Consultation on the ZIGMA Model and Implementation of the Capacity Allocation Mechanism and Balancing EU Network Codes

Similar documents
NATURAL GAS TRANSPORTATION SERVICES PROVIDED BY IUK BETWEEN GB AND BELGIUM

IUK Access Agreement Summary. 10 Oct 2013

European Update. 2nd July 2015

European Transparency Project (ETP)

TENP JOINT INFORMATION MEMORANDUM FOR THE DEVELOPMENT OF SOUTH-NORTH GAS TRANSMISSION CAPACITY FROM ITALY TO GERMANY AND BELGIUM THROUGH SWITZERLAND

IUK is key infrastructure in physically connecting pipeline systems and markets

Market Consultation Session

EU Gas Balancing Code - Daily Nominations at Interconnection Points (IP)

European Developments

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Exhibit G to the General Terms and Conditions Forward Flow as of 2018

Exhibit G to the General Terms and Conditions Forward Flow November 2015

European Network Code Workshop

Entry Point Registrations

EU Phase 3 Update. Chris Logue Gas Markets Manager

Network Code. on Capacity Allocation Mechanisms

Exhibit G to the General Terms and Conditions Forward Flow as of 2018

Demand assessment report for incremental capacity between PEG Nord and ZTP

Tariff Network Code. An Overview

Re: UNC Modication Proposal Removal of the Zero Auction Reserve Price for Within-day Daily NTS Entry Capacity (WDDSEC)

Exhibit G to the General Terms and Conditions Forward Flow as of 2018November 2015

eni proposed UNC Mod 501C

Representation - Draft Modification Report 0541A/B

EU Network Code Implementation Project

What are your main views of the proposed measures? Do you think Network codes

EU Gas Market Reform what does it mean in practice?

ACCESS CODE FOR TRANSMISSION. Attachment B: Subscription & Allocation of Services

Introducing PRISMA European Capacity Platform

Roadmap for early implementation of the Network Code on Capacity Allocation Mechanisms (CAM NC)

GLOSSARY OF DEFINITIONS

CEER Vision for a European Gas Target Model Conclusions Paper Ref: C11-GWG December 2011

EU Gas Market Reform what does it mean in practice?

EU Code Implementation Programme

Consultation on the integration of gas markets of Czech Republic and Austria

Brussels/Ljubljana, TITRE 1 April 2015

Gas Transmission Charging Methodology Statement. Gas Year 2016/17

Applicable TSO Terms for Use of the PRISMA Capacity Platform. 01 November 2015

Gas Charging Review. NTSCMF 5 April 2017 Final slide pack Update provided on 3 April All slides added or updated are marked with a blue star

NATIONAL GRID. NTS Shrinkage Incentive Methodology Statement Submitted for Approval

UNC 0616: Capacity Conversion Mechanism for Interconnection Points. UNC Modification. 01 Modification. 02 Workgroup Report

Bacton Entry Capacity Retaining flexibility through modification to overrun regime. Nick Wye

Workshop CAM, CMP. GTS shippermeeting, 21 November 2012

GLOSSARY OF EXISTING DEFINITIONS

Draft position paper for consultation. Exploring the feasibility of implicit allocation in the (North West) European gas market

ENTSOG s Capacity conversion model

The present ACER Guidance to ENTSOG provides a framework for the development of a

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011

Institutional Arrangements for Virtual Reverse Flow at Moffat

Gas Transmission Charging Methodology Statement. Gas Year 2017/18

European Developments

Implementation of the Balancing Network Code: an overview of TSOs main challenges

Interconnector (UK) Limited IUK Access Code

OPEN SEASON second capacity enhancement. 03 february 2011

Demand assessment report for incremental capacity between PEG Nord and ZTPL

National Grid s specific response to questions raised in E10- GNM-13-03b: ERGEG consultation on Pilot Framework Guidelines on gas balancing rules.

NATIONAL GRID. NTS Shrinkage Incentive Methodology Statement

Workshop Slovenian Gas Market in the Region. Ljubljana, 12 th september 2018

Transmission Planning Code February 2017 v0.1

COMMISSION STAFF WORKING DOCUMENT

By 22 nd June 2018

Workshop Slovenian Gas Market in the Region. Ljubljana, 4 th april 2018

Responses are given here with the section references from the consultation document.

EU Update. Transmission Workgroup 1 November 2018

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES OF THE SYNCHRONOUS AREA CONTINENTAL EUROPE

Stakeholder Workshop II

Interconnector (UK) Limited

Towards efficient and effective congestion management of the European gas transmission network:

Demand Assessment Report For Incremental Capacity. between. National Grid Moffat IP. and. Premier Transmission Limited (PTL) Exit IP Moffat

Amend obligation for the acceptance of EPDQD revisions made after D+5. Transmission Workgroup 6 th October 2016

Network Capability & Operations - Gas

Capacity Allocation Concepts in the RO-HU-AT Open Season Procedure

Study about models for integration of the Spanish and Portuguese gas markets in a common Iberian Natural Gas Market

Groningen Production Cap and European gas (& electricity) markets

BORDER STATIONS WITH ULTRASONIC & TURBINE METERS IN SERIES Laurent Cordier Quality & Metrology (Fluxys Belgium)

Capacity Allocation Concepts in the RO-HU-AT Open Season Procedure

Introduction of Entry Capacity to Northern Ireland Transitional Arrangements

Business Requirement Specification NOM& Matching Report on Public Consultation Responses BAL April 2015

Interconnector (UK) Limited. IUK Access Code

The Entry Capacity Transfer and Trade Methodology Statement

Portfolio Plan Overview

GTE+ Capacity Product Coordination First Phase Report

Gas transmission Technical and Economic Aspects for TSOs

Joint Office of Gas Transporters. Re: Modification Proposals 0116V/116VD/0116A/0116BV/0116CV: Reform of the NTS Offtake Arrangements

1. Principles for transmission capacity management in common Baltic gas market

ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE

Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld Bonn

Main developments in the gas and electricity markets in France in Commission de Régulation de l Energie (CRE) 31 st July 2013

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007

The Statement for Gas Transmission Connection Charging

17th April Page 1 of 7

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

1 The Modification Proposal

INFO SESSION. 9 March :30 17:00. Fluxys Belgium non-binding document for discussion & information purposes only

8 th February Page 1 of 7

(Non-legislative acts) REGULATIONS

Dennis Hesseling, Head of Gas Department GIE Sofia, June

Union of the Electricity Industry - EURELECTRIC comments to the ERGEG discussion paper Roadmap for a competitive single gas market in Europe

Object: Re: Centrica Storage Limited s response to National Grid Informal Consultation on Exit Capacity Substitution and Revision

ACER and the Transparency Platform

Transcription:

8 April 2014 Dear Stakeholder, Consultation on the ZIGMA Model and Implementation of the Capacity Allocation Mechanism and Balancing EU Network Codes Interconnector (UK) Ltd (IUK), Fluxys Belgium and National Grid Gas (NGG) are jointly seeking your views on their proposals outlined in the Concept Document accompanying this consultation to amend, where appropriate, their arrangements. The Concept Document sets out: The market model and service offer for IUK and Fluxys Belgium s proposed crossborder Entry-Exit zone called ZIGMA (Zeebrugge beach Interconnector Gas Market Area). ZIGMA brings together the Interconnector Pipeline, Zeebrugge area and Zeebrugge Beach which becomes the virtual trading point within the zone The key concepts for implementing the Capacity Allocation Mechanism (CAM) Network Code across the 3 Transmission System Operators (TSOs) that form part of the Interconnector chain (i.e. NGG, IUK and Fluxys Belgium) The key concepts for implementing the Balancing (BAL) Network Code within ZIGMA The Concept Document forms the first stage in implementation of these proposed changes and is not intended to be legally binding on IUK, Fluxys Belgium or NGG. The second stage will involve the TSOs modifying their individual contracts where appropriate 1 2 to reflect the changes and outcomes from this consultation. This document provides background information and sets out the consultation process, timeline and how to respond. 1 In relation to the relevant European Network Codes / Regulation, (CAM and BAL) 2 In relation to ZIGMA as relevant for IUK and Fluxys Belgium Consultation Letter 8 April 2014 Page 1

PART 1: BACKGROUND INFORMATION IUK is the owner and operator of the Interconnector Pipeline between Bacton in the UK and Zeebrugge in Belgium. The bi-directional pipeline provides a strategic link between the UK and Continental European gas markets. As such, IUK plays an important role in the realisation of the single European gas market and in providing security of supply to both GB and continental European markets. Fluxys Belgium is the operator of the infrastructure for gas transmission, gas storage and terminalling of liquefied natural gas (LNG) in Belgium. The company is an affiliate of Fluxys, a Belgium-based, fully independent gas infrastructure group with assets throughout Europe. Besides its assets in Belgium, Fluxys partnerships include ownership in the Interconnector and BBL pipelines linking the UK with mainland Europe, the Dunkirk LNG terminal under construction in France, the NEL and TENP pipelines in Germany, the Transitgas pipeline in Switzerland and the TAP pipeline from Turkey to Italy to be constructed so as to bring gas coming from Azerbaijan to Europe. The Zeebrugge area is a cornerstone of security of supply in north-western Europe. Together with Emden in northern Germany, Zeebrugge is the main supply area for natural gas in north-western Europe, Zeebrugge s reception capacity corresponding to around 10% of the total border capacity needed to supply the European Union. NGG is the owner and operator of the gas National Transmission System (NTS) in Great Britain that connects with the Interconnector Pipeline at Bacton. The NTS plays an important role in facilitating the competitive gas market and helping to provide the UK with a secure gas supply. It is a network of pipelines, presently operated at pressures of up to 94 barg, which transports gas safely and efficiently from coastal terminals and storage facilities to exit points from the system. Exit points are predominantly connections to Distribution Networks (DNs), but also include storage sites, and direct connections to power stations, large industrial consumers and other systems, such as interconnectors to and from other countries. Consultation Letter 8 April 2014 Page 2

PART 2: MAIN CONCEPTS ZIGMA market model (developed by IUK and Fluxys Belgium) ZIGMA is a proposed cross-border Entry-Exit zone, bringing together the Interconnector Pipeline, the Zeebrugge area and Zeebrugge Beach: ZIGMA connects with trading markets NBP, ZTP and TTF ZIGMA provides sourcing possibilities via ZPT, SILK and LNG ZIGMA connects to downstream markets in the UK, Belgium and the Netherlands Zeebrugge Beach will become the virtual trading point of ZIGMA. Entry and Exit services at any ZIGMA point will give access to/from Zeebrugge Beach ZIGMA provides a market-based balancing system, enabling shippers to use flexibility services Figure 1: The proposed new cross-border Entry-Exit zone, ZIGMA (Zeebrugge beach Interconnector Gas Market Area) The Concept Document contains more information on ZIGMA, more specifically regarding the service offer, the roles within ZIGMA, the contracts and treatment of existing contracts, the balancing system and the quality compliancy service. Consultation Letter 8 April 2014 Page 3

Capacity Allocation Mechanisms (CAM) and Balancing (BAL) Implementation (developed by IUK, NGG and Fluxys Belgium) To improve the regulatory framework for a liberal wholesale energy market, the Third Energy Package (a package of legislative measures) was adopted in 2009. The Third Energy Package includes Regulation (EC) No 715/2009, which is supplemented by Network Codes on Capacity Allocation Mechanisms (CAM) and Balancing (BAL). CAM introduces rules to ensure efficient, transparent and non-discriminatory access to infrastructure networks. Specifically, CAM establishes rules relating to how capacity can be offered and allocated, including standard cross-border capacity products and auction rules. It also includes aspects of TSO cooperation, in order to facilitate capacity sales, including commercial and technical rules relating to post-auction capacity allocation. CAM is to be implemented by 1 November 2015. BAL sets out harmonised rules on balancing to give Network Users greater flexibility and greater certainty in relation to their balancing positions across adjacent balancing zones. The rules aim to financially incentivise Network Users to balance their portfolios via costreflective balancing charges, facilitated by trading platforms established by the TSOs. BAL is to be implemented by 1 October 2015. The Concept Document covers CAM and BAL implementation. From 1 November 2015, at the Interconnection Points (IPs) subject to CAM, all available capacity will be offered as a bundled product where possible. For example NGG exit capacity at IBT and ZIGMA entry capacity at IBT would be offered as a bundled product and could be purchased together. Any unmatched capacity on either side of an IP will be offered as an unbundled product. Capacity will be auctioned on the PRISMA auction platform, using the auction algorithms defined in CAM. Following a successful bid for bundled capacity, the capacity can be used according to the contracts in force with each TSO e.g. if a Shipper bought bundled NGG exit capacity and ZIGMA entry capacity at IBT, then the use of the NGG exit capacity would be subject to the contract signed with NGG whilst the use of the ZIGMA entry capacity would be subject to the contract signed with IUK. A single nomination can be submitted to nominate the flows in both systems (exit from one system and entry to the other system) for bundled capacity 3. 3 It is the intention that single nominations will also be accepted for unbundled capacity as long as the counterparty on both sides of the IP is the same entity. This is subject to further detailed discussion and analysis by the TSOs. Consultation Letter 8 April 2014 Page 4

PART 3: PROCESS AND INDICATIVE TIMELINE Below is the indicative timetable that we propose to follow for CAM and BAL implementation: Date Action 8 April 2014 Consultation opens 25 & 28 April 2014 Industry Workshops on ZIGMA Brussels (25 April 2014) London (28 April 2014) 6 May 2014 Consultation closes 13 May 2014 Non-confidential responses published May 2014 IUK, Fluxys Belgium and NGG review responses and refine proposals Late 2014 NGG UNC mod consultation (Summer 2014) Fluxys Belgium STA, ACT, TP consultation (Late 2014) IUK IAA consultation (Late 2014) 1 November 2015 Implementation (subject to the required agreements and approvals and subject to process and system changes) PART 4: YOUR FEEDBACK We are interested in hearing your views on the proposals outlined in the Concept Document and your responses to a number of specific questions: ZIGMA questions (IUK and Fluxys Belgium) 1. What is your general feedback on ZIGMA? 2. Do you agree that the proposed balancing model is compliant with the BAL Network Code? 3. We are evaluating whether the balancing contract is in a separate contract or within the IUK Access Agreement (IAA). Do you have any preference? 4. The Concept Document meets the requirement in article 26(4) of BAL to consult Stakeholders on Within Day Obligations (WDOs). Do you agree that the WDOs detailed in Appendix 4 are an appropriate set of WDOs? Consultation Letter 8 April 2014 Page 5

CAM questions (IUK, Fluxys Belgium and NGG) 5. Do you agree that the proposals set out in Sections 3, 4 and 5 are compliant with the CAM Network Code? 6. The Concept Document meets the requirement in article 8(9) of CAM to consult Stakeholders on the capacity to be set aside for short-term auctions. Do you support the quantity of capacity to be set aside for short-term auctions defined in sections 3.4.5 and 4.4.3 of the Concept Document? 7. Do you support single-sided nominations being accepted for unbundled capacity if the same entity owns the capacity on both sides of the IP? 8. Do you support the proposal that surrendered capacity that is not reallocated in an auction is not automatically rolled forward to future auctions? 9. Do you have any other feedback on the Concept Document? We would appreciate the comments of all interested parties on the Concept Document. Please send your response to consultations@interconnector.com including info.transport@fluxys.com and box.transmissioncapacityandcharging@nationalgrid.com in copy by 17:30 on 6 May 2014. Please ensure that a read receipt is requested to confirm that your response has been received. Please note that any responses not marked confidential may be published on IUK s, Fluxys Belgium s and NGG s websites. Confidential responses may be shared with Ofgem and CREG at their request. If you wish to clarify any aspect in relation to this letter, or have any questions, please contact in the first instance Lucy Manning (IUK) on +44 (0)20 7092 6594. Appendix 1 contains full details of how to contact each TSO. We look forward to hearing from you. Yours faithfully Darren Reeve Commercial Director IUK Huberte Bettonville Director Commercial Regulated Fluxys Belgium Chris Logue European Policy Manager National Grid Gas Consultation Letter 8 April 2014 Page 6

APPENDIX 1: TSO CONTACT DETAILS Interconnector (UK) Ltd. Fluxys Belgium National Grid Gas Lucy Manning Commercial Analyst Interconnector (UK) Limited 8th floor, 61 Aldwych London WC2B 4AE Marlies Verhanneman Commercial Back-Office Manager Fluxys Belgium SA Avenue des Arts 31 B-1040 Brussels Matthew Hatch Commercial Development Manager National Grid Warwick Technology Park Gallows Hill Warwick CV34 6DA Direct Dial: + 44 (0)20 7092 6594 Switchboard: + 44 (0)20 7092 6500 Direct Dial: + 32 (0)2 282 62 37 Switchboard: +32 (0)2 282 72 11 Direct Dial +44 (0)1926 655893 Switchboard +44 (0)1926 653000 consultation@interconnector.com www.interconnector.com Info.transport@fluxys.com www.fluxys.com/belgium box.transmissioncapacityandchargi ng@nationalgrid.com http://www2.nationalgrid.com/uk/ Industryinformation/Europe/Consultations/ Consultation Letter 8 April 2014 Page 7