Erecting structural carcassing components in the workplace

Similar documents
Installing bespoke first fixing components in the workplace

Erecting timber roof structures in the workplace

COSVR11 - SQA Unit Code DY13 04 Erect structural carcassing components

components in the workplace

Maintaining non-structural carpentry work in the workplace

Installing side hung doors in the workplace

Preparing background surfaces and fixings to receive stone cladding in the workplace

Installing door ironmongery in the workplace

Fabricating timber framework in the workplace

Installing stone cladding to solid structures in the workplace

Contributing to the piling operation in the workplace

Cutting and Bending Reinforcement Steel to Shape in the Workplace T/504/9585

COSVR09 Install first fixing components

Moving, handling and storing resources in the workplace Level: 2 Credit value: 5 GLH: 17 TQT: 50

Preparing and Operating Industrial Counterbalanced Forklifts to Lift and Transfer Loads in the Workplace

COSVR290 - SQA Unit Code H36A 04 Erect timber roof structures

Qualification Unit Cskills Awards L2 NVQ Diploma in Specialist Occupations (Construction) - Door and Shutter Systems

Setting Out Masonry Structures in the Workplace

COSVR71 SQA Unit Code HL77 04 Install mechanically fixed plasterboard

Preparing Areas for Concrete Flooring in the Workplace Unit Level 2. CITB Unit 316 v2

Commissioning Lightning Conductor Installation Systems in the Workplace Unit Level 2 A/616/8698. CITB 257v1

COSVR10 - SQA Unit Code F Install second fixing components

Level 2 NVQ Diploma in Wood Occupations (Construction)

Level 3 NVQ Diploma in Wood Occupations (Construction) (6571) August 2015 Version 4.4

COSVR322 (SQA Unit Code - H0HR 04) Apply insulation and finishes to cylindrical and flat surfaces

Regulated Qualifications Unit and Assessment Specification

Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction)

Installing Industrial Shelving in the Workplace Unit Level 2 M/617/0562. CITB 505v2

QCF Unit and Assessment Specification

T/616/8697. CITB 256v1

COSVR188 SQA Unit Code HP85 04 Produce standard stonemasonry components

Producing and Applying Complex Stencil Designs in the Workplace J/615/0138

COSVR166 (SQA Unit Code - FW1E 04) Cut and bend reinforcement steel to shape

COSVR274 SQA Unit Code HM24 04 Install single-lap roof tiles to a variable gauge

Producing wood and wood-based

Producing Stencil Designs using Pre-cut Stencil Plates in the Workplace D/615/0405

Incremental Change 2015

Controlling, directing and guiding the operation of plant or machinery in the workplace L/615/2120

COSVR324 (SQA Unit Code - H0HT 04) Fit sheet metal insulation protection

COSVR242 (SQA Unit Code - H1PF 04) Install insulated cladding walls

COSVR329 - SQA Unit Code H0XR 04 Produce decorative metal roofing and weathering details

COSVR448 - SQA Unit Code H1RK 04 Install external wall insulation

QCF Unit and Assessment Specification

Preparing Thatching Materials in the Workplace Unit Level 2. CITB Unit 117v2

QCF Unit and Assessment Specification

COSVR358 SQA Unit Code HM34 04 Install fire resisting timber door assemblies and doorsets

Hanging Specialised Paper Wallcoverings in the Workplace L/615/0139

COSVR157 - SQA Unit Code H1P0 04 Demolish/dismantle timber-framed structures

COSVR278 SQA Unit Code HN36 04 Install natural roof slate to mitred and vertical roof details

COSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds

COSVR676 SQA Unit Code HM1L 04 Install door systems

Overview COSVR272. Install underlay, battens and roofing components. Install underlay, battens and roofing components

COSVR133 - SQA Unit Code DY1W 04 Install raised access flooring systems

COSVR296 Install supplementary steel frame finishings

Overview COSVR130. Install plasterboard linings

Regulated Qualifications Unit and Assessment Specification

COSVR130 Install plasterboard linings

COSVR67 - SQA Unit Code DY92 04 Produce external solid render finishes

COSVR767 SQA Unit Code HG63 04 Prepare and mix earth plasters and earth renders

Conforming to General Health, Safety and Welfare in the Workplace

Overview. COSVR204 - SQA Unit Code HP7M 04. Contribute to stone cladding lifting procedures

QCF Unit and Assessment Specification

COSVR400 Operate powered units, tools or pedestrian plant, machinery or equipment

COSVR121 SQA Unit Code HN8E 04 Install fitted furniture

V COSVR??? Dynamic load and integrity testing of piles

COSVR143 SQA Unit Code HN48 04 Produce tiled, mosaic and stone surface finishes

COSVR118 SQA Unit Code HM2D 04 Thatch structures

COSVR118 SQA Unit Code HG6X 04 Thatch structures

COSVR289 Erect timber walls and floors

COSVR141 Prepare backgrounds for tiling

COSVR374 - SQA Unit Code DY9N 04 Reinstate excavation and highway surfaces

Level 3 NVQ Diploma in Wood Occupations (Construction)

COSVR67 SQA Unit Code HL75 04 Apply solid render to background surfaces and produce finishes

COSVR654(SQA Unit Code-H4X9 04) Fabricate joints in thermal insulation protection using sheet metal

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures

COSVR121 - SQA Unit Code F7A7 04 Install fitted furniture

COSVR277 Install double-lap artificial roof slates

FY68 04 Operate Ancillary Equipment (Pecker/hammer)

COSVR284 - SQA Unit Code DY0E 04 Install double-lap concrete roof slates

COSVR95 - SQA Unit Code DY2K 04 Install roof sheeting and cladding systems

FY66 04 Operate Ancillary Equipment (Auger)

COSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components

COSVR257 HL4M 04 Commission lightning conductor installation systems

COSVR618 - SQA Unit Code FW1L 04 Finish dry lining walls or ceilings

COSVR272 - SQA Unit Code DY1C 04 Install roofing backgrounds and components

Overview COSVR182. Erect precast concrete structural units

COSVR81 - SQA Unit Code DY8P 04 Produce complex plasterwork moulds

COSVR509 - SQA Unit Code FW18 04 Fabricate and maintain timber and proprietary formwork systems

COSVR660 - SQA Unit Code H4HL 04 Service plant or machinery

COSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems

COSVR96 - SQA Unit Code DY2G 04 Install roof sheeting and cladding rainwater goods

COSVR276 Install regular sized natural roof slate to standard roof details

Level 2 NVQ Diploma in Associated Industrial Services Occupations Passive Fire Protection (Construction)

COSVR339 - SQA Unit Code F Apply coatings by the airless spray method

Transcription:

Unit Update M/503/2641: ERECTING STRUCTURAL CARCASSING COMPONENTS IN THE WORKPLACE U s e f r o m 2 0 1 2 J a n u a r y This version of this unit replaces all previously published versions with effect from January 2012. This unit should be used by all learners registering for qualifications that include it in their structure from this date. Unit title: Unit number: Erecting structural carcassing components in the workplace M/503/2641 QCF level: 2 Credit value: 20 Guided learning hours: 67 Start date: January 2012 Unit summary The aim of this unit is to develop the skills, knowledge and understanding required to confirm competence in erecting structural carcassing components in the workplace within the relevant sector of industry. Assessment requirements/evidence requirements This unit must be assessed in a work environment, in accordance with: - the Additional Requirements for Qualifications using the title NVQ in QCF - the ConstructionSkills Consolidated Assessment Strategy for Construction and the Built Environment. Assessors for this unit must have verifiable, current industry experience and a sufficient depth of relevant occupational expertise and knowledge, and must use a combination of assessment methods as defined in the Consolidated Assessment Strategy. Workplace evidence of skills cannot be simulated. 1

Assessment recording This unit is assessed in the workplace. The table on the following pages shows the learning outcomes and the assessment criteria for this unit. The table includes space for learners to enter the s of evidence they are presenting for assessment and the submission date against each assessment criterion. Alternatively, centres can use their own documentation. 2

Learning outcomes and assessment criteria M/503/2641: ERECTING STRUCTURAL CARCASSING COMPONENTS IN THE WORKPLACE 1 Interpret the given information relating to the work and resources when erecting structural 1.1 Interpret and extract relevant information from drawings, specifications, schedules, method statements, risk assessments and manufacturers' information. 1.2 Comply with information and/or instructions derived from risk assessments and method statement. 1.3 State the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented. 1.4 Describe different s of information, their source and how they are interpreted in relation to: - drawings, specifications, schedules, method statements, risk assessments, manufacturers' information and regulations governing buildings. 2 Know how to comply with relevant legislation and official guidance when erecting structural 2.1 Describe their responsibilities under current legislation and official guidance whilst working: - in the workplace, below ground level, at height, in confined spaces, with tools and equipment, with materials and substances, with movement/ storage of materials and by manual handling and mechanical lifting. 2.2 Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, company and operative. 2.3 Explain what the accident reporting procedures are and who is responsible for making reports. 3

2.4 State the s of fire extinguishers available when erecting structural carcassing components and describe how and when they are used. 3 Maintain safe working practices when erecting structural carcassing components. 3.1 Use health and safety control equipment and access equipment/working platforms safely to carry out the activity in accordance with legislation and organisational requirements when with erecting structural carcassing components. 3.2 Explain why and when health and safety control equipment, identified by the principles of protection, should be used relating to erecting structural carcassing components, and the s, purpose and limitations of each, the work situation and general work environment, in relation to: collective protective measures personal protective equipment (PPE) respiratory protective equipment (RPE) local exhaust ventilation (LEV). 3.3 Describe how the relevant health and safety control equipment should be used in accordance with the given instructions. 3.4 State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards. 4

4 Select the required quantity and quality of resources for the methods of work to erect structural 4.1 Select resources associated with own work in relation to materials, components, fixings, tools and equipment. 4.2 Describe the characteristics, quality, uses, sustainability, limitations and defects associated with the resources in relation to: timber, manufactured sheet material, plastic mouldings, metals, trussed rafters, adhesives, sealants, fixings and associated ancillary items hand and/or powered tools and equipment. 4.3 Describe how the resources should be used correctly and how problems associated with the resources are reported. 4.4 Explain why the organisational procedures have been developed and how they are used for the selection of required resources. 4.5 Describe any potential hazards associated with the resources and method of work. 4.6 Describe how to calculate quantity, length, area and wastage associated with the method/procedure to erect structural 5 Minimise the risk of damage to the work and surrounding area when erecting structural 5.1 Protect the work and its surrounding area from damage in accordance with safe working practices and organisational procedures. 5.2 Minimise damage and maintain a clean work space. 5.3 Dispose of waste in accordance with legislation. 5

5.4 Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions. 5.5 Explain why the disposal of waste should be carried out safely in accordance with environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance. 6 Complete the work within the allocated time when erecting structural 6.1 Demonstrate completion of the work within the allocated time. 6.2 State the purpose of the work programme and explain why deadlines should be kept in relation to: s of progress charts, timetables and estimated times organisational procedures for reporting circumstances which will affect the work programme. 7 Comply with the given contract information to erect structural carcassing components to the required specification. 7.1 Demonstrate the following work skills when erecting structural carcassing components: measuring, marking out, cutting, fitting, finishing, positioning and securing. 7.2 Erect one of the following to given working instructions: inclined roofs with gables roof verge and eaves finishings joists (ground, upper or flat roof), including coverings (flat roofs, decks or floors). 6

7.3 Safely use and handle materials. 7.4 Safely use hand tools, portable power tools and ancillary equipment. 7.5 Safely store the materials, tools and equipment used when erecting structural 7.6 Describe how to apply safe work practices, follow procedures, report problems and establish the authority needed to rectify them, to: prepare and fix gable roof trussed rafters, cut roofs, ground, upper and flat roof joists cut, fit and fix coverings and finishings in timber and plastic (flat roofs, verges and eaves, floors, decks) form joints associated with carcassing use hand tools, power tools and equipment work at height use access equipment. 7.7 Describe the needs of other occupations and how to effectively communicate within a team when erecting structural 7.8 Describe the methods of sharpening the hand tools used when erecting structural 7.9 Describe how to maintain the tools and equipment used when erecting structural 7

Learner name: Learner signature: Assessor signature: Internal verifier signature: (if sampled) : : : : 8