Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 1 of 11

Similar documents
"13Gro\ving FOrv~ ~H'dWater Management Program Fact Sheet

Module 2 Planning Your Water System. For more information refer to the Water Wells That Last video (Part I Planning and Construction).

LONG-TERM WATER MANAGEMENT PLAN (LTWMP)

LONG-TERM WATER MANAGEMENT PLAN (LTWMP)

Identification. Module 4 Water Well Drilling Agreements

British Columbia s Water Sustainability Act and regulations. March 2016

Water Well Drilling Agreements

Module 6 Shock Chlorination. For more information refer to the Water Wells That Last video (Part III Shock Chlorination).

Farm Infrastucture Considerations Resource Kit for Nova Scotia Farmers

Section 8 Minimum Horizontal and Vertical Setback Distances

Chapter 2. Editor. Ted W. van der Gulik, P.Eng. Senior Engineer. Authors. Stephanie Tam, P.Eng. Water Management Engineer

DFO s Fish Habitat Management Program

Fact Sheet #1 Reducing the Risk of Groundwater Contamination by Improving Drinking Water Well Condition

Canadian Agricultural Partnership Proposed CAP Programs. CAP Consultations

Remote Pasture Water Systems for Livestock

Soil and Water Sustainability Program Guidelines Version 2.0

WASTE TREATMENT LAGOON

Private Wells & Septic Systems

Application for On-Site Wastewater Treatment System Permit

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Land Use Office, PO Box 197, 6683 County Road 13, Conejos CO Phone #: Fax:

PROJECT HIGHLIGHTS,

Pasture Water Systems for Livestock

Source Water Assessment Program (SWAP) Report for Heath Elementary School

Clean Water ~ Green Spaces. Rural and Agricultural Landowner Water Quality & Natural Areas Restoration Grant Program Guidelines

CITY OF BLOOMINGDALE WELL DRILLING APPLICATION. Estimated depth in feet & method of construction: Purpose of Well & Desired Yield:

Background. AEM Tier 2 Worksheet Farmstead Water Supply Evaluation. AEM Principle: Glossary

FACT SHEET: Water Rights and Property Rights

Montana Department of Public Health and Human Services Food and Consumer Safety Section CIRCULAR FCS

Module 3 Design and Construction of Water Wells. For more information refer to the Water Wells That Last video (Part I Planning and Construction).

PLANNING DEPARTMENT 701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA (831) FAX: (831)

RWASH Information System Household Access Survey. Completion notes. H2: What is the main source of drinking water used by members of your household?

GLASI GLASI. Priority Subwatershed Project. Great Lakes Agricultural Stewardship Initiative

APPLICATION FOR A PERMIT TO CONSTRUCT A WATER WELL IN THE LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

You are your own water manager

Water. For Our Future. Open House. Rural Potable Water. May 4, pm 9 pm. Bonanza Recreation Hall

Introduction to Water Supply

ALTERNATIVE LAND USE SERVICES PROGRAM GUIDELINES

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Protecting Water Supply Springs

Guide for Well Owners

Voluntary Water Quality Conservation Plan

Emergency Preparedness for Farm Animals, Livestock, and Poultry

DONALA WATER AND SANITATION DISTRICT

AGRICULTURAL BUILDING SETBACKS FROM WATERCOURSES IN FARMING AREAS

CHAPTER IX RULES AND REGULATIONS FOR GRINDER PUMPS. A. "Department" means Concord Township Sewer Department.

Wind-Powered Water Pumping

DSP-3 Practice FAQs. General

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

PROPER CARE OF UNUSED WELLS

MCLEOD COUNTY JOINT DRAINAGE SYSTEM POLICY AND GUEIDELINES FOR REPAIR

Annex I Lyons Ferry Hatchery Modification Plan

(this cover page left intentionally blank)

Whatcom County Farm Plan

Application for Drilling Permit Instructions. last updated: 3/1/2018

WHATCOM COUNTY STANDARD CONSERVATION FARM PLAN PLANNING WORKBOOK: Checklist and Action Plan

WHATCOM COUNTY STANDARD FARM CONSERVATION PLAN PLANNING WORKBOOK: Checklist and Action Plan

Good Agricultural Practices (GAP) for Fresh Fruit and Vegetable Growers. Water

IOWA ADMINISTRATIVE CODE SUMMARY

Central Assiniboine and Lower Souris River Watershed. Public Consultation What you told us. June 2010

GRAYWATER STANDARD PLAN For Simple Residential System

POINT OF SALE INSPECTION SEWAGE TREATMENT SYSTEM (STS) AND/OR PRIVATE WATER SYSTEM (PWS)

Implementation Plan and FAQs for the Guide to Water Act Authorizations Required for Dugouts, Borrow Pits and other types of Pits/Excavations

County of San Mateo Planning and Building Department

DRAINAGE REPAIR POLICY FOR COUNTY DRAINAGE SYSTEMS. Drainage System No.

STANDARD SITE CONTAINMENT BACKFLOW PREVENTION DECEMBER 2016 VERSION: 1.0

Septic Systems. A Complete Guide To Understanding How They Work and How To Keep Them Healthy

EID POLICY MANUAL. WATER Water Delivery and Operations Policy Revised January [supersedes May ]

Individual Sewage Disposal Systems Site Review and Permit Procedure

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

Environmental Management Chapter

Well Checklist page 1

Ferry Point Riparian Restoration Program

If dugout is over 2500 m3 (2 acre-ft) requires an approval under the Water Act. We encourage dugouts to be set up off

provides a list of licensed on-site sewage designers.

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Soil and Site Evaluation for OSS

11.0 HANDLING AND STORING AGRICULTURAL INPUTS

DEPARTMENT OF PUBLIC UTILITIES

Reviewed and updated by John M. Jemison, Jr., Extension water quality and soil specialist

Source Water Assessment Program (SWAP) Report for Rowe Elementary School

Government. Alberta s Irrigation A Strategy for the Future

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13

The Regulatory Framework

beneficial management practices

LICENSE AND INSURANCE:

Rural Servicing Guidelines

Distribution of Project Inventory Facilities (n ~3,900; doesn t include rental accommodation, unlicensed care facilities 3% 5% 3% 6% 20% 20% AHS-NLHR

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

Application For Graywater Irrigation System Permit

Alberta s Water Supply. As a province, Alberta has an abundant

Controlling runon and runoff:

CLOCA Rural & Agricultural Guide to Permits

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Sudbury & District Health Unit

CONSTRUCTION SPECIFICATION FOR DEWATERING

Transcription:

Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 1 of 11 To be eligible for funding, projects must be identified in a Long-Term Water Management Plan (LTWMP) approved by an Agriculture and Forestry (AF) Water Specialist prior to starting the project and incurring any expenses. Projects must meet the requirements of all applicable federal and provincial legislation and contact made to pertinent agencies (e.g., Alberta Environment and Parks (AEP)) prior to starting the project as indicated in the LTWMP. The Farm Water Supply Program (Program) Terms and Conditions govern the administration of the Program and must be reviewed prior to starting work on a project and/or applying to the Program. Projects must meet minimum requirements at the time of application and be operable (i.e., can permanently deliver water for its intended use) within one year of receiving a grant. Well Note: see the Farm Water Source Completion section for eligible connection costs. Note: see the Well Decommissioning and Pit Conversions sections for information on these activities. Note: shallow and/or large diameter wells may be considered spring developments. Please see the spring developments section for more information. Standard Incentives for New or Expanded Water Source Developments Cost Share: 1/3 up to $5000 New well construction including drilling, dry holes, well casing, and one new pump per well. Eligible activities for new wells include 1) electroseismology tests for well siting, 2) 2hr pump/2hr recovery test with drawdown and recovery measurements, 3) routine potable water quality test for the new well. Well Reconstruction will be considered if recommended by the approved water well drilling contractor and the well specifications meet the program requirements for a new well. A routine potable water quality test for the reconstructed well can be included. Chlorination or disinfection of the new or reconstructed well. New drilled well must have: casing exposed 18 above ground, 2hr pump/2hr recovery test with drawdown and recovery measurements, and vermin proof cap. An AEP well ID tag is required once available from AEP or a certified driller. New bored wells must have a cover that is securely attached to the cribbing with an appropriate screened vent to make the cover vermin-proof. Bored wells must have a yield test completed. Well must be constructed by an approved water well drilling contractor according to the requirements provided in the Water (Ministerial) Regulation of the Water Act (ALBERTA REGULATION 205/98). A Water Well Drilling Report for a new or reconstructed well must be submitted with the application. Equipment warranty or insurance; routine maintenance such as shock chlorination, cleaning, or acid treatments on existing wells; replacement pumps; water witching; extended well monitoring, consultant fees or groundwater studies (these are usually completed for licensing purposes and beyond the scope of this program). Wells must not be located in a pumphouse or other building. Wells will not be eligible for funding if they are located in a building, including a pumphouse.

Dugout Note: AF strongly recommends test holes prior to constructing a dugout. An AEP approval is required prior to constructing a groundwater dugout. See groundwater dugouts for more information. Note: Please see the Wetland Assessments section when consulting fees are required for the purpose of properly planning and siting a new water project that may potentially impact a wetland. environmental effects, dugouts should be sited at least 30 m from existing water bodies. New construction or the Must meet min. specs.: side and end expansion of an existing dugout slopes (1.5:1), spoil pile (min. 15 feet if the original capacity of the horizontally from dugout excavated dugout is increased by a edge), and min. depth (13 feet). minimum of 200,000 Imp Gal or 25% of the existing dugout, Must meet 440000 gallons (2000 m 3 ) whichever is greater, and no unless discussed and approved by an less than the dugout volume AF Water Specialist to have a smaller determined in the approved dugout. LTWMP. Permanent pumps (within a farm site) for household and/or farm site distribution, floating intake and wet well on new construction or expansion. Must meet legislative requirements. AEP must be contacted for an approval prior to constructing dugouts greater than 2500 m3 (550,000 gallons). Must include the completed Dugout Construction sheet and Environmental Checklist with the application. Unlicensed dugouts within the SSRB; dugouts built for the purpose of commercial aquaculture; cleaning or maintenance of a dugout including removal of weed growth or repair to side slopes; livestock access ramps into dugouts; large (6,250 cu meters or 1.38 million Imp Gal) irrigation dugouts or dams within Irrigation Districts; excessive spoil transport cost. Dugouts that do not meet the requirements in the Water (Ministerial) Regulation of the Water Act (ALBERTA REGULATION 205/98). Groundwater Dugout Note: AF strongly recommends test holes prior to constructing a groundwater dugout. An AF Water Specialist can provide information to help decide whether a groundwater dugout or spring development is the best option. New groundwater dugouts only. An AEP approval to construct the groundwater dugout must be obtained prior to any construction. Protection identified by the Water Specialist in the approved LTWMP, such as an off-source watering system and sloping the berm away, is required. Groundwater dugouts constructed without an AEP approval. Unprotected groundwater dugouts. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 2 of 11

Spring Development Note: shallow and/or large diameter wells may be considered spring developments and must be done by an approved water well contractor or by a landowner with prior approval from AEP. environmental effects, spring developments should be constructed according to the specific construction guidelines for spring developments. New spring developments done Must be protected (e.g., fenced off, offsource by a class A well contractor (i.e., watering system) as outlined in driller) or Class B water well the approved LTWMP. contractor or the landowner must obtain approval to construct from AEP. Must meet the requirements of AEP. An AEP approval or license may be required depending on the type of spring development. In-stream work, if needed, may require approval from AEP, Fisheries and Oceans and Transport Canada. Non AEP approved spring developments. Unprotected spring developments or developments that contaminate a spring (i.e., direct livestock access). Tie-In to a Multi-User Water Supply Pipeline Note: water meters associated with tie-ins to a multi-user water supply pipeline are cost shared under this category. effects, pipeline projects should be designed to avoid crossing any water body. Construction related cost of tiein to an existing multi-user water supply pipeline (e.g., water co-ops); cisterns or tanks included as part of the tie-in installation. Applicants must provide documentation of their right to access water from the specified pipeline and have authorizations to construct the Tie-In on lands not owned by them (i.e., right of ways). Membership/share costs for multi-user water supply pipelines (e.g., water co-ops) including those paid toward association costs such as loan lien notes or interest, engineering costs, environmental assessments, establishment of reserves, ongoing maintenance or service provision; member s purchase of additional water units or ongoing fees for water use; routine maintenance or replacement; surface or shallow pipelines; a series of distribution pipelines; and irrigation pipeline systems. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 3 of 11

Dams See Farm Water Source Completion section for eligible connection costs. Development of a new dam (i.e., Dams must meet AEP criteria for earthen structures built in a construction and be licensable by AEP. water course to hold back water). As part of a new dam, a wet well and intake with appropriate fish screen can be included. See publication Freshwater intake End-of-Pipe Fish Screen Guideline (DFO, March 1995). In-stream work will likely require approval from AEP, Fisheries and Oceans Canada, and Transport Canada. AEP approval must be included with the Program application. Project must be protected (e.g., fenced off, off-source watering system) as outlined in the approved LTWMP. Cleaning, routine maintenance or repair of an existing dam. Water Source for Crop Irrigation environmental effects, dugouts and intakes should be sited at least 30 m from existing water bodies (except for an intake pipe). Water source developments for private irrigators (i.e., outside an Irrigation District) provided this water use is licensed. Examples include market gardens or greenhouses (intakes on water bodies, etc.). Wet wells and intakes with appropriate fish screens can be included as part of the water source development. See publication Freshwater Intake End-of-Pipe Fish Screen Guideline (DFO, March 1995). In-stream work may require approval from AEP, Fisheries and Oceans Canada and Transport Canada. Required approvals must be obtained prior to starting project activities and submitted with the Program application. Unlicensed dugouts within areas of the South Saskatchewan River Basin closed to new licenses. Any costs associated with sourcing, storage or distribution of water for field scale irrigation within an Irrigation District. Irrigation water application equipment. Unshared Water Pipelines Note: please see the Environmental Stewardship and Climate Change Producer Program for pipelines from a natural water source to distribute water in a pasture and protect a water body. Deep or shallow buried pipelines installed to extend existing permanent constructed water sources from the farm site to an adjacent land parcel farmed by the applicant. Pipeline plan must be discussed and approved by a Water Specialist. Routine Maintenance or replacement; a series of distribution pipelines (e.g., rotation grazing operations, acreage developments); irrigation pipeline systems. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 4 of 11

Farm Water Source Completion effects, pipeline projects should be designed to avoid crossing any water body Standard Incentives that Support New or Expanded Water Source Development Cost Share: 1/3 up to $5000 Connection of a new or expanded water source to one water appliance (e.g., waterer or hydrant) or to the existing farm site system. Examples of eligible activities include trenching, piping, electrical wiring, distribution line, pump, pressure tank, and materials required to complete the water source development within a farmstead. The new or expanded water source development must be included in the Program application and identified on the LTWMP (Farm Water Source Completions are not standalone projects). Multiple farm site waterers or hydrants and plumbing of pens, barns, shops, houses, etc. Additional waterlines beyond the 1 st connection to the system or appliance. Roads. Repair, maintenance or replacement of existing equipment such as pumps, filters or softeners, watering bowls, pressure tanks, or stock tanks, etc. Pumphouses Cost Share Notes: Pumphouses are covered under standard incentives as part of the water development project they are tied to (i.e., a pumphouse for a new well, a tie-in to a water co-op). Pumphouses that are a dedicated building with the sole purpose to house connections, treatment, and water related equipment. Must be done in conjunction with a new water project development or on a well pit conversion. Pumphouses in accordance with Section 45(1 and 2) or the Water (Ministerial) Regulation (205/98). For design information, see the Factsheet Pump houses (AF, Agdex 716 (C28)). Pumphouses on top of a well. Pumphouses used as a multipurpose building. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 5 of 11

Cisterns/Water Tanks Cost Share Notes: Internal thresholds are applied based on the type of project completed. environmental effects, the storage system should be at least 30 m from existing water bodies and not result in the release of a polluting substance. Energy Source for Supplying Water Cost Share Notes: Energy sources are covered under standard incentives as part of the water development project they are tied to (i.e., a energy source for connection to a new well, energy source for an off-site waterer). Note: energy sources for remote watering systems are covered with the remote watering system. Custom Equipment Rates Cost Share Notes: 1/3 up to $5000 as part of the water development project they are tied to (i.e., a construction of a new dugout). Cisterns as part of a permanent The cistern must be permanent and Tanks used to haul water. system within the farm site and functional. used for extra storage and water supply (e.g., permanent cisterns to support use from low producing wells or to store water from a tie-in to a multiwater supply pipeline). For new or expanded water source developments only. Permanent power installations including the first transformer (i.e., connection to grid and/or power sources within the farm site). Producers doing their own work may use their own equipment. Eligible In-Kind costs will be based on industry standard rental rates. The new or expanded water source development must be included in the Program application and identified on the LTWMP (i.e., energy sources are not standalone projects). Producers must supply make, model, year, horsepower, attachments, hours operated and dates and breakdown of work done. Costs will be reviewed for reasonableness. The new or expanded water source development must be included in the Program application and identified on the LTWMP (i.e., custom equipment rates cannot be claimed alone). Energy Sources not associated with new or expanded water source projects. Rural electrification costs. Natural gas service installation. Back-up power sources and generators. Labor costs for producers doing their own work. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 6 of 11

Test Holes, Construction Surveying, or Materials Analysis Cost Share Notes: 1/3 up to $5000 as part of the water development project they are tied to (i.e., test holes prior to construction of a dugout or test holes when drilling a new well). Internal thresholds apply for different projects. Water Treatment Equipment Recommended as part of a new water source development to prevent seepage from dugouts or identify the best location for a dugout or well. Includes electro-seismology. Water treatment equipment that is used to meet minimum water quality guidelines for livestock or poultry water consumption and meet a specific production issue that is identified in an approved LTWMP (i.e., poor animal weight gain, poor reproductive capacity in the herd). Professional services (e.g., veterinary production/reproduction impact report, engineering fees for system design), water analyses by a certified lab, and installation of water treatment equipment required to address the identified water quality issue. Production or reproduction impact must be identified in LTWMP, and supporting documentation identifying issue must be submitted with Program application. Projects for other agricultural uses must be approved by a water specialist on a case-by-case basis. Extended (i.e., more than one day) monitoring or studies. A hydrologist or hydrogeologist study for the purpose of fulfilling AEP license requirements after well construction. Funding will not be provided toward: The cost of water treatment equipment or supplies for domestic use. Water treatment equipment connected to a human drinking water supply. Water treatment equipment required to meet the water quality requirements of a national on-farm food safety program or equivalent. Water treatment equipment without scientific study/supporting information for intended use (e.g., magnetic water treatment). Water treatment for disinfection purposes to address microbial concerns. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 7 of 11

Off-source Watering Systems (e.g., solar pumping systems, remote watering systems) The Environmental Stewardship and Climate Change Producer Program should be investigated for alternative watering systems for livestock from natural water bodies. Standard Incentives that Protect New, Expanded or Existing Water Sources Cost Share: 1/3 up to $5000 Off-site watering on new or expanded constructed water sources. Off-site watering on existing dugouts and springs. Only one run and one appliance is covered (from source to tap). Eligible systems include: solar, wind, composite systems (e.g., trailer with windmill and solar panels), portable watering systems, and used equipment. In-kind costs for materials and equipment. Applications must include pictures showing the operational offsource watering system. For systems on a new well, a picture showing no mechanism for drain back into the well must be included with the application. Drain-back systems on new wells. Off-site watering systems on existing wells. Multiple waterers in pens Portable generators. Portable tanks (i.e., tank on back of truck). In-kind costs for labor. Livestock ramps. Fencing Please see the Environmental Stewardship and Climate Change Producer Program for fencing that does not protect a constructed water source (e.g., riparian fencing). Exclusion fencing, installed as part of a new or expanded water source construction to protect the new or expanded water source or as part of the protection required for an existing dugout or spring development. Fencing is not eligible if it does NOT protect the water source development identified in the application and LTWMP. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 8 of 11

Off-source Watering System Monitors The Environmental Stewardship and Climate Change Producer Program should be investigated for remote watering system monitors used for alternative watering systems for livestock from natural water bodies. Monitors are eligible as part of a A remote watering system monitor new or existing off-source must be identified as part of the remote watering system on a protection outlined for a water source constructed water source. in an approved LTWMP. Alert monitoring system. 3 different options are available: Line of sight system using a beacon light Cellular system Satellite system Monthly subscription fees for cellular and satellite alert systems. Homemade alert monitoring system. Monitoring systems funded by another program (e.g., Environmental Stewardship and Climate Change Program). Grant payouts less than $250. Aeration Systems Dugout aeration systems on new or existing dugouts including electrically connected air compression systems, wind driven aeration systems, solar aeration systems, and proper air diffusers. Must be identified in approved LTWMP as part of protection requirements for a new or existing dugout. Fountains Waterfalls Surface agitators Vermin-proof Caps Vermin-proof caps for existing wells. Existing wells must be identified on the approved LTWMP, and identified in the Program application form (i.e., the number of vermin-proof caps claimed must match the number of existing wells identified in the LTWMP). Grant payout must be higher than $250. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 9 of 11

Well Decommissioning Cost Share: Special Incentive: 1 at 50%, 2 at 60% each, and 3 or more at 75% each if all on the same application. Up to 20 wells may be decommissioned. For a well less than 500 in depth, no single well decommissioning or wellpit conversion shall receive more than $2,000. For a well greater than or equal to 500 in depth, a single well decommissioning may receive up to the maximum of $6000. Special Incentives See Specific Project Below for Cost Share Well decommissioning of a drilled well by an approved water well drilling contractor; well decommissioning of a bored or large diameter well (greater than 18 in diameter) by an approved method (see Module 9 of Water Wells that Last or Well Decommissioning Fact Sheet). A Water Well Decommissioning (Plugging) Report must be filled out by an approved water well contractor and submitted with the application. The report must be filled out for each well decommissioned. This report is required for all wells (small diameter and bored wells). Wells must be decommissioned according to the requirements in the Water (Ministerial) Regulation of the Water Act (ALBERTA REGULATION 205/98). The well(s) must be identified on the approved LTWMP. Well decommissioning of small diameter wells by non-approved water well drilling contractor. Well decommissioning by any method that contravenes the Water (Ministerial) Regulation of the Water Act (ALBERTA REGULATION 205/98). Well Pit Conversions Cost Share: 50% up to a maximum of $2000 per project and a maximum of $6000 for multiple projects. Well pit conversions (refer to the Working Well Program fact sheet: Upgrading your Well in a Pit). A complete well pit conversion. Well pit conversions that do not remove the pit. Water Use Meter Cost Share: 1 at 50%, 2 at 60% each, and 3 or more at 75% each if all on the same application. Maximum of $1000 per project. Up to 10 water use meters may eligible. Purchase and installation of water use meters for agricultural point of use monitoring (e.g., metering at each livestock barn or pen). Meter must be installed at an appliance (i.e., intake to a barn) rather than at the source (i.e., well). Purchase and installation of water use meters for domestic water use. Purchase and installation of water use meters required to meet AEP license requirements. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 10 of 11

Water Level Monitor Cost Share: 50% up to a maximum of $1000 per project. Purchase and installation of well Well level monitors, well logging or water level monitors, logger or level measuring equipment that other level measuring cannot be disinfected or have a equipment for existing or new design that introduces significant wells. contamination risk. Wetland Assessments. Cost Share: 50% up to a maximum of $2000. Note: For assessments related to cropping practices or drainage, please refer to the Environmental Stewardship and Climate Change Program. Consulting fees for the purpose of properly planning and siting a new water project that may potentially impact a wetland. Assessment report must be for the same area identified in the LTWMP where a potential water source was identified. Consulting fees covered by another program (e.g., Environmental Stewardship and Climate Change Program). Replacement costs for an impacted wetland. Program Funding List Canadian Agricultural Partnership Farm Water Supply Program Version 1.0 Page 11 of 11