SUPPLIER PRODUCT / PROCESS CHANGE NOTIFICATION

Similar documents
GLOBAL PURCHASING. Supplier Technical Assistance. Phased PPAP

Supplier Quality Manual

SECTION II.2.4 PRODUCTION PART APPROVAL PROCESS (PPAP)

Works Standard. PPAP - Production Part Approval Process

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

Overview of Production Part Approval Process PPAP. Factor Quality, Inc.

Pegasus Manufacturing SUPPLIER QUALITY REQUIREMENTS MANUAL

PPAP 3rd Edition Check List (Steel Suppliers)

Applied PPAP within a Process Approach, Including Fourth Edition Updates. Jim Collins

SUPPLIER GUIDELINES MANUAL

TOOLING AND GAGING REQUIREMENTS/IDENTIFICATION Section 20

SUPPLIER QUALITY MANUAL

Supplier Quality Requirements FSQ01

Supplier Quality Assurance Manual

SUPPLIER QUALITY COMMON SUPPLIER REQUIREMENTS. Author: Supplier Quality Issue Date: May 11, 2015 Effective Date: July 10, 2015

PRODUCTION PART APPROVAL PROCESS. Peter BÓLLO

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A

Supplier Quality Manual

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

Its purpose is to define the approval process of new or revised parts, or parts resulting from new or significantly revised production methods.

Supplier. Quality. Assurance. Manual (SQAM)

SUPPLIER QUALITY MANUAL

Supplier Quality Assurance Manual (SQAM)

Supplier Quality System Requirements Manual

Western Diversified Plastics, LLC. Supplier Requirements Manual

SUPPLIER MANUAL Quality Policy

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

Quality System Standard Operating Procedure

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

Supplier Quality Manual

Supplier Quality Systems Requirements Manual

Supplier Quality Manual

DaimlerChrysler Customer Specific Requirements For PPAP 4th Edition March, 2006

001 Inspection/Test Data Reports

SUPPLIER QUALITY MANUAL

Revcor Supplier Quality Manual

Vernay Quality System Supplier Quality Manual

KEY PERSON MANAGEMENT SYSTEMS CERTIFICATION. (attach copy of certificate) MAIN CUSTOMERS

Supplier Quality Manual

Supplier Expectation Manual

PPAP Process Checklist \ Sign Off Sheet instructions

Supplier. Quality Manual

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

Production Part Approval Process (PPAP)

10/24/18. Printed document is uncontrolled after 10/24/2018, unless in a controlled book

Metal Powder Products Company

Supplier Quality Standard

WITTUR PRODUCTION PART APPROVAL PROCESS

SUPPLIER QUALITY ASSESSMENT

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual

Supplier Quality Manual (QQS )

R.H. SHEPPARD CO., INC. HANOVER, PA QUALITY BY DESIGN SUPPLIER QUALITY MANUAL NINTH EDITION

4. Delivery. 5. Manageme

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by

Sisler Manufacturing Group Supplier Quality Manual

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP)

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2

VU Manufacturing Supplier Quality Manual

This document has been printed from the network and will not be updated. The user is responsible for verification of current revision.

SUPPLIER QUALITY MANUAL

Production Part Approval Process (PPAP)

Supplier Requirement Manual. Preface

Supplier Quality Manual CHASSIX Inc.

NAV 06 MATERIAL CONTROL

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Metric Manufacturing Supplier Manual

Supply Chain Supplier Quality Manual. Creation Date: 19 th September 2012 Last Updated: February 16, 2016 Revision Number: 03 Document Number: AQM005

Supplier Quality Manual CHASSIX Inc.

Quality System Standard Operating Procedure

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

SUPPLIER QUALITY MANUAL

CD Supplier Handbook. * Marine Canada Acquisition Limited Partnership DBA Teleflex Canada

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5

Global Supplier Quality Manual. Revision 4

Supplier Quality Requirements Manual

Supplier Requirements Manual

Supplier Change Management

Charleston Metals Products, Inc.

Union Pacific Railroad. Supplier Excellence Manual. Contents

Supplier Quality Manual

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

PURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe

Supplier Handbook Issue 12 September 2011

Supplier Requirements Manual

... Supplier Manual . REV 1. P d --KICKHAEFER MANUFACTURING COMPANY SUPPLIER MANUAL (PRINTED COPIES ARE UNCONTROLLED)

Compliance with YFTFC001 Quality System for Manufacturers is required for this Purchase Order.

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

Document Number: L1-743I003/09 Supplier Quality Requirements

Supplier Quality Requirements Manual

Global Supplier Standards Manual- Supplier Quality September

Supplier Quality Manual

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

Blue Chip Engineered Products Supplier Quality Manual

Transcription:

SUPPLIER PRODUCT / PROCESS CHANGE NOTIFICATION Complete this form and e-mail to your customer organization whenever customer notification is required by the PPAP Manual in Table 3.1. Your customer will respond back with an acknowledgement and may request additional change clarification or PPAP submission requirements. To: Organization Part Number: Dated: Customer Part Number: Dated: Purchase Order Number: Safety and/or Government Regulation: Customer: Engineering Revision Level: Engineering Revision Level: Application: ORGANIZATION MANUFACTURING INFORMATION Name: Street Address: City, State, Zip: Change Type (Check all that apply) Dimensional: Materials: Functional: Appearance: Design Responsibility: Customer: Organization: Organization Change That May Affect End Item: Product Change: Engineering Drawing Change: New or Revised Subcomponent: Expected PPAP Completion / Submission DETAILED DESCRIPTION OF PRODUCT / PROCESS CHANGE: Planned Date of Implementation: I hereby certify that representative samples will be manufactured using the revised product and/or process and verified, where appropriate, for dimensional change, appearance change, physical property change, functionally for performance and durability. I also certify that documented evidence of such compliance is on file and available for customer review. Explanation/Comments: Name: Business Phone NO: Email: Title: Fax NO: NOTE: Please submit this notification at least 6 weeks prior to the planned change implementation! Contact your customer to determine if this form is available in an electronic format or if this form should be faxed. F-ENG-1032 Page 1 of 5 10/7/2016

FOR CUSTOMER USE ONLY Change Approval: Approved: Rejected: Engineering Signoff: Quality Signoff: Manufacturing Signoff: Purchasing Signoff: F-ENG-1032 Page 2 of 5 10/7/2016

Customer Communication Shaw Development to Shaw Development customers, or Shaw Development suppliers to Shaw Development MUST request approval before making changes to a specification or process for supplied products. The "customer" may elect to require a PPAP submission. Those submissions are to follow AIAG guidelines. Table 1 - Planned Changes Requiring Notification Prior to Implementation Rule Requirement Clarification or Examples 1 Use of other construction or material than For example, other construction as documented on a deviation or was used in the previously approved part or product. included as a note on the design record (print) and not covered by an engineering change. 2 Production from new or modified tools (except for perishable tools), dies molds patterns, etc.., including additional or replacement tooling. 3 Production following refurbishment or rearrangement of existing tooling or equipment. This requirement only applies to tools, which due to their unique form or function can be expected to influence the integrity of the final product. It is not meant to describe standard tools (new or repaired), such as standard measuring devices, drivers(manual or power), etc.. Refurbishment means the reconstruction and/or modification of a tool or machine or to increase the capacity, performance, or change its existing function. This is not meant to be confused with normal maintenance or parts, etc., for which no change in performance is to be expected and post repair verification methods have been established. Rearrangement is defined as activity which changes the sequence of product/process flow from that documented in the process flow diagram (including the addition of a new process). Minor adjustments of production equipment may be required to meet safety requirements such as, installation of protective covers, elimination of potential electro static discharge risks, etc. These changes can be made without customer approval unless the process flow is changed as a result of this adjustments. 4 Production from tooling and equipment transferred to a different plant location, or from an additional plant location. Production process tooling and/or equipment transferred between buildings or facilities in one or more locations. 5 Change of supplier for parts, nonequivalent materials, or services (e.g.: heat- and services that do not affect customer fit/form/function, Suppliers are responsible for approval of subcontracted material treating, painting, plating) that affect durability performance. customer fit/form/function, durability, or performance requirements. 6 Product produced after the tooling has been inactive for volume production for 12 months or more. For product that has been produced after tooling has be inactive for 12 months or more: Notification is required when the part has had no active purchase order and existing tooling has been inactive for volume production for 12 months or more. The only exception is when the part has low volume, e.g. service or specialty vehicles, However, a customer may specify certain PPAP requirements for service parts.

7 Product and process changes related to components of the production product manufactured internally or manufactured by suppliers that impact safety, fit/form/function, performance, durability, and/or appearance of the salable product. Additionally, the supplier shall concur with any request by a subcontractor before submission to the customer. Any change that affects customer requirements for safety, fit/form/function performance, durability, and/or appearance requires notification to the customer. NOTE: The safety, fit/form/function performance, durability, and/or appearance requirements should be part of a customer specification as agreed on during reviews. 8 For bulk materials only: New source of raw materials with special characteristics from new or existing subcontractor. These changes would normally be expected to have an effect on the performance of the product. Change in product appearance attributes where there is not appearance specification. Revised parameters in the same process (outside pfmea parameters of the approved product, includes packaging). 9 Change in test/inspection method - new technique (no effect on appearance criteria). For change in test method, supplier should have evidence that the new method provides results equivalent to the old method. (GRR results). Submission to Customer Supplier shall obtain PPAP approval prior to the first production shipment in the following situations unless the customer has been waived this requirement (see table 2). Conditional approval may be granted to authorize limited production shipments when there are outstanding PPAP requirements. The supplier shall review and update, as necessary, all applicable items in the PPAP file to reflect the production process, regardless of weather or not the customer request a formal submission. {THIS MEANS ALL 18 SECTIONS OF PPAP} The PPAP file shall contain the name of the responsible customer contact for product approval activity "person granting the waiver and the date". Table 2 - Changes Requiring PPAP Approval Prior to First Production Shipment Rule Requirement Clarification or Examples 10 A new part of product (i.e. a specific part, material, or color not previously supplied to the specific customer). Submission is required for a new product (initial release) or a previously approved product which has a new or revised (e.g. suffix) product/part number assigned to it. A new part/product or material added to a family may use appropriate PPAP documentation from a previously fully approved PPAP part within the same product family if approved by customer.

11 Correction of a discrepancy on a previously Submission is required to correct any discrepancies on a previously submitted part. submitted part. A "discrepancy" can be related to: a) The product performance against the customer requirement b) Dimensional or capability issues c) Subcontractor Issues d) Full approval of a part replacing an interim approval e) Testing, including material, performance, engineering validation issues 12 Engineering change to design records (prints), specifications, or materials for production product/part numbers(s). Submission is required on any engineering change to production product/part design records, specifications or materials. 13 For Bulk Materials only: Process technology new to the supplier, not previously used for this product, Changes in any of the above situations (Table 1 or 2) require appropriate quality planning and written request per customer prescribed methods to proceed PRIOR to implementation. The supplier shall ensure that proper notification of changes by their supply chain are communicated as well. Shaw will review supplier requested changes weekly during the engineering change review meetings or on an as needed basis depending upon change urgency.