RECORD DRAWINGS NOTE: alt32 ARCHITECTURE DESIGN 310 OLD VINE STREET, SUITE 300 LEXINGTON, KY 40507

Similar documents
Utility Partner Data Report

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Utility Partner Data Report

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES


MONTHLY OPERATION REPORT (MOR)--ALL WATER SYSTEMS

City of Topeka Utilities Department

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

4.8. Subsurface Infiltration

Trident. Package Water Treatment System

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

SECTION TRENCHING & BACKFILLING

SECTION EROSION AND SEDIMENTATION CONTROLS

DW Module 22 Inorganic Removal Basics Answer Key

4.8. Subsurface Infiltration

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

Tampa Bay Water (TBW) is a regional

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Wastewater Treatment. Knowledge. Commitment. Excellence.

TECHNICAL SPECIFICATION

BMP 6.4.4: Infiltration Trench

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

SECTION 10 - TRENCHING AND BACKFILLING

Stabilized Construction Entrance/Exit TC-1

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

Facility & Operations Field Division

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout )

Tiffin Water Treatment Plant. Comprehensive Facility Plan (Audit)

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

SOIL TRACKING PREVENTION DEVICE TYPE A

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

APPLICATION FOR A SITE CONSTRUCTION PERMIT

OPERATOR DUTIES WEEDKDAY SHIFT

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

Backup Generators Bacon Road Water Treatment Plant Case Study

Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION TRENCHING, BACKFILL AND COMPACTION

Lowering The Total Cost Of Operation

New Administration Building

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

Lauren Striegl City of Madison Engineering UPDATE ON CITY OF MADISON S SPECIAL TREATMENT PROJECTS

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

ADDENDUM NO. 2. Wilder Road Rehabilitation Project I-69 to Imlay City Road LCRC No DATE: August 31, 2017

SECTION EROSION CONTROL DEVICES

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

Improved Membrane Design Addresses Integrity Issues for the City of Yuba City Water Treatment Plant

JUDD STREET LIFT STATION DEWATERING CONTRACT

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

Rectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft.

Comparing the Leopold Clari-DAF System to Upflow Contact Clarification

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

EAGLE DRAINAGE DESIGN STANDARDS

Rock Sock (RS) Rock Sock height.

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

WAKULLA SITE PLANNING

(b) Water Engineering Basics

biologically active filtration

GRAVITY RETAINING WALL TECHNICAL MANUAL

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

AGENDA. PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am

ACTIVITY: Dewatering Operations AM 12

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Attachment D-1: Civil/Structural Scope of Work

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.

GRADING, EROSION AND SEDIMENTATION CONTROL

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION


SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

ADDENDUM # 3 DATE: February 16, 2018

TWIN VALLEY PUMP STATION IMPROVEMENTS - CITY OF FARMINGTON FARMINGTON, MI 48335

Nantasket Beach Revetment Design

City of Enderby Water Treatment Plant

Environmental Management Chapter

TEMPORARY SEDIMENT TRAP CODE

City of Logan Sanitary Sewer Design Standards

Water Treatment Overview. Gabe Sasser December 2016

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Pesticide Mixing-Loading Facility 1

Class Environmental Assessment for Burloak Water Purification Plant Phase 2 Expansion Public Information Centre No.1

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

PROJECT AT THE DENVER

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

ADDENDUM NO. 1 MILES CITY WASTEWATER IMPROVEMENTS PHASE II PART 3, Section 3.9, Subsection A Please Modify the following subsection to read:

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water

Transcription:

CIVIL MECHANICAL STRUCTURAL CALHOUN, KENTUCKY 2013 EXISTING RAW WATER INTAKE & PUMP STATION ELECTRICAL NEW WATER TREATMENT PLANT CALHOUN, KENTUCKY NEW WATER TREATMENT PLANT McLEAN COUNTY REGIONAL WATER COMMISSION NEW WATER TREATMENT PLANT McLEAN COUNTY REGIONAL WATER COMMISSION CONTRACT NO. 601-12-02 2013 FACSIMILES OF LICENSED PROFESSIONAL ENGINEER AND/OR LAND SURVEYOR SEALS, IF AFFIXED TO THIS DOCUMENT, SHALL BE CONSIDERED LEGITIMATE ONLY IF SIGNED AND DATED BY THE REGISTRANT. BUD NOTE: KENTUCKY STATUTES (KRS 367.4901 THROUGH 367.4917) REQUIRE THAT ALL EXCAVATORS PLANNING EXCAVATION OR DEMOLITION WORK SHALL NOTIFY ALL UTILITY COMPANIES IN THE AREA AND/OR AN UNDERGROUND PROTECTION SERVICE SUCH AS BUD (1-800-752-6007 OR 811) AT LEAST TWO (2) WORKING DAYS BEFORE COMMENCING WORK TO ALERT UTILITY COMPANIES IN THE AREA WITH UNDERGROUND FACILITIES OF THE PLANNED EXCAVATION OR DEMOLITION ACTIVITIES. VICINITY MAP NOT TO SCALE CLIENT REVIEW-RD REVIEW BELL (QA) REVIEW DIVISION OF WATER REVIEW HBC REVIEW BID DOCUMENTS RECORD DRAWINGS NOTE: alt32 ARCHITECTURE DESIGN 310 OLD VINE STREET, SUITE 300 LEXINGTON, KY 40507 (859) 233-4804 alt32.com THIS SET OF DRAWINGS AND REFERENCED SPECIFICATIONS HAS BEEN PREPARED BY PLACING THE APPROPRIATE PORTIONS OF THE ADDENDA ISSUED DURING BIDDING OF THE PROJECT WITHIN THE "AS-BID" DOCUMENTS AT APPLICABLE LOCATIONS. THESE DOCUMENTS HAVE BEEN PROVIDED AS A CONVENIENCE TO THE CONTRACTOR, OWNER AND ENGINEER AND DO NOT REPLACE THE "CONTRACT DOCUMENTS" IDENTIFIED BY THE AGREEMENT. WHILE THIS SET IS BELIEVED TO BE ACCURATE, ERRORS AND OMISSIONS MAY EXIST. THE CONTRACT DOCUMENTS AND REQUIREMENTS MUST BE REFERRED TO IN MAKING INTERPRETATIONS FOR CONSTRUCTION. LOVO SYSTEMS, INC. 2501 Sandersville Rd. Unit 120 Lexington, KY 40511 (859) 225-0113 lovosystems.com ADDENDA INCORPORATED 2480 fortune drive, suite 350 lexington, kentucky 40509 P: 859-278-5412 F: 859-278-2911 www.hkbell.com

GENERAL STRUCTURAL FIRE PROTECTION PLUMBING CIVIL MECHANICAL BUILDING CODE & FIRE ELECTRICAL ARCHITECTURAL INSTRUMENTATION

GENERAL PIPING NOTES GENERAL CONSTRUCTION NOTES EROSION CONTROL GENERAL DEMOLITION NOTES

250,000 GALLON ELEVATED CLEARWELL GREEN RIVER INTAKE SCREEN RAW WATER PUMP (2) (TYPICAL) 1 PERMANGANATE (FOR IRON & MANGANESE REMOVAL) CHLORINE (DISINFECTION) COAGULANT PRE-pH CONTROL FEED FUTURE COAGULANT POLYMER CARBON FEED (TASTE AND ODOR CONTROL) INLINE RAPID MIXER W/ BYPASS (MIXING OF CHEMICALS & WATER) CARBON FEED 2 FLOCCULATION BASINS (2) SETTLING BASIN (2) CHLORINE FUTURE FILTER AID 3 FILTERS (3) 4 5 6 FUTURE 50,000 GALLON CLEARWELL FLUORIDE (PREVENTION OF TOOTH DECAY) PHOSPHATE POST ph ADJUSTMENT CHLORINE (DISINFECTION) BACKWASH ph GRAVITY FROM ELEVATED TANK LOW LIFT PUMP (2) HIGH LIFT PUMPS (2) HIGH LIFT PUMPS (2) TO McLEAN COUNTY CUSTOMERS TO McLEAN COUNTY CUSTOMERS SAMPLING LOCATIONS SLUDGE STORAGE LAGOON (2) DRIED SOLIDS TO LAND APPLICATION EFFLUENT TO GREEN RIVER TRIBUTARY 1 2 3 4 5 6 7 RAW WATER SAMPLE TO LAB AND RAW WATER TURBIDITY POST-CHEMICALLY TREATED WATER TO LAB SETTLED WATER SAMPLE TO LAB AND PH, TURBIDITY, CHLORINE RESIDUAL TURBIDIMETERS ON INDIVIDUAL FILTER EFFLUENTS COMBINED FILTER EFFLUENT TURBIDIMETER AND SAMPLE LINE TO LAB POST CHEMICAL SAMPLE LINE TO LAB PLANT EFFLUENT AND CHLORINE RESIDUAL LEGEND EXISTING PROPOSED DAVID E. GERHART

PER ADDENDUM NO. 3: PER ADDENDUM NO. 4: PER ADDENDUM NO. 2: PER ADDENDUM NO. 4: PER ADDENDUM NO. 3:

PER ADDENDUM NO. 6:

PER ADDENDUM NO. 3: PER ADDENDUM NO. 6: PER ADDENDUM NO. 4:

PER ADDENDUM NO. 3: PER ADDENDUM NO. 4:

PER ADDENDUM NO. 6:

PER ADDENDUM NO. 6:

PER ADDENDUM NO. 6:

NOTE: 150 160 170 180 190 191 191 200

BLOWER AND AIR COMPRESSOR PIPING: PER ADDENDUM NO. 6:

NOTE:

712S5530 712S5530 712S6530 712S8530 712S5530 712S5530 1-2 - 22"DP 806S6920 257S8320 373S4320 115S6320 179S8320 115S8320 406S6320 257S7320 20706

A L1 B L1 C L1 1 -

NOTE:

PER ADDENDUM NO. 6:

PER ADDENDUM NO. 6:

PER ADDENDUM NO. 4:

PER ADDENDUM NO. 4:

PER ADDENDUM NO. 6:

NOTES:

NOTE: NOTE:

MARK A B C D E F G CRITICAL DIMENSION CHART DESCRIPTION FORMULA CLEAR OPENING A COUNTERBALANCE POST SPACING C/C (A/2)-11" OVERALL GATE LENGTH A x 1.5 COUNTERBALANCE LENGTH A x 0.5 NOMINAL GATE HEIGHT E POST HEIGHT (W BARB ARMS) E + 1'-6" FABRIC HEIGHT E - 1'-0" DIM. - - - - - - - PER ADDENDUM NO. 4:

MAXIMUM SLOPE 3:1 GEOTEXTILE UNDER-LINER 6" MIN. THICKNESS COURSE AGGREGATE SECTION A-A CHANNELIZE RUNOFF TO A SEDIMENT TRAPPING DEVICE MINIMUM RADIUS = 20' (DEPENDS ON TYPE OF TRAFFIC) STORMWATER RUNOFF CULVERT AS NEEDED A 20' MIN. OR AS NEEDED FOR ANTICIPATED TRAFFIC STONE SIZE - TWO-INCH STONE SHALL BE USED, OR RECYCLED CONCRETE EQUIVALENT. LENGTH - THE CONSTRUCTION ENTRANCE SHALL BE AS REQUIRED TO STABILIZE HIGH TRAFFIC AREAS BUT NOT LESS THAN 50 FT. 6. CULVERT - A PIPE OR CULVERT SHALL BE CONSTRUCTED UNDER THE ENTRANCE IF NEEDED TO PREVENT SURFACE WATER FLOWING ACROSS THE ENTRANCE FROM BEING DIRECTED OUT ONTO PAVED SURFACES. 7. MAINTENANCE - TOP DRESSING OF ADDITIONAL STONE SHALL BE APPLIED AS CONDITIONS DEMAND. MUD SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC ROADS, OR ANY SURFACE WHERE RUNOFF IS NOT CHECKED BY SEDIMENT CONTROLS SHALL BE REMOVED IMMEDIATELY. REMOVAL SHALL BE ACCOMPLISHED BY SCRAPING OR SWEEPING. 8. CONSTRUCTION ENTRANCES SHALL NOT BE RELIED UPON TO REMOVE MUD FROM VEHICLES AND PREVENT OFF-SITE TRACKING. VEHICLES THAT ENTER AND LEAVE THE CONSTRUCTION SITE SHALL BE RESTRICTED FROM MUDDY AREAS. THICKNESS - THE STONE LAYER SHALL BE AT LEAST 6 IN. THICK. WIDTH - THE ENTRANCE SHALL BE AT LEAST 20 FT. WIDE, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. A 50' MIN PLAN VIEW BEDDING - A GEOTEXTILE SHALL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING STONE. IT SHALL HAVE A GRAB TENSILE STRENGTH OF AT LEAST 200 LB. AND A MULLEN BURST STRENGTH OF AT LEAST 190 LB.