Sabine River Basin Big Sandy Creek Watershed Characterization Report 2015

Similar documents
Sabine River Basin Lake Fork Reservoir Watershed Characterization Report 2017

Sandies Creek Watershed

Peach Creek Watershed

SABINE RIVER AUTHORITY OF TEXAS

SABINE RIVER AUTHORITY OF TEXAS

SABINE RIVER AUTHORITY OF TEXAS

SABINE RIVER AUTHORITY OF TEXAS

Water Quality Improvement Through Implementation of a Watershed Protection Plan in the Leon River Watershed

Sabine River Basin Highlights 2016

Lake of the Pines. Watershed TMDL. Depressed DO conditions in 3,700 acres of upper reservoir; declining

SAN BERNARD RIVER ABOVE TIDAL - SEGMENT 1302

CARANCAHUA BAY WATERSHED PROTECTION PLAN. Allen Berthold, Michael Schramm November 2, 2017

EAST FORK SAN JACINTO RIVER - SEGMENT 1003

Water Quality in Southeast Texas Brian Koch Regional Watershed Coordinator Texas State Soil and Water Conservation Board Clean Waters Initiative

LAVACA BASIN SUMMARY REPORT

Little Cypress Bayou Special Study - Subwatershed 1.10

Monitoring site - Indian Creek

Gilleland Creek Intensive Bacteria Survey Addendum. March 18, 2010

6. Pollutant Sources in

5. Pollutant Sources in the Lower Nueces River Watershed

Tres Palacios Creek Watershed Meeting Overview. T. Allen Berthold, PhD Texas Water Resources Institute July 30, 2015

Stakeholder Meeting. Water Quality Update and Plans for Future Monitoring Efforts. July 13, 2017

Sabine River Basin Volunteer Water Quality Monitoring Data Summary Report compiled by Texas Watch

CUMULATIVE IMPACT ANALYSIS: A SIMPLE MODEL FOR LOCAL GOVERNMENT RESERVOIRS AND WITHDRAWALS IN GEORGIA

Lower Guadalupe River Watershed

PINEY RUN WATERSHED 2005 PROFILE

Watershed Response to Water Storage. 8/1/2012 Paul Wymar Scientist Chippewa River Watershed Project

Central and Southeast Texas Recreational Use-Attainability Analyses Project Cedar Creek (Segment 1209G) Basic RUAA. Results Report

Ward Ling Texas A&M AgriLife Extension Service

EXECUTIVE SUMMARY. Project Summary. Background

Oso Creek and Oso Bay Data Report

TDS Dissolved ph Indicator Temperature Life Water (mg/l) (mg/l) (mg/l) Oxygen Range Bacteria 1 ( F) Supply (mg/l) (SU) #/100ml

Goose Island Ranch /- Acres Harrison County, Texas $515,057

#* #* #* #* #* #* «46 «123 «80 GUADALUPE RIVER BELOW COMAL RIVER MIDDLE GUADALUPE RIVER BELOW NEW BRAUNFELS " " " " " !. USGS Stream Gage LEGEND

The Clean Rivers Program was begun in (72 nd TX Leg Session SB 818) Its purpose is to assess the waters of the state and to maintain or improve

Existing Conditions and Environmental Consequences Water Quality

Pearl River Basin Symposium. MS Museum of Natural Science Jackson, MS

Pennsylvania Pequea and Mill Creek Watershed Section 319 National Monitoring Program Project

Guadalupe River Watershed below Comfort

Background. Oso Watershed Land Uses

Appendix X: Non-Point Source Pollution

2 USCID/EWRI Conference

GULF OF MEXICO - SEGMENT 2501

Reservoir age, increasing human population,

Texas Watch Volunteer Water Quality Monitoring Program 2006 Mary s Creek Data Summary

5,000+ Acres Rusk County, Texas $2,000/acre in its entirety

Blanco River Watershed

Henderson Watershed WRIA 13. Chapter Includes: Tanglewilde Stormwater Outfall Woodard Creek Woodland Creek

7.9 Lake Whitney Reallocation

Upper Sabine Basin Water Supply Study

Using Simple Tools. (Alternatives to Mechanistic Models)

Center for Nutrient Solutions (CNS) Nutrient Solution Scenarios Concept Paper September 5, 2014 Draft

s. w. Wolff T.A. Wesche W.A. Hubert

E. COLI TOTAL MAXIMUM DAILY LOADS FOR THE BIG HORN RIVER WATERSHED

Continuous records for the Chariton River indicate that 2004 was an average water year, with total flow approximately equal to the average annual

WATER QUALITY MONITORING IN THE LOXAHATCHEE ESTUARY

LAVACA RIVER WATERSHED PROTECTION PLAN. Michael Schramm, Allen Berthold Texas Water Resources Institute

Mud Creek Recreational Use Attainability Analysis Overview

Acidity and Alkalinity:

TAPPAN LAKE 9/30/2014 RAPID WATERSHED INVENTORY INTRODUCTION

Little Cypress Bayou. Recreational Use Attainability Analysis Summary of Findings & Public Comment

Plum Creek. The Plum Creek Watershed. Your Water, Your Home. Watershed Partnership

Decentralized Wastewater Treatment in Texas Watersheds

SECTION 10 WATER QUALITY

WATERSHED. Maitland Valley. Report Card 201

Water Quality and Flow Building Blocks for Caddo Lake and Cypress Basin Flow-Ecology Workshop

«225 «146. ^_ Texas Stream Team. !. Monitoring Station. "/ USGS Flow Station # Wastewater Outfall. Location Map. Morgan's Point. La Porte.

Gathering Data to Assess Your Watershed

Cypress Creek Basin Summary Report Texas Clean Rivers Program

Lower Guadalupe River Watershed

Lisa Prcin Research Associate Watershed Coordinator Texas A&M AgriLife Research at Blackland Research & Extension Center

SOURCE WATER ASSESSMENT SUMMARY BROCHURE

OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE. June 24, 2010 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE BIRD CREEK AREA WATERSHED

Goose Creek Watershed Assessment Summary October 2003

Section V.H. Fresh Water Resources

Multipurpose Wetland Creation and Restoration to Improve Water Quality and Wildlife Habitat in Coastal Urban Bayous

16 September Water Management Wilmington District. US Army Corps of Engineers BUILDING STRONG

CLMP+ Report on Grass Lake (Anoka County) Lake ID# CLMP+ Data Summary

Prepared in Cooperation with: the Houston Galveston Area Council and the Texas Commission on Environmental Quality. By Lee Bodkin and Jeannette Oden

Maitland Valley WATERSHED

Long Prairie River Watershed Restoration and Protection Strategies (WRAPS) Report Summary

Charlotte Harbor SWIM Plan Update Proposed Quantifiable Objectives and Management Actions, January 2019

4. Present Activities and Roles

U.S. Department of the Interior U.S. Geological Survey

Upper Guadalupe River Watershed above Comfort

ENVIRONMENTAL FLOWS FOR THE MAINTAINACE OF SOUND RIPARINE AND WETLAND HABITATS IN THE CYPRESS RIVER BASIN. October 17, 2012 Fort Worth, Texas

Nonpoint Source Pollution in Texas

Salem River Water Quality

Impacts of Rainfall Events on Water Quality in the Houston Metro Area

CLMP+ Report on Fleming Lake (Aitkin County)

LEESVILLE LAKE 9/30/2014 RAPID WATERSHED ASSESSMENT INTRODUCTION

Summary of Basin Characteristics and Facilities. General Land-use Characteristics: Withdrawal and Discharge Sites: Sampling Site Statistics:

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

SECTION 2 CALDWELLL COUNTY CHARACTERISTICS

BIG ROCHE A CRI LAKE CHARACTERISTICS

OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY PUBLIC NOTICE. January 24, 2008 AVAILABILITY OF DRAFT BACTERIA TMDL FOR THE NEOSHO RIVER BASIN

Otter Creek Watershed TMDL Project. Stakeholder Meeting June 6, 2013

The Geronimo and Alligator Creeks Watershed Protection Plan. Ward Ling Texas A&M AgriLife Extension

Instream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas

Lower Howard Creek W atershed Watershed Number:

Transcription:

67. Big Sandy Big Sandy Creek at White Oak Road Station 16011 Sabine River Basin Big Sandy Creek Watershed Characterization Report 2015 Prepared in Cooperation with the Texas Commission on Environmental Quality under the Authorization of the Texas Clean Rivers Act www.sratx.org Sabine River Authority of Texas P.O. Box 579 Orange, TX 77631 Phone (409) 746-2192 Fax (409) 746-3780

Segment 0514 Big Sandy Creek Segment Description: Segment 0514 begins at the confluence of Big Sandy Creek and the Sabine River in Upshur County and extends to a point 2.6 kilometers (1.6 miles) upstream of SH 11 in Hopkins County. The Big Sandy Creek watershed is 58 miles long, has an approximate drainage area of 245 square miles, and is located in the South Central Plains Ecoregion. This watershed is characterized by low rolling hills, deciduous forest, hay pastures, woody wetlands, and is predominately rural. The cities of Big Sandy and Winnsboro and the community of Holly Lake are located within this watershed and all have a population under 5,000 (see Figure 1). Big Sandy Creek is comprised of two assessment units (AUs): AU 0514_01 and AU 0514_02. AU 0514_01 is defined as Big Sandy Creek from the confluence of the Sabine River southeast of Big Sandy upstream to the confluence of Mill Creek near FM49 north of Hawkins (Figure 1). AU 0514_02 is defined as Big Sandy Creek from the confluence of Mill Creek near FM 49 north of the City of Hawkins upstream to the headwater 2.6 kilometers (1.6 miles) upstream of SH11 northwest of the City of Winnsboro and includes Lake Winnsboro (see Figure 1). The TCEQ station IDs used for the 2014 TCEQ Integrated Report (IR) assessment along with their descriptions, assigned AU_IDs and monitoring entities are listed in Table 1. Table 1. Segment 0514 Monitoring Stations TCEQ Station ID (SRA-TX ID) 16011 (BS9) 10468 (BS1) * 17950 * * Active monitoring stations Description Big Sandy Creek at White Oak Road 3.5 kilometers (2.2 miles) east of Big Sandy Big Sandy Creek 70 meters (76.6 yards) downstream from SH155 northeast of Big Sandy Lake Winnsboro 0.4 kilometers (0.25 miles) upstream from center of dam structure 9.7 kilometers (6.0 miles) southwest of Winnsboro AU_ID Monitoring Entity 0514_01 SRA-TX 0514_01 SRA-TX 0514_02 TCEQ

Hydrologic Characteristics: Big Sandy Creek is classified as a freshwater stream with perennial flow and is used as a sole-source surface drinking water supply for the International Alert Academy and the City of White Oak. Segment 0514 has a high aquatic life use designation. The United States Geologic Survey (USGS) maintains one flow gaging station (USGS #08019500) located on Big Sandy Creek at SH155 at TCEQ station 10468 (see Figure 1). During the Big Sandy Creek at SH155 Station 10468 2014 IR assessment period of 12/1/2005 to 11/30/2012, the mean flow at this site was 160 cubic feet per second (cfs) with a maximum flow of 11,100 cfs on 05/04/2009 and a minimum flow of 0.35 cfs on 09/15/2006. The 7Q2 1 for this site is 12.4 cfs and the flood stage gage height is 16.5 feet. Intermittent flows with pools are typical in the upper AU 0514_02 during late summer, early fall and periods of drought. Lake Winnsboro, which was impounded in 1962 and has a surface area of 800 acres, is located in AU0514_02. Wood County District 4 is the reservoir controlling authority for Lake Winnsboro. This watershed has numerous springs which contribute to the flow of Big Sandy Creek. During high rainfall runoff events, Big Sandy Creek can experience rapid changes in water levels and overbank flows. Changes in the stream channel, shifting sandbars and soil deposition are observed during high flow events. Land Use Spatial analysis of this segment s watershed indicates that deciduous forests, hay pastures, woody wetlands, and shrub/scrub account for 79 % of land use (see Figure 2). Farming, dairy and 1 The 7Q2 is the lowest average discharge over a period of 7 days with a recurrence interval of two years.

poultry production, commercial nursery operations, silviculture activities, and oil and gas production occur within this rural watershed. Hay pastures are the dominant land cover in the upper portion of AU0514_02 (see Figure 2). These hay pastures are fertilized with chicken litter and manure from numerous dairy and poultry farms in the area. The watershed population is approximately 14,469, which correlates to a density of 59 people per square mile (US Census Bureau, 2010). Big Sandy Creek at FM2088 Station 16867 There are eight closed or inactive landfills and no superfund sites within this watershed. The City of Winnsboro has a permit to discharge 1.5 million gallons per day (MGD) of treated wastewater into Indian Creek, located approximately 16 kilometers (9.94 miles) upstream of TCEQ station 16867. Crutcher Tie and Lumber, LLC is a hardwood sawmill which produces lumber, railroad ties, chips, and sawdust. Its permitted discharge volume is intermittent and flow variable. The discharge flows from a settling pond to a manmade ditch and then into Indian Creek, approximately 11 kilometers (6.8 miles) upstream of TCEQ station 16867. Algonquin Water Resources of Texas, which serves the Holly Lake Ranch Community, has a wastewater permit to discharge 0.068 MGD into Warren Swamp, approximately 24 kilometers (14.9 miles) upstream of TCEQ station 10468 (BS1). Nestle Waters North America, Inc., or Wood County Bottling Plant, a producer and distributor of spring drinking water products, is permitted to discharge 0.15 MGD process wastewater into Boggy Creek, approximately 19 kilometers (11.8 miles) upstream of TCEQ station 10468 (BS1).

Potential Stakeholders Potential stakeholders and entities with possible interest in this watershed are as follows: AgriLife Extension City of Gladewater City of Henderson City of Kilgore City of Longview City of White Oak Eastman Chemical Company International Alert Academy Landowners / Citizens Permitted Dischargers Railroad Commission of Texas Sabine River Authority of Texas Texas Commission on Environmental Quality Texas Forest Service Texas Parks and Wildlife Department Texas State Soil and Water Conservation Board Upshur- Gregg Soil and Water Conservation District Impairment/Area of Interest The 2014 TCEQ IR indicated non-support for E. coli in both AUs, as well as screening level concerns for depressed dissolved oxygen (DO) and chlorophyll-a (Chl-a), in the upper AU 0514_02. This segment was first listed in 2006 for E. coli and remains on the 303(d) list. The 2014 TCEQ IR assessment results for AU0514_01 indicated a geometric mean of 210 MPN for the 36 samples collected for E. coli analysis, which exceeds the Texas Surface Water Quality Standard (TSWQS) of 126 MPN for primary contact recreation. This impairment is currently classified as Category 5c, which indicates that additional data or information must be collected or evaluated before a management strategy is Lake Winnsboro near Dam

scheduled. The remaining water quality parameters assessed met the TSWQS, and AU 0514_01 had no other designated use impairments. For AU 0514_02, the non support assessment for bacteria was carried forward from the 2012 TCEQ IR and was also classified as Category 5c. A carryforward designation indicates the integrated level of support was extended from a previous assessment due to inadequate data. Possible Causes of Impairment Due to the small number of permitted dischargers in this rural watershed, Non-point source runoff is a probable source of bacteria impairment. Elevated bacteria levels are consistently observed during periods of increased flows from rainfall runoff and are correlated with increased turbidity and reduced Secchi transparencies. Non-point bacteria sources within this watershed include urban runoff, agriculture practices, wildlife, and private septic systems. Agricultural sources include livestock grazing and the use of manure for fertilizing hay meadows. This rural watershed has large populations of wildlife including feral hogs, beaver, otter, and deer. Recommendations: The SRA-TX will continue to monitor and sample TCEQ station 10468 (BS1) monthly. This is the most downstream representative station with a USGS flow gage. TCEQ station 17950 on Lake Winnsboro, has been monitored quarterly by the TCEQ Region 5 personnel since 2010. Future monitoring and sampling plans for the Big Sandy Creek watershed will be discussed during the 2016 Coordinated Monitoring Meeting. Big Sandy Creek at SH37

Figure 1. Big Sandy Creek Watershed Segment 0514

Figure 2. Big Sandy Creek Watershed Segment 0514 Land Cover Classification