Mitigation Monitoring Program Campus Master Plan 2015

Similar documents
Draft Environmental Impact Report. Campus Master Plan California State University, Sacramento

ZAB Hearing May 14, 2015

Exhibit G. Construction Mitigation Plan

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

Mitigation Monitoring Program

SUMMARY. Mitigated Negative Declaration for the Academic Building, Mission Bay Block 25A State Clearinghouse Number

Water Pollution Control for Work in Sensitive Areas

A. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE

RINCONADA WATER TREATMENT PLANT RELIABILITY IMPROVEMENT PROJECT Addendum to the Final Environmental Impact Report

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Monterey Bay Unified Air Pollution Control District (

Mitigation Monitoring and Reporting Program

Environmental Guidelines for Construction Sites

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Building Better Storm Water Quality

El Dorado Avenue

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

RESOLUTION NO Adopted by the Sacramento City Council. July 14, 2015

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014

Q. CONSTRUCTION IMPACTS

New Administration Building

BARRY S CORNER. Draft Construction Management Plan

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists

Appendix H Mitigation Monitoring Plan

Facilities Environmental Protection Plan: Burnaby Terminal

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

CCSD#1 Stormwater Standards

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

Construction Management Plan (CMP) 227 Princess Highway, Dandenong

SECTION AIR POLLUTION AND HAZARDOUS WASTE CONTROLS

MAINE MEDICAL CENTER

RINCONADA WATER TREATMENT PLANT RELIABILITY IMPROVEMENT PROJECT Second Addendum to the Final Environmental Impact Report

Preferred Elevated Tank Site

Menlo Park Planning Commission Draft EIR Public Hearing June 20, 2016

CHAPTER THREE: Construction Impacts

SECTION 7.0 Other CEQA Considerations

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

RESOLUTION NO:

Preliminary Project Assessment

Second Avenue Subway (SAS) Project. Construction on Second Avenue. Interim Report. Prepared for: MTA Capital Construction.

IV.E. HYDROLOGY AND WATER QUALITY

RESPONSES TO COMMENTS ON THE INITIAL STUDY/NEGATIVE DECLARATION FOR THE MT. SAN ANTONIO COLLEGE TRANSIT CENTER PROJECT

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

O. NOISE. 1. Existing Conditions. 2. Future without the Proposed Project

Attachment 1 Findings and Conditions

Environmental Control Plan

CITY OF SAN MATEO GENERAL PLAN MITIGATION MONITORING AND REPORTING PROGRAM

Alberta Transportation The City of Edmonton The City of Calgary

South Coast Air Quality Management District Copley Drive, Diamond Bar, CA (909)

Concrete Waste Management

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

No change in the hours of operation is proposed. In accordance with the existing CUP, the facility will operate from 7 a.m. to 8 p.m. daily.

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

Plaza and Sidewalk Cleaning

D EROSION AND SEDIMENT CONTROL. Table of Contents

MITIGATION MONITORING AND REPORTING PROGRAM FOR THE

State Clearinghouse Number Prepared for: City of Fontana 8353 Sierra Avenue Fontana, CA

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

INFORMATION SHEET WINTER 2013 CLOVER PUMP STATION & CONVEYANCE PIPE. Road to Ogden Point, then under the. to the Treatment Plant planned for

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

Concrete Waste Management WM-8

FINAL RECOMMENDATION OF THE DEVIL S GATE DAM SEDIMENT WORKING GROUP

District of North Vancouver Construction Traffic Management Plan Guidelines

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)

5.0 LONG-TERM CEQA CONSIDERATIONS

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing

IV. ADVERSE IMPACTS THAT CANNOT BE AVOIDED

Concrete Waste Management

Notice of Preparation of Initial Study

MITIGATION MONITORING AND REPORTING PROGRAM CHABOT COLLEGE 2012 FACILITIES MASTER PLAN

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

ROADS: OPERATION AND MAINTENANCE

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project

Erosion & Sedimentation Control Policy

FF-8 MINOR CONSTRUCTION

Public Information Meeting - 14 September 2015 New Champlain Bridge Corridor Project

6.2.2 Environmental Consequences and Mitigation Measures

Outdoor Equipment Operations SC-32

3 CONSTRUCTION-GENERATED CRITERIA AIR POLLUTANT AND PRECURSOR EMISSIONS

Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project. Mitigation Monitoring and Reporting Program

E. Other Federal Requirements and CEQA Considerations

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

Chapter 4 Environmental Setting, Impacts, and Mitigation 4.6 NOISE Environmental Setting. Approach to Analysis

NOTICE OF PREPARATION OF A MASTER ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE 2040 GENERAL PLAN UPDATE AND CLIMATE ACTION PLAN

6.0 OTHER ENVIRONMENTAL CONSIDERATIONS 6.1 Significant Unavoidable Impacts

AMERICAN FORK CITY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION

CHAPTER BEVERAGE CONTAINER RECYCLING COLLECTION CENTERS

FINDING OF NO SIGNIFICANT IMPACT

Sapphos. February 28, South Alameda Street Project

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS

Barr Road Quarry (Site N) Frequently Asked Questions Last updated: November 19, 2007

4.2 Air Quality and Greenhouse Gas

IN THE KYRGYZ REPUBLIC

NYU CORE Construction Presentation

Transcription:

Mitigation Program Campus Master Plan 2015 California State University, Sacramento May 2015

Environmental Mitigation Program Sacramento Campus Master Plan 2015 Project Section 1: Authority This Environmental Mitigation Program has been prepared pursuant to Section 21081.6 of the California Environmental Quality Act, known as CEQA (Public Resources Code Section 21000 et seq.), to provide for the monitoring of mitigation measures required of the Sacramento Campus Master Plan 2015 project, as set forth in the Final Environmental Impact Report (EIR) prepared for the project (State Clearinghouse No. 2014102021). This report will be kept on file in the office of the Sacramento, Facilities Planning and Construction Services, 6000 J Street, Sacramento, CA 95819-6002. Section 2: Schedule The Sacramento will be responsible for ensuring compliance with mitigation monitoring applicable to implementation of the Project. Staff will prepare or cause to be prepared reports identifying compliance with mitigation measures, as appropriate. Once construction of individual facilities and improvements pursuant to the Campus Master Plan 2015 has begun and is underway, monitoring of the mitigation measures associated with construction will be carried out by the Sacramento. Section 3: Changes to Mitigation Measures Any substantive change in the monitoring and reporting program made by the Lead Agency will be reported in writing. Modifications to the mitigation measures may be made by the Lead Agency subject to one of the following findings, documented by evidence included in the record: a. The mitigation measure included in the Final Environmental Impact Report (EIR) and the Mitigation Program is no longer required because the significant environmental impact identified in the EIR has been found not to exist, or to occur at a level which makes the impact less than significant as a result of changes in the project, changes in conditions of the environment, or other factors. OR b. The modified or substitute mitigation measure to be included in the Mitigation Program provides a level of environmental protection equal to or greater than that afforded by the mitigation measure included in the EIR and the Mitigation Program; and The modified or substitute mitigation measures do not have significant adverse effects on the environment in addition to or greater than those which were considered by the Board of Trustees and other responsible hearing bodies in their decision on the EIR and the proposed project; and The modified or substitute mitigation measures are feasible, and the Lead Agency, through measures included in the Mitigation Program or other Lead Agency procedures, can assure their implementation. CALIFORNIA STATE UNIVERSITY, SACRAMENTO 2 MITIGATION MONITORING PROGRAM

Findings and related documentation supporting the findings involving modifications to mitigation measures will be maintained in the project file with the Mitigation Program and will be made available to the public upon request. Section 5: Mitigation Matrix The mitigation monitoring matrix identifies the environmental issue areas for which monitoring is required, the required mitigation measures, the time frame for monitoring, and the responsible monitoring agencies. Mitigation Measures Short-term Construction Effects 1. Construction hours will be limited to between 6:00 am and 8:00 pm during the week and 8:00 am and 7:00 pm on weekends. Time Frame / Milestone Responsible Party 2. Contractors will be required to minimize exhaust emissions by maintaining equipment engines in good condition and properly tuned. 3. The hours of operation of heavy-duty equipment will be minimized. 4. The idling time of construction equipment at the construction site will be limited to no more than 5 minutes. 5. The will ensure that diesel particulate filters are installed on diesel equipment and trucks. 6. Trucks carrying contents subject to airborne dispersal will be covered. 7. Alternative fueled or electrical construction equipment will be used when feasible. 8. The minimum practical engine size for construction equipment and electric carts and other smaller equipment will be used when feasible. CALIFORNIA STATE UNIVERSITY, SACRAMENTO 3 MITIGATION MONITORING PROGRAM

Mitigation Measures 9. Throughout the construction period of individual facilities and improvements in close proximity to student residence halls, academic facilities, health and wellness facilities, and/or other sensitive uses on campus, ventilation systems in those facilities will be tested more frequently to provide for the maintenance schedule that ensures proper ventilation. Time Frame / Milestone Responsible Party 10. Muffled heavy construction equipment will be used. 11. Construction staging areas will be located as far as possible from student residence halls, campus academic facilities, health and wellness facilities, and other places where students gather. 12. The will ensure that each piece of operating equipment is in good working condition and that noise suppression features, such as engine mufflers and enclosures are working and fitted properly. 13. The will locate noisy construction equipment as far as possible from nearby sensitive uses. 14. A flag person will be employed as needed to direct traffic when heavy construction vehicles enter the campus from J Street, Folsom Boulevard, and College Town Drive. 15. Construction trucks will avoid travel on residential areas to access campus and use the City of Sacramento designated truck routes to travel to and from campus. 16. Construction-related truck traffic will be scheduled to avoid peak travel time on the US Highway Route 50 (US 50), as feasible. 17. If major pedestrian or bicycle routes on campus are temporarily blocked by construction activities, alternate routes around construction areas will be provided, to the extent feasible. These alternative routes will be posted on campus for the duration of construction. 18. If any bus stop or other transit facility on campus is obstructed by construction activity, the University, in cooperation with the transit service providers, will temporarily relocate such transit facility on campus as appropriate. 19. Demolition and construction inert materials, including vegetative matter, asphalt, concrete, and other recyclable materials will be recycled to the extent feasible. CALIFORNIA STATE UNIVERSITY, SACRAMENTO 4 MITIGATION MONITORING PROGRAM

Compliance with Existing Regulations During Construction For construction, in compliance with the existing regulations and as applicable a Construction Storm Water General Permit will be obtained from the Central Valley Regional Water Quality Control Board, and Pollution Prevention Plan (SWPPP) will be instituted to reduce the entry of construction debris, sediment, and other material from the construction site into local waterways. The SWPPP may include the following: Schedule excavation and grading work for dry weather Use as little water as possible for dust control Never hose down dirty pavement or impermeable surfaces where fluids have spilled Avoid grading activities during wet weather Install sediment filters and/or debris traps at or near entrances to the storm drain system Cover stockpiles and excavated soil with tarps or plastic sheeting Plant permanent vegetation as soon as possible CALIFORNIA STATE UNIVERSITY, SACRAMENTO 5 MITIGATION MONITORING PROGRAM