A-2. Soils. Soil Media. Chapter Contents. Soil Media In-situ Soil Testing Separation from Seasonal High Water Table (SHWT)

BURLINGTON COUNTY HEALTH DEPARTMENT 15 PIONEER BOULEVARD, WESTAMPTON PO BOX 6000 MOUNT HOLLY, NEW JERSEY 08060

City of Vineland Health Department 640 E. Wood Street, Vineland, NJ (856) (ph.) / (856) (fax)

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

STORMWATER MANAGEMENT. 158 Attachment 2. Borough of Perkasie

CITY OF MONTCLAIR Montclair Civic Center 5111 Benito Street Montclair, CA 91763

STORMWATER CHECKLIST (Part 1) Stormwater Management Information Required to Be Submitted to Commission and Municipality for Review

Introduction. (N.J.A.C.) 7:8 the general definition of infiltration basin failure consists of:

GROUNDWATER TABLE HYDRAULIC IMPACT ASSESSMENT GUIDE FOR INFILTRATION BMPS

Hydrologic Soil Group Knowledge Matrix

Alteration/Expansion or Change in Use Alteration/Malfunctioning System Deviation from Standards Repairs to Existing System

Soil Class Handouts Greeley Colorado October 22 & 23, 2015

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

Appendix 10-A. Optional Recharge Volume Approach

Commonwealth of Massachusetts City/Town of Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal. Street Address Map/Lot #

N.J.A.C. 7:8 Stormwater Management Rules - Design and Performance Standards. Nonstructural Strategies Assist with Strategy #2; See Page 3

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement

The National Cooperative Soil Survey Program when complete. will have produced soil survey reports for all counties in the

4.8. Subsurface Infiltration

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

Infiltration Testing For Stormwater BMPs: What Would Mickey Mouse Do?

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

WELCOME ASSESSING ENVIRONMENTAL IMPACTS: CONSIDERING STATE REGULATIONS IN SITE PLAN REVIEW

3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities

WESTERN UPPER PENINSULA HEALTH DEPARTMENT RESIDENTIAL ON-SITE SEWAGE PROGRAM ALTERNATIVE TECHNOLOGY POLICY

05/2012 Page 1 of 13 pages Fee Enclosed. Municipality Block Lot

Review Zone Application for D&R Canal Commission Decision

Design Guideline for Gravity Systems in Soil Type 1. January 2009

Private Sewage Permit Application

SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP Permit No.

4.8. Subsurface Infiltration

3.2 INFILTRATION TRENCH

Suggested Stormwater Management Practices For Individual House Lots

Form 1 - General Information

Ordinance No Lot Surface Drainage

N.J.A.C. 7:9A STANDARDS FOR INDIVIDUAL SUBSURFACE SEWAGE DISPOSAL SYSTEMS

Standard for Infiltration Basins

August 15, 2006 (Revised) July 3, 2006 Project No A

LIVINGSTON COUNTY PRIVATE SEWAGE DISPOSAL SYSTEM ORDINANCE

County of Los Angeles - Department of Public Works

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

CITY UTILITIES DESIGN STANDARDS MANUAL

Michigan Criteria for On-Site Wastewater Treatment ~~~~~~~

Developing an Effective Infiltration Design for Clay Soils

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

PUBLIC NOTICE PROFESSIONAL ENGINEERING SERIVCES: DESIGN OF TURF FIELD

COMPACTED CLAY LINERS

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE. N.J.A.C.

WQ-08 ENHANCED DRY SWALE

Permeable Pavement Facilities and Surfaces

Estimating the Seasonal High Water Table: A Mix of Art & Science

Mercer County Household Sewage Treatment System Regulations

Novel Modeling Approach to Understand the Fate of Infiltrated Water at Green Stormwater Infrastructure in Philadelphia, PA

Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL

Project/Research Sponsors. Why Manage Stormwater? Why Manage Stormwater? Why Manage Stormwater? Soils. Applications to Stormwater Management

Appendix A. Infiltration and Soil Texture Testing Methods. Appendix A. A.1 General Description. A.2 Infiltration Testing: A Four-Step Process

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Soil Permeability Testing

Transitioning from the Percolation Test to Soils Evaluation Colorado Environmental Health Association Annual Education Conference 2015

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

6.5 Extended Detention Basin

5.0 SITE CONDITIONS. 5.1 Surface Conditions

RAPID INFILTRATION BASINS REVIEW CHECKLIST

Stormwater Infiltration Investigation and Regulation. Geoffrey M. Goll, P.E., SEO

Sizing Calculations and Design Considerations for LID Treatment Measures

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

How & Where does infiltration work? Context: Summary of Geologic History Constraints/benefits for different geologic units

Water Resources Management Plan

PERVIOUS CONCRETE PAVEMENT

Section 1I-3 - Bioswales

CHAPTER 4 GEOTECHNICAL SITE CHARACTERIZATION

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

March 14, Mr. Bill Vetos 5473 Secrest Court Golden, Colorado 80403

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA

EAGLE DRAINAGE DESIGN STANDARDS

A. GENERAL PROPERTY INFORMATION. Applicant s name Day Phone Installer Name Send permit to installer. B. PROPERTY DESCRIPTION

SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP File No.

The following sections provide the approved standard infiltration testing specifications.

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA

A. GENERAL PROPERTY INFORMATION. Applicant s name Day Phone Installer Name Send permit to installer. B. PROPERTY DESCRIPTION

C-1. Infiltration System

Components Used: Septic Tank; Size Lagoon Packaged Sewage Treatment Plant Holding Tank; Size

Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017

SEDIMENT QUALITY ASSURANCE/QUALITY CONTROL PLAN DUVAL COUNTY BEACH NOURISHMENT PROJECT. FDEP Permit No JC

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

Re: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

GRAY WATER RECYCLING SYSTEMS

KINGWOOD TOWNSHIP THREE PART PUMP TEST CHECKLIST. APPLICANT: Road Name: TAX MAP Sheet/Block/Lot Date Submitted: Name of Project (If Any):

June i TABLE OF CONTENTS

Grand Traverse County Health Department Environmental Health Division. Pressure Mound System (PMS) Policy and Procedure Manual

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

LOCATION RESTRICTIONS SEISMIC IMPACT ZONES BASIN 6

BMP #: Infiltration Basin

Site and Soil Evaluation for Sewage Treatment and Dispersal

ENGINEERING HYDROLOGY

Stormwater Quality Review Checklist - General

Transcription:

November 2007 DRAFT Appendix E: Soil Testing Criteria Stormwater management design is dependent upon the changes that occur between pre and postdevelopment conditions. The impacts are assessed based on changes in hydrologic response, which are determined by a combination of land use and soils. Although land use is simple to determine, the impact of the soils, particularly in historically amended areas are more difficult to determine. Soils are a critical factor, both to establish the resulting hydrologic impacts from development and also to provide a design that adequately accomplishes the protection required from the increases in runoff resulting for additional development. This guidance provides methods to determine a hydrologic soil group for unmapped soils, to adjust the hydrologic soil group where detailed site investigation provides information contradictory to the county soil surveys, to develop an associated soil type for the groundwater recharge analysis and to establish the requirements for soil testing where infiltration BMPs are proposed. Note: This guidance does not provide all of the required soil testing to assess hydraulic impacts on groundwater from an infiltration BMPs. Additional soil information may be necessary depending on the type of mounding analysis and the specific site being assessed. 1. Establishing Hydrologic Soil Groups The county soil surveys are used to establish the existing soils condition and the associated hydrologic soil group (HSG) for the soil series. The soil type and HSG impact the computations to establish the existing groundwater recharge and existing runoff conditions necessary to evaluate compliance with the recharge and quantity control criteria of the Stormwater Management rules. However, many areas in the State have been amended or modified and the county soil surveys do not provide sufficient information with which to determine the hydrologic soil group and the associated hydrologic response. As a result, there is the need for a methodology to associate these areas with the applicable soil series and associated hydrologic soil group for areas mapped as Urban Land, Cut and Fill Land, Made Land or other indeterminately and previously altered areas in the State as well as for instances where map classifications do not represent field conditions. The design engineer has the option to utilize default hydrologic soil groups in areas where the HSG is not known. Under existing conditions for the Coastal Plain, HSG A may be utilized. For the remainder of the State, HSG B may be utilized. For proposed conditions, HSG D should be used. These values will result in a conservative design for stormwater runoff and groundwater recharge computations. However, if the designer engineer does not wish to utilize these assumed hydrologic soil groups, a process is outlined below to establish the HSG based on site-specific investigation. 1

1.1 Soil Testing Locations To establish the characteristics for a site, a minimum of one (1) test pit and four (4) soil borings shall be performed within each unknown soil mapping unit to determine the distribution of soil types present at the site within that unit. For unknown mapping unit areas larger than two (2) acres, a minimum of one (1) additional soil test pit shall be conducted within each additional area of two (2) acres. The additional test pit(s) shall be placed approximately equidistant to other test pits, so as to provide adequate characterization of the subsurface material. In all cases, where soil and or groundwater properties vary significantly, additional test pits shall be excavated in order to accurately characterize the subsurface conditions. In a soil mapping unit where more than one test pit is required, soil borings may be used to replace a test pits in areas where performing test pits would substantially disturb natural conditions. When using a soil boring to replace a test pit during a preliminary soil investigation, the borings shall be performed and reported in accordance with ASTM D 1452 Practice for Soil Investigation and Sampling Auger Borings & ASTM D 1586 - Test Method for Penetration Test and Split-Barrel Sampling of Soils. Sampling shall be continuous for the entire depth of the boring to fully characterize the soil profile. 1.2 Establishing Hydrologic Soil Groups Soil test pits shall extend to the depth of the seasonally high water table, or the deeper of six (6) feet below existing grade or four (4) feet below proposed grade. The depth of the restrictions, depth of the seasonally high water table (SHWT) and the permeability rate are critical to establishing the hydrologic soil groups. The following guidance documents from the USDA Natural Resources Conservation Service should be utilized to establish the hydrologic soil groups: USDA Natural Resources Conservation Service. Part 630 Hydrology National Engineering Handbook Chapter 7 Hydrologic Soil Group, May 2007. USDA Natural Resources Conservation Service. National Soil Survey Handbook, Part 618.49 Restriction Kind, Depth, Thickness, and Hardness, pp 618-33 to 618-34, 1996. The Department summary of the NRCS guidance documents to establish hydrologic soil group based on permeability rates is provided in the Addendum at the end of this guidance. 2.0 Soil Series for Groundwater Recharge Computations The New Jersey Groundwater Recharge spreadsheet provides average annual groundwater recharge for a site given an area, a land use and a soil type. The methodology to establish hydrologic soil group is not sufficient to provide the necessary soil type. The groundwater recharge based on the soil type was evaluated, and the groundwater recharge does not value significantly within the hydrologic soil group. Therefore, the design engineer can assume a soil type based on the median groundwater recharge for each HSG as shown below. HSG A: HSG B: Fort Mott Nixon 2

HSG C: HSG D: Venango Any D soil NOTE: The establishment of soil type discussed at 2.0 is only for the use in the New Jersey annual groundwater recharge computations. The use of this soil type for groundwater recharge computations is not an indication that the selected soil is the exact soil on site, and additional soil testing and characterization may be needed if the soil type is necessary for other types of analysis. 3.0 Soil Testing for Infiltration BMPs Stormwater infiltration BMPs are those BMPs which rely on infiltration for groundwater recharge, stormwater runoff quality, and/or stormwater runoff quantity control. Examples include, but are not limited to, bioretention basins without underdrains, dry wells, infiltration basins, and sand filters without underdrains. Structural BMPs may be constructed with a portion of the basin as the infiltration component, while the remainder of the basin simply provides the necessary storage for stormwater or water quality runoff control. In these cases, the infiltration BMP soil testing criteria would apply to only the portion of the basin providing the infiltration for the BMP. Infiltration BMPs are required to be sited in soils verified by field-testing to have permeability rates of one (1) inch per hour or greater. If such site soils do not exist or if the design engineer demonstrates that it is not practical for engineering, environmental or safety reasons to site a stormwater infiltration BMP(s) in such soils, then the stormwater infiltration BMP(s) may be sited in soils verified by field testing to have permeability rates of at 0.4 inches per hour or greater in limited circumstances. Detailed discussion is provided in Chapter 5 of the NJ Stormwater BMP manual. Field tested permeability rates in excess of 20 inches per hour must be limited to no more than 10 inches per hour as the design permeability rate to determine if it complies with the maximum allowable 72 hour drawdown time for infiltration facilities. Note: In cases where the use of the field tested infiltration rate as opposed to the 10 in/hr maximum rate is conservative, the larger rate must be utilized in those specific computations to ensure design adequacy. All soil test pits and soil permeability results shall be performed under the direct supervision of a Professional Engineer with experience in soil testing or in consultation with a specialist in the soil sciences, such as Certified Professional Soil Scientists. 3.1 Soil Testing Locations Soil test pit and soil borings are only required in the areas of the BMP being utilized for infiltration. Where the entire basin is being utilized for infiltration, the basin area will be equivalent to the infiltration area. Where only a portion of the BMP is being utilized for 3

infiltration, the infiltration BMP area discussed below is applicable only to the infiltration portion of the BMP. Generally, a minimum of two (2) soil test pits shall be excavated within the footprint of any proposed infiltration BMP to determine the suitability and distribution of soil types present at location of the BMP. Soil test pits shall extend to a minimum depth of eight (8) feet below the lowest elevation of the basin bottom or to a depth that is at least two (2) times the maximum potential infiltration depth in the proposed BMP, whichever is greater. Placement of the test pits shall be within twenty (20) feet of the basin perimeter, located along the longest axis bisecting the BMP. For BMPs larger than ten thousand (10,000) square feet in area, a minimum of one (1) additional soil test pit shall be conducted within each additional area of ten thousand (10,000) square feet. The additional test pit(s) shall be placed approximately equidistant to other test pits, so as to provide adequate characterization of the subsurface material. For infiltration BMPs less that 100 square feet, the requirement for two (2) soil test pits may be reduced and replaced with a minimum of one test pit for the site and one (1) soil boring or test pit at the location of each individual BMP. The test pit must be located to adequately depict the conditions of the site. Where the soil logs demonstrate significant changes in the soil or groundwater properties, additional test pits will be required. For drywells in residential structures, only one soil boring or test pit is required per lot. For linear infiltration BMPs, a minimum of two soil test pits is required with an additional test pit for every 2000 linear feet or any change in soil mapping unit, whichever is more frequent. If the mapping unit exceeds 1000 feet at the location of the infiltration BMP, an additional test pit shall be provided. Linear infiltration BMPs are typically located along roadways to infiltrate runoff over a long distance and has a minimum length to width ratio of 4:1 along the length of the road. 4

An additional test pit or soil boring shall be provided every 500 linear feet or to demonstrate any significant changes in soil properties, whichever is more frequent. In all cases, where soil and or groundwater properties vary significantly, additional test pits or soil borings shall be excavated in order to accurately characterize the subsurface conditions below the proposed infiltration BMP. Soil permeability tests shall be conducted on the most hydraulically restrictive horizon or substratum to be left in place below the basin as follows: Where no soil replacement is proposed, the permeability tests shall be conducted on the most hydraulically restrictive horizon or substratum within four (4) feet of the lowest elevation of the basin bottom or to a depth equal to two (2) times the maximum potential water depth within the basin, whichever is greater. Where soil replacement is proposed, the permeability tests shall be conducted within the soil immediately below the depth of proposed soil replacement or within the most hydraulically restrictive horizon or substratum to a depth equal to two (2) times the maximum potential water depth within the basin, whichever is greater. Permeability tests may be performed on the most hydraulically restrictive soil horizons or substrata at depths greater than those identified above. A permeability test shall be conducted in all soils that immediately underlie a perched zone of saturation. Any zone of saturation which is present below a soil horizon which exhibits an inplace permeability of less than 0.2 inches per hour shall be considered an artesian zone of saturation unless a minimum one foot thick zone of unsaturated soil, free of mottling or other redoxomorphic features possessing a chroma of four of higher exists immediately below the unsuitable soil. Stormwater infiltration BMPs shall not be installed in soils that exhibit artesian groundwater conditions. 3.2 Soil Test Procedures During all subsurface investigations and soil test procedures, adequate safety measures shall be taken to prohibit unauthorized access to the excavations at all times. It is the responsibility of 5

persons performing or witnessing subsurface investigations and soil permeability tests to comply with all applicable Federal, State and local laws and regulations governing occupational safety. All soil test pits and soil permeability results shall be performed under the direct supervision of a Professional Engineer with experience in soil testing or in consultation with a specialist in the soil sciences. All soil logs and permeability test data shall be accompanied by a certification by a Professional Engineer. The results and locations (horizontal and vertical) of all soil test pits, borings and soil permeability tests, both passing and failing, shall be included in the Stormwater Management Report submitted to the appropriate review agency. A minimum of one (1) permeability test shall be performed at each soil test pit location. Permeability rates can be determined as prescribed in N.J.A.C. 7:9A-6.2 (Tube Permeameter Test), N.J.A.C. 6.5 (Pit Bailing Test) or N.J.A.C. 6.6 (Piezometer Test). When the tube permeameter test is used, a minimum of two replicate samples shall be taken and tested. Alternative permeability test procedures may be accepted by the approving authority provided the test procedure utilizes undisturbed material to establish the permeability rate, attains saturation of surrounding soils, accounts for hydraulic head effects on infiltration rates, provides a permeability rate with units expressed in inches per hour and is accompanied by a published source reference. These tests may include constant head or falling head tests in both soil or fractured rock materials. Examples of suitable sources include hydrogeology, geotechnical, or engineering text and design manuals, proceedings of American Society for Testing and Materials (ASTM) symposia, or peer-review journals. Neither a Soil Permeability Class Rating Test, as described in N.J.A.C. 7:9A-6.3, nor a Percolation Test, as described in N.J.A.C. 7:9A-6.4, are acceptable tests for establishing permeability values for the purpose of complying with this requirement. 4.0 Post-Construction Soil Permeability Testing Permeability rates are necessary to establish the hydrologic soil group and to design an infiltration BMP. Permeability rates should be measured before any construction has occurred at a given location. The results of a subsurface investigation shall serve as the basis for the site selection and design of stormwater infiltration BMPs. The subsurface investigation shall include, but not be limited to, a series of soil test pits and soil permeability tests. During construction, regular oversight should be provided by the professional engineer responsible for ensuring the effectiveness of infiltration BMPs to ensure that the basin functions as designed. Oversight includes, but is not limited to, the following: A pre-construction meeting with the contractor to ensure their familiarity with the special care necessary in constructing an infiltration BMP. Testing each soil layer where the permeability rate is critical prior to the placement of a new layer to ensure that the permeability rate has been retained. For example, in bioretention-infiltration basins, the subsoil should be tested prior to the placement of the soil filter media. 6

Ensure proper precautions are taken to prevent sediment entering the structure during construction or if the basin is used as a sedimentation basin, ensuring that the construction sediment does not result in clogging.. Additional information for each infiltration BMP is provided in the New Jersey Stormwater Best Management Practices manual. After all construction activities have been completed on the site and the finished grade has been established in the infiltration BMP, post-development field permeability tests should be conducted within the most hydraulically restrictive soil horizon or substratum below the as-built BMP to ensure that the installed BMP functions as designed. Hand tools and manual permeability test procedures shall be used for the purpose of confirming BMP performance. If the post-development field tested permeability rates vary by no more than 10% from the preconstruction permeability rates utilized in the design, the infiltration BMP is acceptable. Variations of greater than 10% in the tested permeability rate must be addressed through either additional computations submitted to the reviewing agency to demonstrate that the postconstruction rate would function as required or the infiltration BMP must be renovated and retested to ensure the necessary permeability rates are achieved. In addition, the infiltration BMP should be flooded with water sufficient to demonstrate the performance of the BMP. Pre and post construction soil test results shall be certified to by a licensed engineer. 4.1 Significant changes in soil or groundwater properties A soil profile is typically described by noting the depth (subsequently converted to an elevation) of the boundaries between the soil horizons. The horizontal boundaries between soil horizons or layers should be noted (i.e. a new horizon should be called out) whenever there is a change in color or color pattern, texture (grain size distribution), consistence (e.g. stiff, loose, etc.), structure.(e.g. massive, platy, etc.) and course fragment content (% of gravel, cobbles, etc.). The depth (elevation) of zones of saturation between soil profiles is also very significant. Each of these characteristics can either directly affect soil permeability or provide insight to the inherent permeability of the material. A deviation of greater than 1 foot between the elevation of boundaries between soil profiles may represent a "significant change" between the profiles. The inclusion of a soil material or a morphological feature in one profile but not another may also represent a significant change. Any changes in the soil logs that materially affect the sizing or the vertical or horizontal placement a stormwater management BMP constitutes significant change. 4.2 Soil Logs A soil test pit log shall be prepared for each soil test pit. The test pit log shall, at a minimum, provide the elevation of the existing ground surface; the depth and thickness (in inches) of each soil horizon or substratum; the dominant matrix or background and mottle colors using the Munsell system of classification for hue, value and chroma; the appropriate textural class as shown on the USDA textural triangle; the volume percentage of coarse fragments (larger than two (2) millimeters in diameter); the abundance, size, and contrast of mottles; and the soil 7

structure, soil consistence, and soil moisture condition, using standard USDA classification terminology for each of these soil properties. Soil test pit logs shall identify the presence of any soil horizon, substratum or other feature that exhibits an in-place permeability rate less than one (1) inch per hour. Each soil test pit log shall report the depth to seasonally high water level, either perched or regional, and the static water level based upon the presence of soil mottles or other redoximorphic features, and observed seepage or saturation. Where redoxomorphic features including soil mottles resulting from soil saturation are present, they shall be interpreted to represent the depth to the seasonally high water table unless soil saturation or seepage is observed at a higher level. When the determination of the seasonally high water table is made in ground previously disturbed by excavation, direct observation of the static water table during the months of January through April shall be the only method permitted. Each soil test pit shall also report the depth and occurrence of soil restrictions, including but not limited to, abrupt textural boundaries likely to restrict the movement of water, fragipans, dense materials, bedrock or ortstein. Each soil boring shall, at a minimum, provide the elevation of the existing ground surface, the depth and thickness of each soil horizon or substratum, the dominant matrix and mottle color in the Munsell stem for hue, value and chroma, the abundance, size and contrast of mottles and soil moisture conditions using standard USDA classification terminology. Any soil horizon or substratum which exists immediately below a perched zone of saturation shall be deemed by rule to exhibit unacceptable permeability. The perched zone of saturation may be observed directly, inferred based upon soil morphology, or confirmed by performance of a hydraulic head test as defined at N.J.A.C. 7:9A-5.9. 8

ADDENDUM This addendum is a Department summary of the NRCS guidance documents to establish hydrologic soil group based on permeability rates. Restrictions are based on the conditions that comply with the definition of restriction in the 1996 National Soil Survey Handbook and include, but are not limited to the presence of bedrock, dense material, fragipans, and ortsteins. The SHWT shall be based either observed saturation or redoxomorphic features. If a layer of restriction is found in the upper 20 inches or if the seasonally high water table (SHWT) is within the upper 24 inches, the soil should be classified as HSG D. If the restriction or SHWT is at 20 40 inches below grade, the first column of Table 1 shall be utilized to establish the hydrologic soil group (HSG). If no SWHT or restriction is found in the upper 40 inches, the second column of Table 1 shall be used to establish the HSG. The lowest permeability rate of the area above the restriction or of the top 40 inches, if no restriction is found, must be compared with the values in Table 1 to establish the HSG. Table 1. Permeability Rates for Hydrologic Soil Groups Based on Lowest Permeability Rate (Most Restrictive Soil Layer) Restriction at 20-40 Restriction at 40" or greater in/hr In/hr HSG A >5.67 >1.42 HSG B 1.42-5.67 0.57 1.42 HSG C.14-1.42 0.06 0.57 HSG D <= 0.14 <=0.06 HSG D if depth to most restrictive layer is less than 20" or depth to SHWT < 24 inches. Restriction includes, but is not limited to, abrupt textural boundary, fragipan, bedrock, dense material or ortstein 9

References USDA Natural Resources Conservation Service, Soil Survey Manual, Chapter 3. http://soils.usda.gov/technical/manual/. ASTM D 1452 Practice for Soil Investigation and Sampling Auger Borings & ASTM D 1586 - Test Method for Penetration Test and Split-Barrel Sampling of Soils USDA Natural Resources Conservation Service. Part 630 Hydrology National Engineering Handbook Chapter 7 Hydrologic Soil Group, May 2007. USDA Natural Resources Conservation Service. National Soil Survey Handbook, Part 618.49 Restriction Kind, Depth, Thickness, and Hardness, pp 618-33 to 618-34, 1996. USDA Natural Resources Conservation Service Soil Quality Institute. Soil Quality Agronomy Technical Note No. 17, Soil Compaction: Detection, Prevention and Alleviation, June, 2003. USDA Natural Resources Conservation Service Soil Quality Institute. Urban Technical Note No. 2, Urban Soil Compaction and Management Practices to Improve Soil Quality, March 2000. Skupien, J.J., Median Soil Recharge by HSG Excel Spreadsheet Analysis for NJDEP Stormwater Rule Implementation Process for Highway Projects, October, 2006. 10