Connecting to Sydney Water systems. This policy applies to all customers who want to connect to or disconnect from Sydney Water s systems.

Similar documents
How to connect to Sydney Water services and what to do once you are

Backflow explained About backflow prevention containment. Backflow explained. About backflow prevention containment. Page 1

Backflow prevention. Information for plumbers

Backflow Prevention Containment Policy

STANDARD SITE CONTAINMENT BACKFLOW PREVENTION DECEMBER 2016 VERSION: 1.0

Land Development Manual

Our. contract. with you

Standard terms and conditions

Integrated Catchment Modelling

CORPORATE STANDARD ROUTINE MINOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS

How to set up a sewer mining scheme

You can help to secure our water supply by installing a rainwater tank. Rainwater tanks

Standard connections for water, sewerage and electricity supply

ON-SITE WASTEWATER MANAGEMENT POLICY

CORPORATE STANDARD ROUTINE MAJOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS VERSION: 1.0

NSW Plumbing and Drainage Regulations. National Backflow Prevention Conference 28 th July 2016

Capacity Infrastructure Services Ltd

SPRINGWOOD COMMUNITY & CULTURAL FACILITIES

Supplementary Manual to Water Services

Builders Guide Pitt Town Water Builders Guide, March 2013

WESTERN WATER DESIGN AND CONSTRUCTION GUIDELINES FOR SUBDIVISIONAL WORKS

To know about metering for other building types, read our Water meter installation guide on our website.

Reviewing designs not using Deemed- To-Comply drawings

WASTEWATER DRAINAGE BYLAW

Water Supply / Drainage / Vehicle Crossing Service Connection Information Sheet

Acceptance guideline 16: Stormwater contamination/first flush collection and stormwater bypass

TRADE WASTE ENVIRONMENTAL MANAGEMENT PLAN

Environmental Sustainability

WSSC CODE OF REGULATIONS 2019

Water and Sewer connections application form. Section 1. 1a. Applicant details

Cross Connection Control And Backflow Prevention Program. City of Rifle, Colorado Utility Department

Iron Ore (WA) Utilites Division. Property owners and plumbers handbook

Catchment Water Quality Protection

Palmerston North City Council Policy

Meter and Sub- Metering Technical Specifications

A bylaw to establish a cross connection control program and process for the District of Squamish.

ULDA Decision Notice

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual

CROSS CONNECTION CONTROL PROGRAM POLICY Adopted March, 1990 Revised October, 2006

Acceptance guideline 16: Stormwater contamination/first flush collection and Undercroft Carparks

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 1: Water services. Australian/New Zealand Standard. Superseding AS/NZS 3500.

Galston and Glenorie Wastewater Scheme Community update August 2014

Solo Water. Home Owner s Manual. Catherine Hill Bay Water Utility IMS-OPER-8312-SW

CROSS-CONNECTION CONTROL/BACKFLOW PREVENTION

ARTICLE 11 - Backflow Prevention and Cross Connection Control

Application form AWS2

CHAPTER 15 PLUMBING CODE

Guide to installing a rainwater tank in Lismore City

ULDA Decision Notice

PORTLAND WATER DISTRICT CROSS-CONNECTION CONTROL PROGRAM 1989 REVISED MAY, 2006 REVISED SEPTEMBER, 2009 REVISED JUNE, 2017

Sec Backflow prevention and cross-connection control.

Dillon Valley District

Vent. Vent. Soil Stack. Basin. Waste Stack. Basin NOT FOR DRINKING. Approved Irrigation System

Pressure Sewerage Systems Connections and extensions Urban Growth and Water Servicing Coordinator roles

AS/NZS :2003. Plumbing and drainage AS/NZS :2003. Australian/New Zealand Standard. Part 3: Stormwater drainage

ASSET CREATION DEVELOPER PROCESS INSTRUCTIONS TO DESIGNERS - MAJOR WORKS

HOLLEY NAVARRE WATER SYSTEM, INC. BACKFLOW PREVENTION & CROSS CONNECTION CONTROL POLICIES & REGULATIONS

TOWN OF PAONIA RESOLUTION

The Corporation Of The City of Grand Forks BYLAW NO. 1817

National Performance Framework:

CASE FOR CHANGE QUALIFICATIONS REVIEW. NWP NATIONAL WATER TRAINING PACKAGE Water Industry Reference Committee

Draft approval framework for the use of non-drinking water in Western Australia

ORDINANCE NO AN ORDINANCE ESTABLISHING A CROSS CONNECTION AND BACKFLOW PROTECTION PROGRAM

PALMERSTON NORTH CITY PALMERSTON NORTH WATER SUPPLY BYLAW

What is backflow prevention?

WATER REGULATIONS SMALL AND MEDIUM SIZED BUSINESSES FOR. Information guide for your business

Multi-level individual metering guide. Version 3: December 2013

Shannon Water and Sanitation District Backflow Prevention and Cross-Connection Control Program

Summary of Charges A householder s guide to how we calculate your bill

RESIDENTIAL CROSS-CONNECTION CONTROL

Everett Water Department Rules. & Regulations. Notification Page 2. Public Water Mains Page 2. Private Water Mains Page 2. Water Conservation Page 3

Policy. Allowances and rebates on your bill. 1. Overview. 1.1 At a glance. 1.2 Scope. 1.3 Objective

Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia

Residential Sewer Backup Prevention Program

Water Quality and Public Health. Water Suppliers

Solo Water. Retail Supply Management Plan IMS-OPER-B-8314-SW

To understand how runoff water can be polluted if land uses are not properly managed

Environment Plan Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities.

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

Alternate Water Systems

Appendix 9 - Engineering Performance Standards

Let Them Count An Argument for Inclusion of the Impact of. Household Rainwater Tanks When Designing an Urban Drainage. Network

to facilitate sewer mining by providing timely information, advice and responses to sewer mining enquiries and applications

WATER SERVICE SYSTEM

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

Complying Development

Docs File G01/1274/1 Web Version. Water and sewerage service and installation rules

MANUAL DELIVERY OF DEVELOPER WORKS VERSION:

A BRIEF LOOK AT BACKFLOW PREVENTION AND CROSS-CONNECTION CONTROL LES O BRIEN

Works, services and infrastructure code

caring for the coastal environment

National Water Demand Management Policy

KĀPITI COAST RAINWATER AND GREYWATER CODE OF PRACTICE. Table of Contents. Interpretation 2. Objective and Functional Statements 3.

Residential Recycled Water Household Guide

WHY NOT Install a Rainwater Tank step by step guide to assist you

Legacy Bylaw Provisions on On-site Wastewater Management. Confirmed 29 October 2015

STORMWATER HARVESTING, AN INNOVATIVE WAY OF MEETING THE CATCHMENT WIDE NEEDS OF THE BUILT AND SOCIAL ENVIRONMENTS

Transcription:

Policy Connecting to Sydney Water systems 1. Overview 1.1 At a glance This policy explains: the services we offer customers when customers need permission to connect and disconnect requirements for connecting to our systems when we will enter into an additional services agreement with you what happens if customers do not observe requirements or obligations. 1.2 Scope This policy applies to all customers who want to connect to or disconnect from Sydney Water s systems. 1.3 Objective This policy aims to improve the way customers connect to and disconnect from our systems. It will help us: better protect our assets and water quality enhance customer service. Doc no. BCS0304 Document uncontrolled when printed Page: 1 of 7

2. Policy in detail 2.1 What services do we offer customers? You can connect to our systems to: receive drinking water receive recycled water discharge wastewater and trade wastewater discharge stormwater. We may also give you permission to conduct sewer mining or stormwater harvesting. Services are not available to all properties in Sydney Water s area of operations. 2.2 Permission to connect and disconnect You must have our written permission to connect or disconnect from our systems. This is a requirement of section 48 of the Sydney Water Act 1994. You also must have our written permission before you discharge trade wastewater to our systems. This is a requirement of section 49 of the Sydney Water Act 1994. You must observe all the conditions in the written approval, which we give you to connect or disconnect. If you do not observe all conditions of approval, your connection or disconnection will be unauthorised. If you want to connect a new development or subdivision, we will only approve the connection after: You or your agent (Water Servicing Coordinator - WSC) have applied for a compliance certificate, if we require it for this kind of development you have had your building plans checked and approved by Sydney Water, to meet the requirements of section 44 of the Sydney Water Act 1994. 2.3 What agreement will we have with you? If you have a standard connection to any of our systems, you must operate and maintain your services as required by our Customer Contract. If we have any other requirements for your ongoing connection to our service we will include them in a separate additional services agreement with you. 2.4 Connecting to drinking water and recycled water services Which connections will we approve? We will approve at least one water main connection and one recycled water main connection for each property if: your property has a frontage of at least two metres to a connectable water main or recycled water main on any boundary there is adequate pressure and flow in that main to support your connection your connection won t compromise the service we offer other customers. If you make a connection to our system, you must not use it until you have met all the requirements we give you in our written permission. We may approve non-standard connections if you do not meet these criteria, but your connection must provide you with a usable service that won t affect other customers or landowners. Doc no. BCS0304 Document uncontrolled when printed Page: 2 of 7

When won t we approve a water connection? We may not approve a connection if: there is not enough water pressure or flow in any main to supply your property water demand from the connection will disadvantage existing customers or cause us to breach our operating licence your private service line would cross another private property to connect to our main and there is no easement or property owner agreement to allow you access to the pipes the number of private services from the end of a water main would affect service quality. Do we allow fire service connections? We will allow connections for fire services, if the operating demand when they operate will not damage our pipes or affect the services that we offer other customers under our Customer Contract. Unmetered water connections for fire services must only be used for firefighting, and system testing and servicing. Unmetered water connections that supply fire sprinklers, hydrants or drenchers must not be connected to any other domestic or commercial water-using fixture, including fire hose reels. Water used by fire hose reels must be metered. 2.5 Water meters All water and recycled water connections (except for fire sprinklers, hydrants and drenchers) must be metered with meters issued by us. If you use our water for construction activities, it must be from an approved, metered connection. 2.6 Backflow prevention All water main connections, including those used for construction activities must have appropriate backflow prevention containment devices installed. These must be appropriate for the cross-connection hazard rating of the property. The backflow prevention device in our 20 and 25mm water meters satisfies this requirement for low hazard properties, such as most stand-alone houses. Individual backflow containment devices (ie not low hazard devices built into the water meter) must be tested annually by an accredited backflow plumber, and meet the requirements set by us. 2.7 Wastewater connections Which connections will we approve? We will approve at least one wastewater connection for each property if you have access to a connectable main in or next to your property. If our wastewater main is outside your property, you may need to construct an extension to provide a point of connection within your property. If you are in a Priority Sewerage Program (PSP) area and want to connect during the initial period nominated by Sydney Water, you must apply directly through the PSP. If a NSW Fair Trading plumbing inspection finds that your wastewater service does not comply with their requirements you must not use it. You must not discharge trade wastewater, stormwater or groundwater to a wastewater system without our approval. Doc no. BCS0304 Document uncontrolled when printed Page: 3 of 7

When won t we approve a wastewater connection? We will not approve any wastewater connection if: there is no wastewater service available in your area the available wastewater main is not a connectable main there is not enough capacity in existing wastewater mains for your connection your connection or your wastewater will damage our assets. 2.8 Trade wastewater You must have our written permission before discharging trade wastewater. Trade wastewater is any wastewater generated from or as a result of an industrial or commercial activity. We will not accept trade wastewater from any business, multi-unit dwelling or community title development, if it will: harm our systems and operations impose unacceptable risks on the health of workers or the public threaten our compliance with environmental laws and licences hamper the beneficial reuse of wastewater not conform to our standards. 2.9 Stormwater We will approve at least one stormwater connection for each property that has access to a connectable stormwater asset. You must not allow stormwater to be contaminated by pollutants such as oil, grease, paint, soil and sediment, detergent or household wastewater. You must not discharge stormwater or roof-water to our wastewater system. 2.10 Working on our systems Connections to our water and wastewater systems must conform to: the most recent Sydney Water editions of the relevant Water Services Association of Australia codes of practice the Plumbing Code of Australia the AS/NZS 3500 series on plumbing and drainage. Connections to our water system must also comply with Sydney Water s Asset creation developer process Instructions and technical requirements. Stormwater connections for stand-alone houses must conform to the standard drawing we give you. Any development other than stand-alone houses are required to follow the Sydney Water s Asset Creation Process for stormwater connection, as part of the Section 73 application process for that development. If the development does not require a Section 73 certificate, then the application for the stormwater connection is to be lodged through Water Servicing Coordinator via edeveloper as Adjustment and Deviation application and need to follow the Sydney Water s Asset Creation Process. Doc no. BCS0304 Document uncontrolled when printed Page: 4 of 7

If we require you to install, test and maintain equipment as a condition of connection, you must follow the Plumbing Code of Australia and AS/NZS 3500. This equipment may include: trade waste pre-treatment devices backflow prevention containment devices pumps tanks other plumbing equipment. You are responsible for all costs of connecting to our systems. 2.11 Disconnecting from our systems You must apply to us for permission to disconnect from our systems. You must have signed, written permission of all affected property owners, if you apply to disconnect: a property service that you do not own (unless you have been contracted directly by the owner of the private service) an encroaching private service or joint service that crosses your property. If we give you permission to disconnect, you must follow all the conditions of disconnection, which we give you in our letter of approval. If you retain access to shared services on your property after you ve disconnected, you will still be charged for services. (eg common facilities in a small commercial/industrial development) 2.12 When does Sydney Water start charging new connections? We will start charging for water services, as soon as you make a water or recycled water connection. If you have a pre-laid property service with a locked and tagged device in place of a meter, you must contact us and ask us to install a meter, before you use our services. This applies to all properties, including construction sites. This ensures you are charged correctly. We will start charging for other services when you connect to them. When you connect a non-residential property to our services, we will apply the relevant sewer usage discharge factor for your property, so that we can calculate any relevant wastewater usage charges. 2.13 Unauthorised connections We will consider you to have an unauthorised connection if you: connect to our systems without our approval do not comply with all the conditions of connection we require of you do not comply with conditions in your additional services agreement do not install a meter on a new water main connection before you start using the water do not install backflow containment appropriate for the hazard rating of the property, test it, send the results to Sydney Water and fix any defects found discharge wastewater or trade wastewater without our written permission breach your trade wastewater discharge standards, not meet our requirements for trade wastewater pre-treatment equipment or the conditions of your agreement. Doc no. BCS0304 Document uncontrolled when printed Page: 5 of 7

3. Definitions Term Definition Source Additional services agreement Backflow Backflow prevention device Combined service Connectable stormwater asset Connectable watermain Cross-connection hazard rating Customer Contract Developer process Fire service connection Frontage Locked and tagged service An additional services agreement is a document that outlines your responsibilities for non-standard connections. It will also explain the level of service we can offer you, if it is different to that contained in the Customer Contract. Backflow is the unintended reverse flow of water into pipes, which could contaminate the water supply system. A backflow prevention device is equipment that stops water from flowing back into Sydney Water s pipes to prevent potential contamination of our water supplies. Our 20 and 25mm meters include a backflow prevention device that is suitable for low hazard properties, such as most stand-alone houses. A combined service is a single water connection used to provide both firefighting and domestic water needs. A stormwater pipe or channel is a connectable stormwater asset when: - it is in one of our stormwater catchment system areas - you are able to access it legally - your property can drain to it by gravity. A connectable watermain is any water main that Sydney Water allows private water service connections to, and that is an adequate size and has adequate flows to service proposed connections. Cross-connection hazard rating is a three-level rating of the potential for any condition, device or practice in connection to the water supply to cause nuisance, endanger health or cause death The Customer Contract outlines your rights and obligations as a customer and sets out the minimum standards of customer service that you can expect. It is our service guarantee to our customers. It also outlines Sydney Water s rights and obligations to help us meet our key objectives. The developer process is Sydney Water s process to ensure that new developments in our area of operations are serviced by adequate water, wastewater and stormwater assets. A fire service connection is a water connection used to supply essential fire safety measures, such as fire sprinklers, drenchers and hydrants. Fire services include combined services. Frontage is the part of the Sydney Water main that is immediately outside of the property s boundary and is available for connection. A locked and tagged service is a water service connection provided as a pre-laid property service in a new residential subdivision. A locked and tagged device prevents anyone using the water service until the customer asks for a Sydney Water meter to be fitted. This policy Customer Contract 2015-20 Doc no. BCS0304 Document uncontrolled when printed Page: 6 of 7

Term Definition Source Pre-laid property service Priority Sewerage Program (PSP) Roof water Sewer mining Sewer Usage Discharge Factor (SUDF) Stormwater Stormwater catchment system area Stormwater harvesting Trade wastewater Wastewater Water meter Water Servicing Coordinator (WSC) Water Services Association of Australia (WSAA) A pre-laid property service is a water service connection provided to newly developed properties before a customer has installed a meter on the connection. A locked and tagged device prevents customers from using water, until they ask Sydney Water to install a meter on the connection. A Priority Sewerage Program is a coordinated group of projects whereby Sydney Water provides wastewater services to previously unsewered areas. Many PSP services are provided by pressure sewer systems. Roof water is rainfall that runs off building rooves and enters Sydney Waters stormwater assets which carry the water into creeks, rivers, harbours and oceans. Sewer mining is the extraction and treatment of wastewater from a Sydney Water pipe, so that it can be used in lieu of potable water. The Sewer Usage Discharge Factor is the calculation of how much wastewater you discharge compared with how much of our water you use. Stormwater is rainfall that runs off the land and enters Sydney Water s stormwater assets which carry the water into creeks, rivers, harbours and oceans. A stormwater catchment system area is a geographical area in which stormwater is collected, transported and discharged using Sydney Water s stormwater assets. Stormwater harvesting is the extraction and treatment of stormwater from a Sydney Water pipe or channel, so that it can be used as in lieu of potable water Trade wastewater is any wastewater generated from or as a result of an industrial or commercial activity undertaken, other than at domestic or household. Wastewater is the used water that goes down sinks, toilets and drains. A water meter is a device used to measure how much drinkig water or recycled water flows through a pipe. A Water Servicing Coordinator (WSC) is the Listed Provider who will manage the design and construction of any water, wastewater or stormwater works and asset protection. The peak industry body that brings together and supports the Australian urban water industry. Members provide water and wastewater services to over 16 million Australians. They also provide services to many of Australia s largest industries and commercial enterprises Doc no. BCS0304 Document uncontrolled when printed Page: 7 of 7