INSTALLATION MANUAL. ZIP System R12 Sheathing. Contents. 07 ZIP System R12 Sheathing Window Installation 08 ZIP System R12 Sheathing Siding Guidelines

Originally Issued: 11/04/2016 Revised: 11/28/2017 Valid Through: 11/30/2018

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: EVALUATION SUBJECT: STRUCTURAL PANELS

HUB REV 8/18 INSTALLATION MANUAL ZIPSYSTEM.COM

ESR-2894 Reissued April 2014 This report is subject to renewal April 1, 2016.

GAF EnergyGuard Polyiso Wall Sheathing

REPORT HOLDER: R.L. ADAMS PLASTICS, INC CROSSROADS COMMERCE PARKWAY WYOMING, MICHIGAN EVALUATION SUBJECT: POLYCORE BRAND INSULATION

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

Gold Bond BRAND Gypsum Sheathing

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

ESR-1365 Reissued March 2014 This report is subject to renewal April 1, 2015.

ESR-1061 Reissued May 1, 2011 This report is subject to renewal in two years.

Joint Evaluation Report ICC-ES (800) (562)

DIVISION: CONCRETE SECTION: INSULATING CONCRETE FORMING REPORT HOLDER: DIVERSIFOAM PRODUCTS EVALUATION SUBJECT:

REPORT HOLDER: THE DOW CHEMICAL COMPANY 1501 LARKIN CENTER DRIVE MIDLAND, MICHIGAN EVALUATION SUBJECT:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS/WEATHER BARRIERS

(800) (562) A Subsidiary of the International Code Council

SECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION

PRODUCT: Structural Insulated Panels (SIPs) DIVISION: Wood, Plastics, and Composites (06) SECTION: Structural Panels ( )

ICC ES SYSTEM SYSTEM. Trusted DIVISION: 07 SECTION: AND FINISH REPORT HOLDER: ICC-ES Evaluation. Reissued 08/2016.

LP OSB Sheathing & Structural 1 Sheathing

ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015.

The better way to build TM. Installation Manual NAILBASE PANELS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

Originally Issued: 03/28/2014 Revised: 05/25/2017 Valid Through: 03/31/2018

EPA Seal and Insulate with ENERGY STAR Insulation Product Certification Report: GAF EnergyGuard Polyiso Insulated Sheathing Board Insulation

for New Construction Applications

PRODUCT: Structural Insulated Panels (SIP) DIVISION: Wood and Plastics (06) SECTION: Structural Panels ( )

ESR-1655 Reissued April 2014 This report is subject to renewal April 1, 2016.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS

R-Matte Plus-3: Insulation for the Building Envelope

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: PROWALL BUILDING PRODUCTS, INC.

DIVISION: FINISHES SECTION: GYPSUM BOARD REPORT HOLDER: PANEL REY, S.A.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) LLC

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: NAILS REPORT HOLDER: HY-TEK FASTENERS INC. EVALUATION SUBJECT: HY-TEK NAILS

application instructions

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: FOUR SEASONS SOLAR PRODUCTS

Guide Specification for the OSI QUAD Window and Door Flashing System

ESR-1826 Reissued May 1, 2009 This report is subject to re-examination in one year.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: THE DOW CHEMICAL COMPANY

INSTALLATION GUIDE Structural insulated sheathing, all in ONE panel!

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

May 2013 CONSTRUCTION MANUAL

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP-APPLIED WOOD COATINGS SECTION: SHEATHING REPORT HOLDER:

LP SmartSide Perfection Shingle

Code Compliance Research Report CCRR 0270

Framing Methods Structural Components

Originally Issued: 2/12/2016 Revised: 07/28/2017 Valid Through: 2/28/2018

Trusted ICC ES DIVISION: ATLANTA, CGF PRO, ENERGYS. Look. Conformity! Evaluation. ICC-ES Evaluation

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: GENTEK BUILDING PRODUCTS, INC.

PRODUCT: Structural Insulated Panels (SIPs) DIVISION: Wood and Plastics (06) SECTION: Structural Panels ( )

Listing Report: MUR Reissue Date: 12/07/17 This report is subject to annual review

REPORT HOLDER: LOUISIANA-PACIFIC CORPORATION 414 UNION STREET, SUITE 2000 NASHVILLE, TENNESSEE EVALUATION SUBJECT:

Originally Issued: 03/28/2014 Revised: 05/19/2017 Valid Through: 03/31/ General

Originally Issued: 03/28/2014 Revised: 05/19/2017 Valid Through: 03/31/ General

REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE DAVID TAYLOR DRIVE, SUITE 300 CHARLOTTE, NORTH CAROLINA 28262

Building Division Informational Handout

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER-CEMENT SIDING REPORT HOLDER: EQUITONE

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: BAYER MATERIALSCIENCE, LLC

Originally Issued: 12/12/2014 Revised: 12/29/2017 Valid Through: 12/29/2018

TECH BULLETIN. SIP No. Subject: Engineered Wood Lap Siding from Louisiana-Pacific. Date: August 2010 (Revised January 2015)

3.0 DESCRIPTION. Division: Thermal and Moisture Protection Section: Thermal Insulation

DIVISION: CONCRETE SECTION: INSULATING CONCRETE FORMING REPORT HOLDER: SUPERFORM PRODUCTS LTD. EVALUATION SUBJECT:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER CEMENT SIDING REPORT HOLDER: RIEDER FASERBETON ELEMENTE GmbH

ICC-ES Evaluation Report Reissued November 2014 This report is subject to renewal November 2016

ICC-ES Evaluation Report Reissued March 2014 This report is subject to renewal March 1, 2015

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: ICYNENE, INC.

INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT

ESR-2847 Reissued September 1, 2013 This report is subject to renewal September 1, 2015.

Guide to Attaching Exterior Wall Coverings through Foam Sheathing to Wood or Steel Wall Framing

Deer Ridge Consulting, Inc.

Stone and Masonry Veneer

LP SmartSide Strand Substrate Treated-Engineered-Wood Lap & Panel Siding Louisiana-Pacific Corporation Revised December 2, 2016

Trusted ICC ES APA TH STREET. Conformity! subject of the

General. Moisture. Secondary Water-Resistive Barrier. Storage. Gaps & Sealants. Stud Spacing. Flashing, Windows, Doors & Openings

Specifications. Materials and Fabrication. Physical Properties. Environmental Impact. Sizes. Installation - General Requirements.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS

DECK PERMIT APPLICATION

SECTION STRUCTURAL INSULATED PANELS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: SIDING REPORT HOLDER: SHAKERTOWN 1992, INC.

PERM-A-BARRIER VPS. Product Description. Product Data Sheets. Self-adhering vapor permeable air and water barrier membrane

Technical Data Sheet

Perm-A-Barrier VPS (Vapor Permeable Sheet)

REPORT HOLDER: GEORGIA PACIFIC GYPSUM LLC 2861 MILLER ROAD DECATUR, GEORGIA EVALUATION SUBJECT: DENSELEMENT BARRIER SYSTEM

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: LAPOLLA INDUSTRIES, INC. EVALUATION SUBJECT:

HP+ Wall System X Series Technical Installation Manual

REPORT HOLDER: OMEGA PRODUCTS INTERNATIONAL, INC CALIFORNIA AVENUE CORONA, CALIFORNIA EVALUATION SUBJECT:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER CEMENT SIDING REPORT HOLDER: KMEW CO., LTD. EVALUATION SUBJECT:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: DIRECT-APPLIED FINISH SYSTEMS REPORT HOLDER: BASF CORPORATION WALL SYSTEMS

Strong-Drive SDWS TIMBER Screw

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS

REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE DAVID TAYLOR DRIVE, SUITE 300 CHARLOTTE, NORTH CAROLINA 28262

Transcription:

ZIP System R-Sheathing 2 Contents 02 ZIP System R-Sheathing General Notes, Guidelines and Limitations 03 ZIP System R-Sheathing Installation 05 Structural Bracing to Resist Lateral Forces 06 ZIP System Tape Installation ZIP System R-Sheathing Panel Seams ATTENTION: This installation guide is intended to provide general information for the designer and end user. The following guidelines will help you properly install the ZIP System R-Sheathing. We urge anyone installing this product to read these guidelines in order to minimize the risk of safety hazards and to prevent voiding any applicable warranties. This manual is a general installation guide and does not cover every installation condition. Proper installation shall be deemed to mean the most restrictive requirement specified by Huber Engineered Woods (HEW), local building code, engineer or architect of record or other authority having jurisdiction. Please acknowledge that it is solely your obligation for all safety requirements and code compliance. For additional information, contact Huber Engineered Woods LLC. ZIP System R-Sheathing Safety Guidelines - Follow all OSHA regulations and any other safety guidelines and safety practices. - Use approved safety belts and/or harnesses or other fall protection equipment. - Install ZIP System R-Sheathing and ZIP System tape only in dry conditions and on dry surfaces. Do not install in rain, snow, frost or other slippery conditions. - Do not apply flame directly to foam layer. Foam will burn and smoke if exposed to an ignition source of sufficient heat and intensity or open flame, such as a welder's torch. What is ZIP System R-Sheathing? ZIP System R-Sheathing panels consist of an oriented strand board panel laminated with a water-resistive facer on the exterior and a rigid foam insulation panel bonded on the opposite (interior) face. When properly installed and taped, ZIP System R-Sheathing provides a water-resistive barrier, air barrier and exterior insulation in one product. It may also be used in the construction of braced wall panels or shear walls in certain conditions. See the Structural Bracing to Resist Lateral Forces section of this installation manual for more information. The OSB substrate complies with Voluntary Product Standard PS2 for wood structural panels and the water-resistive barrier complies as an alternate to the water-resistive barrier prescribed in the code. ZIP System R-Sheathing is available with a 1/2-inch, 1-inch, 1-1/2-inch and 2-inch foam insulation panel. ZIP System R-Sheathing Includes: - ZIP System wall sheathing panels with built-in water-resistive barrier and preprinted fastening and tape guides. - Foam insulation panel. - ZIP System tape. 07 ZIP System R-Sheathing Window Installation 08 ZIP System R-Sheathing Exterior Cladding Installation: Lap Siding 09 ZIP System R-Sheathing Exterior Cladding Installation: Anchored Masonry Brick Veneer Storage and Handling - Set panel stack on three supports (stickers) to keep a minimum of 4 inches of clearance above ground level. - Outdoors, cover panels loosely with a waterproof protective material such as a tarpaulin. - Anchor covers on top of the stack, but keep away from sides and bottom to assure good air circulation. - In high moisture environments, cut banding on the panel stack to prevent edge damage. - Factory applied packaging is intended only for protection during transit. - Packaged units must be stored indoors or within a covered structure. - For temporary job-site storage, units should be stacked on pallets at least three inches above ground level and completely covered with a weatherproof covering such as a tarpaulin. - The temporary factory-applied packaging should be slit or removed to prevent accumulation of condensation. - Do not stack more than three units high. ZIP System R-Sheathing Notes and Limitations - ZIP System R-Sheathing is approved for wall use only. Do not use on roofs. - Do not use abutted against stone or masonry without providing a minimum of a 1/2-inch gap. - Do not install ZIP System tape in temperatures less than 20 F. - ZIP System R-Sheathing products are not approved for manufactured housing applications that are built under a federal building code administered by the U.S. Department of Housing and Urban Development (HUD). - Not intended to replace traditional wood structural panels in applications where the wall sheathing is designed to resist combined wind uplift and shear. - Do not use in fire-rated assemblies in lieu of a required wood structural panel. - Do not apply secondary coatings to the overlay on ZIP System R-Sheathing. - Minimum 1/2-inch gypsum wall board must be installed on the interior side of the wood wall studs as a thermal barrier using code-recognized fasteners per IRC or IBC requirements. - Only use in buildings of Type V construction or construction permitted under the International Residential Code. - In areas where the probability of termite infestation is very heavy the clearance between ZIP System R-Sheathing and finished grade shall be no less than 6-inches. Note: In cladding systems requiring multiple layers of water-resistive barriers, like traditional hard-coat stucco and adhered stone veneers, ZIP System R-Sheathing is intended only to replace the first layer.

3 ZIP System R-Sheathing Installation Overview: ZIP System R-Sheathing is composed of ZIP System wall sheathing panels, laminated exterior foam panel insulation and ZIP System seam sealing tape. ZIP System R-Sheathing panels should be fully installed before the seam sealing tape is applied. The following manufacturer installation steps and recommendations are presented as a general outline of the installation process. You are fully and solely responsible for all safety requirements. Good construction practices should be followed at all times. Step 1. Install any necessary mechanical strapping directly to framing. Any metal straps, ties or other connectors designed to resist uplift, shear or diaphragm loading must be installed prior to ZIP System R-Sheathing installation. The requirement for mechanical uplift connections shall be determined by the designerof-record, local building codes or authority having jurisdiction. Detail A should not be considered typical and only applies when mechanical uplift connections are specified. Straps, ties and connectors installed on the exterior face of stud will not be visible after ZIP System R-Sheathing panels are installed. Schedule any necessary anchor or nailing inspections accordingly. DETAIL A Roof Sheathing Roof truss or rafter ZIP System R-Sheathing Wall cavity Insulation Mechanical strapping per code or designer-ofrecord, if required. Rafter/truss shall be attached to wall below to resist uplift forces per IRC or IBC requirements. Wall cavity insulation ½-inch min. gypsum Subfloor Rimboard ZIP System R-Sheathing Mechanical strapping per code or designer-ofrecord to resist uplift forces, if required. Wall cavity insulation Floor joist/truss ½-inch min. gypsum ZIP System R-Sheathing Foundation Step 2. Install ZIP System R-Sheathing panels positioned with the water-resistive barrier facing out. The panels may be installed with the long side of the panel oriented either horizontally or vertically to the framing members. Wall panels that are designed to resist lateral shear forces should have solid framing or blocking behind all panel edges. Foam insulation is oversized on one 4-ft and one 8-ft. edge relative to the ZIP System R-Sheathing face to accommodate proper gapping of panels. Panels should be installed with foam edges touching. Please coordinate panel field placement and orientation in order to take advantage of this gapping feature.

4 ZIP System R-Sheathing Installation Step 3. Fasten the panels to the framing members with code approved fasteners. When used to resist lateral forces, nail fastener penetration into the wood wall stud should be a minimum of 1 1/2-inches. If staples are used (R3 and R6 only), fasteners must penetrate a minimum 1-inch into the framing. See, Structural Bracing to Resist Lateral Forces, on page 5, for fastener and fastener spacing options. It is the responsibility of the general contractor to ensure correct fastener type and spacing prior to installation. Apply fasteners 3/8 inch from panel edge. ZIP System R-Sheathing thickness may influence building interior and exterior dimensions, framing layout or foundation design for anchored veneers. For example: Foundation brick ledges may need to be wider when using ZIP System R-Sheathing (See DETAIL G on page 9), or wall stud placement may need to be adjusted from building corners to allow for sheathing thickness. Designer and general contractor should make necessary adjustments (if any) to the design and/or construction methods to accommodate these changes. ZIP System tape must be installed using a roller to apply pressure to the pressure sensitive adhesive layer of the tape. DETAIL B Wood stud framing Install edge and interior fasteners per ZIP System R-Sheathing installation manual ZIP System tape installed over all panel seams (use roller on all taped seams) Install solid wood blocking between studs as needed for required edge nailing ½-inch min. gypsum Additional stud may be required to fasten ZIP System R-Sheathing panels at inside corner Wall cavity insulation not shown for clarity DETAIL C Wood stud framing NOT OK OK ½-inch min. gypsum Wall cavity insulation not shown for clarity NOTE: Ensure that the framing spacing takes into account for the overlap of the panel in the outside corners or rip the panel to fall on existing framing. California Corner or drywall clips may be used in lieu of stud shown Install ZIP System tape at all exterior corners with minimum 1-inch contact on overlay of both panels; 6-inch ZIP System tape or multiple pieces of 3-3/4-inch ZIP System tape installed over all panel seams (use roller on all taped seams) Ensure tape at corner is positioned for a min. 1-inch of contact on overlay surface on both panels; 6- inch tape or multiple pieces of 3-3/4 -inch tape Install solid wood blocking between studs as needed for required edge nailing Install edge and interior fasteners per ZIP System R-Sheathing installation manual

5 Structural Bracing to Resist Lateral Forces ZIP System R-Sheathing wood-framed walls may be designed to resist lateral shear forces by prescriptive or engineered methods in accordance with the International Building and Residential Codes (See Table 1 and Table 2 below). All seams between panels used to resist lateral loads must be backed by solid wood framing. If the panel is not required for structural bracing, the panels should be installed with a minimum 0.131 shank diameter nails (minimum 1- inch embedment into wood studs) spaced at 6 inches on center on panel edges and 12 inches on center in the field of the panel. Minimum 1/2-inch thick gypsum wallboard must be installed as a thermal barrier in accordance with Chapter 26 of the IBC or Chapter 3 of the IRC. Installation When Not Part of Lateral Force Resisting System ZIP System R-Sheathing that is not intended to resist wind or seismic loads may be attached to framing using 0.131 diameter shank nails. Nails must penetrate the studs at least 1 inch. Installation When used in Wall Bracing or Shear Walls ZIP System R-Sheathing may be used in the construction of braced wall panels in accordance with WSP bracing method (2009 IRC) as an equivalent alternative to the prescribed wood structural panels ONLY if installed per Table 1 below. All requirements, restrictions and limitations listed in the IRC regarding the applicability and use of prescriptive wall bracing methods still apply. TABLE 1 PRESCRIPTIVE METHOD: FASTENING REQUIREMENTS FOR ZIP SYSTEM R-SHEATHING WITH FRAMING OF DOUGLAS FIR-LARCH FOR WIND OR SEISMIC LOADING UNDER THE 2009 IRC (WSP METHOD) R-SHEATHING TYPE 3 FRAMING 4 FASTENERS (R-Value of foam) Nominal Stud Size Maximum Stud Fastener Specifications 2 Maximum Edge/Field Spacing Minimum Penetration (Min.) Space (inches) (inches) into Framing (inches) R-3 2-by-4 24 0.131-inch shank nails 4/12 1.5 R-3 2-by-4 16 16ga staples, 7/16-inch crown, 2-inch length 3/6 1.0 0.131-inch shank nails 4/12 1.5 R-6 2-by-4 24 15ga staples, 7/16-inch crown, 2-inch length 3/6 1.0 R-9 2-by-4 24 0.131-inch shank nails 3/12 1.5 R-12 2-by-4 24 0.131-inch shank nails 3/12 1.5 1. All fasteners must be located a minimum of 3/8 inch from panel edges. 2. Fasteners must be common nails or equivalent, or staples, of a type generally used to attach wood sheathing. 3. R-12 R-Sheathing panels have a foam plastic insulation thickness of 2.0 inch. R-9 R-Sheathing panels have a foam plastic insulation thickness of 1.5 inch. R-6 R-Sheathing panels have a foam plastic insulation thickness of 1.0 inch. R-3 R-Sheathing panels have a foam plastic insulation thickness of 0.5 inch. 4. All panel edges must be backed by framing. Designers may use ZIP System R-Sheathing as an alternate to wood structural panels in the construction of wood shear walls when designed in accordance with 2012 or 2009 IBC Sections 2305 and 2306 (as applicable). The allowable shear loads are listed in Table 2. TABLE 2 ENGINEERED METHOD: FASTENING REQUIREMENTS AND ALLOWABLE SHEAR CAPACITY FOR ZIP SYSTEM R-SHEATHING WITH FRAMING OF DOUGLAS FIR-LARCH 2 FOR WIND OR SEISMIC LOADING UNDER THE 2009, 2012 AND 2015 IBC. R-SHEATHING TYPE 4 FRAMING FASTENERS ALLOWABLE SHEAR (R-Value of foam) Nominal Stud Size Maximum Stud Fastener Specifications 3 Edge/Field Minimum Penetration (Min.) Space (inches) Spacing (inches) into Framing (inches) CAPACITY 5,6,7 (plf) R-3 2-by-4 24 0.131-inch shank nails 4/12 1.5 245 R-3 2-by-4 24 0.131-inch shank nails 3/12 1.5 280 R-3 2-by-4 16 16ga staples, 7/16-inch crown, 2-inch length 3/6 1.0 210 R-6 2-by-4 24 0.131-inch shank nails 4/12 1.5 230 R-6 2-by-4 0.131-inch shank nails 3/12 1.5 255 R-9 2-by-4 24 0.131-inch shank nails 3/12 1.5 240 R-12 2-by-4 24 0.131-inch shank nails 3/12 1.5 215 For SI: 1 inch = 25.4 mm; 1 pound per foot (ppf) = 14.59 N/m. 1. All fasteners must be located a minimum of 3/8 inch from panel edges. 2. For framing of other species, the shear value above must be multiplied by the Specific Gravity Adjustment Factor = [1- (0.50 SG)], where SG = Specific Gravity of the framing lumber in accordance with the AF&PA NDS. This adjustment factor must not be greater than 1. 3. Fasteners must be common nails or equivalent, or staples, of a type generally used to attach wood sheathing to wood framing. 4. R-12 R-Sheathing panels have a foam plastic insulation thickness of 2.0 inch. R-9 R-Sheathing panels have a foam plastic insulation thickness of 1.5 inch. R-6 R-Sheathing panels have a foam plastic insulation thickness of 1.0 inch. R-3 R-Sheathing panels have a foam plastic insulation thickness of 0.5 inch. 5. The maximum height-to-width aspect ratio of 2:1. 6. The allowable shear capacity may be increased by 40% for wind in Allowable Stress Design in accordance with Section 2306.3 of the 2015, 2012 and 2009 IBC. 7. All panel edges must be backed by framing.

6 ZIP System R-Sheathing Tape Installation Apply ZIP System tape after ZIP System R-Sheathing panels are fully fastened to wall framing. Only ZIP System tape should be used to seal the seams of ZIP System R-Sheathing. Make sure that the panel surface is dry and free of sawdust and dirt prior to taping. ZIP System tape is a contact tape that requires application pressure for an adequate seal. Step 1. Tape all seams using ZIP System tape. Center the tape over the seam within +/- 1/2 inch to provide adequate coverage and reduce wrinkles in tape. Use the ZIP System tape gun or ZIP System roller to apply pressure to the tape and smooth out any wrinkles. Step 2. Wherever tape splices occur at a horizontal or vertical seam, create an overlapping splice of at least 3 inches. At T-joints, the tape pieces should overlap by at least 1 inch. Apply pressure onto the surface of the tape to ensure a secure bond between the panel and the tape. Use the ZIP System tape gun or ZIP System roller to apply pressure to the tape and smooth out any wrinkles. Take special care to remove any voids and/or trapped air at splice areas and T-joints. Step 3. Tape inside and outside corner seams. Tip: When taping inside corner seams, it is helpful to cut a manageable length of ZIP System tape and hold the ends in the middle using only your index fingers and thumbs. Slightly pulling both ends of the tape causes the tape edges to naturally curl inward. With the tape in tension, place it in the inside corner. Repeat as you go up the full height of the wall. Outer Corner Seam Inside Corner Seam

7 ZIP System R-Sheathing Window Installation DISCLAIMER: Please defer to/consult the installation instructions of your window manufacturer as well as local code requirements. It is the responsibility of the general contractor to coordinate rough opening dimensions with window dimensions and install any necessary extensions or solid blocking as needed. Step 1. Install sill/pan flashing that satisfies the requirements of ASTM E 2112 and AAMA 711into the rough opening. ZIP System tape or ZIP System stretch tape may be used as pan flashing. Other adhesive-based flashing tapes may be used if they satisfy ICC-ES AC- 148 or AAMA 711. DETAIL D Refer to window manufacturer for window attachment through continuous insulation systems. This may involve solid blocking through foam thickness. Step 2. From the interior of the rough opening, apply low-pressure polyurethane foam (for windows) between the rough opening and the window frame. (Caulk sealant compatible with the flashing and backer rod may be used in lieu of polyurethane foam.) When using ZIP System tape, 100% silicone, butyl and polyurethane sealants are acceptable. Jamb flange flashing tape not to extent past the mid-point of head flange flashing tape Installed Window

ZIP System R-Sheathing Installation Manual 8 ZIP System R-Sheathing Exterior Cladding Installation The outside layer of ZIP System R -Sheathing consists of a 7/16 wood structural panel that can be used as a nailbase for finished exterior cladding that does not require direct attachment to structural framing. For finished wall cladding requiring fasteners to penetrate into the structural framing we recommend following the finished cladding manufacturer s installation recommendations. The maximum allowable cladding weights and cladding fastener schedules are listed in Table R703.15.1 of the 2015 IRC. DISCLAIMER: The following steps represent a general overview of exterior cladding installation. Please defer to/consult the installation instructions of your cladding manufacturer as well as local code requirements. Lap Siding DETAIL E Min. ½-inch gypsum wallboard Wall stud framing Wall cavity insulation ZIP System tape installed over all panel seams (install with ZIP System tape gun or roller) Install solid blocking between studs as needed for required edge nailing on braced wall panels Wood, fiber-cement, hardboard or vinyl lap siding, follow building code or siding manufacturer installation instructions for fastening 7/16 wood sheathing and/or wall studs It is the responsibility of the general contractor to ensure that fasteners used to install lap siding are of adequate length to satisfy the requirements of governing building codes and siding manufacturer s installation instructions.

ZIP System R-Sheathing Installation Manual 9 ZIP System R-Sheathing Exterior Cladding Installation Anchored Masonry Brick Veneer DETAIL F Min. ½-inch gypsum wallboard Wall stud framing Wall cavity insulation ZIP System tape installed over all panel seams (install with ZIP System tape gun or roller) Install solid blocking between studs as needed for required edge nailing on braced wall panels Anchored masonry brick veneer Brick veneer anchors (ties) shall be anchored to wall studs through ZIP System R-Sheathing panels and spaced per governing code DETAIL G ZIP System R-Sheathing Brick veneer anchors (ties) shall be anchored to wall studs through ZIP System R-Sheathing panels Top edge of flashing taped with ZIP System tape or adhesive backed flashing (Must meet AC148 or AAMA 711) Air gap per code Wall cavity insulation Min. ½-inch gypsum wallboard Code approved base flashing NOTE: Coordinate brick ledge dimension to include thickness of ZIP System R-Sheathing panel Foundation It is the responsibility of the general contractor to ensure that fasteners used to install brick veneer anchors (ties) are of adequate length to satisfy the requirements of governing building codes. To learn more about our ZIP system R-sheathing call 1.800.933.9220 or visit ZIPsystem.com. HUB-3021 07/16