) build method. See page 9-10 DO NOT CLIMB ON TO THE PLATFORM UNTIL IT IS FULLY GUARDRAILED 7 Fit a set of toe boards to the platform (see page 18). Check there are no gaps through which any material could fall and that the trapdoor opens correctly. 2 Fit a platform to the 10th rungs of the tower. Engage the wind locks, underneath the rungs, at both ends of the platform. 3 Fit a diagonal brace (blue) on the open side of the tower between the 1st and 5th rungs. The tower is now complete. 6.05m Tower 6.05m Platform Height 4.3m Platform Height 4.3m Tower IMPORTANT. Always ensure braces are fully locked in position. NEVER stand on the platform until the guardrail braces are in place. 18 19 20

4 Climb the tower on the inside using the rungs of the end frames. From the protected trapdoor position, fit 4 horizontal braces as guardrails, 2 and 4 rungs above the platform (the 12th and 14th rungs of the tower) on both sides of the tower. 5 Fit a 4 rung guardrail frame to each end of the tower. Ensure the frame interlock clips are engaged. 6 The platforms must now be repositioned as follows: Whilst standing on the upper deck, unlatch the 4 guardrail brace hooks furthest from the trapdoor but leave the braces in position. From the protects position of the trapdoor deck, unlatch the remaining 4 brace hooks and remove the 4 guardrail braces and then descend immediately to the lower platform. NEVER stand on a platform without guardrails. Remove the platform from the 10th rungs of the tower. Fit a diagonal brace between 7th and 11th rungs of the tower in the opposite direction to the lower diagonal. Reposition the deck from the 2nd rung to the 6th rung of the tower and fully guardrail, as shown. 21 22 23

7 Fit a diagonal between the 9th and 13th rungs of the tower. Fit a deck on the 14th rungs of the tower. From the protected position of the trapdoor deck, fit a pair of guardrails 2 and 4 rungs above the platform (16th & 18th rungs of the tower). Fit a diagonal between the 14th and 18th rungs of the tower, as shown. Fit toeboards (see instructions page 18) The tower is now complete. Stabilisers and Outriggers Mobile Towers - 3T Method STABILISERS Stabilisers are used when the tower is to be moved occasionally, frequent movement will require outriggers. SP10 and SP15 telescopic stabilisers must always be fully extended. Position the lower clamp so that the lower arm is as close to the horizontal as possible. Adjust the position of the top clamp to ensure the stabiliser foot is in firm contact with the ground. Ensure clamps are secure When moving, check for obstructions and lock feet a maximum 25mm off the ground, unlock castors, and move. After moving, check all castors are in ground contact and lock stabilser feet. OUTRIGGERS For information on mobile outriggers please consult your supplier. For further information please contact : Youngman are members of: Youngman Group Ltd The Causeway, Maldon, Essex, CM9 4LJ, United Kingdom t +44 (0)1621 745900 f +44 (0)1621 859845 e sales@ 24 25 Part No: 033001 Date: 07/09